TABLE OF CONTENTS PAGE I. NEED AND PURPOSE........................................................................................... 1 A. Introduction ....................................................................................................... 1 B. Planning Basis for the Action............................................................................. 4
C. Deficiencies in the System ................................................................................ 7 D. Logical Termini .................................................................................................. 10
II. DESCRIPTION OF ALTERNATIVES ..................................................................... 12 A. Introduction ....................................................................................................... 12 B. Build Alternative ................................................................................................ 12 C. Other Alternatives Considered .......................................................................... 17 III. ENVIRONMENTAL CONSEQUENCES ................................................................. 19 A. Introduction ....................................................................................................... 19 B. Effects on the Social Environment..................................................................... 20 1. Land Use.................................................................................................... 20 2. Community Cohesion................................................................................. 24 3. Relocations ................................................................................................ 25 4. Churches and Institutions........................................................................... 27 5. Environmental Justice ................................................................................ 27 6. Economic ................................................................................................... 30
iii
TABLE OF CONTENTS (Continued)
PAGE C. Effects on the Cultural Environment .................................................................. 31 1. Cultural Resources..................................................................................... 31
a. Historic Resources.............................................................................. 33 b. Effects to Historic Resources .............................................................. 43
c. Archeological Resources .................................................................... 65 d. Section 106 Coordination.................................................................... 66 2. Parklands/Recreation Areas/Wildlife Refuges............................................ 67 3. Section 4(f) Applicability ............................................................................. 76 D. Effects on the Natural Environment................................................................... 76 1. Water Quality ............................................................................................. 76 2. Waters of the U.S....................................................................................... 77
a. Wetlands ............................................................................................. 77 b. Open Waters....................................................................................... 80
c. Streams............................................................................................... 80 d. Measures to Avoid and Minimize Impacts........................................... 81 3. Floodplains................................................................................................. 83 4. Farmland.................................................................................................... 85 5. Threatened and Endangered Species........................................................ 85 a. Species and Effects ............................................................................ 85 b. Section 7 Coordination........................................................................ 89 6. Neotropical/Migratory Bird Habitat ............................................................. 89 7. Invasive Species ........................................................................................ 90 E. Effects on the Physical Environment ................................................................. 90 1. Noise.......................................................................................................... 90 2. Air.. ............................................................................................................ 91
iv
TABLE OF CONTENTS (Continued)
PAGE 3. Energy/Mineral Resources ......................................................................... 92 4. Construction/Utilities .................................................................................. 92
5. UST/Hazardous Waste Sites...................................................................... 93 F. Permits/Variances ............................................................................................. 93
1. U.S. Coast Guard Permit ........................................................................... 93 2. Forest Service/Corps Land......................................................................... 93 3. Permits... .................................................................................................... 93 4. Tennessee Valley Authority........................................................................ 94 5. Stream Buffer Variance.............................................................................. 94 6. Coastal Zone Management Coordination................................................... 94 IV. DRAFT SECTION 4(f) EVALUATION.................................................................... 95 V. COORDINATION AND COMMENTS .................................................................... 115 Appended Response Letter............................................................................... 120 APPENDICES Appendix A – Correspondence Appendix B – Noise Impact Assessment Appendix C – Air Quality Impact Assessment Appendix D – Conceptual Stage Study Appendix E – Concept Report Appendix F – Public Information Open House and Public Involvement Materials
v
LIST OF FIGURES
PAGE Figure 1 – Project Location Map .................................................................................. 2 Figure 2 – Green Space Concept Location Map .......................................................... 3 Figure 3 – Locations of Sandy Springs Parks and Recreation Areas........................... 6 Figure 4A – Johnson Ferry Road and Bridge Typical Section...................................... 15 Figure 4B – Johnson Ferry Road and Abernathy Road Typical Section ...................... 16 Figure 5A – Current Zoning for Abernathy Road.......................................................... 21 Figure 5B – Future Land Use Plan Map for Abernathy Road....................................... 22 Figure 5C – 2015 Land Use Plan for Sandy Springs ................................................... 23 Figure 6 – Right-of-Way and Easement for the Sandy Springs Christian Church ........ 28 Figure 7 – Historic Resources Location Map ............................................................... 32 Figure 7A – Abernathy Arts Center Boundary.............................................................. 35 Figure 7B – Sears House Boundary ............................................................................ 36 Figure 7C – Roy-Fuller House Boundary ..................................................................... 38 Figure 7D – Long Acres Subdivision Historic District Boundary................................... 41 Figure 7E – Woodward House Boundary..................................................................... 42 Figure 7F – Eden House Boundary.............................................................................. 44 Figure 8A – Right-of-Way and Easement for the Abernathy Arts Center ..................... 46 Figure 8B – Construction Limits for the Sears House .................................................. 48 Figure 8C – Right-of-Way and Easement for the Roy-Fuller House ............................ 52 Figure 8D – Close-up View of the Right-of-Way and Easement from the Roy-Fuller House........................................................................................................................... 53 Figure 8E – Right-of-Way and Easement for the Long Acres Subdivision Historic District ..................................................................................................................................... 56 Figure 8F – Right-of-Way and Easement for the Long Acres Subdivision Historic District..................................................................................................................................... 57 Figure 8G – Right-of-Way and Easement for the Woodward House............................ 60 Figure 8H – Right-of-Way and Easement for the Eden House..................................... 63 Figure 9 – Chattahoochee River National Recreation Area Location Map................... 68 Figure 9A –Johnson Ferry Road North Location Map.................................................. 70 Figure 9B –Johnson Ferry Road South Location Map ................................................. 71 Figure 10A – Right-of-Way and Easement Required from Parcel 4 of the CRNRA ..... 72
vi
LIST OF FIGURES
PAGE Figure 10B – Right-of-Way and Easement Required from Parcel 5 & 5A of the CRNRA ..................................................................................................................................... 73 Figure 10C – Close-up View of ROW and Easement from Parcels 5 & 5A.................. 74 Figure 11A – Stream Location Map ............................................................................. 78 Figure 11B – Stream Location Map ............................................................................. 79 Figure 12 – Floodplain Location Map........................................................................... 84 Figure 13 – 4(f) Avoidance Alternatives Location Map................................................. 96
Figure 14 – 2A and 2B Avoidance Alternatives............................................................ 101
vii
LIST OF TABLES
PAGE Table 1 – Average Daily Traffic and Level-of-Service Estimates ........................................8 Table 2 – Accident, Injury, and Fatality Rates: Project Corridor Compared to Statewide...10 Table 3 – Minority and Low Income Populations for Geographic Comparison Areas.........29 Table 4 – Summary of Effects to Historic Resources..........................................................65 Table 5 – Federal List of Threatened and Endangered Species for Fulton and Cobb Counties ..............................................................................................................86
1
I. NEED AND PURPOSE A. Introduction STP-9252(6) is the proposed widening and improvements of approximately 1.24
miles of Johnson Ferry Road in Cobb and Fulton Counties from Columns Drive to
Abernathy Road including the widening of the bridge spanning the Chattahoochee River
(see Figure 1, Project Location Map and Other Programmed Projects in the Area). The
proposed improvements to Johnson Ferry Road would widen the existing four-lane
roadway from Columns Drive to Riverside Drive to six lanes including a 16-foot raised
grassed median, 4-foot bike lanes, 16-foot urban shoulders, and 8-foot sidewalks.
Johnson Ferry Road would then maintain four 11-foot travel lanes from Riverside Drive to
Abernathy Road and introduce a 16-foot raised grassed median, 4-foot bike lanes, 16-
foot urban shoulders, and 8-foot sidewalks. The four lane section is being maintained
along this section of Johnson Ferry Road to avoid unnecessary displacements and
reduce impacts to subdivisions and individual properties in this area.
STP-9150(1) is the proposed widening and improvements of approximately 0.93
mile along Abernathy Road in Fulton County from Johnson Ferry Road to Roswell Road
(see Figure 1, Project Location Map and Other Programmed Projects in the Area). The
improvements to Abernathy Road would widen the existing two 12-foot lane roadway to
four 11-foot lanes with a variable 16-foot to 32-foot raised grassed median, 4-foot bike
lanes, 16-foot urban shoulders, and 8-foot sidewalks.
In addition to the two transportation widening projects, Fulton County is proposing
to construct a green space project using the properties aligning both sides of Abernathy
Road from the east side of the Brandon Mill Road and realigned Johnson Ferry Road
intersection to just west of the Sandy Springs Crossing and Sandy Springs Village
shopping centers located to the west of the Roswell Road intersection (see Figure 2,
Green Space Concept Location Map).
This document will outline the environmental impacts associated from the
proposed roadway widening projects as well as the impacts associated from the green
space project sponsored by Fulton County. Impacts associated from the green space
project will be discussed after the transportation project impacts but within the same
section heading.
2
Begin STP-9252(6)
End STP-9252(6)
Begin STP-9250(1)
End STP-9250(1)Green Space
Green Space
Chattahoochee River
Columns Driv
eRiverside Drive
CM-0000-00(640)
STP-7532-00(940)
Study Area for PRP-8540-1(121)
Figure 1:Project Location Map and
Other Programmed Projects in the AreaProject STP-9252(6) & STP-9250(1)
P.I. No. 751300 & 751310Widening and Reconstruction of Johnson Ferry
and Abernathy RoadsFulton/Cobb Counties
5
0 0.5 1 1.5 20.25Miles
Figure 2: Green Space Concept
4
B. Planning Basis for the Action STP-9252(6) and STP-9250(1)
The purpose of STP-9252(6) and STP-9250(1) is to improve both the operations
and safety of Johnson Ferry Road and Abernathy Road in the Sandy Springs community.
The need and purpose of the proposed improvements are due to high traffic volumes.
Johnson Ferry Road and Abernathy Road are both heavily used by commuters from
Cobb County who are trying to access I-285 and Downtown Atlanta. The proposed
raised median will limit access and create turn bays to allow safer movement of vehicles.
