3
Sika at Work No. 20.09 – July 2009 Infrastructure Project Corrosion- and Fire Protection Renovation of Fire Protection System in Vienna’s Rail Network Station “Wien Mitte” Austria

Sika at Work · Sika at Work No. 20.09 ... Sikacrete®-213F and the concrete behind has to be repaired. That fire ... railway passengers per day,

  • Upload
    hakiet

  • View
    218

  • Download
    4

Embed Size (px)

Citation preview

Page 1: Sika at Work · Sika at Work No. 20.09 ... Sikacrete®-213F and the concrete behind has to be repaired. That fire ... railway passengers per day,

Sika

at W

ork

No. 20.09 – July 2009 Infrastructure Project

Corrosion- and Fire ProtectionRenovation of Fire Protection System in Vienna’s Rail Network Station “Wien Mitte”Austria

Page 2: Sika at Work · Sika at Work No. 20.09 ... Sikacrete®-213F and the concrete behind has to be repaired. That fire ... railway passengers per day,

Temperatur Curve

0100200300400500600700800900

10001100120013001400

0 5 10 15 20 25 30 35 40 45 50 55 60

Time [min

Tem

pera

tur

[°C]

Requirements Metro Wien

RWS Sikacrete® -213F

Project requirementsThe old asbestos fire protection mortar should be replaced with Sikacrete®-213F and the concrete behind has to be repaired. That fire protection layer must protect the concrete in case of a burning railway-car. During the renovation the passengers have to be protected against (asbestos) dust. The refurbishments don’t have to obstruct the traffic.

Project SolutionsDue to low-pressure chambers the refurbishment could be done without pollution in the passenger-areas. After sandblasting the damaged concrete reinforcement was protected by SikaMonoTop®-610 and the defective concrete was repaired with SikaTop®-122 SP.A layer thickness of 25 mm Sikacrete®-213F was enough to fulfil the required standard. The 2200 m2 were applied by an application crew of 3-5 workers plus 1 man at the pump outside of the depression camber.

Applicator: Komat Koller Korrosionschutz GmbH, AustriaMachine: PFT Förderpumpe (worm pump) with external mixer

IntroductionThe railway station Wien Mitte is very centrally located between the center of Vienna (Innenstadt) and the precinct Landstrasse. With 30’000 railway passengers per day, Wien Mitte is the highest frequented rail-way station in Vienna. At this junction several railway lines and two underground lines (U3 and U4) intersect. The project envisions reconstruction of the entire railway station, with the reconstruction’s investment worth of EUR 400 million. The station building itself will be expanded into a shopping center and office complex. Groundbreaking occurred in July 2007 and completion of the railway station is projected for mid-2010.

Below ground the train platforms will be renovated and lengthened and escalators for both directions will be installed as well as an elevator from the main entrance directly to the platforms. For this purpose and to improve safety, the reinforced concrete construction must be refurbished.

Renovation of Fire Protection System in Vienna’s Rail Network Station “Wien Mitte”Austria

Temperatur curve (red) of burning a railway car in a tunnel. Burning load (blue) in the test procedure of Sikacrete®-213F.

Overhead spraying work underneath the train platform zone

Repair work with SikaMonoTop®-610 and SikaTop®-122 SP

Filling of removable profiles

Filling of screw pump with Sikacrete®-213F

Reconstructed surface

Sika ProductsReinforcement Protection SikaMonoTop®-610Refurbishment Mortar SikaTop®-122 SPFire Protection Mortar Sikacrete®-213F

by Markus Jahn, Sika Services AG, Switzerland

Page 3: Sika at Work · Sika at Work No. 20.09 ... Sikacrete®-213F and the concrete behind has to be repaired. That fire ... railway passengers per day,

Our most current General Sales Conditions shall apply. Please consult the Product Data Sheet prior to any use and processing.

Sika Services AGCorporate Business Unit ConcreteTüffenwies 16CH-8048 ZürichSwitzerlandPhone +41 58 436 40 40Fax +41 58 436 47 29www.sika.com ©

Sik

a Se

rvic

es A

G / B

U Co

ncre

te /

20.0

9 –

July

200

9 / C

MS

gho