44
SIERRA Payload Preliminary Design Review Lesli Monforton NASA ARC BAER Institute July 17, 2008

SIERRA Payload Preliminary Design Review Lesli Monforton NASA ARC BAER Institute July 17, 2008

Embed Size (px)

Citation preview

Page 1: SIERRA Payload Preliminary Design Review Lesli Monforton NASA ARC BAER Institute July 17, 2008

SIERRA Payload Preliminary Design

Review

Lesli Monforton

NASA ARC

BAER Institute

July 17, 2008

Page 2: SIERRA Payload Preliminary Design Review Lesli Monforton NASA ARC BAER Institute July 17, 2008

SIERRA NosePayloads

Primary Payload: NASA ARC; Hyperspectral – Stephen Dunagan

Piggyback Payload 1: NASA Wallops FRC; Microspectrometer – Geoff Bland

Piggyback Payload 2: University of Colorado; Laser - James Maslanik Laser

Additional Instrumentation: NASA ARC; CMIGITS III - Paul Bui

Page 3: SIERRA Payload Preliminary Design Review Lesli Monforton NASA ARC BAER Institute July 17, 2008

Hyperspectral Payload Stephen Dunagan

Specim ImSpector Imperx Camera Data System Data Disk

Page 4: SIERRA Payload Preliminary Design Review Lesli Monforton NASA ARC BAER Institute July 17, 2008

Nose Layout Notes

Upper Shelf - Vibration Isolated (Lord 150APL Series Mounts) 1/8 7075 T6

Lower Shelf - Vibration Isolated (Lord 150APL Series Mounts) 1/8 7075 T6

CM3, HMR 3000 require Hard Mounting Also directly mounted: GPS Antenna,

Microspectrometer Lenses, K&Z Pyrometers-All to Top or Bottom Skin of Nose

All Drawing do not show Fiberglass Skin & Aeromat Thickness for Clarity

Page 5: SIERRA Payload Preliminary Design Review Lesli Monforton NASA ARC BAER Institute July 17, 2008

Side ViewAll Instruments Shown

Page 6: SIERRA Payload Preliminary Design Review Lesli Monforton NASA ARC BAER Institute July 17, 2008

Lower ShelfAll Instruments Shown

Page 7: SIERRA Payload Preliminary Design Review Lesli Monforton NASA ARC BAER Institute July 17, 2008

Upper ShelfAll Shown

Page 8: SIERRA Payload Preliminary Design Review Lesli Monforton NASA ARC BAER Institute July 17, 2008

HyperspectralSide View

Page 9: SIERRA Payload Preliminary Design Review Lesli Monforton NASA ARC BAER Institute July 17, 2008

HyperspectralTop View-Lower Shelf

Page 10: SIERRA Payload Preliminary Design Review Lesli Monforton NASA ARC BAER Institute July 17, 2008

Hyperspectral Top View Upper Shelf

Page 11: SIERRA Payload Preliminary Design Review Lesli Monforton NASA ARC BAER Institute July 17, 2008

MicrospectrometerGeoff BlandNASA Wallops Flight Facility

USB2000 Microspectrometer USB4000 Microspectrometer CT08.85 Pyrometer CT08.K6 Pyrometer K&Z Zenith Pyrometer K&Z Nadir Pyrometer P300 0-15 PSIA Pressure Pace TRH-160 Humidity Sensor Pace PT907 Thermister

Page 12: SIERRA Payload Preliminary Design Review Lesli Monforton NASA ARC BAER Institute July 17, 2008

MicrospectrometerContinued

Sony VAIO Computer VGN-UX180P Sony VAIO Computer VGN-UX280P Pace XR5 Data Logger Lithium Polymer 14.8V 8000MAH Battery Lithium Polymer 11.1V 2100MAH Battery

Page 13: SIERRA Payload Preliminary Design Review Lesli Monforton NASA ARC BAER Institute July 17, 2008

MicrospectrometerSide View

Page 14: SIERRA Payload Preliminary Design Review Lesli Monforton NASA ARC BAER Institute July 17, 2008

MicrospectrometerTop View Lower Shelf

Page 15: SIERRA Payload Preliminary Design Review Lesli Monforton NASA ARC BAER Institute July 17, 2008

MicrospectrometerTop of NoseZenith Microspectrometer-Delrin Tower Zenith Pyrometer

Page 16: SIERRA Payload Preliminary Design Review Lesli Monforton NASA ARC BAER Institute July 17, 2008

MicrospectrometerTop View-Bottom (From Inside)Nadir Microspectrometer Sensor &Nadir Pyrometer

Page 17: SIERRA Payload Preliminary Design Review Lesli Monforton NASA ARC BAER Institute July 17, 2008

LaserJames MaslanikUniversity of Colorado

Universal Laser Sensor Data System Battery IMU 3DM-G (may share CM3 Data) GPS and Antenna (may share CM3 Data)

Page 18: SIERRA Payload Preliminary Design Review Lesli Monforton NASA ARC BAER Institute July 17, 2008

