30
Silicon Valley Advanced Water Purification Center and Groundwater Replenishment with Purified Recycled Water SFPUC Annual Water Quality & Technology Workshop NOVEMBER 12, 2015

Silicon Valley Advanced Water Purification Center …sfwater.org/cfapps/wholesale/uploadedFiles/2015 Workshop...Silicon Valley Advanced Water Purification Center and Groundwater Replenishment

  • Upload
    others

  • View
    10

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Silicon Valley Advanced Water Purification Center …sfwater.org/cfapps/wholesale/uploadedFiles/2015 Workshop...Silicon Valley Advanced Water Purification Center and Groundwater Replenishment

Silicon Valley Advanced Water Purification Center and Groundwater Replenishment with

Purified Recycled Water

SFPUC Annual Water Quality & Technology Workshop NOVEMBER 12, 2015

Page 2: Silicon Valley Advanced Water Purification Center …sfwater.org/cfapps/wholesale/uploadedFiles/2015 Workshop...Silicon Valley Advanced Water Purification Center and Groundwater Replenishment

Silicon Valley Advanced Water Purification Center

2

Page 3: Silicon Valley Advanced Water Purification Center …sfwater.org/cfapps/wholesale/uploadedFiles/2015 Workshop...Silicon Valley Advanced Water Purification Center and Groundwater Replenishment

3

Presentation will cover:

Presentation will cover:

Santa Clara Valley Water District & Water Supply Picture

Monitoring, Lessons & Moving Forward

Silicon Valley Advanced Water Purification Center

Page 4: Silicon Valley Advanced Water Purification Center …sfwater.org/cfapps/wholesale/uploadedFiles/2015 Workshop...Silicon Valley Advanced Water Purification Center and Groundwater Replenishment

County’s Water Resources Manager

• Santa Clara Valley Water District: Providing Silicon Valley safe, clean water for a healthy life, environment and economy

4

Presenter
Presentation Notes
ANIMATED SLIDE – 3 clicks The district manages an integrated water resources system in order to provide safe, reliable drinking water – click, flood protection- click and stream stewardship for all of Santa Clara County.
Page 5: Silicon Valley Advanced Water Purification Center …sfwater.org/cfapps/wholesale/uploadedFiles/2015 Workshop...Silicon Valley Advanced Water Purification Center and Groundwater Replenishment

Headquarters in San Jose, California

5

Presenter
Presentation Notes
ANIMATED – 1 click The SCVWD was formed in 1929, which makes it 86 years old. Our headquarters building is located in San Jose, the largest city in northern ca< THE THIRD LARGEST IN ca, AND THE 10th largest city IN THE NATION.
Page 6: Silicon Valley Advanced Water Purification Center …sfwater.org/cfapps/wholesale/uploadedFiles/2015 Workshop...Silicon Valley Advanced Water Purification Center and Groundwater Replenishment

Santa Clara Valley Water District Serves:

6

2 million people

15 cities

4,700 well owners

13 water retailers

San Francisco Bay Area

Page 7: Silicon Valley Advanced Water Purification Center …sfwater.org/cfapps/wholesale/uploadedFiles/2015 Workshop...Silicon Valley Advanced Water Purification Center and Groundwater Replenishment

Diversified portfolio for a reliable supply

7

Imported water Local surface &

groundwater

Conservation Recycled Water

Presenter
Presentation Notes
Talking points We recognize that an adequate and reliable supply of clean water is crucial to our sustained development. That is the reason, we have a diversified water supply portfolio. Today there are four primary sources of water for Santa Clara County… Imported water from the Sierra Nevada, Local surface and groundwater, Water Conservation, and Non-potable recycled water
Page 8: Silicon Valley Advanced Water Purification Center …sfwater.org/cfapps/wholesale/uploadedFiles/2015 Workshop...Silicon Valley Advanced Water Purification Center and Groundwater Replenishment

| 8

Water Shortages –Almaden Reservoir, San Jose

Need locally-controlled, drought-proof supply

Presenter
Presentation Notes
ANMITED – Three clicks
Page 9: Silicon Valley Advanced Water Purification Center …sfwater.org/cfapps/wholesale/uploadedFiles/2015 Workshop...Silicon Valley Advanced Water Purification Center and Groundwater Replenishment