The addition of turn lanes to the corridor will provide safer operating conditions for thru
traffic. The addition of bike lanes and sidewalks will provide a link between the
commercial district on Roswell Road, the Chattahoochee River National Recreational
Area, a planned linear park (green space) along Abernathy Road, and the neighborhoods
on Johnson Ferry Road. The design for this project was influenced by the Citizen’s
Advisory Committee formed to help determine the locally preferred alternative.
Fulton County is a part of Atlanta’s metropolitan area and is a rapidly growing
residential area. It is the largest county in Georgia in both land area and population and
is the region’s most densely populated area. Based on the United States Census, Fulton
County’s population in 1990 and 2000 was 648,951 and 816,006 respectively. Between
1990 and 2000, Fulton County gained approximately 167,055 residents, a 25.7 percent
increase which ranked second in the region in net population increase. The 2010
population projection for Fulton County is 860,797, an increase of 44,791 residents from
the 2000 Census population totals.
In April 2000, the Atlanta Regional Commission (ARC) adopted the 2025 Regional
Transportation Plan (RTP) for the 13-county Atlanta Metropolitan area. The Plan
addresses travel needs through the year 2025. The RTP is the direct result of a
comprehensive, cooperative, and continuous planning process conducted by ARC, local
governments, and the Georgia Department of Transportation in cooperation with the
Federal Highway and Federal Transit Administrations. The Transportation Improvement
Program (TIP)/RTP recommends roadway improvements along Johnson Ferry Road
from the Chattahoochee River to Abernathy Road under TIP number FN-023 as well as
the widening of Abernathy Road from Johnson Ferry Road to Roswell Road under TIP
5
number FN-034C. The description of the proposed improvements for Johnson Ferry
Road and Abernathy Road are consistent with the ARC air quality model for the Atlanta
region. While these corridors are not shown on a designated state bike route, Fulton
County has also committed to update the county’s and ARC’s Bike Route Plans. As
such, the projects will provide local and through traffic with a facility that will serve current
and future traffic demand and provide the public with a safer driving, walking, and biking
environment.
Green Space Plan
The purpose of the Green Space Plan is to provide Fulton and Cobb Counties and
the Sandy Springs area with a recreational and multi-use facility in which to allow its
neighborhoods and citizens a safe environment to gather and play as a community. The
Green Space Plan originally evolved through a series of community meetings initiated by
then Fulton County Commissioner Tom Lowe, the Fulton County Department of
Environment and Community Development, and Sandy Springs Revitalization, Inc. This
plan called for the acquisition of the residential properties on both sides of Abernathy
Road for a linear park. Purchase of the properties on both sides of the road was
intended to relieve residents from the negative effects such as residential property
devaluation or commercialization that an increased capacity road would cause. It would
also remove the hazard to traffic flow and safety caused by the many residential
driveways entering Abernathy Road.
In addition to these issues, the linear park would also serve another pressing
community problem: the Sandy Springs community’s lack of adequate parks and green
space (see Figure 3, Locations of Sandy Springs Parks and Recreation Areas). The
Sandy Springs updated Comprehensive Plan 2010 states that the community has
approximately 244 acres of parkland to serve a population of approximately 80,000
residents - about a third of what is considered adequate for a community of this size
which is continually growing. The Green Space plan concept would create a system of
multi-use trails along both sides of the roadway and introduce neighborhood-scale traffic
control elements currently lacking in the community. The required right-of-way for
implementation of the Green Space would also provide the opportunity to create linkages
6
Figure 3: Locations of Sandy Springs Parks and Recreation Areas
7
for a cluster of community-oriented amenities such as the trails and playground areas in
the surrounding neighborhoods.
Complete funding for the Green Space is the responsibility of Fulton and Cobb
Counties, including right-of-way acquisition. GDOT is responsible for coordinating the
two efforts, the road widening and green space, together. GDOT will also be responsible
for acquiring the right-of-way needed for both the road widening project and land for the
green space park at the same time to prevent further disruption to the citizens along
Abernathy Road that will be displaced as a result of project implementation by either
project. However, should the condemnation process be implemented regarding a
property or part of a property needed for Green Space, it will be the responsibility of
Fulton County to acquire that parcel.
In addition, a Local Government Project Agreement (LGPA) was signed on
October 20, 2004 between GDOT, Cobb County, and Fulton County. This agreement
details the responsibilities, including funding, for all involved parties of the Green Space
project. A copy of the signed LGPA is included in Appendix A – Correspondence.
C. Deficiencies in the System STP-9252(6) and STP-9250(1) would address two basic needs. The first need of
the project is to increase highway capacity, thus providing improved level-of-service
(LOS) for current and projected high traffic volumes. The second need is to improve
operations and safety along the project corridor.
The first deficiency that would be addressed by the proposed projects is under
capacity and declining level-of-service (LOS). As shown in Table 1, Average Daily Traffic
(ADT) along the STP-9252(6) corridor is expected to increase by approximately 30
percent for this section of roadway between 2006 and 2026, increasing from 32,050 -
47,000 vehicles per day (vpd) to 41,700 – 60,000 vpd. ADT along the STP-9250(1)
corridor is expected to increase by approximately 50 percent for this section of roadway
between 2006 and 2026, increasing from 20,090 – 25,380 vehicles per day (vpd) to
29,020 – 34,600 vpd.
Roadways like Johnson Ferry Road and Abernathy Road are rated for operational
effectiveness using a Level-of-Service (LOS) scale. LOS is a standard means of
8
classifying traffic conditions associated with various traffic volume levels and traffic flow
conditions. There are six levels of service at which a roadway can operate, represented
by the letters “A” through “F.” Each level is defined by a maximum value for the ratio of
traffic volume (V) to facility capacity (C). The highest LOS is “A” which occurs when
volume is well below capacity and travel is free flowing. Traffic flow conditions
incrementally degrade as LOS declines from “A” to “B” to “C” to “D.” When the traffic
volume is equal or nearly equal to capacity, conditions are at LOS “E.” The lowest LOS,
“F,” occurs when the volume greatly exceeds capacity and lengthy delays occur.
TABLE 1 Average Daily Traffic and Level-of-Service Estimates
STP-9252(6) and STP-9250(1), Fulton County
Average Daily Traffic Level-of-Service
Year 2006 Year 2026 Location Year 2002 Year 2006 Year 2026
No Build Build No Build Build
Johnson
Ferry Road 18,000 –
43,200
32,050 –
47,000
41,700 –
60,000 D - E C, E F C, E
Abernathy
Road 21, 600 –
22,600
20,090 –
25,380
29,020 –
34,600 E C F C
Source: Georgia Department of Transportation, Office of Planning
Also located in Table 1, LOS for the STP-9252(6) project corridor is predicted to
operate between LOS “D” and “E” in 2006 and LOS “F” in 2026 under the no-build
alternative. LOS “D” and “E” indicate the roadway will feature high-density traffic flow in
which vehicle speed is reduced to a low, but relatively uniform value and freedom to
maneuver is extremely difficult. LOS “F” indicates traffic volume greatly exceeds
capacity and lengthy delays occur. If the roadway between Columns Drive and Riverside
Drive is widened to six lanes as proposed, the LOS between 2006 and 2026 would
become “C”, indicating stable traffic flow, but speed and manueverability that are more
closely controlled by the high volume of traffic. East of Riverside Drive along Johnson
9
Ferry Road, where the 4-lane section is being maintained, the Build LOS shows a slight
increase from the No-Build “F” LOS rating to “E” for the year 2026.
The STP-9250(1) project corridor is predicted to operate at LOS “E” in 2006 and
LOS “F” in 2026 under the no-build alternative. If the roadway is widened to four lanes
as proposed, the LOS between 2006 and 2026 would become “C,” indicating stable
traffic flow, but speed and manueverability are more closely controlled by the high traffic
volume.
A second need for widening and improving Johnson Ferry Road and Abernathy
Road is to maintain and increase safety on the roadway. For the years 2000 - 2002, the
most recent years for which complete accident data is available, the accident rate on
Johnson Ferry Road has been lower than the statewide average for similar urban
principal arterial roadways and has stayed relatively consistent. Likewise, injury rates
along Johnson Ferry Road are also lower than the statewide averages for similar
facilities and have also stayed around the same value.
On the other hand, Abernathy Road has experienced higher accident rates than
the statewide average for similar urban collectors. However, the injury rates for
Abernathy Road are lower than the statewide average for similar facilities. There were
also no fatalities observed on either roadway during this three year period. Accident data
for the project corridors are summarized in Table 2.
Safety along the roadway would also be improved by the separation of traffic by
raised medians and the addition of turning lanes. Based upon 2000 - 2002 accident
data, approximately 91% of accidents observed during the year 2000 were rear-end
collisions or angle intersecting accidents. In 2001, that percentage dropped slightly to
88% of the total accidents. In 2002, 86% of the total accidents along Johnson Ferry
Road and Abernathy Road were either rear-end or angle intersecting accidents. The
high percentages of rear-end and angle intersecting accidents indicate a need for
directional separation as well as the need for turning lanes along both roadways. These
proposed design features would help improve the safety along both roadways.
10
TABLE 2 Accident, Injury, and Fatalities: Project Corridor Compared to Statewide
STP-9252(6) & STP-9250(1), Fulton County
Accident Rates Injury Rates Fatalities
Year Johnson Ferry
Road / Statewide
Averages
Abernathy Road /
Statewide
Averages
Johnson Ferry
Road /
Statewide
Averages
Abernathy
Road /
Statewide
Averages
Johnson
Ferry
Road
Abernathy
Road
2000 86 / 430 966 / 515 14 / 172 163 / 191 0 0
2001 89 / 485 639 / 540 24 / 190 82 / 200 0 0
2002 76 / 504 639 / 534 18 / 197 150 / 199 0 0 Source: Georgia Department of Transportation, Office of Traffic Operations NOTE: Rates are per 100 Million Vehicle Miles
The project corridor is likely to continually experience rising accident rates if
improvements are not made to accommodate increasing traffic volumes. The proposed
improvements, in particular the addition of a median, the widening of the roadway to
accommodate traffic growth, and the addition of turning lanes would help to serve and
protect motorists as well as maintain and improve safety along the project corridor.
