79
1130 RAINIER AVENUE SOUTH, SUITE 300 CONSULTING ENGINEERS SEATTLE, WASHINGTON 98109 (206) 284-0860 WALDENWOOD LIFT STATION REPLACEMENT SILVER LAKE WATER & SEWER DISTRICT SNOHOMISH COUNTY WASHINGTON G&O JOB #18510.01 MAY 2019 DISTRICT OFFICIALS Curt Brees General Manager Rick Gilmore, P.E. Bill Anderson Rod Keppler District Engineer Anne Backstrom Commissioners

SILVER LAKE WATER & SEWER DISTRICT · 2019. 5. 13. · SEATTLE, WASHINGTON 98109 (206) 284-0860 WALDENWOOD LIFT STATION REPLACEMENT SILVER LAKE WATER & SEWER DISTRICT SNOHOMISH COUNTY

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

  • 1130 RAINIER AVENUE SOUTH, SUITE 300

    CONSULTING ENGINEERS

    SEATTLE, WASHINGTON 98109 (206) 284-0860

    WALDENWOOD LIFT STATION REPLACEMENT

    SILVER LAKE WATER & SEWER

    DISTRICT

    SNOHOMISH COUNTY

    WASHINGTON

    G&O JOB #18510.01

    MAY 2019

    DISTRICT OFFICIALS

    Curt Brees

    General Manager

    Rick Gilmore, P.E.

    Bill Anderson Rod Keppler

    District Engineer

    Anne Backstrom

    Commissioners

  • 112T

    H S

    T S

    E

    51S

    T A

    VE

    S

    E

    5

    0

    T

    H

    A

    V

    E

    S

    E

    1

    1

    1

    T

    H

    P

    L

    S

    E

    5

    2

    N

    D

    A

    V

    E

    S

    E

    1

    1

    0

    T

    H

    S

    T

    S

    E

    5

    0

    T

    H

    D

    R

    S

    E

    111TH ST

    SE

    WALDENWOOD

    LIFT STATION

    VIC

    IN

    IT

    Y M

    AP

    , L

    OC

    AT

    IO

    N M

    AP

    ,

    GE

    NE

    RA

    L N

    OT

    ES

    A

    ND

    S

    HE

    ET

    IN

    DE

    X

    G-1

    WA

    LD

    EN

    WO

    OD

    L

    IF

    T S

    TA

    TIO

    N

    RE

    PL

    AC

    EM

    EN

    T

    8

    CO

    NS

    ULT

    IN

    G E

    NG

    IN

    EE

    RS

    SIL

    VE

    R L

    AK

    E W

    AT

    ER

    AN

    D S

    EW

    ER

    D

    IS

    TR

    IC

    T

    SILVER LAKE AREA

    VICINITY MAP

    GENERAL NOTES:

    LOCATION MAP

    PROJECT

    LOCATION

    OWNER/APPLICANT:

    ENGINEER:

    OWNER'S CERTIFIED EROSION CONTROL SPECIALIST:

    SITE ADDRESS:

    GEOTECHNICAL ENGINEER:

    SHEET INDEX

    SHEET NO. DESCRIPTION

    SHEET INDEX

    SHEET NO. DESCRIPTION

    PUMP STATION DESIGN CRITERIA

    SHEET INDEX

    SHEET NO. DESCRIPTION

  • AB

    BR

    EV

    IA

    TIO

    NS

    , G

    EN

    ER

    AL

    S

    YM

    BO

    LS

    , S

    YM

    BO

    L

    LE

    GE

    ND

    , N

    UM

    BE

    RIN

    G S

    YS

    TE

    M A

    ND

    G

    EN

    ER

    AL

    N

    OT

    ES

    G-2

    WA

    LD

    EN

    WO

    OD

    L

    IF

    T S

    TA

    TIO

    N

    RE

    PL

    AC

    EM

    EN

    T

    8

    CO

    NS

    ULT

    IN

    G E

    NG

    IN

    EE

    RS

    SIL

    VE

    R L

    AK

    E W

    AT

    ER

    AN

    D S

    EW

    ER

    D

    IS

    TR

    IC

    T

    NEWEXISTING

    GENERAL SYMBOLS

    ABBREVIATIONS

    SYMBOL LEGEND

    DRAWING TITLE

    EXAMPLE OF SECTION NUMBERING SYSTEM AND

    PLAN/DRAWING TITLES

    SECTION

  • SU

    RV

    EY

    D

    AT

    A

    G-3

    WA

    LD

    EN

    WO

    OD

    L

    IF

    T S

    TA

    TIO

    N

    RE

    PL

    AC

    EM

    EN

    T

    8

    CO

    NS

    ULT

    IN

    G E

    NG

    IN

    EE

    RS

    SIL

    VE

    R L

    AK

    E W

    AT

    ER

    AN

    D S

    EW

    ER

    D

    IS

    TR

    IC

    T

    SURVEY CONTROL POINTS

    SURVEY CONTROL POINTS

    Horizontal Datum: NAD83/2011 (MODIFIED GROUND COORDINATES)

    W.S.P.C.S. NORTH ZONE, AVG CFG = 0.99994033554

    Vertical Datum: NAVD88

    POINT NORTHING EASTING ELEV. DESCRIPTION

    RIGHT-OF-WAY DISCLAIMER

    5/13

    /19

  • G-4

    WA

    LD

    EN

    WO

    OD

    L

    IF

    T S

    TA

    TIO

    N

    RE

    PL

    AC

    EM

    EN

    T

    8

    CO

    NS

    ULT

    IN

    G E

    NG

    IN

    EE

    RS

    SIL

    VE

    R L

    AK

    E W

    AT

    ER

    AN

    D S

    EW

    ER

    D

    IS

    TR

    IC

    T

    TESC CONSTRUCTION SEQUENCE

    1. ATTEND PRE-CONSTRUCTION MEETING.

    2. INSTALL CATCH BASIN PROTECTION.

    3. INSTALL PERIMETER PROTECTION (SILT FENCE, NPGA AREAS, BRUSH BARRIER, ETC.)

    4. CONDUCT SITE CLEARING AND GRADING.

    5. INSTALL DRAINAGE FACILITIES AND OTHER UTILITIES.

    6. COMPLETE PROJECT PER THE PROJECT PLAN

    7. MAINTAIN EROSION CONTROL MEASURES IN ACCORDANCE WITH LOCAL JURISDICTION

    REQUIREMENTS AND MANUFACTURER'S RECOMMENDATIONS.

    8. RELOCATE SURFACE WATER CONTROLS OR EROSION CONTROL MEASURES, OR INSTALL

    NEW MEASURES SO THAT AS SITE CONDITIONS CHANGE, THE EROSION AND SEDIMENT

    CONTROL IS ALWAYS IN ACCORDANCE WITH LOCAL JURISDICTION REQUIREMENTS.

    9. COVER ALL AREAS THAT WILL BE UNWORKED FOR MORE THAN TWO DAYS BETWEEN

    OCTOBER 1ST AND APRIL 30TH OR SEVEN DAYS BETWEEN MAY 1ST AND SEPTEMBER 30TH.

    10. STABILIZE ALL AREAS WITHIN SEVEN DAYS OF REACHING FINAL GRADE.

    11. SEED OR SOD ANY AREAS TO REMAIN UNWORKED FOR MORE THAN 30 DAYS.

    12. UPON COMPLETION OF THE PROJECT, STABILIZE ALL DISTURBED AREAS AND REMOVE

    TEMPORARY BMPS.

    DEWATERING PLAN

    DEWATERING DISCHARGE

    CONTRACTOR SHALL DESIGN, PROVIDE, INSTALL, OPERATE AND MANAGE DEWATERING DISCHARGE

    FACILITIES TO ACCOMMODATE THE ENCOUNTERED FLOWS IN A MANNER THAT WILL PREVENT EROSION.

    THE CONTRACTOR SHALL NOT ALLOW THE WATER DISCHARGED FROM ANY DEWATERING SYSTEM

    WELLS OR SUPPLEMENTAL WATER CONTROL SYSTEMS (I.E. SUMPS) TO DEGRADE THE WATER QUALITY

    OF ANY RECEIVING WATERS.

    THE DEWATERING DISCHARGE SYSTEM SHALL OPERATE SUCH THAT WATER PUMPED DURING

    DEWATERING OPERATIONS IS DISCHARGED TO ADJACENT LANDS FOR INFILTRATION AND/OR

    CONTROLLED OVERLAND FLOW. THE SYSTEM SHALL DISPOSE OF WATER SO AS NOT TO CAUSE

    DAMAGE TO PUBLIC OR PRIVATE PROPERTY, TO CAUSE EXCEEDANCES OF WATER QUALITY STANDARDS

    OR TO CAUSE A NUISANCE OR MENACE TO THE PUBLIC.

    ALL DEWATERING DISCHARGE POINTS SHALL BE A MINIMUM OF 100 FEET FROM ANY CREEK OR DITCH.

    CONTRACTOR SHALL OBTAIN ACCESS PERMISSION FROM PRIVATE PROPERTY OWNERS FOR ANY

    DISCHARGE.

    THE DEWATERING DISCHARGE SYSTEM SHALL MAINTAIN WATER QUALITY STANDARDS FOR SURFACE

    WATERS BY PERFORMING IN COMPLIANCE WITH CHAPTER 173-201A WAC, WATER QUALITY STANDARDS

    FOR SURFACE WATERS OF THE STATE OF WASHINGTON, AND ALL REQUIRED PERMITS, INCLUDING BUT

    NOT LIMITED TO THE NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM GENERAL PERMIT FOR

    CONSTRUCTION ACTIVITY.

    THE CONTRACTOR SHALL INSTALL, OPERATE, AND MAINTAIN A WATER TREATMENT SYSTEM TO PROVIDE

    FOR SETTLING, FILTRATION (IF NEEDED) AND REMOVAL OF SUSPENDED SOLIDS IN THE DISCHARGE

    FROM THE DEWATERING SYSTEM.

    THE DISCHARGE SYSTEM MAY CONSIST OF ANY COMBINATION OF CONVEYANCE PIPING, VISQUEEN

    PADS, FILTER BAGS, DRIP IRRIGATION, SLOTTED OR PERFORATED DISCHARGE PIPING, SPRAY

    IRRIGATION, OR OTHER MEANS TO APPLY THE WATER OVER A LARGE AREA AT LOW VELOCITY, IN SUCH

    A MANNER AS TO CAUSE NO EROSION, REMOVAL OF TOPSOIL, OR VIOLATION OF WATER QUALITY

    STANDARDS IN THE RECEIVING WATERS.

    CONTRACTOR SHALL ADD OR MOVE DISCHARGE COMPONENTS AS NEEDED TO ENSURE NO OVERLAND

    FLOW CAUSES SOIL EROSION, LEAVES THE PROJECT SITE, ENTERS THE ADJACENT PROPERTIES OR

    ROADWAYS, ENTERS THE ACTIVE CONSTRUCTION AREA, OR CAUSES A VIOLATION OF WATER QUALITY

    STANDARDS IN THE RECEIVING WATERS.

    CONTRACTOR SHALL PROVIDE SUFFICIENT DISCHARGE TUBING, FILTER BAGS, OR OTHER DISCHARGE

    SYSTEMS TO POTENTIALLY APPLY WATER OVER AS MUCH AREA AVAILABLE FOR DISCHARGE AS

    NEEDED, IF REQUIRED, TO ALLOW SUFFICIENT INFILTRATION TO MITIGATE EROSION ISSUES.

    FILTER BAGS SHALL BE OF SUFFICIENT NUMBER, SIZE, AND CAPACITY TO HANDLE ANTICIPATED FLOW

    RATES, AND MUST BE INSPECTED, MAINTAINED, AND REPLACED WHEN FULL OR DAMAGED. SLOTTED OR

    PERFORATED DRAIN PIPE, IF USED, MUST BE DESIGNED TO DISCHARGE ALONG THE ENTIRE LENGTH AT

    EQUAL PRESSURES.

    DISCHARGE TREATMENT

    THE CONTRACTOR SHALL PROVIDE TREATMENT OF THE DISCHARGE INCLUDING SUFFICIENT SEDIMENT

    SETTLING CAPACITY (PONDS, STORAGE TANKS, ETC.) TO ENSURE DISCHARGE DOES NOT EXCEED

    TURBIDITY STANDARDS AT THE RECEIVING WATERS; AND 10 PPM SUSPENDED SOLIDS (SILT, SILICA,

    SEDIMENT ETC.) AS MEASURED USING A ROSSUM SAND TESTER IMMEDIATELY PRIOR TO DISCHARGE TO

    THE DESIGNATED DISCHARGE AREA.