Silicon Valley Advanced Water Purification Center

9

SJ/SC Regional Wastewater Treatment Facility

SBWR Transmission Pump Station

SILICON VALLEY ADVANCED WATER

PURIFICATION CENTER

9

Presenter
Presentation Notes
ANIMATED – 3 clicks So we build a facility in Santa Clara County Across from the SJ/SC RWF and SBWR The SVAWPC is enclosed in the red lines
Page 10: Silicon Valley Advanced Water Purification Center …sfwater.org/cfapps/wholesale/uploadedFiles/2015 Workshop...Silicon Valley Advanced Water Purification Center and Groundwater Replenishment

| 10

Santa Clara Valley Water District constructed & owns a new recycled water purification facility – completed in early 2014

• 8 million gallons per

day of purified water

• Built in partnership –

Santa Clara Valley

Water District & the

City of San Jose

• Serves Silicon Valley

Presenter
Presentation Notes
This new facility is a vital part of the SCVWD’s plan to continue to ensure a clean, reliable water supply for Santa Clara County We built a duality in this facility in that it can produce 8 mgd of ultra purified water or serve 10 mgd of tertiary recycled water Built as a regional facility with a thought towards future expansion
Page 11: Silicon Valley Advanced Water Purification Center …sfwater.org/cfapps/wholesale/uploadedFiles/2015 Workshop...Silicon Valley Advanced Water Purification Center and Groundwater Replenishment

Silicon Valley Advanced Water Purification Center

0.1 micron

Incoming TDS = 900 ppm 11

MICROFILTRATION

Presenter
Presentation Notes
ANIMATED – 1 click The $72 million project in San Jose was completed in early 2014. It had a soft opening in March, with service to customer.. Describe technology
Page 12: Silicon Valley Advanced Water Purification Center …sfwater.org/cfapps/wholesale/uploadedFiles/2015 Workshop...Silicon Valley Advanced Water Purification Center and Groundwater Replenishment

Silicon Valley Advanced Water Purification Center 0.0001 micron

Outgoing TDS= 3-5 ppm 12

REVERSE OSMOSIS

Page 13: Silicon Valley Advanced Water Purification Center …sfwater.org/cfapps/wholesale/uploadedFiles/2015 Workshop...Silicon Valley Advanced Water Purification Center and Groundwater Replenishment

Filtration: Pore Size Matters (nanometer)

13

Page 14: Silicon Valley Advanced Water Purification Center …sfwater.org/cfapps/wholesale/uploadedFiles/2015 Workshop...Silicon Valley Advanced Water Purification Center and Groundwater Replenishment

Silicon Valley Advanced Water Purification Center

Ultraviolet light disinfection 14

Presenter
Presentation Notes
ANIMATED – 1 click Describe Technology
Page 15: Silicon Valley Advanced Water Purification Center …sfwater.org/cfapps/wholesale/uploadedFiles/2015 Workshop...Silicon Valley Advanced Water Purification Center and Groundwater Replenishment

Pilot Scale Testing – UV AOP for Potable Reuse

15

Tested for…

– NDMA Destruction

– 1,4-dioxane Destruction

– Trace Pollutant Destruction

– AOP Oxidant Optimization

– Surrogate Analysis

15

Page 16: Silicon Valley Advanced Water Purification Center …sfwater.org/cfapps/wholesale/uploadedFiles/2015 Workshop...Silicon Valley Advanced Water Purification Center and Groundwater Replenishment

| 16

Independent Advisory Panel Assures Quality

Nationally recognized experts review the District’s approach to potable reuse testing efforts at the purification center – assess,

review, and guide District’s potable reuse efforts

April 30, 2013 May 29, 2014

16

Presenter
Presentation Notes
Talking points In April the Independent Advisory Panel evaluating the District’s potable reuse opportunities and potential held its first meeting. The panel is appointed by the National Water Research Institute, will provide assessment on various issues related to potable reuse such as public health and safety, advanced water treatment design issues, permitting and regulatory requirements, and public outreach and advocacy. It will assess, review, comment and guide the district’s potable reuse efforts. The IAP will be instrumental in providing a third party review of the District’s approach to potable reuse and will be important for gaining public support for future potable reuse projects. Successful IPR projects in Southern California have utilized IAP as a component of these planning efforts.  
Page 17: Silicon Valley Advanced Water Purification Center …sfwater.org/cfapps/wholesale/uploadedFiles/2015 Workshop...Silicon Valley Advanced Water Purification Center and Groundwater Replenishment