D. Logical Termini The termini are logical for the proposed projects when taken together because of
the overall need to improve capacity, operational, and safety to both Johnson Ferry Road
and Abernathy Road. STP-9252(6) begins on Johnson Ferry Road at the Columns Drive
intersection. This terminus is logical due to the fact that the existing roadway on Johnson
Ferry Road to the west of Columns Drive in Cobb County is a six lane divided highway
with a raised grassed median. The southern terminus of STP-9250(1) would end on
Abernathy Road at the Roswell Road intersection. This terminus is logical because
traffic decreases by approximately 29 percent at the Roswell Road/Abernathy Road
intersection, and the Abernathy Road intersection with Roswell Road is currently a 4-lane
roadway. STP-9250(1) would tie into this existing four lane section of roadway and
proposes to upgrade the failing 4-lane intersection at Roswell Road.
11
The existing Roswell Road/Abernathy Road intersection under current traffic
conditions is in need of much improvement. Currently, there is no roadway project
programmed to address these needs. However, STP-9250(1) does propose the addition
of dual turning lanes in all directions at this intersection. The project also proposes the
addition of a median along Roswell Road to help improve traffic operations and safety.
These additions in safety and operations will not only improve the existing LOS along the
roadway but will also decrease delay time.
In addition, another long-range programmed project, STP-9250(2), proposes the
widening and improvements of Abernathy Road from State Route (SR) 9/Roswell Road
to SR 400. It is anticipated that STP-9250(2) will be needed in the future to handle the
continuing traffic growth to this area of Fulton County.
The proposed projects are viable by themselves, but along with other proposed
projects in the area, they would improve capacity and safety throughout a broader area
of Fulton and Cobb Counties (refer to Figure 1, Project Location Map and Other
Programmed Projects in the Area). Other proposed projects in the area include:
• GDOT project CM-0000-00(640) is the proposed construction of a bicycle
pedestrian path along River Valley Road from Abernathy Road to Riverside Drive
in Fulton County. The construction schedule for this project is for 2005.
• GDOT project STP-9250(2) is the proposed widening and improvements to
Abernathy Road from SR 9/Roswell Road to SR 400. This project begins at the
southern terminus of STP-9250(1). The construction schedule for this project is
long range (outside of six years).
• GDOT project STP-7532-00(940) is the construction of new sidewalks on Johnson
Ferry Road from Abernathy Road to Hildebrand Road. This project is currently
under construction.
• GDOT project PRP-8540-1(121) is the construction of a new Morgan Falls Bridge
crossing from Lower Roswell Road to SR 400. The construction schedule for this
project is long range (outside of six years).
12
II. DESCRIPTION OF ALTERNATIVES A. Introduction
The proposed project alignments were developed by the Office of Urban Design.
Basic data on the corridor is then gathered and studied. Data for this project included, at
a minimum, aerial photography, topographic maps, traffic (existing and projected),
previous studies, wetland inventory maps, soil survey maps, floodplain maps, and
Georgia Department of Natural Resources historic resource survey maps.
Wetland or hydric soil boundaries, floodplains, parks and recreational facilities,
known or suspected historical and archaeological sites, existing rights-of-way, possible
UST/landfill/hazardous waste sites, and areas of possible endangered species habitat
were delineated on the aerial photography prior to layout of an alignment. Also identified
on the aerial photography are other “controls” such as churches, cemeteries, schools,
hospitals, and any other noise sensitive areas. Only at this point was the proposed
alignment developed with every attempt being made to avoid sensitive, ecological,
historic, and archaeological areas. In the event that avoidance was not possible, every
attempt was made to minimize harm to such resources.
The proposed alignment, once laid out on aerial photography, was then field
surveyed and additional refinements were made to further minimize harm to both the
natural and built environment.
As discussed below, four alternatives for the widening and improvements of
Johnson Ferry Road and Abernathy Road were considered: the Build Alternative, the
No-Build Alternative, the Extensive Widening Alternative, and Alternative 1. The Build
Alternative is preferred for meeting the need and purpose of the project as well as
minimizing overall environmental impacts.
B. Build Alternative for STP-9252(6) and STP-9250(1) The build alternative for STP-9252(6) and STP-9250(1) consists of the widening
and reconstruction of Johnson Ferry Road and Abernathy Road in Fulton and Cobb
Counties (refer to Figure 1, Project Location Map). The build alternative for STP-9252(6)
would widen the existing roadway from Columns Drive to Riverside Drive from four lanes
to six lanes separated by a 16-foot raised median. From Riverside Drive to Abernathy
13
Road, the existing four 12-foot lanes would decrease slightly in width to four 11-foot
lanes but include a 16-foot raised median. Eleven-foot lanes in this area of the project
were chosen as a result of the Citizens Advisory Committee (CAC) public involvement
process. The CAC requested that the footprint for the roadway be minimized in this area
as much as possible reducing the amount of right-of-way needed from adjacent homes.
This footprint also allowed for the minimization of impacts to the Long Acres Historic
District, the Sandy Springs Christian Church, and the Abernathy Arts Center. The bridge
spanning the Chattahoochee River would also be widened from the existing four lanes to
six lanes and include a 16-foot raised median. The build alternative for STP-9250(1)
would widen Abernathy Road from the existing two lanes to four lanes separated by a
variable 16-foot to 32-foot raised median.
STP-9252(6) would begin on Johnson Ferry Road just north of the Columns Drive
intersection in Cobb County. The project would tie into the existing six lane urban
section of Johnson Ferry Road in Cobb County. The project would continue southward
along the existing Johnson Ferry Road in Fulton County, widening the roadway to
accommodate six lanes of traffic (three lanes in each direction) and a raised median.
STP-9252(6) would continue southward and widen the existing bridge on Johnson Ferry
Road spanning the Chattahoochee River. The bridge would be widened to the east to
accommodate six travel lanes and include a raised median. The project would continue
southward until it reached the Riverside Drive intersection. At Riverside Drive, the six
lane typical section would transition to a four lane roadway (two lanes in each direction)
with a raised median. STP-9252(6) would end at the intersection of Johnson Ferry Road
and Abernathy Road where STP-9250(1) would begin. The length of the project is
approximately 1.24 miles.
STP-9250(1) would begin on Abernathy Road at its intersection with Johnson
Ferry Road. STP-9250(1) would tie into the four lane roadway of STP-9252(6) and
include a variable-width (16-foot to 32-foot) raised grassed median with turning lanes.
STP-9250(1) would proceed east along Abernathy Road and end just east of the Roswell
Road intersection. The Abernathy Road/Roswell Road intersection would be improved
by adding dual left turning lanes and a median on Roswell Road and Abernathy Road.
The length of STP-9250(1) is approximately 0.93 mile.
14
One typical section for the proposed STP-9252(6) would include six 12-foot travel
lanes from Columns Drive to Riverside Drive, three lanes in each direction. A second
typical section for STP-9252(6) would include four 11-foot travel lanes from Riverside
Drive to Roswell Road, two lanes in each direction. Both typical sections would include a
16-foot raised median, 4-foot bike lanes, 8-foot sidewalks, and 16-foot urban shoulders
(See Figure 4A, Johnson Ferry Road and Bridge Typical Section and Figure 4B, Johnson
Ferry Road and Abernathy Road Typical Section).
The typical section for the proposed STP-9250(1) would include four 11-foot travel
lanes, two lanes in each direction, separated by a varying width 16-foot to 32-foot raised
grassed median including turn lanes, 4-foot bike lanes, 8-foot sidewalks, and 16-foot
urban shoulders (See Figure 4B, Johnson Ferry Road and Abernathy Road Typical
Section).
There is one major structure included in the widening and improvements of STP-
9252(6). The existing four lane bridge carrying Johnson Ferry Road over the
Chattahoochee River would be widened to the east in order to accommodate
anadditional lane of traffic in each direction. Bridge 121-0457-0 is currently a 314-foot by
65-foot structure which was originally constructed in 1969. The sufficiency rating of the
bridge is 69.60, which does not warrant the replacement of the entire bridge. The
proposed typical section of the Chattahoochee River Bridge includes six 12-foot travel
lanes, three lanes in each direction, separated by a 16-foot raised median, 4-foot bike
lanes, and 10-foot sidewalks with 2-foot gutters. A decorative rail parapet and a path for
pedestrians and bicyclist under the north end of the bridge are proposed additions
requested by the Chattahoochee River National Recreation Area and will be designed
prior to project implementation (refer to Figure 4A, Johnson Ferry Road and Bridge
Typical Section).
The existing right-of-way consists of approximately 72 feet on Johnson Ferry Road
and 48 feet on Abernathy Road. The proposed right-of-way on Johnson Ferry Road and
Abernathy Road would vary from 100 feet to 116 feet depending on median width and
number of travel lanes. Both roadways would be constructed to meet a 35 mph design
speed.
15
Figure 4A: Johnson Ferry Road from Columns Drive to Riverside Drive and Bridge Typical Section
16
Figure 4B: Johnson Ferry Road from Riverside Drive to Abernathy Road and Abernathy Road Typical Section
17
For both projects, traffic would be maintained on the existing roadway utilizing staged
construction.
Build Alternative for the Green Space Plan The build alternative for the Green Space Plan consists of the construction of a
green space linear park utilizing the properties currently aligning both sides of Abernathy
Road from the east side of the Brandon Mill Road and realigned Johnson Ferry Road
intersection to just west of the Sandy Springs Crossing and Sandy Springs Village
shopping centers located to the west of the Roswell Road intersection (refer to Figure 2 –
Green Space Concept Location Map). The Green Space Plan consists of the
construction of a linear park which includes the following amenities: a multi-use trail
along both sides of Abernathy Road, playground facilities, several open greenway areas,
and a community center for holding meetings for community groups.
C. Other Alternatives Considered No-Build Alternative The No-Build Alternative has also been considered. The No-Build Alternative is
one in which the Georgia Department of Transportation would take no action to construct
the proposed projects. Please see Section IV, Draft Section 4(f) Evaluation for further
discussion of the No-Build Alternative.
