Northern Virginia Chapter of the
Construction Specifications InstituteKevin Volbrecht
Deputy Director, Construction
February 13, 2013
Dulles Corridor Metrorail Project Dulles Corridor Metrorail Project At-a-Glance
3
Route MapRoute Map
4
Nearing the Finish LineNearing the Finish LineConstruction Marching ForwardConstruction Marching ForwardPhase 1 from I-66 to RestonConstruction of the Dulles Corridor Metrorail Project is under way along the 11.7-mile corridor, from East Falls Church to Reston
CONSTRUCTION IS 88% CONSTRUCTION IS 88%
COMPLETECOMPLETE• Tracks almost complete
• Stations – elevators, escalators, systems being installed
• Pedestrian bridges and pavilions almost complete
• Completion – Summer 2013
• Opening – To Be Determined by WMATA
5 West Falls Church YardWest Falls Church Yard
6West Falls Church YardWest Falls Church Yard
7Orange Line Tie-InOrange Line Tie-In
McLean Station
9McLean Station Pedestrian Bridge Work
10McLean Station Stair and Escalator Installation
11Tysons Corner Station Pedestrian BridgeTysons Corner Station Pedestrian Bridge
12Tysons Corner Station First Span of the Pedestrian Tysons Corner Station First Span of the Pedestrian
BridgeBridge
Tysons Corner StationTysons Corner Station
14 Tunnel Entrance at Route 123
15 Tunnels at Route 123 and Route 7
16 Cut and Cover Tunnel at Route 123 and Route 7
17 Greensboro Station
18Greensboro Station Looking West
19 Spring Hill Station
Guideway from Route 7 to Dulles International Airport Guideway from Route 7 to Dulles International Airport Access Highway/Dulles Toll RoadAccess Highway/Dulles Toll Road
Wiehle-Reston East Station (Wiehle Ave.)(Wiehle Ave.)Wiehle –Reston East StationWiehle –Reston East Station
22 Comstock Development at Wiehle Avenue Station
23Tail Track at Wiehle-Reston East Station
24 Clearance Car Running the Alignment
25
Phase 2Phase 2
• 11.4 –mile extension from Wiehle Avenue in Reston to Ashburn
• 6 stations:• Reston Town Center• Herndon• Innovation Center• Dulles Airport• Route 606• Route 772/Ashburn
• Rail Yard & Maintenance Facility
• 5 Parking Garages
View from Platform to TerminalView from Platform to Terminal
• The Dulles Airport Station will feature an aerial station approximately 1,000 feet north of the terminal near the Daily 2 (North) Garage.
• The station will be linked to the terminal via the existing tunnel that connects with the North Garage and includes a number of moving walkways
Dulles Airport Location DetailsDulles Airport Location Details
Phase 2 StatusPhase 2 Status
Completed Preliminary Engineering
February 2012
Qualifications Information Received
September 2012
Short-list Phase 2 Teams Selected
October 2012
Bechtel Transit PartnersBechtel Infrastructure Corporation
Capital Rail ConstructorsClark Construction Group, LLCKiewit Infrastructure South Co.
Dulles APC RailbuildersArcher Western Contractors, LLCPCL Civil Constructors, Inc.Corman Construction, Inc.
Dulles Metrorail ConnectorsSkanska USA Civil Southeast / Granite Construction CompanyG.A. & F.C. Wagman, Inc. / Trumbull CorporationFacchina Construction Company, Inc.
Silver Line ConstructorsFluor Enterprises, Inc. / Tutor Perini Corporation / Stacy and Witbeck, Inc.
Price Proposals Due April 2013
Contract Awarded May 2013
28
Contact Information
1593 Spring Hill Road Suite 300
Vienna, VA 22182
703-572-0500
www.dullesmetro.com
www.mwaa.com