    THE DEWATERING DISCHARGE TREATMENT SYSTEM SHALL INCLUDE ANY STORAGE TANKS, PLUMBING,

    PUMPS, FILTRATION SYSTEMS, OTHER EQUIPMENT, APPURTENANCES, AND RELATED WORK TO

    PERFORM THE FUNCTION OF WATER TREATMENT.

    DISCHARGE MONITORING

    THE CONTRACTOR'S EROSION CONTROL SPECIALIST SHALL ANALYZE DISCHARGE FOR TURBIDITY

    HOURLY DURING THE FIRST FOUR HOURS OF TESTING, DAILY DURING FIRST WEEK, WEEKLY

    THEREAFTER, AND AFTER ANY RAINFALL EVENT EXCEEDING 0.25 INCHES PER DAY, WITH A FIELD

    TURBIDITY METER USING STANDARD METHOD 2130 (STANDARD METHODS FOR THE EXAMINATION OF

    WATER AND WASTEWATER). THE CONTRACTOR SHALL MEASURE TURBIDITY AT ALL DISCHARGE POINTS

    TO RECEIVING WATERS OR WETLANDS, AND BACKGROUND. TURBIDITY SHALL BE CALCULATED AS THE

    AVERAGE (MEAN) FOR ANY NUMBER OF SAMPLES. THE NUMBER AND TIMING OF SAMPLES SHALL BE

    THE SAME FOR EACH SAMPLING STATION (I.E., BACKGROUND AND DISCHARGE POINTS). THE

    CONTRACTOR SHALL PROVIDE ADDITIONAL TREATMENT PRIOR TO DISCHARGE, AS NECESSARY, TO

    MEET THE DISCHARGE LIMITS.

    THE CONTRACTOR SHALL VISUALLY INSPECT THE DISCHARGE SYSTEM DAILY FOR SYSTEM OPERATION,

    OVERLAND FLOW, EROSION, AND TURBIDITY THROUGHOUT THE TESTING.

    THE CONTRACTOR SHALL SUBMIT WEEKLY MONITORING REPORTS TO THE OWNER'S DESIGNATED

    REPRESENTATIVE DOCUMENTING THE REQUIREMENTS HEREIN.

    EROSION RISK ASSESSMENT

    FACTORS ANTICIPATED TO CREATE RISK OF EROSION THROUGHOUT THE PROJECT INCLUDE EXPOSURE OF EXCAVATED SOILS

    TO RAINFALL AND DISTURBANCE OF THE PROJECT SITE BY HEAVY EQUIPMENT. HEAVY RAINFALL CAN ERODE SOILS AND LEAD TO

    TRANSPORT OF SEDIMENTS OVERLAND, THROUGH OPEN SEWER OR STORM PIPES AS THEY ARE CONSTRUCTED, OR IN

    DRAINAGE DITCHES. DEWATERING OF THE TRENCHES AND LIFT STATION EXCAVATION WILL ALSO CREATE A RISK OF SEDIMENT

    TRANSPORT, RELATIVE TO THE AMOUNT OF WATER THAT MUST BE REMOVED. THE SOURCES OF WATER FOR DEWATERING

    INCLUDE RAINFALL, STORMWATER FLOW, AND GROUNDWATER FLOW.

    SWPPP TEMPORARY EROSION CONTROL NOTES

    1. NON-COMPLIANCE WITH THE EROSION CONTROL REQUIREMENTS, WATER QUALITY REQUIREMENTS AND CLEARING LIMITS

    VIOLATIONS MAY RESULT IN A TEMPORARY STOP-WORK ORDER UNTIL SAID EROSION CONTROL MEASURES ARE FUNCTIONAL.

    2. CLEARING LIMITS SHALL BE ESTABLISHED FIRST THEN EROSION CONTROL BEST MANAGEMENT PRACTICES (BMPS) SHALL BE

    INSTALLED PRIOR TO ANY SITE DISTURBANCE. THE EROSION/SEDIMENTATION CONTROL FACILITIES SHALL BE CONSTRUCTED

    PRIOR TO ANY GRADING OR EXTENSIVE LAND CLEARING IN ACCORDANCE WITH THE APPROVED CONSTRUCTION STORM

    WATER POLLUTION PREVENTION PLAN (SWPPP). THESE FACILITIES MUST BE SATISFACTORILY MAINTAINED UNTIL

    CONSTRUCTION AND LANDSCAPING IS COMPLETED, THE PERMANENT VEGETATIVE COVER IS ESTABLISHED AND THE

    POTENTIAL FOR ON-SITE EROSION HAS PASSED.

    3. PUBLIC STREETS ARE TO BE KEPT CLEAR OF DIRT AND DEBRIS DURING CONSTRUCTION EXCAVATION AND FILL OPERATIONS.

    MATERIAL SHALL BE REMOVED FROM THE STREETS BY SWEEPING. PAVED SURFACES MUST BE CLEANED AT THE END OF

    EACH DAY.

    4. SEDIMENT CONTROL FACILITIES SHOWN ON THESE PLANS SHALL BE INSTALLED AS PART OF THE PLAN TO REMOVE SEDIMENT

    FROM THE WATER BEFORE CLEARING AND GRADING IS ALLOWED. THIS MAY INCLUDE SEDIMENT PONDS, SILT FENCES,

    SWALES, CHANNELS, BERMS, BARRIERS AND OTHER MEASURES. SEE THE CONSTRUCTION SEQUENCE FOR ORDER OF

    INSTALLATION.

    5. EXCAVATED MATERIAL SHALL BE PLACED ON THE UPHILL SIDE OF TRENCHES, UNLESS INCONSISTENT WITH SAFETY OR SITE

    CONSTRAINTS.

    6. THE CONSTRUCTION PLANS INDICATE INSTALLATION OF BEST MANAGEMENT PRACTICES (BMPS) TO RETAIN ALL SEDIMENT ON

    SITE. ADDITIONAL MEASURES ARE NORMALLY NEEDED TO REMOVE TURBIDITY AND MEET WATER QUALITY STANDARDS.

    DURING CONSTRUCTION, THE CONTRACTOR SHALL INSTALL SUCH ADDITIONAL COUNTY APPROVED BMPS AS MAY BE

    REQUIRED, E.G. BAKER TANKS OR OTHER SEDIMENTATION FACILITIES, TO PREVENT SEDIMENT OR TURBID WATER FROM

    LEAVING THE SITE. THE CONTRACTOR MAY CONTACT THE DESIGN ENGINEER (OR THE OWNER'S DESIGNATED EROSION

    CONTROL PERSON) FOR GUIDANCE ON ADDITIONAL MEASURES.

    7. STABILIZE ALL EXPOSED AND NON-WORKED SOIL.

    8. FROM MAY 1 TO SEPTEMBER 30 NO UN-WORKED SOIL MAY REMAIN EXPOSED FOR MORE THAN 7 DAYS.

    9. COVER DENUDED AREAS AS SPECIFIED ON THE PLANS BY APPROPRIATE COVER BMPS (SUCH AS MULCH, SOD, AND STRAW).

    WHERE STRAW MULCH IS REQUIRED, IT SHALL BE APPLIED A MINIMUM OF 2".

    10. COVER MATERIAL SHALL BE STOCKPILED ON SITE.

    11. SOIL STOCKPILES SHALL BE STABILIZED AND PROTECTED WITH SEDIMENT RETENTION BMPS WITHIN 24 HOURS.

    12. GRADING AND CONSTRUCTION SHALL BE TIMED AND CONSTRUCTED IN STAGES TO MINIMIZE SOIL EXPOSURE.

    CONSTRUCTION SHALL BE TIMED TO RECOGNIZE CONDITIONS CREATED BY THE WEATHER.

    13. FROM OCTOBER 1 TO APRIL 30 NO UN-WORKED SOIL MAY REMAIN EXPOSED FOR MORE THAN 2 DAYS.

    14. AN ESTABLISHED GROUND COVER THAT FULFILLS THE REQUIREMENT OF THE APPROVED CONSTRUCTION PLANS IS

    REQUIRED FOR ACCEPTANCE BY THE COUNTY WHERE POSSIBLE, MAINTAIN NATURAL VEGETATION FOR SILT CONTROL.

    a. ALL AREAS TO BE SEEDED SHALL BE CULTIVATED BY DISKING, RAKING, HARROWING OR OTHER ACCEPTABLE MEANS.

    b. PERFORM ALL CULTIVATING ACROSS OR AT RIGHT ANGLES TO THE SLOPE.

    c. COVER THE SITE WITH MULCH, TOPSOIL OR OTHER SOIL AMENDMENTS.

    d. IF NECESSARY, SURFACE RUNOFF CONTROL MEASURES SUCH AS GRADIENT TERRACES, INTERCEPTOR DIKE/SWALES,

    LEVEL SPREADERS, AND SEDIMENT BASINS SHALL BE INSTALLED PRIOR TO SEEDING.

    e. IMMEDIATELY FOLLOWING FINISH GRADING, PERMANENT VEGETATION (CONSISTING OF RAPID, PERSISTENT AND

    LEGUME) WILL BE APPLIED (MINIMUM 80# PER ACRE), UNLESS OTHERWISE NOTED AS A WETLAND RESTORATION AREA

    OR OTHERWISE APPROVED FOR ALTERNATIVE LANDSCAPING TREATMENT. THIS IS TO INCLUDE THE FOLLOWING: 60%

    3-WAY PERENNIAL RYE GRASS BLEND, 25% CHEWING FESCUE, 15% CREEPING FESCUE. NO CLOVER OR NOXIOUS

    WEEDS WILL BE PERMITTED.

    f. FERTILIZER SHALL BE APPLIED AT 400# PER ACRE OF 10-20-20 (10 POUNDS PER 1100 SQUARE FEET) OR EQUIVALENT.

    DEVELOPMENTS ADJACENT TO WATER BODIES SHALL USE NON-PHOSPHORUS FERTILIZER.

    15. UNLESS IN A WETLAND RESTORATION AREA OR AN AREA APPROVED FOR ALTERNATIVE LANDSCAPING TREATMENT, ALL

    DISTURBED AREAS SHALL BE SEEDED WITH A PERENNIAL GROUND COVER USING AN APPROVED HYDROSEEDER OR AS

    OTHERWISE APPROVED BY THE OWNER.

    16. PROTECT CUT AND FILL SLOPES FROM EROSIVE FLOWS AND CONCENTRATED FLOWS UNTIL PERMANENT COVER AND

    DRAINAGE CONVEYANCE SYSTEMS ARE IN PLACE.

    17. INSTALL INLET PROTECTION ON ALL STORM DRAIN INLETS DURING CONSTRUCTION SO THAT SEDIMENT AND SILT LADEN

    WATER IS FILTERED OR TREATED TO MINIMIZE SEDIMENT THAT ENTERS THE INLET.

    18. CHANNELS, DITCHES, SWALES AND OTHER CONVEYANCE SYSTEMS SHALL BE STABILIZED TO PREVENT EROSION DURING AND

    AFTER CONSTRUCTION. INSTALL OUTLET PROTECTION FOR ALL CULVERTS.

    19. FOLLOW THE SPECIFIC REQUIREMENTS ON THE PLAN TO CONTROL POLLUTANTS DURING CONSTRUCTION. THE CONTRACTOR

    AND OWNER SHALL DEVELOP ON GOING PLANS TO CONTROL POLLUTANTS GENERATED DURING CONSTRUCTION, INCLUDING

    WASTE MATERIALS AND DEMOLITION DEBRIS. THIS INCLUDES MAINTENANCE OF CONSTRUCTION EQUIPMENT, FERTILIZERS,APPLICATION OF CHEMICALS, AND WATER TREATMENT SYSTEMS. THE PLANS SHALL BE UPDATED TO RESPOND TO SITE

    EXPOSURE AND WEATHER CONDITIONS.

    20. THE WATER FROM DE-WATERING SYSTEMS FOR TRENCHES, VAULTS AND FOUNDATIONS SHALL BE DISCHARGED INTO A

    CONTROLLED SYSTEM OR SEDIMENT RETENTION BMP (I.E. BAKER TANK). ADDITIONAL MEASURES ARE NEEDED TO REMOVE

    TURBIDITY AND MEET WATER QUALITY STANDARDS. UNFILTERED WATER MUST NOT BE RELEASED INTO SENSITIVE AREAS

    SUCH AS WETLANDS OR DESIGNATED NGPA AREAS.