Extensive Widening Alternative
The Extensive Widening Alternative was once considered a viable alternative.
The Extensive Widening Alternative consists of widening Johnson Ferry Road from the
existing four 12-foot lanes (two lanes in each direction) to six 12-foot lanes (three lanes in
each direction) from Columns Drive to River Valley Drive, located slightly north of the
Johnson Ferry Road/Abernathy Road intersection. The Extensive Widening Alternative
would also include a 16-foot raised median, 4-foot bike lanes, 8-foot sidewalks, and 16-
foot urban shoulders. From River Valley Drive to Cherry Tree Lane on Abernathy Road,
the existing four 12-foot lanes transition to four 11-foot lanes and would include a 16-foot
raised median, 4-foot bike lanes, 8-foot sidewalks, and 16-foot urban shoulders.
18
The Extensive Widening Alternative was supported strongly by Cobb County but
opposed by Fulton County and the residents residing on Johnson Ferry Road on the
Citizens Advisory Committee. Fulton County opposed this alternative due to the
extensive amount of right-of-way required and community impacts created along this
portion of Johnson Ferry Road which were deemed too extensive and costly (see
Appendix E, Public Information Open House Materials, February 11, 2003 CAC Meeting
Minutes). However, due to the additional capacity and improvements needed to Johnson
Ferry and Abernathy Roads, Cobb County did agree to maintain the proposed four lanes
along Johnson Ferry Road from Riverside Drive to Abernathy Road if all other
improvements were implemented with the widening project.
In addition to the agreement by both counties to maintain four lanes along this
area of the project corridor, a drop in traffic is seen at the intersection of Johnson Ferry
Road and Riverside Drive for those motorists accessing I-285 from this location. Traffic
in 2006 shows 23,500 vehicles per day (vpd) traveling south along Johnson Ferry Road
just before reaching the Riverside Drive intersection which drops to 16,050 vpd after the
Riverside Drive intersection. This is a decrease of approximately 7,450 vehicles. Traffic
predictions for 2026 anticipate 30,000 vpd traveling south on Johnson Ferry Road before
reaching the Riverside Drive intersection which drops to 20,900 vpd after the Riverside
Drive intersection. This decrease is approximately 9,100 vehicles. Level-of-service
(LOS) also improves slightly in this area from “F” to “E” if additions such as turning lanes
and medians are implemented.
Although the Johnson Ferry Road/Riverside Drive intersection will not function
adequately for the design year (2006), motorists will experience a reduction in delay
times due to the addition of dedicated turning lanes on Johnson Ferry Road in both
directions onto Riverside Drive. An additional left turn lane will be added to Riverside
Drive at this intersection on to Johnson Ferry Road which will also aid in the reduction of
delay for motorists. Based on this information, it was determined that operation and
safety improvements could be made without the need to further widen Johnson Ferry
Road to six lanes from Riverside Drive to River Valley Drive.
19
Alternative 1
Alternative 1 was also considered as a possible alternative. Alternative 1 consists
of the same proposed features as the build alternative but also includes an option to cul-
de-sac the southern leg of Wright Road. This alternative was developed after several
citizens who attended the Citizens Advisory Committee meetings expressed concern
about the amount of cut-through traffic on the southern end of Wright Road to Johnson
Ferry Road and requested GDOT investigate this problem. During the March 25, 2003
public information open house, a survey was taken of the neighboring subdivisions in the
area to investigate what their opinion would be to cul-de-sac the southern portion of
Wright Road. The survey revealed that the community was closely split between leaving
the southern portion open and the option to cul-de-sac it (see V. Coordination and
Comments and Appendix E for a further discussion of the survey results).
Alternative 1 is not preferred for several reasons. First, coordination with local fire
and emergency personnel regarding this issue was initiated in which they responded with
their desire to leave the southern end of Wright Road open due to their need to access
citizens on Wright Road in a timely manner during an emergency situation and the ability
to access properties using grid system connectivity (see Appendix A - Correspondence
for a copy of the response coordination letter). Secondly, a traffic signal warrant study
was also conducted for the entire project corridor based upon the existing and projected
traffic volumes along Johnson Ferry Road, Abernathy Road, and traffic patterns from
side roads onto Abernathy Road. The signal warrant study revealed that the existing and
projected traffic volumes did not warrant a traffic signal at the intersection of Abernathy
Road and Wright Road. Therefore, Wright Road would continue to be a two-way stop
intersection without the option for a cul-de-sac based on the evaluation of concerns
expressed by the public and recommendations from emergency personnel.
III. ENVIRONMENTAL CONSEQUENCES A. Introduction
The environmental effects of the proposed projects have been evaluated in
accordance with the National Environmental Policy Act (NEPA) and associated laws and
regulations. Surveys identified a number of environmental resources on the project
20
corridor, including six sites eligible for listing on the National Register of Historic Places
(NRHP), two Waters of the U.S., and the identification of two public parks. The effects of
the proposed projects on these resources are discussed below.
B. Effects on the Social Environment 1. Land Use Changes
STP-9252(6) and STP-9250(1) Land use in the proposed project area consists primarily of urban residential
neighborhoods with some commercial development located near Roswell Road (see
Figure 5A, Current Zoning for Abernathy Road and Figure 5B, Future Land Use Plan
Map for Abernathy Road). The roadway project is aligned in such a way as to minimize
effects to existing developments and current land uses would remain approximately the
same (see Figure 5C, 2015 Land Use Plan for Sandy Springs).
Some residential properties along the project corridor would be adversely affected
by right-of-way acquisitions, particularly in the area of Johnson Ferry Road through the
Long Acres Subdivision Historic District. These effects would be minimized by avoiding
total relocations where possible and by acquiring portions of lots where practical. The
Georgia Department of Transportation does not anticipate any significant adverse effects
to future land use in the project vicinity because Johnson Ferry Road and Abernathy
Road have been a part of the landscape of the area for some time and has contributed to
the character of its use. The Department expects residences and businesses in the area
to be positively influenced by the increased capacity, safety, and operation of the
roadway that project implementation would create. The roadway construction is not
anticipated to change the existing land uses along the corridor.
Green Space Plan
Land use within the proposed green space area consists primarily of urban
residential properties and neighborhoods. The green space plan would convert the
residential use of these properties aligning both sides of Abernathy Road to a linear
park/recreational use facility. Land use of these properties as residential parcels would
be adversely affected by right-of-way acquisitions; however, the conversion of these
21
Figure 5A: Current Zoning for Abernathy Road
22
Figure 5B: 2015 Land Use Plan Map for Abernathy Road
23
Figure 5C: 2015 Land Use Plan for Sandy Springs
24
properties combined to create a linear park/recreational use facility benefits the area by
creating a place where the neighborhoods in the area can congregate and gather
together as a community. Fulton County anticipates residences and neighborhoods in
the area to be positively influenced by the green space/recreational land created. In
addition, the green space would also create a protective buffer between neighborhoods
and the expanded roadway adding safety for pedestrians and bicyclists.
2. Community Cohesion
The proposed transportation improvements should have a beneficial impact on
the cohesion of the community in the Sandy Springs area. The existing two lane facility
of Abernathy Road is currently a crowded roadway deterring vehicular traffic from
reaching destinations such as Cobb County, SR 400, and I-285. If the road is widened
to the proposed four lanes, traffic capacity should increase allowing better movement of
vehicles and allowing for less congestion for motorists and a quicker commute to and
from the interstate. The additional lanes and raised median would also provide
emergency vehicles with a safer and quicker route in responding to potential emergency
situations.
The addition of sidewalks to the project corridor would also promote safe
pedestrian travel along the roadway to locations such as the Chattahoochee River
National Recreation Area, the Abernathy Arts Center, and eventually the green space
linear park. However, the addition of two extra travel lanes and a raised median would
further separate the community allowing for a roadway which is more difficult for
pedestrian traffic to cross. The raised median would allow pedestrians a safe place to
reside while attempting to cross the busy roadway. Sidewalks would allow for safe
movement to the park areas from all surrounding neighborhoods, thereby promoting the
use of the sidewalks for pedestrian travel and preventing increased congestion to the
roadway. The proposed green space would also bring the surrounding neighborhoods
and communities together to an area in which they can enjoy a common recreational
environment.
There are several neighborhoods lining Johnson Ferry Road which are, for the
most part, contained. Currently, pedestrian traffic which may cross Johnson Ferry Road
25
to access these neighborhoods is not excessive. Since the neighborhoods are already
separated by the existing Johnson Ferry Road, the addition of a raised median and
sidewalks would not further divide or impact these subdivisions.
Approximately 22 properties residing on the south side and 3 properties on the
north side of Abernathy Road will be displaced as a result of the proposed project. In
addition, approximately 16 additional properties on the north side of Abernathy Road will
be displaced as a result of the proposed green space project. The relocation of the
residents residing along this roadway will impact the community. These residents will
be required to relocate from their current location to other areas either within the
existing community or to other areas of their choice. However, there are several
properties available for sale within the existing community or in surrounding
communities. The relocation of elderly residents along the project corridor will be given
due consideration and given relocation benefits which are reasonable and necessary.
Special circumstances or unique situations will be handled by the Office of Right-of-Way
on a case by case basis.
3. Relocations
STP-9252(6) and STP-9250(1) The build alternative minimizes impacts to residents and property to the fullest
extent possible. The proposal to widen and reconstruct the existing Johnson Ferry and
Abernathy Roads represents a major effort by the GDOT to minimize displacements as
much as possible. The impact of the build alternative on residential and commercial
properties has been assessed through a Conceptual Stage Study.
A Conceptual Stage Study was conducted on STP-9252(6) and STP-9250(1) to
help determine the effects of the proposed project on businesses and residences in the
project’s area of potential effect. A Conceptual Stage Study attempts to estimate the
number of potential displacements along a proposed project and is associated with
complete takes of property where the proposed roadway would touch an existing
structure. The proposed projects would displace approximately seven verifiable owner-
occupied residences due to the need to purchase land for right-of-way use and no
displacements of commercial businesses.