Phase I: evaluate on-going operational data at SVAWPC – MF: filtrate turbidity, cleaning intervals, integrity

tests – RO: permeate EC, specific flux, – UV: UVT, UV dose, sensor intensity

Phase II: detailed challenge & pilot testing – Virus removal – CECs removal – surrogates

Phase III: quarterly testing over 1 year – Confirm Phase II results over long-term

Overview: Three Phases of Testing

FOCUS

17 17

Presenter
Presentation Notes
I changed the highlighting of the “Focus” text
Page 18: Silicon Valley Advanced Water Purification Center …sfwater.org/cfapps/wholesale/uploadedFiles/2015 Workshop...Silicon Valley Advanced Water Purification Center and Groundwater Replenishment

18

SCVWD Operators

Large internal candidate pool

Career path mobility & cross-over training opportunities available

SVAWPC operators are T operators

Presenter
Presentation Notes
With three very large drinking water treatment plants, District had Drinking water T license - focus SCVWD has 32 drinking water T-license holders plus 3 with T-5 T licenses as district staff at the drinking WTPs. Over 50 years experience with T-license holders. SCVWD operators have growth opportunities at the District, the SCVWD pays fairly, and over (get data from HR) 90% of the operators stay for the long-haul – starting as entry-level, moving up and staying for 15-20 years. Opened the SVAWPC job postings to W & T, internal and external We started at the SVAWPC allowing for both T and WW operators to quality. We ended up with mostly T operators to begin with and quickly evolved to all T licensed operators and supervisor, while allowing for both. That’s our experience. Knowing that the State of California has more T operators than WW operators, we suspect the treand to continue. Going forward, the District may only advertise for T operators because of the ease of cross-training, career ladder etc. Currently all the operators at the SVAWPC are T operators, although initially there was one W operator for a short period of time. Career path mobility available at the district between the SVAWPC and the drinking WTPs – assistants, journey WTPOs, seniors, supervisors One Supervisor, one SWTO (in hire), WTO, Assistant WTO, career ladder – 7 days a week, all year 10 hour days.
Page 19: Silicon Valley Advanced Water Purification Center …sfwater.org/cfapps/wholesale/uploadedFiles/2015 Workshop...Silicon Valley Advanced Water Purification Center and Groundwater Replenishment

Initial equipment vendor training

On-the-Job Training

Using ISO & QMES SOPs – ISO 9001 & 14001 certified

Consultant developed training videos

Current Training Program

Presenter
Presentation Notes
3 minutes – not animated - Read off list of Ops Training Sign-off sheet, SOPs, etc, It was successful to bring in the operators on the job before the plant became operation. Since that time, we have found our internal training program to be good and we have demonstrated that we can train T2 and T3 license holders to become proficient with the plants operations in about 4 months, less than a year. We have found a strong internal training program to be an essential part of our operator development program. We have a strong On-the-Job training program for our conventional WTPs and now we have developed an equally strong membrane plant OJT program.
Page 20: Silicon Valley Advanced Water Purification Center …sfwater.org/cfapps/wholesale/uploadedFiles/2015 Workshop...Silicon Valley Advanced Water Purification Center and Groundwater Replenishment

| 20

Public tours at the new facility – increases public confidence and acceptance for future potable reuse

Public tours at the new facility – increases public confidence and acceptance for future potable reuse

Presenter
Presentation Notes
ANIMATED – one -click
Page 21: Silicon Valley Advanced Water Purification Center …sfwater.org/cfapps/wholesale/uploadedFiles/2015 Workshop...Silicon Valley Advanced Water Purification Center and Groundwater Replenishment

| 21

Potable Reuse

Indirect Potable

Direct Potable

Percolation Ponds

Injection Wells

Before Conventional Drinking WTP

Presenter
Presentation Notes
Explain that we are looking at both IPR and DPR – not really looking at reservoir augmentation Nonpotable Reuse Potable Reuse Differences between Indirect and Direct Potable Reuse
Page 22: Silicon Valley Advanced Water Purification Center …sfwater.org/cfapps/wholesale/uploadedFiles/2015 Workshop...Silicon Valley Advanced Water Purification Center and Groundwater Replenishment

| 22

Drivers for potable reuse

• Non-potable recycled water

(purple pipe) expansion insufficient to meet future needs

• Additional water conservation efforts insufficient to meet future needs – need the “wet stuff”

• Potable reuse identified as most reliable and cost-effective option, per the District’s Water Supply & Infrastructure Master Plan