    21. THE OWNER AND CONTRACTOR ARE RESPONSIBLE FOR WATER QUALITY AS FURTHER DEFINED IN THE PROJECT

    SPECIFICATIONS. THE CONTRACTOR'S CERTIFIED EROSION CONTROL SPECIALIST SHALL BE RESPONSIBLE FOR INSPECTION

    AND THE WATER QUALITY MONITORING PROGRAM AND SHALL REPORT TO THE OWNER AS REQUIRED.

    22. THE CONSTRUCTION EROSION CONTROL BMPS SHALL BE INSPECTED AFTER EACH SIGNIFICANT RAIN EVENT. MAINTENANCE

    SHALL BE PERFORMED AS NEEDED TO MAINTAIN THE PERFORMANCE AND FUNCTION.

    a. SILT BARRIERS AND SEDIMENT PONDS (IF USED) SHALL BE INSPECTED IMMEDIATELY AFTER EACH RAINFALL AND AT

    LEAST DAILY DURING PROLONGED RAINFALL.

    b. NECESSARY REPAIRS TO BARRIERS, CHANNELS, AND PONDS (IF USED) OR REPLACEMENT SHALL BE ACCOMPLISHED

    PROMPTLY.

    c. SEDIMENT DEPOSITS SHOULD BE REMOVED AFTER EACH RAINFALL FROM SILT BARRIERS AND CHECK DAMS.

    d. WHEN THE SEDIMENT REACHES THE CLEAN OUT LEVEL IN A SEDIMENT POND, IT SHALL BE REMOVED AND PROPERLY

    DISPOSED. DEPOSITS MUST BE REMOVED WHEN THE LEVEL OF DEPOSITION REACHES APPROXIMATELY ONE-THIRD

    THE HEIGHT OF THE BARRIER, CHECK DAM OR OTHER CATCHMENT.

    e. IF USED, THE EMBANKMENT OF SEDIMENT BASINS SHALL BE CHECKED REGULARLY TO INSURE THAT IT IS

    STRUCTURALLY SOUND AND HAS NOT BEEN DAMAGED BY EROSION OR CONSTRUCTION EQUIPMENT.

    f. THE EMERGENCY SPILLWAY OF A SEDIMENT POND SHALL BE CHECKED REGULARLY TO INSURE THAT ITS LINING IS

    WELL ESTABLISHED AND EROSION-RESISTANT.

    g. ANY SEDIMENT DEPOSITS REMAINING IN PLACE AFTER THE BARRIER IS NO LONGER REQUIRED SHALL BE DRESSED TO

    CONFORM TO THE EXISTING GRADE, PREPARED AND SEEDED.

    SWPPP EROSION CONTROL PLAN

    (THIS PLAN MAY BE REVISED BY THE EROSION CONTROL SPECIALIST TO MEET FIELD CONDITIONS, IF NECESSARY.)

    1. EROSION PROBLEM AREAS

    a. THERE ARE CURRENTLY NO KNOWN EROSION PROBLEM AREAS ON SITE. HOWEVER, EROSION IS A POSSIBILITY DURING CONSTRUCTION. THE RISK OF

    EROSION IN THIS AREA MAY BE MITIGATED THROUGH THE USE OF PROPER BEST MANAGEMENT PRACTICES AS DESCRIBED BELOW. SINCE RAINFALL ON THE

    SITE IS LIKELY TO BE A PRINCIPAL CAUSE OF EROSION, THE RISK OF EROSION WILL BE REDUCED BY SCHEDULING EARTHWORK FOR THE DRY SUMMER

    SEASON.

    b. IF THIS PROJECT CONTINUES INTO THE WINTER SEASON, THE FOLLOWING WET WEATHER PRECAUTIONS WILL BE PRACTICED.

    i. PREVENTION OF TRACKING MUD ONTO ROADS THROUGH THE USE OF EQUIPMENT SWEEPING ONSITE.

    ii. EXPOSED PORTIONS OF THE SITE SHALL BE ADEQUATELY COVERED BY STRAW OR OTHER MATERIAL BASED UPON THE WEATHER. STRAW OR

    APPROVED EQUIVALENT MATERIAL SHALL ALWAYS BE AVAILABLE ON SITE AND READY TO USE. EXPOSED AREAS SHALL BE ADEQUATELY COVERED

    WHEN RAINING AND AT THE END OF THE DAY IF THE NEXT DAY IS A "NON-WORKING" DAY. WEATHER FORECASTS SHALL BE USED TO GOVERN

    WHETHER WORK WILL COMMENCE OR STOP FOR THE DAY.

    iii. ALL SITE WORK GENERATING EXPOSED SOIL (WITH THE EXCEPTION OF INSTALLATION AND MAINTENANCE OF EROSION CONTROL BMPS) SHALL CEASE

    DURING WEATHER CONDITIONS WHEN RAIN GENERATES RUNOFF AND CAUSES EROSION.

    iv. IF NECESSARY, EARTHWORK SHALL BE PHASED TO MINIMIZE AREAS OF EXPOSED SOIL.

    v. THE CONTRACTOR SHALL DEVISE A MAINTENANCE AND INSPECTION SCHEDULE WITH AN IDENTIFIED EROSION CONTROL SPECIALIST RESPONSIBLE

    FOR THESE ITEMS.

    vi. AN EROSION CONTROL SPECIALIST SHALL BE PRESENT OR ON-CALL THROUGHOUT THE PROJECT DURATION TO INSURE THE BMPS ARE WORKING

    APPROPRIATELY AND ARE WELL MAINTAINED. THE SPECIALIST SHALL MONITOR THE DISCHARGE FROM THIS SITE AFTER EACH STORM EVENT THAT

    GENERATES RUNOFF. THEY SHALL ALSO CONDUCT SITE INSPECTION REPORTS ON THE INSTALLED BMPS. THESE REPORTS SHALL BE AVAILABLE ON

    SITE AND PROVIDED TO THE OWNER ON A MONTHLY BASIS AND WHEN REQUESTED. THE MONITORING SHALL BE DONE IN A PROFESSIONAL MANNER

    CONSISTENT WITH CURRENT SAMPLING PROTOCOLS AND REPORTING REQUIREMENTS.

    vii. VEGETATED BUFFERS AND CRITICAL AREAS SHALL BE PROTECTED, ESPECIALLY THROUGH THE USE OF SILT FENCES AND MINIMIZATION OF SOIL

    EXPOSURE.

    viii. IF NECESSARY, WATER FROM THE PROJECT SITE SHALL BE FILTERED THROUGH AN APPROVED DEVICE SUCH AS A BAKER TANK, PRIOR TO RELEASING

    IT TO THE VEGETATED WETLAND AREA. THE CONTRACTOR SHALL CREATE/MODIFY THE DEWATERING PLAN BASED UPON SITE CONDITIONS AND SHALL

    ATTACH IT TO THIS STORMWATER POLLUTION PREVENTION PLAN (SWPPP).

    2. CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN ELEMENTS

    a. MARK CLEARING LIMITS (BMP C103 - HIGH VISIBILITY PLASTIC)

    CLEARING LIMITS ARE SHOWN ONTHE PLANS.

    b. ESTABLISH CONSTRUCTION ACCESS (BMP C105 - STABILIZED CONSTRUCTION ENTRANCE)

    CONSTRUCTION ACCESS WILL BE THE PAVED DRIVEWAY FROM MUKILTEO SPEEDWAY. AS A PROTECTIVE MEASURE, STREET SWEEPING WILL BE

    PERFORMED WHEN REQUIRED.

    c. CONTROL FLOW RATES (BMP C200 - INTERCEPTOR SWALE; BMP C206 - LEVEL SPREADER)

    MINOR ADDITIONAL FLOW IS EXPECTED FROM THIS PROJECT FLOW WILL BE CONTROLLED WITH APPROPRIATE BMPS AS NEEDED SUCH AS WITH CHECK

    DAMS (BMP C207) OR STRAW WATTLES (BMP C235) IF REQUIRED.

    d. INSTALL SEDIMENT CONTROLS (BMP C233 - SILT FENCE)

    SEDIMENT CONTROLS INCLUDE A SILT FENCE ALONG THE PERIMETER OF THE SITE, COVERING OF SOIL STOCKPILES, AND INSTALLATION OF STRAW WHEN

    NECESSARY. EROSION CONTROL BMPS SHALL BE INSTALLED PRIOR TO LAND DISTURBING ACTIVITIES AS NOTED ON THE PLANS. THE SITE SHALL ALSO BE

    MONITORED AND TESTED SO THAT TURBIDITY IN THE WATER LEAVING THE AREA WILL NOT EXCEED 5 NTU ABOVE BACKGROUND.

    e. STABILIZE SOILS (BMP C122 - NETS AND BLANKETS; BMP C123 - PLASTIC COVERING)

    TO PROTECT THE SOIL STOCKPILES FROM EROSIVE FORCES SUCH AS RAIN, PLASTIC SHEETING, JUTE MATS OR SIMILAR BMPS WILL BE PLACED UPON

    EXPOSED AND NON-WORKED SOIL THROUGHOUT CONSTRUCTION. PER WET WEATHER REQUIREMENTS, THESE BMPS WILL BE PLACED WITHIN 2 DAYS OF

    STOCKPILING THE SOIL FROM OCTOBER 1ST THROUGH APRIL 30TH OR IF RAINING. DUST CONTROL PER BMP C140 SHALL BE IMPLEMENTED AS WELL.

    f. PROTECT SLOPES (BMP C122 - NETS AND BLANKETS)

    ANY SLOPES ALONG THE PROJECT SITE SHALL NOT BE DAMAGED FROM CONCENTRATED FLOWS. STOCKPILE SLOPES SHALL BE PROTECTED AS

    MENTIONED IN THE "STABILIZE SOILS" SECTION.

    g. PROTECT DRAIN INLETS (BMP C220 - STORM DRAIN INLET PROTECTION)

    TO PREVENT SEDIMENT FROM MOVING INTO ANY NEARBY STORM SYSTEM, CATCH BASIN INLET PROTECTION SHALL BE USED FOR CATCH BASINS

    ENCOUNTERED ALONG THE PROJECT. INLETS WILL BE INSPECTED WEEKLY AT A MINIMUM AND DAILY DURING STORM EVENTS AS NOTED ON THE PLANS.

    SEDIMENT SHALL NOT ACCUMULATE GREATER THAN SIX INCHES IN DEPTH WITHIN THE INLET PROTECTION DEVICE.

    h. STABILIZE CHANNELS AND OUTLETS (BMP C209 - OUTLET PROTECTION)

    SHOULD IT BE NECESSARY, CHECK DAMS PER BMP C207 MAY BE USED TOHELP STABILIZE CHANNELS THROUGHOUT THE DURATION OF THE PROJECT.

    i. CONTROL POLLUTANTS (BMP C233 - SILT FENCE)

    GOOD HOUSEKEEPING PRACTICES AND APPROPRIATE BMPS AS SHOWN ON THE PLANS AND APPROVED BY THE GOVERNING JURISDICTION WILL BE

    UTILIZED TO CONTROL POLLUTANTS ON THE SITE. TO ENSURE THIS, A NOTE IS STATED ON THE PLANS REQUIRING ALL POLLUTANTS ON SITE TO BE

    HANDLED AND DISPOSED OF IN A MANNER THAT DOES NOT CAUSE CONTAMINATION OF SURFACE WATER. ANY WATER THAT IS USED TO CLEAN

    EQUIPMENT OR IS PUMPED FROM THE EXISTING DRAINAGE FACILITIES SHALL BE FILTERED THROUGH AN APPROVED FILTERING DEVICE AND TESTED

    PRIOR TO DISCHARGING TO AN UNDEVELOPED PORTION OF THE SITE SAWCUTTING ACTIVITIES SHALL FOLLOW BMP C152.

    j. CONTROL DEWATERING (BMP C251 - CONSTRUCTION STORMWATER FILTRATION)

    ANY WATER FROM DEWATERING OPERATIONS THAT MAY OCCUR THROUGHOUT THIS PROJECT WILL BE CONVEYED TO AN APPROVED FILTER SUCH AS A

    BAKER TANK AND THEN RELEASED TO AND UNDISTURBED AREA ON SITE. ALL MEASURES SHALL COMPLY WITH REGULATION STANDARDS. THE

    CONTRACTOR SHALL CREATE A DEWATERING PLAN BASED UPON SITE CONDITIONS AND SHALL ATTACH IT TO THIS STORMWATER POLLUTION PREVENTION

    PLAN (SWPPP).

    k. MAINTAIN BMPS

    THE BMPS SHOWN ON THE PLANS SHALL BE MAINTAINED AND REPAIRED AS NEEDED. SPECIFIC MAINTENANCE REQUIREMENTS ARE LISTED IN THE NOTES

    AND/OR DETAILS ON THE PLANS. MONITORING SHALL BE CONDUCTED BY THE DESIGNATED EROSION CONTROL SPECIALIST TO INSURE BMPS ARE

    WORKING EFFECTIVELY AND ARE NOT DAMAGING FACILITIES OR WATERWAYS DOWNSTREAM OF THE SITE. A NOTE HAS BEEN ADDED TO THE PLANS

    STATING THAT TRAPPED SEDIMENT SHALL BE REMOVED OR STABILIZED ON THE SITE UPON COMPLETION OF THE WORK AS APPROPRIATE MATERIALS

    SHALL BE ON HAND PER BMP C150 IN ORDER TO PROVIDE MAINTENANCE OR EMERGENCY MEASURES RELATED TO EROSION CONTROL.

    l. MANAGE THE PROJECT

    EROSION CONTROL SPECIALIST: THE CONTRACTOR SHALL PROVIDE THE NAME OF A CERTIFIED EROSION CONTROL SPECIALIST (PER BMP C160) THAT

    WILL VERIFY THE ACTIONS NOTED IN THIS STORMWATER POLLUTION PREVENTION PLAN AND ON THE DRAWINGS WILL BE IMPLEMENTED.