26
The residential displacements are believed to involve approximately 20
individuals, most of who are believed to be white, in relatively good health, and have a
household income that exceeds the poverty level. There are some elderly residents
involved; however, none appear to be handicapped, and all appear capable of self-care.
Also, an additional 28 owner occupied residences would be displaced for various
reasons including the inability of the roadway design to tie residential driveways back
into the expanded roadway due to the steep slope in the area, the cut-fill limits affecting
the residential structures, and the realignment of road beds.
The GDOT can assure that the relocatees would receive the appraised, fair-
market value for their property. Relocatees would also be offered decent, safe, and
sanitary housing within their financial means. Within a reasonable period of time prior to
displacement, a comparable replacement dwelling would be made available for
displaced individuals and families (see Appendix D, Conceptual Stage Study).
The Green Space Plan In addition to the 35 roadway displacements, the Green Space Plan sponsored
by Fulton County would displace an additional sixteen residences along the northern
side of Abernathy Road. The properties would be acquired using funds provided by
Fulton and Cobb Counties; however, these additional properties would be acquired at
the same time during the GDOT right-of-way process as the properties needed for the
road widening project. This will allow for a smooth transition for residents living along
Abernathy Road to prevent them from having to go through the right-of-way process
twice and not be bothered by two separate acquisition periods.
The GDOT can assure that the relocatees would receive the appraised, fair-
market value for their property. Relocatees would also be offered decent, safe, and
sanitary housing within their financial means. Within a reasonable period of time prior to
displacement, a comparable replacement dwelling would be made available for
displaced individuals and families.
27
4. Churches and Institutions
There is one church located along the project corridor, the Sandy Springs
Christian Church. The Sandy Springs Christian Church is located northeast of the
intersection at Johnson Ferry Road and Abernathy Road. It consists of a sanctuary
facility, classrooms, a playground, and parking lot facilities surrounding the church. The
church property consists of approximately 5.35 acres on which these facilities are
located.
The road widening project proposes to acquire approximately 495 square feet of
church property along Johnson Ferry Road as right-of-way and convert approximately
0.21 acre of church land into permanent easement (see Figure 6 – Right-of-Way and
Easement for the Sandy Springs Christian Church). This would leave the church with
approximately 5.14 acres of remaining property. There would be no structures or
worship facilities taken as a result of right-of-way or easements acquired. However,
approximately 35 parking spaces out of a total of approximately 250-300 parking spaces
are proposed to be taken as a result of project implementation. The parking spaces
needed to construct the proposed project should not burden the church to a great extent
due to the additional property located behind the church on which they could expand
their parking lot facilities if needed.
5. Environmental Justice
In accordance with Executive Order 12898, the proposed projects have been
analyzed to avoid disproportional adverse effects to minority and low income
populations and communities. Minority persons include citizens or lawful, permanent
residents of the U.S. who are African American, Hispanic, Asian American, American
Indian, or Alaskan native. Low-income persons are defined as those whose median
household income is below the U.S. Department of Health and Human Services poverty
guidelines. Minority or low income communities are groups of minority or low income
persons who live in reasonably close geographic proximity to one another. Minority and
low income populations are minority or low income persons who reside along the
corridor but who do not reside in communities (perhaps because they are widely
28
Figure 6: Right-of-Way and Easement for the Sandy Springs Christian Church
29
dispersed). These persons receive protection under environmental justice laws if they
comprise a higher percentage of the corridor’s population than would be predicted
based on census data for some geographically larger comparison area, such as the
county in which the projects are located.
Two geographic comparison areas were chosen for this project: the census tracts
in which the project is located as well as Fulton County. The projects extend through
two census tracts (Tract numbers 102.04 and 102.05). As an aggregate, the population
of these tracts is 6.37 percent minority. As can be seen in Table 3, county-level
percentages range from a low of 15.7 percent to a high of 57.8 percent.
After compiling the comparison area census estimates, the GDOT surveyed the
project corridors to identify minority or low income populations and communities. Prior
to the survey, assistance in identifying possible minority and low income communities
was requested from the Atlanta Regional Commission and the Fulton County Board of
Commissioners.
Based on these efforts, it is estimated that minority and low income persons
comprise less than 16 percent of the entire project corridor population. Since the
census tract and county percentages are comparable to this figure, the corridor is not
the locus of a minority or low income population. Therefore, it is anticipated that the
project will not adversely impact any minority or low income populations.
Table 3 Minority and Low Income Populations for Geographic Comparison Areas*
STP-9252(6) and STP-9250(1), Fulton County
Environmental Justice
Population Project Area Census Tracts Fulton County
Minorities as Percent of Total
Population 6.37% 57.8%
Low-Income Persons as
Percent of Total Population N/A 15.7%
*All percentages are derived from 2000 Census Estimates
30
In addition, no minority or low income communities were identified during a field
survey of the project corridor.
The results of this analysis indicate that the project would not have
disproportional adverse effects on minority or low income communities and populations.
Based on this finding, the project is found to comply with Executive Order 12898.
6. Economic
The amount of additional right-of-way needed to implement the proposed project
would be minimal and would not result in significant effects on the tax bases for Fulton
County or the Sandy Springs area. Sales volumes for some area businesses may
temporarily drop during the actual construction of the project; however, following
construction, area businesses should benefit from the expected improvement in access
and increases in traffic volumes. Newly planned developments by Fulton County, such
as the green space, would be provided with appropriate access.
The proposed improvements to Johnson Ferry Road and Abernathy Road would
not cause major adverse impacts to neighborhoods. However, reductions in yard and
property size would occur. The project has been designed to minimize effects to
individual properties where possible, and the symmetrical widening in certain areas of
the corridor, would result in less damage to property than would widening to one side.
Property owners would be compensated for all right-of-way acquisitions in accordance
with applicable laws and regulations.
Several citizens during the public involvement process expressed concerns
about Fulton County’s plans for zoning of this residential area. Fulton County’s desire
and commitment to its citizens will allow this area to remain residential as well as create
additional green space and recreation area for the surrounding Sandy Springs
neighborhoods. The County’s goal is to promote community cohesion for this area of
Sandy Springs and not spur extensive commercial development.
Since the present roadway has no median, driveways to residences or
businesses on Johnson Ferry Road and Abernathy Road may be entered or exited from
either direction. Although the variable 16-foot to 32-foot raised medians included in the
proposed widening would have crossovers at major intersections and where otherwise
31
deemed necessary, movements at most business and private driveways would be
limited to one way entering and exiting. However, the median would enhance safety for
the highway user and ensure that the capacity improvements are not offset in the future
by heavy left turning movements.
C. Effects on the Cultural Environment 1. Cultural Resources
In compliance with Section 106 of the National Historic Preservation Act of 1966
and amendments thereto, the proposed project has been surveyed for archaeological
and historic resources, especially those on or eligible for inclusion in the National
Register of Historic Places (NRHP). The purpose of the survey was to locate, identify
and evaluate the significance of any historic and archaeological resources within the
project corridor. The survey boundary and methodology were established using the
GDOT/Federal Highway Administration (FHWA) Cultural Resource Survey Guidelines.
These guidelines were established as a result of past interaction with the State Historic
Preservation Officer (SHPO) and his staff and were agreed upon by FHWA and the
SHPO.
Prior to surveying the project area, existing information on previously identified
archaeological and historic sites was checked to determine if any resources were
located within the area of potential effect (APE) of this undertaking. The Department of
Natural Resource’s Fulton County survey for historic resources was consulted in
preliminary identification of historic resources. Lists of current and pending NRHP
properties were checked and aerial photographs along the length of the proposed
project were consulted. A field survey for potentially eligible historic resources was also
conducted along the project corridor. In addition, the Atlanta Regional Commission
RDC (Regional Development Center) and the Fulton County Department of
Environment and Community Development were contacted for their assistance in
identifying known historic resources.
As a result of these efforts, six historic properties and no archeological sites
considered eligible NRHP resources were identified within the proposed project’s area
of potential effect (APE) (See Figure 7 – Historic Resources Location Map).
32
Eden HouseWoodward House
Long Acres Subdivision Historic District
Roy-Fuller House
Sears House
Abernathy Arts Center
µFigure 7: Historic Resources Location Map
STP-9252(6) and STP-9250(1)Fulton County
P.I. No. 751300 & 751310
0 0.4 0.8 1.2 1.60.2Miles
33
a. Historic Resources
A total of 11 properties 50 years or older were identified within the proposed
project’s APE. After coordination with the SHPO, six of the 11 were determined eligible
for listing on the NRHP. The NRHP-eligible properties are the Abernathy Arts Center,
the Sears House, the Roy-Fuller House, the Long Acres Subdivision Historic District,
the Woodward House, and the Eden House. The locations of the resources are shown
in Figure 7.
The Abernathy Arts Center
The Abernathy Arts Center is a circa 1930 English Vernacular Revival located at
254 Johnson Ferry Road on the south side of Johnson Ferry Road at the intersection
with Abernathy Road (refer to Figure 7). The one-story L-shaped structure is of frame
construction and is sided with stone veneer with a partially finished basement. Features
of the Abernathy Arts Center include a large stone chimney on both of the front and side
elevations, pink marble floors in the rear ell’s former screened porch, and one arched
window opening. Fenestration includes double-hung sash type windows in six-over-six,
three-over-one, and three-over-three configurations, casement windows, and picture
windows.
The Abernathy Arts Center was originally constructed as a residence for Luther
Barney Adams, a local businessman. As the result of Mr. Adams’ subsequent financial
difficulties, the property reportedly fell into disrepair. In 1975, the property was acquired
by the Fulton County Parks and Recreation Department for use as a local arts center. It
was originally known as the River Valley Arts and Crafts Center, named as such for the
River Valley Park, which is adjacent to the property. The facility’s name was reportedly
changed in 1979, upon the request of the Abernathy Family, one of the founding
families of the Sandy Springs community.
