Upload
lorant
View
29
Download
0
Embed Size (px)
DESCRIPTION
Silent Inspector ICHDMG Report. Review – Technical and Business Operation Update on Implementation status Current Issues. SI Review - FAQ. What does it do? How does it work? Who does what? What do you get?. What Does it Do?. - PowerPoint PPT Presentation
Citation preview
Silent Inspector
Silent InspectorICHDMG Report
Review – Technical and Business Operation
Update on Implementation status
Current Issues
Silent Inspector
SI Review - FAQ
What does it do? How does it work? Who does what? What do you get?
Silent Inspector
What Does it Do?
Reports dredge measured parameters that describe hopper dredge operations
Analyzes the data to guess what the dredge is doing – dredging, turning, sailing, dumping.
Stores, finds, reports, & plots data
Hopper SI Measurements
Hopper Level
PositionSpeedHeadingTide
DraftDrag Depth
PumpsProduction Meters
HopperOpen Status
Silent Inspector
Implementation Principles
Partnership with Dredging Industry
Report the Contractor’s Data Performance based specification Rigorous Data Quality Assurance
Dredges? Hopper? Scows? Pipeline? Mechanical
Contractor
Specifications
District? Operations? Environmental? RE & QARs
NationalSilent Inspector
Database
Email Receive
Email Send
Internet Email / Flash disk
Load/Daily Reports
Data Explorer – eGIS
GlobalStar
SILENT INSPECTOR
Silent Inspector
How does it work? On the dredge …
Silent Inspector
Who Does What?
Corps provide a standard performance specification
Dredge owner designs system, operates, and provides all instrumentation and computers
Corps provides SI software for the ARCO computer
Silent Inspector
Silent Inspector Business Plan
National Always-On automated dredge monitoring
National Operations Support team Evolve with 2012 Team of Teams Operations Improvements
Include smaller contracts & districts Transition support from R&D Decision Support eGIS integration
Silent Inspector
What Do You Get?
Automatic State Determination
Dredging, Turning, Sailing, Dumping, etc.
Production Position
Silent Inspector
Reports – Details
Reports - Summary
Silent Inspector
Reports - Spatial
GIS Track Plot Review
Silent Inspector
Using the Map Interface
Zoom To All Plotted Points
Track Plot Review
Silent Inspector
Features of the National Plan
Expanded Project Monitoring Include Regulatory Expanded Dredge types Simplify Dredge SI Certification Centralized Support under
Operations Regional & National Stakeholders
Silent Inspector
Expanded Plant
All Hoppers Include all Government Hoppers
All Scows Minimum of Tracking Profile Monitoring or TDS Profile specified by
ODMP Pipelines > 30”, + Goetz & Oregon Mechanical dredges TBD
Silent Inspector
Schedule
FY 2006 2007 2008 2009
Hopper Always-on Always-on
Always-on
Always-on
Scow Always-on Always-on
Always-on
Always-on
Pipeline Goetz, Oregon
4 – > 30in
All > 30” All > 18”
Mechanical
TBD TBD TBD TBD
Silent Inspector
SI Center - Services
Data QC and Operational Monitoring
Dredge Certifications Dredge Operator Support Corps User Support Training Database Maintenance Specifications Maintenance
Silent Inspector
Stakeholder Issues
T&E – Turtles & Sturgeon Overdepth Open Water Disposal Monitoring Emergency Response Rentals Regionalization eGIS, eCoastal, RSM integration Decision Support
Silent Inspector
National Team R&D
Demo the Pipeline SI – 4 dredges FY07
Field Review of Mechanical SI spec
Turtle Observer Form Entry Bin Measurement issue Provide hooks to GIS and other
systems
Silent Inspector
Implementation Issues
Funding Mechanism Scope of Scow requirement; barges
for upland disposal Does always-on mean include the
yard? – No Certification and Recertification Issues Mass vs. Volume production measure.
TDS, Bin Measure
Silent Inspector
Implementation Issues - 2
Regulatory implementation Enforcement standardization Contractor data upload Data Access
Silent Inspector
http://si.usace.army.mil/
Gary Howell – 251-441-5732 James (Jay) Rosati – 251-441-
5535 Tim Welp – 601-634-2083 Rhonda Lenoir – 251-690-3011