    PHASING OF CONSTRUCTION): PHASING OF THE WORK SHALL COMPLY WITH BMP C162 (SCHEDULING). THE FIRST ORDER OF WORK WILL INCLUDE

    INSTALLING APPROPRIATE BMPS FOR EROSION CONTROL. PROJECT DEVELOPMENT WILL THEN COMMENCE. THE SITE SHALL BE PROTECTED AS

    DESCRIBED IN THIS PLAN AND ON THE DRAWINGS. THROUGHOUT THE WORK, THE CONTRACTOR IS RESPONSIBLE FOR MAINTAINING ALL BMPS. UPON

    COMPLETION OF THE WORK, TEMPORARY BMPS SHALL BE REMOVED AS NECESSARY.

    SEASONAL WORK LIMITATIONS: WORK IS SCHEDULED FOR THE DRY SEASON HOWEVER, IT MAY BE CONDUCTED DURING THE WET WEATHER SEASON OF

    OCTOBER 1 THROUGH MARCH 31ST. ALL STOCKPILES SHALL BE COVERED WITH PLASTIC SHEETING, STRAW (OR EQUAL) TO MINIMIZE ANY LOSS OF SOIL

    DURING THE WET WEATHER. THE CONTRACTOR WILL BE RESPONSIBLE FOR CONSISTENTLY MONITORING THE OUTFALLS TO ENSURE ALL APPLICABLE

    REQUIREMENTS ARE MET AND THAT WATER QUALITY DOWNSTREAM IS NOT BEING COMPROMISED THROUGHOUT THIS PROCESS. IN ADDITION, THE

    CONTRACTOR'S CERTIFIED EROSION CONTROL SPECIALIST WILL BE RESPONSIBLE FOR ENSURING PROPER BMP MAINTENANCE IS CONDUCTED

    THROUGHOUT THE SEASON AS WELL AS ENSURING THE LOCAL JURISDICTION'S REQUIREMENTS ARE MET THROUGH TESTING AND OTHER APPROPRIATE

    METHODS.

    COORDINATION WITH UTILITIES AND OTHER CONTRACTORS: AS STATED ON THE PLANS AND IN THE SPECIFICATIONS, THE CONTRACTOR SHALL BE

    RESPONSIBLE FOR COORDINATING ANY UTILITY WORK WITH THE APPROPRIATE AGENCIES.

    INSPECTION AND MONITORING: THE CONTRACTOR'S EROSION CONTROL SPECIALIST SHALL BE PRESENT OR ON-CALL THROUGHOUT THE PROJECT

    DURATION TO INSURE THE BMPS ARE WORKING APPROPRIATELY AND ARE WELL MAINTAINED. THE SPECIALIST SHALL CHOOSE APPROPRIATE MONITORING

    SITES AND NOTE THEM ON BOTH THE GROUND AND ON THE FIELD COPY OF THE PLANS. THE SPECIALIST SHALL MONITOR THE DISCHARGE FROM THIS

    SITE AFTER EACH STORM EVENT THAT GENERATES RUNOFF. THE SPECIALIST SHALL ALSO CONDUCT SITE INSPECTION REPORTS ON THE INSTALLED

    BMPS. THE MONITORING SHALL BE DONE IN A PROFESSIONAL MANNER CONSISTENT WITH CURRENT SAMPLING PROTOCOLS AND REPORTING

    REQUIREMENTS.

    REPORTING: A NOTE HAS BEEN ADDED TO THE PLANS STATING THAT THE CONTRACTOR IS RESPONSIBLE FOR REPORTING ALL SPILLS OR DISCHARGE OF

    POLLUTANTS WITHIN 24-HOURS TO THE OWNER. THE SITE INSPECTION REPORTS MENTIONED ABOVE WILL BE AVAILABLE ON SITE AND PROVIDED TO THE

    OWNER ON A MONTHLY BASIS OR WHEN REQUESTED.

    MAINTENANCE : NO MAINTENANCE ON HEAVY EQUIPMENT IS EXPECTED TO OCCUR ON SITE THROUGHOUT THE PROJECT.

    MAINTENANCE OF THE CONSTRUCTION SWPPP: THIS PLAN WILL BE LOCATED ON SITE AT ALL TIMES. THE PLAN WILL BE REVISED ACCORDINGLY IF

    SIGNIFICANT CHANGES HAVE BEEN MADE TO THE DESIGN, CONSTRUCTION, OPERATION, OR MAINTENANCE OF ANY BMPS.

    l. PROTECT LOW IMPACT DEVELOPMENT FACILITIES

    NO LOW IMPACT DEVELOPMENT FACILITIES ARE INTENDED FOR THIS SITE.

    SW

    PP

    P N

    OT

    ES

  • SILTATION FENCE

    FILTER FABRIC CATCH BASIN

    INSERT FOR SEDIMENT ONLY

    TE

    MP

    OR

    AR

    Y E

    RO

    SIO

    N A

    ND

    S

    ED

    IM

    EN

    TA

    TIO

    N

    CO

    NT

    RO

    L D

    ET

    AIL

    S A

    ND

    N

    OT

    ES

    G-5

    WA

    LD

    EN

    WO

    OD

    L

    IF

    T S

    TA

    TIO

    N

    RE

    PL

    AC

    EM

    EN

    T

    8

    CO

    NS

    ULT

    IN

    G E

    NG

    IN

    EE

    RS

    SIL

    VE

    R L

    AK

    E W

    AT

    ER

    AN

    D S

    EW

    ER

    D

    IS

    TR

    IC

    T

  • PIPE TRENCH SECTION VALVE EXTENSION STEM

    PLAN VIEW

    PROFILE VIEW

    VALVE BOX IN ASPHALT AREA

    NON-PAVED

    PAVED

    CLEANOUT DETAIL ASPHALT PATCH AND OVERLAY DETAIL

    ROOF DRAIN DETAIL

    GE

    NE

    RA

    L D

    ET

    AIL

    S

    G-6

    WA

    LD

    EN

    WO

    OD

    L

    IF

    T S

    TA

    TIO

    N

    RE

    PL

    AC

    EM

    EN

    T

    8

    CO

    NS

    ULT

    IN

    G E

    NG

    IN

    EE

    RS

    SIL

    VE

    R L

    AK

    E W

    AT

    ER

    AN

    D S

    EW

    ER

    D

    IS

    TR

    IC

    T

  • PLAN ELEVATION

    MINIMUM BEARING AREA TABLE

    VERTICAL ANCHOR BLOCK THRUST BLOCKS

    ELEVATION

    PLAN

    BYPASS PUMP CONNECTION

    SIDE SEWER DETAIL

    (CONNECTION TO EXISTING MAIN)

    GE

    NE

    RA

    L D

    ET

    AIL

    S

    G-7

    WA

    LD

    EN

    WO

    OD

    L

    IF

    T S

    TA

    TIO

    N

    RE

    PL

    AC

    EM

    EN

    T

    8

    CO

    NS

    ULT

    IN

    G E

    NG

    IN

    EE

    RS

    SIL

    VE

    R L

    AK

    E W

    AT

    ER

    AN

    D S

    EW

    ER

    D

    IS

    TR

    IC

    T

  • SECTION SECTION

    PROFILE

    MAN GATE DETAIL

    CHAIN LINK SECURITY FENCE

    SHIPS LADDER MOUNTING DETAIL FENCE GATE LATCH/LOCK DETAIL

    GE

    NE

    RA

    L D

    ET

    AIL

    S

    G-8

    WA

    LD

    EN

    WO

    OD

    L

    IF

    T S

    TA

    TIO

    N

    RE

    PL

    AC

    EM

    EN

    T

    8

    CO

    NS

    ULT

    IN

    G E

    NG

    IN

    EE

    RS

    SIL

    VE

    R L

    AK

    E W

    AT

    ER

    AN

    D S

    EW

    ER

    D

    IS

    TR

    IC

    T

  • EX

    IS

    TIN

    G S

    IT

    E P

    LA

    N, D

    EM

    OL

    IT

    IO

    N A

    ND

    T

    EM

    PO

    RA

    RY

    ER

    OS

    IO

    N A

    ND

    S

    ED

    IM

    EN

    TA

    TIO

    N C

    ON

    TR

    OL

    P

    LA

    N

    C-1

    WA

    LD

    EN

    WO

    OD

    L

    IF

    T S

    TA

    TIO

    N

    RE

    PL

    AC

    EM

    EN

    T

    4

    CO

    NS

    ULT

    IN

    G E

    NG

    IN

    EE

    RS

    SIL

    VE

    R L

    AK

    E W

    AT

    ER

    AN

    D S

    EW

    ER

    D

    IS

    TR

    IC

    T

  • TE

    MP

    OR

    AR

    Y S

    HO

    RIN

    G P

    LA

    N

    C-2

    WA

    LD

    EN

    WO

    OD

    L

    IF

    T S

    TA

    TIO

    N

    RE

    PL

    AC

    EM

    EN

    T

    4

    CO

    NS

    ULT

    IN

    G E

    NG

    IN

    EE

    RS

    SIL

    VE

    R L

    AK

    E W

    AT

    ER

    AN

    D S

    EW

    ER

    D

    IS

    TR

    IC

    T

  • MO

    DIF

    IE

    D S

    IT

    E P

    LA

    N

    C-3

    WA

    LD

    EN

    WO

    OD

    L

    IF

    T S

    TA

    TIO

    N

    RE

    PL

    AC

    EM

    EN

    T

    4

    CO

    NS

    ULT

    IN

    G E

    NG

    IN

    EE

    RS

    SIL

    VE

    R L

    AK

    E W

    AT

    ER

    AN

    D S

    EW

    ER

    D

    IS

    TR

    IC

    T

    STRUCTURE AND FEATURE COORDINATES

    NORTHING EASTING COMMENT

    STRUCTURE AND FEATURE COORDINATES

    NORTHING EASTING COMMENT

  • SIT

    E P

    IP

    IN

    G P

    LA

    N

    C-4

    WA

    LD

    EN

    WO

    OD

    L

    IF

    T S

    TA

    TIO

    N

    RE

    PL

    AC

    EM

    EN

    T

    4

    CO

    NS

    ULT

    IN

    G E

    NG

    IN

    EE

    RS

    SIL

    VE

    R L

    AK

    E W

    AT

    ER

    AN

    D S

    EW

    ER

    D

    IS

    TR

    IC

    T

    YARD PIPING COORDINATES

    X NORTHING EASTING SIZE-PROCESS COMMENT ℄ ELEVATION

  • PIPING SYMBOLS PROCESS PIPING / EQUIPMENT IDENTIFICATIONS

    PROCESS PIPING EQUIPMENT

    AB

    BR

    EV

    IA

    TIO

    NS

    , G

    EN

    ER

    AL

    S

    YM

    BO

    LS

    ,

    SY

    MB

    OL

    L

    EG

    EN

    D, N

    UM

    BE

    RIN

    G S

    YS

    TE

    M

    AN

    D G

    EN

    ER

    AL

    N

    OT

    ES

    M-1

    WA

    LD

    EN

    WO

    OD

    L

    IF

    T S

    TA

    TIO

    N

    RE

    PL

    AC

    EM

    EN

    T

    11

    CO

    NS

    ULT

    IN

    G E

    NG

    IN

    EE

    RS

    SIL

    VE

    R L

    AK

    E W

    AT

    ER

    AN

    D S

    EW

    ER

    D

    IS

    TR

    IC

    T

  • GREATER THAN 3" DIA.