Presenter
Presentation Notes
ANIMATED – 2 clicks Here are some drivers for my agency in its consideration for potable reuse. The District’s board has a goal of about 40,000 acre-ffet by year 2025 (10% of our county’s swater needs), and purple piepe non-potable expansion will not be sufficient. The low-hanging fruit on purple pipe has been plucked, and to get We, like other agencies in the state are maximizing our water conservation efforts We need local supplies, in-county supplies, drought-prrof supplies, and potable reuse fits this bill.
Page 23: Silicon Valley Advanced Water Purification Center …sfwater.org/cfapps/wholesale/uploadedFiles/2015 Workshop...Silicon Valley Advanced Water Purification Center and Groundwater Replenishment

| 23

Potable reuse – Multiple locations available

Presenter
Presentation Notes
15 seconds- animated District’s efforts with CSJ on Strategic Planning identified a number of potable reuse projects: Expansion of SVAWPC – centralized location – maybe up to 20-32 mgd – about $260M Los Gatos Pond system – recharge – 20,000 acre-feet per year of recharge Ford Road Pond Recharge – 4,200 AFY recharge - $70M Mid Basin Opportunity for well injection – approx. 5000 AFY recharge- $140M Opportunity for Central Pipeline and DPR
Page 24: Silicon Valley Advanced Water Purification Center …sfwater.org/cfapps/wholesale/uploadedFiles/2015 Workshop...Silicon Valley Advanced Water Purification Center and Groundwater Replenishment

| 24

Potable reuse – Mid Basin Injection

Presenter
Presentation Notes
Talk about the : District’s efforts with CSJ on Strategic Planning identified a number of potable reuse projects: Expansion of SVAWPC – centralized location – maybe up to 20-32 mgd – about $260M Los Gatos Pond system – recharge – 20,000 acre-feet per year of recharge Ford Road Pond Recharge – 4,200 AFY recharge - $70M Mid Basin Opportunity for well injection – approx. 5000 AFY recharge- $140M Opportunity for Central Pipeline and DPR
Page 25: Silicon Valley Advanced Water Purification Center …sfwater.org/cfapps/wholesale/uploadedFiles/2015 Workshop...Silicon Valley Advanced Water Purification Center and Groundwater Replenishment

| 25

Future – Direct Potable Reuse Possibility ?

WTP WTP

WTP

Presenter
Presentation Notes
Talk about the : Opportunity for DPR Show the Centralized AWT Expansion Project Point out the District’s three treatment plants RWTP – 80 MGD (100MGD) – 1960s STWTP (100 MGD) – 1980s PWTP (40 MGD) – 1970s Central Pipeline and DPR
Page 26: Silicon Valley Advanced Water Purification Center …sfwater.org/cfapps/wholesale/uploadedFiles/2015 Workshop...Silicon Valley Advanced Water Purification Center and Groundwater Replenishment

| 26

Operational Studies Groundwater models

RO Concentrate Public-Private Partnerships

Grants & Outreach

Expedited Design & CEQA Construction Plans

& Specs Construction

2016-2017

2018-2020

2015-2016

Preliminary Schedule

POTABLE REUSE

Page 27: Silicon Valley Advanced Water Purification Center …sfwater.org/cfapps/wholesale/uploadedFiles/2015 Workshop...Silicon Valley Advanced Water Purification Center and Groundwater Replenishment

| 27

SVAWPC Open House October 2015

Tasting is trust

Page 28: Silicon Valley Advanced Water Purification Center …sfwater.org/cfapps/wholesale/uploadedFiles/2015 Workshop...Silicon Valley Advanced Water Purification Center and Groundwater Replenishment

Labor Intense

NWRI – Independent Advisory Panel Meeting – May 29, 2014

28

There is no “I” in TEAM !

Presenter
Presentation Notes
ANIMATED – 11 clicks
Page 29: Silicon Valley Advanced Water Purification Center …sfwater.org/cfapps/wholesale/uploadedFiles/2015 Workshop...Silicon Valley Advanced Water Purification Center and Groundwater Replenishment

NWRI – Independent Advisory Panel Meeting – May 29, 2014

Going forward

The highest quality water tomorrow

from the best available technology today

with the best qualified operators

29

Page 30: Silicon Valley Advanced Water Purification Center …sfwater.org/cfapps/wholesale/uploadedFiles/2015 Workshop...Silicon Valley Advanced Water Purification Center and Groundwater Replenishment

Questions?

30

www.purewater4u.org