Prior to 1975, the Adams residence had not been properly maintained for many
years. Therefore, the property underwent extensive renovations focusing primarily on
the structural nature of the home, with the exception of the enclosure of a former porch
across the rear of the property. Other changes to the residence include the addition of
both front and side porticos and the replacement of some of the original windows.
34
There are two other structures and some tennis courts located on the property.
One of the structures, located to the west of the residence, is a former 2-story garage
that was constructed at the same time as the residence. The former garage is a front-
gabled building that possesses six-over-six double-hung sash type windows and the
same stone veneer exterior as the residence. The structure currently serves as a
storage facility for the arts center. The other structure sited to the west of the former
garage is a newly constructed building that houses administrative offices, additional
classrooms, and an art gallery.
The Abernathy Arts Center is considered eligible for the National Register under
Criterion C, as it possesses a local level of significance in the area of architecture as an
example of the English Vernacular Revival style of architecture.
As shown in Figure 7A, the eligible NRHP boundary of the Abernathy Art Center
corresponds to the legal property boundary and comprises approximately 3.8 acres. All
significant and character defining features of the property are included within the legal
boundary.
The Sears House
The Sears House is a circa 1953 Ranch style residence located at 198 Johnson
Ferry Road on the west side of Johnson Ferry Road south of Burnett Drive (refer to
Figure 7). The residence is a long, rectangular shaped brick structure that is
distinguished by a hipped roof and stacked stone around the entryway. Other features
include an integral carport, two-over-two horizontal type windows, and a Chicago style
window. The Sears House was recommended for listing in the National Register under
Criterion C as it possesses a local level of significance in the area of architecture as an
example of a Ranch style residence.
As shown in Figure 7B, the eligible NRHP boundary of the Sears House
corresponds to the legal property boundary and comprises approximately 0.49 acre. All
significant and character defining features of the property are included within the legal
boundary.
35
36
37
The Roy-Fuller House The Roy-Fuller House is a circa 1947 Cape Cod style residence located at 178
Johnson Ferry Road on the west side of Johnson Ferry Road at the intersection with
Long Acres Drive (refer to Figure 7). The residence is a frame structure that is sided
with asbestos shingle siding and rests on a continuous stone foundation. Other
features include paired dormers on the front elevation, a large stone chimney on the
north side elevation, paired six-over-six double-hung sash type windows, a side ell, and
a dormer addition on the rear elevation. The Roy-Fuller House was recommended for
listing in the National Register under Criterion C as it possesses a local level of
significance in the area of architecture as an example of a Cape Cod style residence.
As shown in Figure 7C, the eligible NRHP boundary of the Roy-Fuller House
corresponds to the legal property boundary and comprises approximately 2.0 acres. All
significant and character defining features of the property are included within the legal
boundary.
The Long Acres Subdivision Historic District The Long Acres Subdivision is comprised of 23 residences that were developed
primarily between 1952 and 1954. The historic district is roughly bounded by Johnson
Ferry Road to the west, Abernathy Road to the north and east and just east and south
of Long Acres Drive (refer to Figure 7). The properties included within the historic
district are 210 Johnson Ferry Road, 215 Johnson Ferry Road, 223 Johnson Ferry
Road, 7 Abernathy Road, 19 Abernathy Road, 23 Abernathy Road, 33 Abernathy Road,
49 Abernathy Road, 65 Abernathy Road, 73 Abernathy Road, 6531 Long Acres Drive,
6540 Long Acres Drive, 6551 Long Acres Drive, 6552 Long Acres Drive, 6563 Long
Acres Drive, 6564 Long Acres Drive, 6569 Long Acres Drive, 6577 Long Acres Drive,
6589 Long Acres Drive, 6590 Long Acres Drive, 6597 Long Acres Drive, and 6600 Long
Acres Drive.
According to Fulton County records, three of the properties within the subdivision
were constructed between 1955 and 1957. A plat of the proposed subdivision made in
1952 showed the subdivision divided into Block A and Block B, with Block A containing
14 lots along the northwestern portion of the subdivision and Block B containing 9 lots
38
39
along the southeastern side. All of the residences in the subdivision are examples of
the 1950s Ranch style of architecture, except one property located at 49 Abernathy
Road. This property was reportedly constructed in 1957 and is an example of a Shed
style dwelling.
Most of the Ranch style dwellings within the district retain their original, long
rambling designs and many of the distinctive features that characterize this style of post
World War II architecture. Among the features noted are low-pitched hipped roofs with
integral carports, Chicago style windows, two-over-two metal horizontal type windows,
decorative metal porch supports, and large masonry chimneys. Virtually all of the
residences possess brick exterior walls.
The Shed style dwelling located at 49 Abernathy Road is also a good example of
its style. The Shed style is characterized by its use and combination of the shed roof
form in different and often opposing directions in order to produce an effect of colliding
geometric shapes. This example also features the use of ribbon and jalousie windows,
which were popular window treatments during the period of the 1950s through the
1960s.
Another import character defining feature of post World War II architecture is the
suburban landscape, which is clearly illustrated in this subdivision. The subdivision
typifies the suburban experience which is characterized by its moderately sized,
grassed front lawns with straight or curvilinear driveways and groupings of trees and
other plantings. The homes have larger and more private back yards, which often
include decks or patios for family gatherings.
The Long Acres Subdivision Historic District was recommended for listing in the
National Register under Criterion A and C as it possesses a local level of significance in
the areas of architecture, community planning, and landscape architecture. The district
also possesses a national level of significance in the areas of community planning and
landscape architecture. The Long Acres Subdivision Historic District is significant both
locally and nationally as an example of post World War II suburban development. It
also is significant for its collection of mostly intact, mid-twentieth century Ranch style
dwellings and for its relationship to the development of the suburban landscape.
40
As shown in Figure 7D, the eligible NRHP boundary for the Long Acres
Subdivision Historic District corresponds to the legal property boundaries of the 23
properties within the district and is the same as the original boundary of the Long Acres
Subdivision that was platted in 1952. The boundary comprises approximately 16.1
acres. All significant and character defining features of the property are included within
the legal boundary.
The Woodward House The Woodward House is a circa 1935 Colonial Revival style residence located at
84 Abernathy Road on the north side of Abernathy Road east of Long Acres Drive (refer
to Figure 7). The residence is a 2-story frame structure that is sided with asbestos
shingle siding and rests on a continuous brick foundation. Other features include one
original exterior end chimney, a second exterior end chimney constructed as part of a
side addition to the home prior to 1962, a side porch, which was enclosed in the early
1960s, six-over-six double-hung sash type windows, and an enclosed breezeway
connecting the side addition. The current property owner, who has owned the home
since 1962, noted that the side porch was enclosed during the 1960s and the
breezeway was enlarged connecting a side addition prior to 1962. Also sited on the
property is a log cabin that the property owner moved from its original location in
Tennessee and restored, and the original well house located directly west of the
residence. The Woodward House was recommended for listing in the National Register
under Criterion C as it possesses a local level of significance in the area of architecture
as an example of a mid-twentieth century Colonial Revival style residence.
As shown in Figure 7E, the eligible NRHP boundary of the Woodward House
corresponds to the legal property boundary and comprises approximately 1.14 acres.
All significant and character defining features of the property are included within the
legal boundary.
41
42
43
The Eden House The Eden House is a circa 1944 Side Gabled Cottage with a side addition
located at 166 Abernathy Road on the north side of Abernathy Road west of Wright
Road (refer
to Figure 7). The residence is a frame structure that is sided with clapboard siding and
rests on a brick pier foundation with concrete block infill. Other features include a front
gabled portico and six-over-six double-hung sash type windows. The Eden House was
recommended eligible for listing in the National Register under Criterion C as it
possesses a local level of significance in the area of architecture as a representative
example of a Side Gabled Cottage house type.
As shown in Figure 7F, the eligible NRHP boundary of the Eden House
corresponds to the legal property boundary and comprises approximately 1.7 acres. All
significant and character defining features of the property are included within the legal
boundary.
b. Effects to Historic Resources
In concurrence with the SHPO, it has been determined that the proposed
projects would have a conditional no adverse effect to one historic resource, the
Abernathy Arts Center, a no adverse effect on two historic resources, the Sears House
and the Roy-Fuller House, and an adverse effect on three historic resources, the Long
Acres Subdivision Historic District, the Woodward House, and the Eden House. The
boundaries of the resources in relation to the proposed construction are shown in
Figures 8A – 8H.
Abernathy Arts Center A finding of Conditional No Adverse Effect has been determined for the
Abernathy Arts Center (refer to Figure 7 – Historic Resources Location Map). The
condition placed on the No Adverse determination is a stipulation placed in the
Memorandum of Agreement which states that the Abernathy Arts Center would be
contacted to determine if they would be interested in the development of a landscape
plan for the area in front of the Arts Center building that would be affected by the
44
45
proposed project. Should the Arts Center accept the landscaping offer, a landscape
plan will be developed for this area, and the Arts Center and the Georgia SHPO would
be allowed a comment period in which to provide and recommend changes before
acceptance.
In the area of the resource, project implementation would consist of the widening
and realignment of Johnson Ferry and Abernathy Roads and the realignment of River
Valley Road. Approximately 0.05 acre of proposed right-of-way will be required from
within the eligible historic boundary of the property and approximately 0.05 acre will be
acquired as permanent construction easement for construction of the proposed project
(see Figure 8A – Right-of-way and Easement for the Abernathy Arts Center).
Project implementation would not result in a change in the character of the
property’s use. There are no direct or indirect effects anticipated to the Abernathy Arts
Center that would alter the character of the continued recreational use of the property.
The proposed improvements to Johnson Ferry Road and Abernathy Road would not
decrease the distance between the proposed roadways and the resource.
Project implementation would result in a change in the character of the property’s
physical features within the property’s setting that contribute to its historic significance.
However, this effect is not considered adverse. While approximately twenty feet of
right-of-way would be required from within the eligible historic boundary of the property
for construction of the proposed project, no significant landscape features within this
boundary are contributing to the eligibility of the resource would be damaged or
removed due to project implementation.
Project implementation would result in the introduction of visual elements that
diminish the integrity of the property’s significant historic characteristics or features.