    PVC OR FRP PIPE

    FLOORS

    WALLS

    STEEL PIPE CAST OR DUCTILE

    IRON PIPE

    PIPE PENETRATIONS THROUGH NEW CONCRETE WALLS AND FLOORS DETAILS

    EXISTING CONCRETE WALL PIPE PENETRATION

    SLUICE GATE DETAIL

    PLANSECTION

    FLUSH MOUNT SLEEVE DETAIL

    TRENCH DRAIN DETAIL

    PIP

    E P

    EN

    ET

    RA

    TIO

    NS

    A

    ND

    F

    LE

    XIB

    LE

    C

    OU

    PL

    IN

    G

    RE

    ST

    RA

    IN

    T D

    ET

    AIL

    S

    M-2

    WA

    LD

    EN

    WO

    OD

    L

    IF

    T S

    TA

    TIO

    N

    RE

    PL

    AC

    EM

    EN

    T

    11

    CO

    NS

    ULT

    IN

    G E

    NG

    IN

    EE

    RS

    SIL

    VE

    R L

    AK

    E W

    AT

    ER

    AN

    D S

    EW

    ER

    D

    IS

    TR

    IC

    T

  • HIGH LEVEL FLOAT DETAIL

    WET WELL LEVEL CABLE SUPPORT DETAIL

    STILLING WELL

    STILLING WELL PLAN DETAIL

    PRESSURE GAUGE (SEWAGE SERVICE) DETAIL

    MIS

    CE

    LL

    AN

    EO

    US

    P

    IP

    IN

    G D

    ET

    AIL

    S

    M-3

    WA

    LD

    EN

    WO

    OD

    L

    IF

    T S

    TA

    TIO

    N

    RE

    PL

    AC

    EM

    EN

    T

    11

    CO

    NS

    ULT

    IN

    G E

    NG

    IN

    EE

    RS

    SIL

    VE

    R L

    AK

    E W

    AT

    ER

    AN

    D S

    EW

    ER

    D

    IS

    TR

    IC

    T

  • PUMP STATION DEMOLITION PLAN

    ILLUSTRATIVE SECTION

    DE

    MO

    LIT

    IO

    N P

    LA

    N A

    ND

    S

    EC

    TIO

    N

    M-4

    WA

    LD

    EN

    WO

    OD

    L

    IF

    T S

    TA

    TIO

    N

    RE

    PL

    AC

    EM

    EN

    T

    11

    CO

    NS

    ULT

    IN

    G E

    NG

    IN

    EE

    RS

    SIL

    VE

    R L

    AK

    E W

    AT

    ER

    AN

    D S

    EW

    ER

    D

    IS

    TR

    IC

    T

  • LIFT STATION LOWER PLAN

    LIF

    T S

    TA

    TIO

    N P

    LA

    N

    M-5

    WA

    LD

    EN

    WO

    OD

    L

    IF

    T S

    TA

    TIO

    N

    RE

    PL

    AC

    EM

    EN

    T

    11

    CO

    NS

    ULT

    IN

    G E

    NG

    IN

    EE

    RS

    SIL

    VE

    R L

    AK

    E W

    AT

    ER

    AN

    D S

    EW

    ER

    D

    IS

    TR

    IC

    T

    MA

    TC

    HL

    IN

    E, S

    EE

    S

    HE

    ET

    M

    -6

  • FLOW METER VAULT

    LOWER PLAN

    FL

    OW

    M

    ET

    ER

    V

    AU

    LT

    L

    OW

    ER

    P

    LA

    N

    M-6

    WA

    LD

    EN

    WO

    OD

    L

    IF

    T S

    TA

    TIO

    N

    RE

    PL

    AC

    EM

    EN

    T

    11

    CO

    NS

    ULT

    IN

    G E

    NG

    IN

    EE

    RS

    SIL

    VE

    R L

    AK

    E W

    AT

    ER

    AN

    D S

    EW

    ER

    D

    IS

    TR

    IC

    T

    MA

    TC

    HL

    IN

    E, S

    EE

    S

    HE

    ET

    M

    -5

  • SECTION

    LIF

    T S

    TA

    TIO

    N S

    EC

    TIO

    N

    M-7

    WA

    LD

    EN

    WO

    OD

    L

    IF

    T S

    TA

    TIO

    N

    RE

    PL

    AC

    EM

    EN

    T

    11

    CO

    NS

    ULT

    IN

    G E

    NG

    IN

    EE

    RS

    SIL

    VE

    R L

    AK

    E W

    AT

    ER

    AN

    D S

    EW

    ER

    D

    IS

    TR

    IC

    T

  • SECTION SECTION

    LIF

    T S

    TA

    TIO

    N S

    EC

    TIO

    NS

    M-8

    WA

    LD

    EN

    WO

    OD

    L

    IF

    T S

    TA

    TIO

    N

    RE

    PL

    AC

    EM

    EN

    T

    11

    CO

    NS

    ULT

    IN

    G E

    NG

    IN

    EE

    RS

    SIL

    VE

    R L

    AK

    E W

    AT

    ER

    AN

    D S

    EW

    ER

    D

    IS

    TR

    IC

    T

  • SECTION SECTION

    SUMP PUMP DETAIL

    DETAIL

    LIF

    T S

    TA

    TIO

    N S

    EC

    TIO

    NS

    M-9

    WA

    LD

    EN

    WO

    OD

    L

    IF

    T S

    TA

    TIO

    N

    RE

    PL

    AC

    EM

    EN

    T

    11

    CO

    NS

    ULT

    IN

    G E

    NG

    IN

    EE

    RS

    SIL

    VE

    R L

    AK

    E W

    AT

    ER

    AN

    D S

    EW

    ER

    D

    IS

    TR

    IC

    T

  • GENERATOR FUEL TANK PLAN

    SECTION

    FUEL SYSTEM COMPONENT SCHEDULE

    COMPONENT

    FUEL SYSTEM COMPONENT SCHEDULE

    COMPONENT

    FUEL PIPE TRENCH TRANSITION SLEEVE ASSEMBLY TRANSITION SUMP TANK

    FU

    EL

    T

    AN

    K P

    LA

    N A

    ND

    S

    EC

    TIO

    N

    M-10

    WA

    LD

    EN

    WO

    OD

    L

    IF

    T S

    TA

    TIO

    N

    RE

    PL

    AC

    EM

    EN

    T

    11

    CO

    NS

    ULT

    IN

    G E

    NG

    IN

    EE

    RS

    SIL

    VE

    R L

    AK

    E W

    AT

    ER

    AN

    D S

    EW

    ER

    D

    IS

    TR

    IC

    T

  • GENERATOR ROOM PLAN

    GENERATOR SECTION GENERATOR SECTION

    INSULATED ROOF THIMBLE

    FU

    EL

    T

    AN

    K D

    ET

    AIL

    S A

    ND

    C

    OM

    PO

    NE

    NT

    S

    CH

    ED

    UL

    ES

    M-11

    WA

    LD

    EN

    WO

    OD

    L

    IF

    T S

    TA

    TIO

    N

    RE

    PL

    AC

    EM

    EN

    T

    11

    CO

    NS

    ULT

    IN

    G E

    NG

    IN

    EE

    RS

    SIL

    VE

    R L

    AK

    E W

    AT

    ER

    AN

    D S

    EW

    ER

    D

    IS

    TR

    IC

    T

  • ROOM MATERIAL AND FINISH SCHEDULE

    WALLS

    CEILING

    ROOM NAME

    FLOOR NORTH SOUTH EAST WEST

    DOOR SCHEDULE

    NO. MATERIAL & TYPE

    DOOR SIZE: WIDTH x

    HEIGHT x THICKNESS

    DOOR

    TYPE

    FRAME

    TYPE

    MAXIMUM

    U-FACTOR

    FINISH

    HARDWARE

    GROUP

    WINDOW SCHEDULE

    NO. TYPE

    WINDOW SIZE:

    WIDTH x HEIGHT =

    AREA

    QUANTITY TOTAL VGA

    MAXIMUM

    U-FACTOR NFRC

    CERTIFIED

    MAXIMUM

    SHGC

    BUILDING DATA CODE SUMMARY

    TYP DOOR DETAIL DOOR TYPE

    DOOR FRAME TYPE

    RESTROOM FRAMING

    SECTION

    RESTROOM FRAMING

    HEAD SECTION

    BU

    IL

    DIN

    G D

    AT

    A C

    OD

    E S

    UM

    MA

    RY

    A

    ND

    AR

    CH

    IT

    EC

    TU

    RA

    L S

    CH

    ED

    UL

    ES

    A-1

    WA

    LD

    EN

    WO

    OD

    L

    IF

    T S

    TA

    TIO

    N

    RE

    PL

    AC

    EM

    EN

    T

    5

    CO

    NS

    ULT

    IN

    G E

    NG

    IN

    EE

    RS

    SIL

    VE

    R L

    AK

    E W

    AT

    ER

    AN

    D S

    EW

    ER

    D

    IS

    TR

    IC

    T

  • UPPER FLOOR PLAN

    UP

    PE

    R F

    LO

    OR

    P

    LA

    N

    A-2

    WA

    LD

    EN

    WO

    OD

    L

    IF

    T S

    TA

    TIO

    N

    RE

    PL

    AC

    EM

    EN

    T

    5

    CO

    NS

    ULT

    IN

    G E

    NG

    IN

    EE

    RS

    SIL

    VE

    R L

    AK

    E W

    AT

    ER

    AN

    D S

    EW

    ER

    D

    IS

    TR

    IC

    T

  • LOWER FLOOR PLAN BATHROOM CEILING PLAN

    LO

    WE

    R F

    LO

    OR

    P

    LA

    N

    A-3

    WA

    LD

    EN

    WO

    OD

    L

    IF

    T S

    TA

    TIO

    N

    RE

    PL

    AC

    EM

    EN

    T

    5

    CO

    NS

    ULT

    IN

    G E

    NG

    IN

    EE

    RS

    SIL

    VE

    R L

    AK

    E W

    AT

    ER

    AN

    D S

    EW

    ER

    D

    IS

    TR

    IC

    T

  • SOUTHWEST ELEVATIONSOUTHEAST ELEVATION

    NORTHWEST ELEVATION NORTHEAST ELEVATION

    BU

    IL

    DIN

    G E

    XT

    ER

    IO

    R E

    LE

    VA

    TIO

    NS

    A-4

    WA

    LD

    EN

    WO

    OD

    L

    IF

    T S

    TA

    TIO

    N

    RE

    PL

    AC

    EM

    EN

    T

    5

    CO

    NS

    ULT

    IN

    G E

    NG

    IN

    EE

    RS

    SIL

    VE

    R L

    AK

    E W

    AT

    ER

    AN

    D S

    EW

    ER

    D

    IS

    TR

    IC

    T

  • EAVE SECTION RAKE SECTION

    GLASS BLOCK WINDOW

    HEAD AND JAMB DETAIL

    GLASS BLOCK WINDOW

    SILL DETAIL

    NORTHEAST WALL

    BATHROOM ELEVATION

    NORTHWEST WALL

    BATHROOM ELEVATION

    RIDGE DETAIL GUTTER DETAIL

    TYPICAL

    BUILDING SECTION

    AR

    CH

    IT

    EC

    TU

    RA

    L D

    ET

    AIL

    S

    A-5

    WA

    LD

    EN

    WO

    OD

    L

    IF

    T S

    TA

    TIO

    N

    RE

    PL

    AC

    EM

    EN

    T

    5

    CO

    NS

    ULT

    IN

    G E

    NG

    IN

    EE

    RS

    SIL

    VE

    R L

    AK

    E W

    AT

    ER

    AN

    D S

    EW

    ER

    D

    IS

    TR

    IC

    T

  • HVAC DESIGN CRITERIA HVAC SYMBOLS

    HVAC ABBREVIATIONS

    HVAC GENERAL NOTES

    HVAC EQUIPMENT & AIR

    DEVICE IDENTIFICATIONS

    HV

    AC

    N

    OT

    ES

    H-1

    WA

    LD

    EN

    WO

    OD

    L

    IF

    T S

    TA

    TIO

    N

    RE

    PL

    AC

    EM

    EN

    T

    4

    CO

    NS

    ULT

    IN

    G E

    NG

    IN

    EE

    RS

    SIL

    VE

    R L

    AK

    E W

    AT

    ER

    AN

    D S

    EW

    ER

    D

    IS

    TR

    IC

    T

  • LOUVER SCHEDULE

    BUILDING ROOM NAME

    LOUVER

    NO.

