Northern Virginia Chapter of the Construction Specifications Institute Kevin Volbrecht Deputy Director, Construction February 13, 2013

Silver Line Update (February 2013 Meeting)

  • Upload
    novacsi

  • View
    169

  • Download
    0

Embed Size (px)

DESCRIPTION

 

Citation preview

Page 1: Silver Line Update (February 2013 Meeting)

Northern Virginia Chapter of the

Construction Specifications InstituteKevin Volbrecht

Deputy Director, Construction

February 13, 2013

Page 2: Silver Line Update (February 2013 Meeting)

Dulles Corridor Metrorail Project Dulles Corridor Metrorail Project At-a-Glance

Page 3: Silver Line Update (February 2013 Meeting)

3

Route MapRoute Map

Page 4: Silver Line Update (February 2013 Meeting)

4

Nearing the Finish LineNearing the Finish LineConstruction Marching ForwardConstruction Marching ForwardPhase 1 from I-66 to RestonConstruction of the Dulles Corridor Metrorail Project is under way along the 11.7-mile corridor, from East Falls Church to Reston

CONSTRUCTION IS 88% CONSTRUCTION IS 88%

COMPLETECOMPLETE• Tracks almost complete

• Stations – elevators, escalators, systems being installed

• Pedestrian bridges and pavilions almost complete

• Completion – Summer 2013

• Opening – To Be Determined by WMATA

Page 5: Silver Line Update (February 2013 Meeting)

5 West Falls Church YardWest Falls Church Yard

Page 6: Silver Line Update (February 2013 Meeting)

6West Falls Church YardWest Falls Church Yard

Page 7: Silver Line Update (February 2013 Meeting)

7Orange Line Tie-InOrange Line Tie-In

Page 8: Silver Line Update (February 2013 Meeting)

McLean Station

Page 9: Silver Line Update (February 2013 Meeting)

9McLean Station Pedestrian Bridge Work

Page 10: Silver Line Update (February 2013 Meeting)

10McLean Station Stair and Escalator Installation

Page 11: Silver Line Update (February 2013 Meeting)

11Tysons Corner Station Pedestrian BridgeTysons Corner Station Pedestrian Bridge

Page 12: Silver Line Update (February 2013 Meeting)

12Tysons Corner Station First Span of the Pedestrian Tysons Corner Station First Span of the Pedestrian

BridgeBridge

Page 13: Silver Line Update (February 2013 Meeting)

Tysons Corner StationTysons Corner Station

Page 14: Silver Line Update (February 2013 Meeting)

14 Tunnel Entrance at Route 123

Page 15: Silver Line Update (February 2013 Meeting)

15 Tunnels at Route 123 and Route 7

Page 16: Silver Line Update (February 2013 Meeting)

16 Cut and Cover Tunnel at Route 123 and Route 7

Page 17: Silver Line Update (February 2013 Meeting)

17 Greensboro Station

Page 18: Silver Line Update (February 2013 Meeting)

18Greensboro Station Looking West

Page 19: Silver Line Update (February 2013 Meeting)

19 Spring Hill Station

Page 20: Silver Line Update (February 2013 Meeting)

Guideway from Route 7 to Dulles International Airport Guideway from Route 7 to Dulles International Airport Access Highway/Dulles Toll RoadAccess Highway/Dulles Toll Road

Page 21: Silver Line Update (February 2013 Meeting)

Wiehle-Reston East Station (Wiehle Ave.)(Wiehle Ave.)Wiehle –Reston East StationWiehle –Reston East Station

Page 22: Silver Line Update (February 2013 Meeting)

22 Comstock Development at Wiehle Avenue Station

Page 23: Silver Line Update (February 2013 Meeting)

23Tail Track at Wiehle-Reston East Station

Page 24: Silver Line Update (February 2013 Meeting)

24 Clearance Car Running the Alignment

Page 25: Silver Line Update (February 2013 Meeting)

25

Phase 2Phase 2

• 11.4 –mile extension from Wiehle Avenue in Reston to Ashburn  

• 6 stations:• Reston Town Center• Herndon• Innovation Center• Dulles Airport• Route 606• Route 772/Ashburn

• Rail Yard & Maintenance Facility

• 5 Parking Garages

  

Page 26: Silver Line Update (February 2013 Meeting)

View from Platform to TerminalView from Platform to Terminal

• The Dulles Airport Station will feature an aerial station approximately 1,000 feet north of the terminal near the Daily 2 (North) Garage.

• The station will be linked to the terminal via the existing tunnel that connects with the North Garage and includes a number of moving walkways

Dulles Airport Location DetailsDulles Airport Location Details

Page 27: Silver Line Update (February 2013 Meeting)

Phase 2 StatusPhase 2 Status

Completed Preliminary Engineering

February 2012

Qualifications Information Received

September 2012

Short-list Phase 2 Teams Selected

October 2012

Bechtel Transit PartnersBechtel Infrastructure Corporation

Capital Rail ConstructorsClark Construction Group, LLCKiewit Infrastructure South Co.

Dulles APC RailbuildersArcher Western Contractors, LLCPCL Civil Constructors, Inc.Corman Construction, Inc.

Dulles Metrorail ConnectorsSkanska USA Civil Southeast / Granite Construction CompanyG.A. & F.C. Wagman, Inc. / Trumbull CorporationFacchina Construction Company, Inc.

Silver Line ConstructorsFluor Enterprises, Inc. / Tutor Perini Corporation / Stacy and Witbeck, Inc.

Price Proposals Due April 2013

Contract Awarded May 2013

Page 28: Silver Line Update (February 2013 Meeting)

28

Contact Information

1593 Spring Hill Road Suite 300

Vienna, VA 22182

[email protected]

703-572-0500

www.dullesmetro.com

www.mwaa.com