The resource is currently situated at the intersection of two, two-lane roadways and
consists of a view-shed comprised of moderate residential development most of which
is over fifty years old. Also, there is no substantial vegetation to serve as a buffer
between the resource and the existing roadways. As a result, the enlargement of the
existing transportation facilities would significantly diminish the visual character of the
property.
46
Figure 8A: Right-of-Way and Easement for the Abernathy Arts Center
47
Project implementation would not result in the introduction of atmospheric
elements that diminish the integrity of the property’s significant historic characteristics or
features. There would be no atmospheric effect to this property as a result of project
implementation. The project is consistent with the State Implementation Plan for air
quality in the region.
Project implementation would not result in the introduction of audible elements
that diminish the integrity of the property’s significant historic characteristics or features.
The existing noise level at the property is 75 dBA L10. The no-build noise level at the
property is 76 dBA L10. The build noise level (design year 2020) at the resource is 73
dBA L10. This three decibel decrease would occur over twenty years and would not be
perceptible to the human ear. While the build noise level exceeds the FHWA noise
abatement criterion of 70 dBA L10 established for residential land use, the existing
noise level at the property already exceeds this criterion. As a result, the proposed
project would not result in adverse audible effects to the property.
Project implementation would not indirectly affect the Abernathy Arts Center. No
change in traffic patterns would result from project implementation. No additional
access to the existing transportation facility would be provided and no existing access to
the facility would be removed. The proposed project would only increase the capacity
and operational adequacy of the existing roadway to meet current and anticipated future
demand.
Fulton County also proposes to design and construct a green space area along
Johnson Ferry and Abernathy Roads sometime after completion of the proposed road
project. However, the proposed design plan for this green space indicates that no land
from within the eligible historic boundary of the Abernathy Arts Center would be utilized
in the design or construction of this green space.
Sears House A finding of No Adverse Effect has been determined for the Sears House (refer to
Figure 7 – Historic Resources Location Map). In the area of the resource, project
implementation would consist of the widening and realignment of Johnson Ferry Road
and the obliteration of the existing pavement directly in front of the resource along the
48
Figure 8B - Construction Limits for the Sears House
GDOT Projects STP-9252(6) and STP-9250(1) P.I. #751300, 751310, Fulton County
N
Sears House
Roy Fuller House
Pavement along Johnson Ferry Road
Proposed realignment of Johnson Ferry Road
Driveway tie-ins to new roadway will be constructed at Sears House and Roy-Fuller House
49
portion of Johnson Ferry Road to be realigned (see Figure 8B – Construction Limits for
the Sears House). No additional right-of-way or permanent easement from this property
is anticipated.
Physical destruction of or damage to all or part of the property would not occur.
All widening, reconstruction, and obliteration of existing pavement would take place
outside the eligible historic boundary of the resource. As a result, no significant features
within the eligible boundary that contribute to the eligibility of the property would be
disturbed due to project construction.
Project implementation would not result in a change in the character of the
property’s use. There are no direct or indirect effects anticipated to the Sears House
that would alter the character of the continued residential use of the property. The
widening and reconstruction of Johnson Ferry Road would take place on the east side
of the existing road opposite the Sears House. As a result, the proposed improvements
to Johnson Ferry Road would not further encroach upon the eligible boundary of the
property, but instead, would result in an increased distance between the roadway and
the resource.
Project implementation would not result in a change in character of the property’s
physical features within the property’s setting that contribute to its historic significance.
All construction and ground-disturbing activity would take place outside the eligible
historic boundary of the resource. As a result, no significant landscape features
contributing to the eligibility of the resource within this boundary would be damaged or
removed due to project implementation.
Project implementation would result in the introduction of visual elements that
diminish the integrity of the property’s significant historic characteristics or features.
However, this effect is not considered adverse. The resource is situated at an elevation
substantially lower than the existing roadway. There is also an adequate vegetative
buffer between the property and the existing roadway, and the proposed improvements
will take place on the opposite side of Johnson Ferry Road. As a result of these factors,
improvements to this roadway would not be visible from the property. While the
alignment of Johnson Ferry Road would result in the proposed roadway being moved
further away from the resource, the realignment will result in the removal of four historic
50
houses within the Long Acres Subdivision Historic District directly across from the
property. However, because these houses are also situated on an elevation
significantly lower than the existing roadway, they have not historically been in the view-
shed of the Sears House. As a result of these factors, enlarging and realigning the
existing transportation facility would not further diminish the visual character of the
property.
Project implementation would not result in the introduction of atmospheric
elements that would diminish the integrity of the property’s significant historic
characteristics or features. There would be no atmospheric effect to this property as a
result of project implementation.
Project implementation would not result in the introduction of audible elements
that diminish the integrity of the property’s significant historic characteristics or features.
The existing noise level at the property is 58 dBA L10. The no-build noise level at the
property is 59 dBA L10. The build noise level (design year 2020) at the resource is 61
dBA L10. This two decibel decrease would occur over twenty years and would not be
perceptible to the human ear. Also, the build noise level would not exceed the FHWA
noise abatement criterion of 70 dBA L10 established for residential land use.
Project implementation would not indirectly affect the Sears House. No change
in traffic patterns would result from project implementation. No additional access to the
existing transportation facility would be provided and no existing access to the facility
would be removed. The proposed project would only increase the capacity and
operational adequacy of the existing roadway to meet current and anticipated future
demand.
Fulton County also proposes to design and construct a green space area along
Johnson Ferry and Abernathy Roads sometime after completion of the proposed road
project. However, the proposed design plan for this green space indicates that no land
from within the eligible historic boundary of the Sears House would be utilized in the
design or construction of this green space.
51
Roy-Fuller House A finding of No Adverse Effect has been determined for the Roy-Fuller House
(refer to Figure 7 – Historic Resources Location Map). This finding was concurred with
by the Georgia SHPO during a technical assistance meeting between GDOT and the
SHPO on August 13, 2004. In the area of the resource, project implementation would
consist of the widening and realignment of Johnson Ferry Road to the east of the
property. Approximately 15 square feet of proposed right-of-way will be required from
within the eligible historic boundary of the property and approximately 1860 square feet
will be acquired as permanent construction easement for the construction of the
proposed project (see Figure 8C– Right-of-Way and Easement for the Roy-Fuller House
and Figure 8D – Close-up View of Right-of-Way and Easement from the Roy-Fuller
House).
Physical destruction of or damage to all or part of the property would occur.
However, this effect is not considered adverse. While a portion of the right-of-way
within the eligible historic boundary of the resource would be necessary for project
implementation, no significant landscape features on the property would be damaged or
removed, and the distance between the proposed roadway and the resource would not
decrease. As a result, no significant features within the eligible boundary that contribute
to the eligibility of the property would be disturbed due to project construction.
Project implementation would not result in a change in the character of the
property’s use. There are no direct or indirect effects that would alter the character of
the continued residential use of the Roy-Fuller House. The widening and reconstruction
of Johnson Ferry Road would take place on the east side of the existing road opposite
the Roy-Fuller House. As a result, the proposed improvements to Johnson Ferry Road
would not further encroach upon the eligible boundary of the property, but instead,
would result in an increased distance between the roadway and the resource.
Project implementation would result in a change in character of the property’s
physical features within the property’s setting that contribute to its historic significance.
However, this effect is not considered adverse. While a portion of the right-of-way
within the eligible historic boundary of the resource would be necessary for project
52
Figure 8C: Right-of-Way and Easement for the Roy-
Fuller House
53
Figure 8D: Close-up View of Right-of-Way and Easement for the Roy-Fuller House
54
implementation, no significant landscape features on the property would be damaged or
removed.
Project implementation would result in the introduction of visual elements that
diminish the integrity of the property’s significant historic characteristics or features.
However, this effect is not considered adverse. The resource is situated at an elevation
substantially lower than the existing roadway. There is also an adequate vegetative
buffer between the property and the existing roadway, and the proposed improvements
will take place on the opposite side of Johnson Ferry Road. As a result of these factors,
improvements to this roadway would not be visible from the property. While the
alignment of Johnson Ferry Road would result in the proposed roadway being moved
further away from the resource, the realignment will result in the removal of four historic
houses within the Long Acres Subdivision Historic District directly across from the
property. However, because these houses are also situated on an elevation
significantly lower than the existing roadway, they have not historically been in the view-
shed of the Roy-Fuller House. As a result of these factors, enlarging and realigning the
existing transportation facility would not further diminish the visual character of the
property.
Project implementation would not result in the introduction of atmospheric
elements that would diminish the integrity of the property’s significant historic
characteristics or features. There would be no atmospheric effect to this property as a
result of project implementation.
Project implementation would not result in the introduction of audible elements
that diminish the integrity of the property’s significant historic characteristics or features.
The existing noise level at the property is 56 dBA L10. The no-build noise level at the
property is 57 dBA L10. The build noise level (design year 2020) at the resource is 58
dBA L10. This one decibel increase would occur over twenty years and would not be
perceptible to the human ear. Also, the build noise level would not exceed the FHWA
noise abatement criterion of 70 dBA L10 established for residential land use.
Project implementation would not indirectly affect the Roy-Fuller House. No
change in traffic patterns would result from project implementation. No additional
access to the existing transportation facility would be provided and no existing access to
55
the facility would be removed. The proposed project would only increase the capacity
and operational adequacy of the existing roadway to meet current and anticipated future
demand.
Fulton County also proposes to design and construct a green space area along
Johnson Ferry and Abernathy Roads sometime after completion of the proposed road
project. However, the proposed design plan for this green space indicates that no land
from within the eligible historic boundary of the Roy-Fuller House would be utilized in
the design or construction of this green space.
Long Acres Subdivision Historic District A finding of Adverse Effect has been determined for the Long Acres Subdivision
Historic District. In the area of the resource, project implementation would consist of the
widening and realignment of Johnson Ferry Road along the western boundary of the
district and the widening of Abernathy Road along the northern boundary of the district.