    TYPE

    MANUFACTURER

    & MODEL NO.

    ROUGH

    OPENING

    SIZE (WxH)

    MOUNTING

    HEIGHT

    REMARKS

    FAN SCHEDULE

    BUILDING ROOM NAME

    UNIT

    NO.

    TYPE

    MANUFACTURER

    & MODEL NO.

    HP,

    VOLTAGE,

    AND

    PHASE

    CONTROLS

    CFM AND

    STATIC

    PRESSURE

    REMARKS

    HEATER SCHEDULE

    BUILDING ROOM NAME

    UNIT

    NO.

    TYPE

    MANUFACTURER

    & MODEL NO.

    KW

    OUTPUT

    CONTROLS

    VOLTAGE

    AND

    PHASE

    MOUTING

    TYPE

    REMARKS

    GRILLE/DIFFUSER SCHEDULE

    BUILDING ROOM NAME

    DIFFUSER/

    GRILLE

    NO.

    TYPE

    MANUFACTURER

    & MODEL NO.

    SIZE

    (WxL)

    REMARKS

    CONTROL SCHEDULE

    BUILDING ROOM NAME

    UNIT

    NO.

    TYPE

    CONTROLLED

    EQUIPMENT

    MANUFACTURER

    & MODEL NO.

    HEAT

    SET

    POINT

    COOL

    SET

    POINT

    VOLTAGE

    AND

    PHASE

    REMARKS

    HEAT PUMP SCHEDULE

    BUILDING

    ROOM

    NAME

    UNIT NO. TYPE

    MANUFACTURER

    & MODEL NO.

    VOLTAGE,

    PHASE

    AND MCA

    CONTROLS

    STANDARD

    AIRFLOW

    HEATING

    CAPACITY

    COOLING

    CAPACITY

    AHRI

    LISTED

    EFFICIENCY

    REMARKS

    CONTROL DAMPER SCHEDULE

    BUILDING

    ROOM

    NAME

    DAMPER

    NO.

    FRAME

    TYPE

    MANUFACTURER

    & MODEL NO.

    VOLTAGE,

    AND

    PHASE

    NOMINAL

    SIZE

    (WxH)

    ACTUATOR

    MFR.

    ACTUATOR

    MOUNTING

    NO. OF

    ACTUATORS

    FAIL

    POSITION

    REMARKS

    AIR BARRIER AREA CALCULATIONS

    PLAN - FLOOR/CEILING AREA A1/A2

    SECTION - WALL AREA A3/A4 SECTION - WALL AREA A5/A6

    HV

    AC

    S

    CH

    ED

    UL

    ES

    H-2

    WA

    LD

    EN

    WO

    OD

    L

    IF

    T S

    TA

    TIO

    N

    RE

    PL

    AC

    EM

    EN

    T

    4

    CO

    NS

    ULT

    IN

    G E

    NG

    IN

    EE

    RS

    SIL

    VE

    R L

    AK

    E W

    AT

    ER

    AN

    D S

    EW

    ER

    D

    IS

    TR

    IC

    T

  • HVAC UPPER FLOOR PLAN

    UPPER FLOOR

    HVAC SECTION

    ROOFTOP

    FAN DETAILLOUVER DETAIL HEATER MOUNTING

    HV

    AC

    U

    PP

    ER

    F

    LO

    OR

    P

    LA

    N

    H-3

    WA

    LD

    EN

    WO

    OD

    L

    IF

    T S

    TA

    TIO

    N

    RE

    PL

    AC

    EM

    EN

    T

    4

    CO

    NS

    ULT

    IN

    G E

    NG

    IN

    EE

    RS

    SIL

    VE

    R L

    AK

    E W

    AT

    ER

    AN

    D S

    EW

    ER

    D

    IS

    TR

    IC

    T

  • HVAC DRY WELL PLAN

    LOWER FLOOR

    HVAC SECTION

    TYPICAL

    DIFFUSER DETAIL

    HV

    AC

    D

    RY

    W

    EL

    L P

    LA

    N

    H-4

    WA

    LD

    EN

    WO

    OD

    L

    IF

    T S

    TA

    TIO

    N

    RE

    PL

    AC

    EM

    EN

    T

    4

    CO

    NS

    ULT

    IN

    G E

    NG

    IN

    EE

    RS

    SIL

    VE

    R L

    AK

    E W

    AT

    ER

    AN

    D S

    EW

    ER

    D

    IS

    TR

    IC

    T

  • DRAINAGE PIPING LEGEND

    WATER PIPING NOTES

    DRAINAGE PIPING NOTES

    PLUMBING SYMBOLS & ABBREVIATIONS

    FLOOR DRAIN AND

    CLEANOUT DETAIL

    HOSE RACK DETAIL

    ELEVATION SECTION

    FREE STANDING

    BACKPLATE DETAIL

    EXTERIOR HOSE BIB DETAIL

    PL

    UM

    BIN

    G N

    OT

    ES

    A

    ND

    D

    ET

    AIL

    S

    P-1

    WA

    LD

    EN

    WO

    OD

    L

    IF

    T S

    TA

    TIO

    N

    RE

    PL

    AC

    EM

    EN

    T

    CO

    NS

    ULT

    IN

    G E

    NG

    IN

    EE

    RS

    SIL

    VE

    R L

    AK

    E W

    AT

    ER

    AN

    D S

    EW

    ER

    D

    IS

    TR

    IC

    T

    2

  • PLUMBING PLAN

    PLUMBING ELEVATION

    DOMESTIC WATER HEATER SCHEDULE

    BUILDING LOCATION ID. NO. TYPE

    MFR &

    MODEL

    NO.

    ELECTRICAL

    MOUNTING CAPACITY REMARKS

    KW VOLTS PHASE

    PL

    UM

    BIN

    G, D

    RA

    IN

    AG

    E, A

    ND

    V

    EN

    TIN

    G P

    LA

    N

    P-2

    WA

    LD

    EN

    WO

    OD

    L

    IF

    T S

    TA

    TIO

    N

    RE

    PL

    AC

    EM

    EN

    T

    CO

    NS

    ULT

    IN

    G E

    NG

    IN

    EE

    RS

    SIL

    VE

    R L

    AK

    E W

    AT

    ER

    AN

    D S

    EW

    ER

    D

    IS

    TR

    IC

    T

    2

  • GENERAL STRUCTURAL NOTES

    I

    WA

    LD

    EN

    WO

    OD

    L

    IF

    T S

    TA

    TIO

    N

    RE

    PL

    AC

    EM

    EN

    T

    11

    CO

    NS

    ULT

    IN

    G E

    NG

    IN

    EE

    RS

    SIL

    VE

    R L

    AK

    E W

    AT

    ER

    AN

    D S

    EW

    ER

    D

    IS

    TR

    IC

    T

    GE

    NE

    RA

    L S

    TR

    UC

    TU

    RA

    L N

    OT

    ES

    S-1

  • SUPPLEMENTAL STRUCTURAL ABBREVIATIONS: STRUCTURAL LEGEND

    SP

    EC

    IA

    L IN

    SP

    EC

    TIO

    N S

    CH

    ED

    UL

    E, S

    UP

    PL

    EM

    EN

    TA

    L

    AB

    BR

    EV

    IA

    TIO

    NS

    A

    ND

    L

    EG

    EN

    D

    S-2

    WA

    LD

    EN

    WO

    OD

    L

    IF

    T S

    TA

    TIO

    N

    RE

    PL

    AC

    EM

    EN

    T

    11

    CO

    NS

    ULT

    IN

    G E

    NG

    IN

    EE

    RS

    SIL

    VE

    R L

    AK

    E W

    AT

    ER

    AN

    D S

    EW

    ER

    D

    IS

    TR

    IC

    T

  • TYPE IITYPE I

    DOUBLE CURTAIN

    INTERSECTIONINTERSECTION

    SINGLE CURTAIN

    CORNER CORNER

    (OPTIONAL)

    CORNER

    TYP. LAP SCHEDULE TYP. CHAMFER DETAIL TYP PENETRATION REINFORCING DETAIL

    TYP REINFORCING @ WALL INTERSECTION DETAIL

    HOUSEKEEPING PAD EQUIPMENT PIER

    TYP HOUSEKEEPING PAD

    & EQUIPMENT PIER DETAILS

    SECTION A-A

    TYP STAIR, GUARD AND HANDRAIL DETAILS

    WA

    LD

    EN

    WO

    OD

    L

    IF

    T S

    TA

    TIO

    N

    RE

    PL

    AC

    EM

    EN

    T

    11

    CO

    NS

    ULT

    IN

    G E

    NG

    IN

    EE

    RS

    SIL

    VE

    R L

    AK

    E W

    AT

    ER

    AN

    D S

    EW

    ER

    D

    IS

    TR

    IC

    T

    TY

    PIC

    AL

    S

    TR

    UC

    TU

    RA

    L D

    ET

    AIL

    S

    S-3

    WATER STOP @ WALL WATER STOP @ SLAB

    TYP WATER STOP PLACEMENT

    TYP WATERSTOP INSTALLATION DETAIL

  • TYPICAL CMU WALL REINFORCEMENT PLACEMENT

    RECESSED LEDGER CONDITION

    LEDGER CONDITION

    PLATE FASTENER

    (ALTERNATE OPTION)