Approximately 2.74 acres of proposed right-of-way will be required from within the
eligible historic district boundary of the property and approximately 0.34 acres will be
acquired as permanent construction easement (see Figure 8E and 8F – Right-of-Way
and Easement for the Long Acres Subdivision Historic District).
Physical destruction of or damage to all or part of the property would occur. Nine
of the twenty-one contributing structures within the district would be removed as a result
of project implementation.
Project implementation would result in a change in the character of the property’s
use. Nine of the twenty-one contributing structures within the district would be removed
as a result of project implementation, thus impacting the character of their continued
residential use. However, the road project would not result in a change in the character
of the residential use of the remaining twelve properties within the district.
Project implementation would result in a change in the character of the property’s
physical features within the property’s setting that contribute to its historic significance.
Nine of the twenty-one contributing structures within the district, along with their
associated landscape features, would be removed as a result of project implementation.
56
Figure 8E: Right-of-Way and Easement for the Long Acres Subdivision Historic District
57
Figure 8F: Right-of-Way and Easement for the Long
Acres Subdivision Historic District
58
Project implementation would result in the introduction of visual elements that
diminish the integrity of the property’s significant historic character or features. The
portion of Abernathy Road in the area of the resource consists of a two-lane roadway,
and there is no substantial vegetative buffer shielding the historic district from the
existing roadway. This roadway would be widened to four lanes and would result in the
removal of nine of the twenty-one contributing structures within the district. While
twelve of the contributing structures within this district would remain intact after project
implementation, the visual character of these properties would be substantially altered
by removing the nine demolished structures fronting Abernathy Road and replacing
them with a new, four-lane roadway.
Project implementation would not result in the introduction of atmospheric
elements that would diminish the integrity of the property’s significant historic
characteristics or features. There would be no atmospheric effect to this property as a
result of project implementation.
Project implementation would not result in the introduction of audible elements
that diminish the integrity of the property’s significant historic characteristics or features.
The existing noise level at the property is 64 dBA L10. The no-build noise level at the
property is 65 dBA L10. The build noise level (design year 2020) at the resource is 66
dBA L10. This one decibel increase would occur over twenty years and would not be
perceptible to the human ear. Also, the build noise level would not exceed the FHWA
noise abatement criterion of 70 dBA L10 established for residential land use.
Project implementation would not indirectly affect the Long Acres Subdivision
Historic District. No change in traffic patterns would result from project implementation.
No additional access to the existing transportation facility would be provided and no
existing access to the facility would be removed. The proposed project would only
increase the capacity and operational adequacy of the existing roadway to meet current
and anticipated future demand.
Fulton County also proposes to design and construct a green space area along
Johnson Ferry and Abernathy Roads sometime after completion of the proposed road
project. As a result, the proposed design plan for this green space indicates that
approximately eleven of the 23 structures within the Long Acres Subdivision Historic
59
District would be demolished as a result of the proposed transportation project. Nine of
the eleven properties lining Abernathy Road would be used as land for the green space
project. Two of these eleven properties will be used as right-of-way for the relocation
and realignment of Johnson Ferry Road. The remaining twelve properties located
within the historic district boundary would remain intact after construction of the
proposed green space.
Woodward House
A finding of Adverse Effect is anticipated for the Woodward House. In the area of
the resource, project implementation would consist of the widening of Abernathy Road
from two lanes to four lanes. Approximately 0.1245 acre of proposed right-of-way will
be required from within the eligible historic boundary of the property and approximately
1,177 square feet will be acquired as permanent construction easement (see Figure 8G
– Right-of-Way and Easement for the Woodward House).
Physical destruction of or damage to all or part of the property would occur. A
portion of the widening of Abernathy Road would require approximately 30 feet of land
within the eligible historic boundary of the property. This widening would result in the
removal of landscape features that are recognized as contributing elements to the
property’s National Register eligibility.
Project implementation would not result in a change in the character of the
property’s use. There are no direct effects anticipated to the Woodward House that
would alter the character of the continued residential use of the property. The current
distance between the resource and the existing edge of pavement along Abernathy
Road is approximately 150 feet. The approximate distance between the resource and
the proposed edge of pavement is approximately 120 feet, resulting in a decreased
distance of approximately 20 percent. Despite this decrease in distance, the residential
use of the property could still be maintained as substantial yard space between the
resource and the edge of pavement.
Project implementation would result in a change in the character of the property’s
physical features within the property’s setting that contribute to its historic significance.
A portion of the widening of Abernathy Road would require approximately 30 feet of
60
Figure 8G: Right-of-Way and Easement for the Woodward House
61
land within the eligible historic boundary of the property. This widening would result in
the removal of a portion of the property’s grassed lawn that is recognized as a
contributing element to the property’s National Register eligibility.
Project implementation would result in the introduction of visual elements that
diminish the integrity of the property’s significant historic characteristics or features.
The portion of Abernathy Road in the area of the resource consists of a two-lane
roadway, and there is no substantial vegetative buffer shielding the resource from the
existing road. This roadway would be widened to four lanes, two in each direction, and
separated by a 32-foot raised median. Because there is no substantial vegetative buffer
shielding the resource from the existing roadway, and because the area immediately
surrounding the resource is not comprised of dense modern residential or commercial
development, enlargement of the existing transportation facility would compromise the
visual character of the property.
Project implementation would not result in the introduction of atmospheric
elements that would diminish the integrity of the property’s significant historic
characteristics or features. There would be no atmospheric effect to this property as a
result of project implementation.
Project implementation would not result in the introduction of audible elements
that diminish the integrity of the property’s significant historic characteristics or features.
The existing noise level at the property is 67 dBA L10. The no-build noise level at the
property is 68 dBA L10. The build noise level (design year 2020) at the resource is 69
dBA L10. This two decibel increase would occur over twenty years and would not be
perceptible to the human ear. Also, the build noise level would not exceed the FHWA
noise abatement criterion of 70 dBA L10 established for residential land use.
Project implementation would not indirectly affect the Woodward House. No
change in traffic patterns would result from project implementation. No additional
access to the existing transportation facility would be provided and no existing access to
the facility would be removed. The proposed project would only increase the capacity
and operational adequacy of the existing roadway to meet current and anticipated future
demand.
62
Also, while Fulton County proposes to design and construct a green space area
along Johnson Ferry and Abernathy Road sometime after completion of the proposed
road project, the proposed design plan for this green space indicates that the
Woodward House and the associated log cabin on the property would remain intact and
would be utilized as a Community Center for the surrounding neighborhoods.
Eden House A finding of Adverse Effect is anticipated for the Eden House. In the area of the
resource, project implementation would consist of the widening of Abernathy Road from
two lanes to four lanes. Approximately 0.06 acre of proposed right-of-way will be
required from within the eligible historic boundary of the property and approximately 700
square feet will be acquired as permanent construction easement (see Figure 8H –
Right-of-Way and Easement for the Eden House).
Physical destruction of or damage to all or part of the property would occur. A
portion of the widening of Abernathy Road would require approximately 30 feet of land
within the eligible historic boundary of the property. This widening would result in the
removal of landscape features that are recognized as contributing elements to the
property’s National Register eligibility.
Project implementation would not result in a change in the character of the
property’s use. There are no direct or indirect effects anticipated to the Eden House
that would alter the character of the continued residential use of the property. The
current distance between the resource and the existing edge of pavement along
Abernathy Road is approximately 80 feet. The approximate distance between the
resource and the proposed edge of pavement is approximately 60 feet, resulting in a
decreased distance of approximately 25 percent. Despite this decrease in distance, the
residential use of the property could still be maintained as substantial yard space
between the resource and the edge of pavement.
Project implementation would result in a change in the character of the
property’s physical features within the property’s setting that contribute to its historic
significance. A portion of the widening of Abernathy Road would require approximately
30 feet of land within the eligible historic boundary of the property. This widening would
63
Figure 8H: Right-of-Way and Easement for the Eden House
64
result in the removal of a portion of the property’s grassed lawn that is recognized as a
contributing element to the property’s National Register eligibility.
Project implementation would result in the introduction of visual elements that
diminish the integrity of the property’s significant historic characteristics or features.
The portion of Abernathy Road in the area of the resource consists of a two-lane
roadway, and there is no substantial vegetative buffer shielding the resource from the
existing road. This roadway would be widened to four lanes, two in each direction, and
separated by a 32-foot raised median. Because there is no substantial vegetative buffer
shielding the resource from the existing roadway, and because the area immediately
surrounding the resource is not comprised of dense modern residential or commercial
development, enlargement of the existing transportation facility would compromise the
visual character of the property.
Project implementation would not result in the introduction of atmospheric
elements that would diminish the integrity of the property’s significant historic
characteristics or features. There would be no atmospheric effect to this property as a
result of project implementation.
Project implementation would not result in the introduction of audible elements
that diminish the integrity of the property’s significant historic characteristics or features.
The existing noise level at the property is 67 dBA L10. The no-build noise level at the
property is 68 dBA L10. The build noise level (design year 2020) at the resource is 69
dBA L10. This two decibel increase would occur over twenty years and would not be
perceptible to the human ear. Also, the build noise level would not exceed the FHWA
noise abatement criterion of 70 dBA L10 established for residential land use.
Project implementation would not indirectly affect the Eden House. No change in
traffic patterns would result from project implementation. No additional access to the
existing transportation facility would be provided and no existing access to the facility
would be removed. The proposed project would only increase the capacity and
operational adequacy of the existing roadway to meet current and anticipated future
demand.
However, Fulton County proposes to design and construct a green space area
along Johnson Ferry and Abernathy Road sometime after completion of the proposed
65
road project. As a result, the proposed design plan for this green space indicates that
the Eden House would be demolished, and the land occupied by the property would be
incorporated into the final design of the green space project.
SUMMARY Project implementation would result in a finding of Conditional No Adverse Effect
for the Abernathy Arts Center, a finding of No Adverse Effect for the Sears House and
Roy-Fuller House, and a finding of Adverse Effect for the Long Acres Subdivision
Historic District, Woodward House, and Eden House (see Table 4 – Summary of Effects
to Historic Resources).