    CLIP FASTENER

    GRATING CONNECTION DETAIL

    TYP GENERATOR PAD DETAIL TYP EXTERIOR EQUIPMENT PAD DETAIL GUARD MOUNTING DETAIL

    TYPICAL 10" INSULATED

    CMU WALL DETAIL

    TY

    PIC

    AL

    S

    TR

    UC

    TU

    RA

    L D

    ET

    AIL

    S

    S-4

    WA

    LD

    EN

    WO

    OD

    L

    IF

    T S

    TA

    TIO

    N

    RE

    PL

    AC

    EM

    EN

    T

    11

    CO

    NS

    ULT

    IN

    G E

    NG

    IN

    EE

    RS

    SIL

    VE

    R L

    AK

    E W

    AT

    ER

    AN

    D S

    EW

    ER

    D

    IS

    TR

    IC

    T

  • LOWER FOUNDATION PLAN

    UPPER FOUNDATION AND

    BRIDGE CRANE FRAMING PLAN

    UP

    PE

    R &

    L

    OW

    ER

    F

    OU

    ND

    AT

    IO

    N P

    LA

    NS

    , A

    ND

    BR

    ID

    GE

    C

    RA

    NE

    F

    RA

    MIN

    G P

    LA

    N

    S-5

    WA

    LD

    EN

    WO

    OD

    L

    IF

    T S

    TA

    TIO

    N

    RE

    PL

    AC

    EM

    EN

    T

    11

    CO

    NS

    ULT

    IN

    G E

    NG

    IN

    EE

    RS

    SIL

    VE

    R L

    AK

    E W

    AT

    ER

    AN

    D S

    EW

    ER

    D

    IS

    TR

    IC

    T

  • MAIN FLOOR PLAN

    CMU WALL PLAN

    LINTEL SCHEDULE

    TYPICAL CMU LINTEL

    SCHEDULE AND DETAIL

    MA

    IN

    F

    LO

    OR

    &

    C

    MU

    W

    AL

    L P

    LA

    NS

    A

    ND

    LIN

    TE

    L S

    CH

    ED

    UL

    E

    S-6

    WA

    LD

    EN

    WO

    OD

    L

    IF

    T S

    TA

    TIO

    N

    RE

    PL

    AC

    EM

    EN

    T

    11

    CO

    NS

    ULT

    IN

    G E

    NG

    IN

    EE

    RS

    SIL

    VE

    R L

    AK

    E W

    AT

    ER

    AN

    D S

    EW

    ER

    D

    IS

    TR

    IC

    T

  • ROOF FRAMING PLAN

    RO

    OF

    P

    LA

    N

    S-7

    WA

    LD

    EN

    WO

    OD

    L

    IF

    T S

    TA

    TIO

    N

    RE

    PL

    AC

    EM

    EN

    T

    11

    CO

    NS

    ULT

    IN

    G E

    NG

    IN

    EE

    RS

    SIL

    VE

    R L

    AK

    E W

    AT

    ER

    AN

    D S

    EW

    ER

    D

    IS

    TR

    IC

    T

    TYP ROOF METAL DECK

    ATTACHMENT SCHEDULE

  • SECTIONSECTION

    SECTIONSECTION SECTION

    SECTION

    SECTION SECTION

    DE

    TA

    IL

    S

    S-8

    WA

    LD

    EN

    WO

    OD

    L

    IF

    T S

    TA

    TIO

    N

    RE

    PL

    AC

    EM

    EN

    T

    11

    CO

    NS

    ULT

    IN

    G E

    NG

    IN

    EE

    RS

    SIL

    VE

    R L

    AK

    E W

    AT

    ER

    AN

    D S

    EW

    ER

    D

    IS

    TR

    IC

    T

  • LEVEL 1 LEVEL 2

    SECTION

    ST

    AIR

    P

    LA

    NS

    S-9

    WA

    LD

    EN

    WO

    OD

    L

    IF

    T S

    TA

    TIO

    N

    RE

    PL

    AC

    EM

    EN

    T

    11

    CO

    NS

    ULT

    IN

    G E

    NG

    IN

    EE

    RS

    SIL

    VE

    R L

    AK

    E W

    AT

    ER

    AN

    D S

    EW

    ER

    D

    IS

    TR

    IC

    T

    SECTION SECTION

    STAIRWAY PLANS

  • SECTION

    UPPER LANDING

    LOWER LANDING

    DETAILSECTION SECTION

    PLAN VIEW

    SECTION SECTION

    PLAN DETAILSECTION

    SECTION

    SECTION

    ST

    AIR

    S

    EC

    TIO

    NS

    S-10

    WA

    LD

    EN

    WO

    OD

    L

    IF

    T S

    TA

    TIO

    N

    RE

    PL

    AC

    EM

    EN

    T

    11

    CO

    NS

    ULT

    IN

    G E

    NG

    IN

    EE

    RS

    SIL

    VE

    R L

    AK

    E W

    AT

    ER

    AN

    D S

    EW

    ER

    D

    IS

    TR

    IC

    T

  • SECTION

    SECTION

    SECTIONSECTION

    SECTION SECTION SECTION

    SECTION

    SECTION

    SECTION

    DE

    TA

    IL

    S

    S-11

    WA

    LD

    EN

    WO

    OD

    L

    IF

    T S

    TA

    TIO

    N

    RE

    PL

    AC

    EM

    EN

    T

    11

    CO

    NS

    ULT

    IN

    G E

    NG

    IN

    EE

    RS

    SIL

    VE

    R L

    AK

    E W

    AT

    ER

    AN

    D S

    EW

    ER

    D

    IS

    TR

    IC

    T

  • SILV

    ER L

    AK

    E W

    ATE

    R &

    SEW

    ERD

    ISTR

    ICT

    WA

    LDEN

    WO

    OD

    LIF

    T ST

    ATI

    ON

    REP

    LAC

    EMEN

    TC

    ON

    SU

    LT

    ING

    EN

    GIN

    EE

    RS

    5/10

    /201

    9

    33E0.0

    SYM

    BO

    L SC

    HED

    ULE

  • DEV

    ICE

    TAG

    LIS

    TS

    SILV

    ER L

    AK

    E W

    ATE

    R &

    SEW

    ERD

    ISTR

    ICT

    WA

    LDEN

    WO

    OD

    LIF

    T ST

    ATI

    ON

    REP

    LAC

    EMEN

    TC

    ON

    SU

    LT

    ING

    EN

    GIN

    EE

    RS

    5/10

    /201

    9

    33E0.1

  • E1.0

    ELEC

    TRIC

    AL

    SITE

    PLA

    N

    SILV

    ER L

    AK

    E W

    ATE

    R &

    SEW

    ERD

    ISTR

    ICT

    WA

    LDEN

    WO

    OD

    LIF

    T ST

    ATI

    ON

    REP

    LAC

    EMEN

    TC

    ON

    SU

    LT

    ING

    EN

    GIN

    EE

    RS

    5/10

    /201

    9

    33

  • E1.1

    LIFT

    STA

    TIO

    N E

    LEC

    TRIC

    AL

    LOW

    ER P

    LAN

    SILV

    ER L

    AK

    E W

    ATE

    R &

    SEW

    ERD

    ISTR

    ICT

    WA

    LDEN

    WO

    OD

    LIF

    T ST

    ATI

    ON

    REP

    LAC

    EMEN

    TC

    ON

    SU

    LT

    ING

    EN

    GIN

    EE

    RS

    5/10

    /201

    9

    33

  • E1.2

    LIFT

    STA

    TIO

    N E

    LEC

    TRIC

    AL

    UPP

    ER F

    LOO

    R P

    LAN

    SILV

    ER L

    AK

    E W

    ATE

    R &

    SEW

    ERD

    ISTR

    ICT

    WA

    LDEN

    WO

    OD

    LIF

    T ST

    ATI

    ON

    REP

    LAC

    EMEN

    TC

    ON

    SU

    LT

    ING

    EN

    GIN

    EE

    RS

    5/10

    /201

    9

    33

  • E1.3

    LIFT

    STA

    TIO

    N L

    IGH

    TIN

    G L

    OW

    ER L

    EVEL

    SILV

    ER L

    AK

    E W

    ATE

    R &

    SEW

    ERD

    ISTR

    ICT

    WA

    LDEN

    WO

    OD

    LIF

    T ST

    ATI

    ON

    REP

    LAC

    EMEN

    TC

    ON

    SU

    LT

    ING

    EN

    GIN

    EE

    RS

    5/10

    /201

    9

    33

  • E1.4

    LIFT

    STA

    TIO

    N L

    IGH

    TIN

    G U

    PPER

    FLO

    OR

    SILV

    ER L

    AK

    E W

    ATE

    R &

    SEW

    ERD

    ISTR

    ICT

    WA

    LDEN

    WO

    OD

    LIF

    T ST

    ATI

    ON

    REP

    LAC

    EMEN

    TC

    ON

    SU

    LT

    ING

    EN

    GIN

    EE

    RS

    5/10

    /201

    9

    33

  • E1.5

    LIFT

    STA

    TIO

    N H

    VAC

    PO

    WER

    LO

    WER

    PLA

    N

    SILV

    ER L

    AK

    E W

    ATE

    R &

    SEW

    ERD

    ISTR

    ICT

    WA

    LDEN

    WO

    OD

    LIF

    T ST

    ATI

    ON

    REP

    LAC

    EMEN

    TC

    ON

    SU

    LT

    ING

    EN

    GIN

    EE

    RS

    5/10

    /201

    9

    33

  • E1.6

    HVA

    C P

    OW

    ER U

    PPER

    FLO

    OR

    PLA

    N

    SILV

    ER L

    AK

    E W

    ATE

    R &

    SEW

    ERD

    ISTR

    ICT

    WA

    LDEN

    WO

    OD

    LIF

    T ST

    ATI

    ON

    REP

    LAC

    EMEN

    TC

    ON

    SU

    LT

    ING

    EN

    GIN

    EE

    RS

    5/10

    /201

    9

    33

  • E1.7

    SITE

    GR

    OU

    ND

    ING

    PLA

    N

    SILV

    ER L

    AK

    E W

    ATE

    R &

    SEW

    ERD

    ISTR

    ICT

    WA

    LDEN

    WO

    OD

    LIF

    T ST

    ATI

    ON

    REP

    LAC

    EMEN

    TC

    ON

    SU

    LT

    ING

    EN

    GIN

    EE

    RS

    5/10

    /201

    9

    33

  • E2.0

    EXTE

    RIO

    R E

    LEC

    TRIC

    AL

    WA

    LL E

    LEVA

    TIO

    N

    SILV

    ER L

    AK

    E W

    ATE

    R &

    SEW

    ERD

    ISTR

    ICT

    WA

    LDEN

    WO

    OD

    LIF

    T ST

    ATI

    ON

    REP

    LAC

    EMEN

    TC

    ON

    SU

    LT

    ING

    EN

    GIN

    EE

    RS

    5/10

    /201

    9

    33

  • E2.1

    UPP

    ER F

    LOO

    R E

    LEC

    TRIC

    AL

    WA

    LL E

    LEVA

    TIO

    NS

    SILV

    ER L

    AK

    E W

    ATE

    R &

    SEW

    ERD

    ISTR

    ICT

    WA

    LDEN

    WO

    OD

    LIF

    T ST

    ATI

    ON

    REP

    LAC

    EMEN

    TC

    ON

    SU

    LT

    ING

    EN

    GIN

    EE

    RS

    5/10

    /201

    9

    33

  • E3.0

    LIFT

    STA

    TIO

    N E

    LEC

    TRIC

    AL

    LOW

    ER S

    ECTI

    ON

    SILV

    ER L

    AK

    E W

    ATE

    R &

    SEW

    ERD

    ISTR

    ICT

    WA

    LDEN

    WO

    OD

    LIF

    T ST

    ATI

    ON

    REP

    LAC

    EMEN

    TC

    ON

    SU

    LT

    ING

    EN

    GIN

    EE

    RS

    5/10

    /201

    9

    33

  • SILV

    ER L

    AK

    E W

    ATE

    R &

    SEW

    ERD

    ISTR

    ICT

    WA

    LDEN

    WO

    OD

    LIF

    T ST

    ATI

    ON

    REP

    LAC

    EMEN

    TC

    ON

    SU

    LT

    ING

    EN

    GIN

    EE

    RS

    5/10

    /201

    9

    33

    SILV

    ER L

    AK

    E W

    ATE

    R &

    SEW

    ERD

    ISTR

    ICT

    WA

    LDEN

    WO

    OD

    LIF

    T ST

    ATI

    ON

    REP

    LAC

    EMEN

    TC

    ON

    SU

    LT

    ING

    EN

    GIN

    EE

    RS

    5/10

    /201

    9

    33E5.0

    DET

    AIL

    S

  • SILV

    ER L

    AK

    E W

    ATE

    R &

    SEW

    ERD

    ISTR

    ICT

    WA

    LDEN

    WO

    OD

    LIF

    T ST

    ATI

    ON

    REP

    LAC

    EMEN

    TC

    ON

    SU

    LT

    ING

    EN

    GIN

    EE

    RS

    5/10

    /201

    9

    33

    SILV

    ER L

    AK

    E W

    ATE

    R &

    SEW

    ERD

    ISTR

    ICT

    WA

    LDEN

    WO

    OD

    LIF

    T ST

    ATI

    ON

    REP

    LAC

    EMEN

    TC

    ON

    SU

    LT

    ING

    EN

    GIN

    EE

    RS

    5/10

    /201

    9

    33E5.1

    DET

    AIL

    S

  • SILV

    ER L

    AK

    E W

    ATE

    R &

    SEW

    ERD

    ISTR

    ICT

    WA

    LDEN

    WO

    OD

    LIF

    T ST

    ATI

    ON

    REP

    LAC

    EMEN

    TC

    ON

    SU

    LT

    ING

    EN

    GIN

    EE

    RS

    5/10

    /201

    9

    33E6.0

    ELEC

    TRIC

    AL

    ON

    ELIN

    E D

    IAG

    RA

    M

  • SILV

    ER L

    AK

    E W

    ATE

    R &

    SEW

    ERD

    ISTR

    ICT

    WA

    LDEN

    WO

    OD

    LIF

    T ST

    ATI

    ON

    REP

    LAC

    EMEN

    TC

    ON

    SU

    LT

    ING

    EN

    GIN

    EE

    RS

    5/10

    /201

    9

    33E6.1

    ETH

    ERN

    ET N

    ETW

    OR

    K D

    IAG

    RA

    M A

    ND

    INTE

    RM

    EDIA

    TE P

    AR

    TIA

    L EL

    ECTR

    ICA

    LO

    NEL

    INE

    DIA

    GR

    AM

  • E6.2

    PAN

    EL S

    CH

    EDU

    LES

    SILV

    ER L

    AK

    E W

    ATE

    R &

    SEW

    ERD

    ISTR

    ICT

    WA

    LDEN

    WO

    OD

    LIF

    T ST

    ATI

    ON

    REP

    LAC

    EMEN

    TC

    ON

    SU

    LT

    ING

    EN

    GIN

    EE

    RS

    5/10

    /201

    9

    33

  • E6.3

    CO

    ND

    UC

    TOR

    S A

    ND

    CO

    ND

    UIT

    SC

    HED

    ULE

    SILV

    ER L

    AK

    E W

    ATE

    R &

    SEW

    ERD

    ISTR

    ICT

    WA

    LDEN

    WO

    OD

    LIF

    T ST

    ATI

    ON

    REP

    LAC

    EMEN

    TC

    ON

    SU

    LT

    ING

    EN

    GIN

    EE

    RS

    5/10

    /201

    9

    33

  • E6.4

    LIG

    HTI

    NG

    CO

    NTR

    OL

    WIR

    ING

    DIA

    GR

    AM

    S A

    ND

    LIG

    HTI

    NG

    SC

    HED

    ULE

    SILV

    ER L

    AK

    E W

    ATE

    R &

    SEW

    ERD

    ISTR

    ICT

    WA

    LDEN

    WO

    OD

    LIF

    T ST

    ATI

    ON

    REP

    LAC

    EMEN

    TC

    ON

    SU

    LT

    ING

    EN

    GIN

    EE

    RS

    5/10

    /201

    9

    33

  • E6.5

    GEN

    ERA

    TOR

    CO

    NTR

    OL

    WIR

    ING

    DIA

    GR

    AM

    SILV

    ER L

    AK

    E W

    ATE

    R &

    SEW

    ERD

    ISTR

    ICT

    WA

    LDEN

    WO

    OD

    LIF

    T ST

    ATI

    ON

    REP

    LAC

    EMEN

    TC

    ON

    SU

    LT

    ING

    EN

    GIN

    EE

    RS

    5/10

    /201

    9

    33

  • E6.6

    MO

    TOR

    STA

    RTE

    R (V

    FD 0

    1) E

    LEM

    ENTA

    RY

    WIR

    ING

    DIA

    GR

    AM

    AN

    D E

    XTER

    IOR

    ELE

    VATI

    ON

    SILV

    ER L

    AK

    E W

    ATE

    R &

    SEW

    ERD

    ISTR

    ICT

    WA

    LDEN

    WO

    OD

    LIF

    T ST

    ATI

    ON

    REP

    LAC

    EMEN

    TC

    ON

    SU

    LT

    ING

    EN

    GIN

    EE

    RS

    5/10

    /201

    9

    33

  • E6.7

    MO

    TOR

    STA

    RTE

    R (V

    FD 0

    2) E

    LEM

    ENTA

    RY

    WIR

    ING

    DIA

    GR

    AM

    AN

    D E

    XTER

    IOR

    ELE

    VATI

    ON

    SILV

    ER L

    AK

    E W

    ATE

    R &

    SEW

    ERD

    ISTR

    ICT

    WA

    LDEN

    WO

    OD

    LIF

    T ST

    ATI

    ON

    REP

    LAC

    EMEN

    TC

    ON

    SU

    LT

    ING

    EN

    GIN

    EE

    RS

    5/10

    /201

    9

    33

  • E6.8

    MO

    TOR

    STA

    RTE

    R (V

    FD 0

    3) E

    LEM

    ENTA

    RY

    WIR

    ING

    DIA

    GR

    AM

    AN

    D E

    XTER

    IOR

    ELE

    VATI

    ON

    SILV

    ER L

    AK

    E W

    ATE

    R &

    SEW

    ERD

    ISTR

    ICT

    WA

    LDEN

    WO

    OD

    LIF

    T ST

    ATI

    ON

    REP

    LAC

    EMEN

    TC

    ON

    SU

    LT

    ING

    EN

    GIN

    EE

    RS

    5/10

    /201

    9

    33

  • SILV

    ER L

    AK

    E W

    ATE

    R &

    SEW

    ERD

    ISTR

    ICT

    WA

    LDEN

    WO

    OD

    LIF

    T ST

    ATI

    ON

    REP

    LAC

    EMEN

    TC

    ON

    SU

    LT

    ING

    EN

    GIN

    EE

    RS

    5/10

    /201

    9

    33E6.9

    PLC

    CO

    NTR

    OL

    PAN

    EL (C

    P 01

    ) IN

    TER

    IOR

    ELE

    VATI

    ON

    S

  • SILV

    ER L

    AK

    E W

    ATE

    R &

    SEW

    ERD

    ISTR

    ICT

    WA

    LDEN

    WO

    OD

    LIF

    T ST

    ATI

    ON

    REP

    LAC

    EMEN

    TC

    ON

    SU

    LT

    ING

    EN

    GIN

    EE

    RS

    5/10

    /201

    9

    33E6.10

    PLC

    CO

    NTR

    OL

    PAN

    EL (C

    P 01

    ) EXT

    ERIO

    R E

    LEVA

    TIO

    N

  • SILV

    ER L

    AK

    E W

    ATE

    R &

    SEW

    ERD

    ISTR

    ICT

    WA

    LDEN

    WO

    OD

    LIF

    T ST

    ATI

    ON

    REP

    LAC

    EMEN

    TC

    ON

    SU

    LT

    ING

    EN

    GIN

    EE

    RS

    5/10

    /201

    9

    33E6.11

    PLC

    CO

    NTR

    OL

    PAN

    EL (C

    P 01

    )EL

    EMEN

    TAR

    Y W

    IRIN

    G D

    IAG

    RA

    M

  • SILV

    ER L

    AK

    E W

    ATE

    R &

    SEW

    ERD

    ISTR

    ICT

    WA

    LDEN

    WO

    OD

    LIF

    T ST

    ATI

    ON

    REP

    LAC

    EMEN

    TC

    ON

    SU

    LT

    ING

    EN

    GIN

    EE

    RS

    5/10

    /201

    9

    33E6.12

    PLC

    CO

    NTR

    OL

    PAN

    EL (C

    P 01

    )EL

    EMEN

    TAR

    Y W

    IRIN

    G D

    IAG

    RA

    M

  • SILV

    ER L

    AK

    E W

    ATE

    R &

    SEW

    ERD

    ISTR

    ICT

    WA

    LDEN

    WO

    OD

    LIF

    T ST

    ATI

    ON

    REP

    LAC

    EMEN

    TC

    ON

    SU

    LT

    ING

    EN

    GIN

    EE

    RS

    5/10

    /201

    9

    33E6.13

    PLC

    CO

    NTR

    OL

    PAN

    EL (C

    P 01

    )EL

    EMEN

    TAR

    Y W

    IRIN

    G D

    IAG

    RA

    M

  • SILV

    ER L

    AK

    E W

    ATE

    R &

    SEW

    ERD

    ISTR

    ICT

    WA

    LDEN

    WO

    OD

    LIF

    T ST

    ATI

    ON

    REP

    LAC

    EMEN

    TC

    ON

    SU

    LT

    ING

    EN

    GIN

    EE

    RS

    5/10

    /201

    9

    33E6.14

    PLC

    CO

    NTR

    OL

    PAN

    EL (C

    P 01

    )EL

    EMEN

    TAR

    Y W

    IRIN

    G D

    IAG

    RA

    M

  • SILV

    ER L

    AK

    E W

    ATE

    R &

    SEW

    ERD

    ISTR

    ICT

    WA

    LDEN

    WO

    OD

    LIF

    T ST

    ATI

    ON

    REP

    LAC

    EMEN

    TC

    ON

    SU

    LT

    ING

    EN

    GIN

    EE

    RS

    5/10

    /201

    9

    33E6.15

    PLC

    CO

    NTR

    OL

    PAN

    EL (C

    P 01

    )EL

    EMEN

    TAR

    Y W

    IRIN

    G D

    IAG

    RA

    M

  • ED6.0

    DEM

    OLI

    TIO

    N O

    NEL

    INE

    DIA

    GR

    AM

    SILV

    ER L

    AK

    E W

    ATE

    R &

    SEW

    ERD

    ISTR

    ICT

    WA

    LDEN

    WO

    OD

    LIF

    T ST

    ATI

    ON

    REP

    LAC

    EMEN

    TC

    ON

    SU

    LT

    ING

    EN

    GIN

    EE

    RS

    5/10

    /201

    9

    33

  • ED6.1

    EXIS

    TIN

    G/D

    EMO

    LITI

    ON

    GEN

    ERA

    TOR

    CO

    NTR

    OL

    WIR

    ING

    DIA

    GR

    AM

    SILV

    ER L

    AK

    E W

    ATE

    R &

    SEW

    ERD

    ISTR

    ICT

    WA

    LDEN

    WO

    OD

    LIF

    T ST

    ATI

    ON

    REP

    LAC

    EMEN

    TC

    ON

    SU

    LT

    ING

    EN

    GIN

    EE

    RS

    5/10

    /201

    9

    33

    Sheets and ViewsCOVERG-1 INDEXG-2 LEGENDG-3 SURVEY DATAG-4 SWPPP NOTESG-5 TESC DETAILSG-6 GEN_DET2 - GD-1G-7 GEN_DET2 - GD-2G-8 GEN_DET2 - GD-3

    GEN_DET2-G-7.pdfSheets and ViewsG-7

    INDEX-Layout1.pdfSheets and ViewsLayout1

    Civil.pdfSheets and ViewsC-1 EX-SITEC-2 TEMP SHORING PLANC-3 P-SITEC-4 PIPING

    SHORING-SHORING.pdfSheets and ViewsSHORING

    Mechanical.pdfSheets and ViewsM-1 M_DETM-2 M_DETM-3 M_DETM-4 DEMOM-5 PL-SECM-6 PL-SECM-7 PL-SECM-8 PL-SECM-9 PL-SECM-10 FUEL PLANM-11 FUEL DETAIL

    PL-SEC-PL.pdfSheets and ViewsPL

    PL-SEC-PL (2).pdfSheets and ViewsPL (2)

    M_GNTR 5-13.pdfSheets and ViewsM-10 FUEL PLANM-11 FUEL DETAIL

    18510.01 A-Sheets.pdfSheets and ViewsA-1 A NOTESA-2 BLDG UPPER PLANA-3 BLDG LOWER PLANA-4 A BLDG ELEVATIONSA-5 A DETAILS

    18510.01 H-Sheets.pdfSheets and ViewsH-1 H NOTESH-2 H SCHEDULESH-3 H PLANH-4 H DRY WELL PLAN

    18510.01 P-Sheets.pdfSheets and ViewsP-1 P- NOTESP-2 P PLAN

    Structural.pdfSheets and ViewsS-1 GEN NOTESS-2 STRUC ABBREVS-3 DET 1S-4 DET 2S-5 FND PLNS-6 FLR PLNS-7 ROOF PLNS-8 DTLSS-9 STAIR PLNSS-10 STAIR SECTIONSS-11 DTLS

    Waldenwood Elec 2019 05 10 rev2.pdfE0.0-SYMBOL SCHEDULEE0.1-DEVICE TAG LISTSE1.0-ELECTRICAL SITE PLANE1.1-LIFT STATION ELECTRICAL LOWER FLOOR PLANE1.2-LIFT STATION ELECTRICAL UPPER FLOOR PLANE1.3-ELECTRICAL PLANE1.4-LIGHTING UPPER FLOORE1.5-ELECTRICAL PLANE1.6-HVAC POWER UPPER FLOORE1.7-GROUNDING SITE PLANE2.0-EXTERIOR WALL ELEVATIONE2.1-INTERIOR WALL ELEVATIONSE3.0-LIFT STATION ELECTRICAL LOWER SECTIONE5.0-DETAILSE5.1-DETAILSE6.0-ONE LINE DAIGRAME6.1-ONE LINE DAIGRAME6.2-PANEL SCHEDULESE6.3-CONDUCTOR AND CONDUIT SCHEDULESE6.4-LIGHTING CONTROL PANEL (19 LCP 01)E6.5-GENERATOR CONTROL WIRING DIAGRAME6.6-VFD 01 EWDE6.7-VFD 02 EWDE6.8-VFD 03 EWDE6.9-PLC ELEVATIONSE6.10-PLC ELEVATIONSE6.11E6.12E6.13E6.14E6.15ED6.0-Existing OnelineED6.1-DEMOLITION GENERATOR WIRING DIAGRAM

    General.pdfSheets and ViewsCOVERG-1 INDEXG-2 LEGENDG-3 SURVEY DATAG-4 SWPPP NOTESG-5 TESC DETAILSG-6 GEN_DET2 - GD-1G-7 GEN_DET2 - GD-2G-8 GEN_DET2 - GD-3

    GEN_DET2-G-7.pdfSheets and ViewsG-7

    INDEX-Layout1.pdfSheets and ViewsLayout1

    INDEX-Layout1.pdfSheets and ViewsLayout1

    206-284-08602019-05-13T11:29:51-07001130 Rainier Ave. S., Seattle, WAAaron M PeaseWAC 196-23-020