LaserSide View

Page 19: SIERRA Payload Preliminary Design Review Lesli Monforton NASA ARC BAER Institute July 17, 2008

LaserTop View Lower ShelfLaser Data & Battery mounted with Velcro

Page 20: SIERRA Payload Preliminary Design Review Lesli Monforton NASA ARC BAER Institute July 17, 2008

Additional Nose InstrumentsPaul BuiNASA Ames Research Center

C-MIGITS III HMR-3000 Digital Compass GPS S67-1575-14 Antenna

Page 21: SIERRA Payload Preliminary Design Review Lesli Monforton NASA ARC BAER Institute July 17, 2008

Additional InstrumentationSide View

Page 22: SIERRA Payload Preliminary Design Review Lesli Monforton NASA ARC BAER Institute July 17, 2008

Additional InstrumentationTop View Note: HMR3000 is shown though it is mounted Inside

Page 23: SIERRA Payload Preliminary Design Review Lesli Monforton NASA ARC BAER Institute July 17, 2008

Additional InstrumentationTop Inside

Page 24: SIERRA Payload Preliminary Design Review Lesli Monforton NASA ARC BAER Institute July 17, 2008

Additional InstrumentationBottom View-from Inside

Page 25: SIERRA Payload Preliminary Design Review Lesli Monforton NASA ARC BAER Institute July 17, 2008

Nose Modifications

Add Plywood and Fiberglass supports for Upper Shelf

Add Plywood mounts to Top Skin Cut away portion of existing plywood Lower

Shelf Add Plywood to bottom inside rear Make Fiberglass cover for existing gimbal

hole

Page 26: SIERRA Payload Preliminary Design Review Lesli Monforton NASA ARC BAER Institute July 17, 2008

Nose ModificationsContinued

Click Bond 8x32 & 6x32 Locking Nut Plates bonded to Plywood Shelves

All Plywood Aircraft Grade and Sealed with Epoxy

Page 27: SIERRA Payload Preliminary Design Review Lesli Monforton NASA ARC BAER Institute July 17, 2008

Nose Modifications Side View New Top & Upper/Lower Shelf Mounts

Page 28: SIERRA Payload Preliminary Design Review Lesli Monforton NASA ARC BAER Institute July 17, 2008

Nose Modifications Top View Lower Shelf Before

Page 29: SIERRA Payload Preliminary Design Review Lesli Monforton NASA ARC BAER Institute July 17, 2008

Nose Modifications Top View Lower Shelf After CutoutUpper Shelf & Bottom Mod’s not shown for Clarity

Page 30: SIERRA Payload Preliminary Design Review Lesli Monforton NASA ARC BAER Institute July 17, 2008

Nose BottomHole Glassed & Bottom Shelf Supports Added

Page 31: SIERRA Payload Preliminary Design Review Lesli Monforton NASA ARC BAER Institute July 17, 2008

Nose ModificationsNew Top Mounts InsideView

Page 32: SIERRA Payload Preliminary Design Review Lesli Monforton NASA ARC BAER Institute July 17, 2008

Nose Modifications Top View New Upper Shelf

Page 33: SIERRA Payload Preliminary Design Review Lesli Monforton NASA ARC BAER Institute July 17, 2008

Nose ModificationsTop View-New Bottom ¼ ShelfLower Shelf Not Shown for Clarity

Page 34: SIERRA Payload Preliminary Design Review Lesli Monforton NASA ARC BAER Institute July 17, 2008

Nose Modifications Front ViewForward Bulkhead & Hatch Cross Section

Page 35: SIERRA Payload Preliminary Design Review Lesli Monforton NASA ARC BAER Institute July 17, 2008

Nose ModificationsFront Views: New Upper Shelf; Top Mounts; CM3 Mount

Page 36: SIERRA Payload Preliminary Design Review Lesli Monforton NASA ARC BAER Institute July 17, 2008

Lower Shelf PlateVAIO & Microspectrometer Mounts RivetedNut Plates Riveted for the Imperx, ImSpector & Laser Mounts

Page 37: SIERRA Payload Preliminary Design Review Lesli Monforton NASA ARC BAER Institute July 17, 2008

Upper Shelf PlateComputer Mounting Rails Riveted to Plate

Page 38: SIERRA Payload Preliminary Design Review Lesli Monforton NASA ARC BAER Institute July 17, 2008

ImSpector & Imperx Mounting BracketsMachined from 6061 T6 4”x3” Stock Shown

Page 39: SIERRA Payload Preliminary Design Review Lesli Monforton NASA ARC BAER Institute July 17, 2008

Microspectrometer MountUSB2000 &USB4000Bent from 0.070 2024 T3 Sheet

Page 40: SIERRA Payload Preliminary Design Review Lesli Monforton NASA ARC BAER Institute July 17, 2008

VAIO Computer Mounts Bent from 0.070 2024 T3 Sheet Riveted to Lower Plate & VAIO secured using Velcro & Foam Spacer

Page 41: SIERRA Payload Preliminary Design Review Lesli Monforton NASA ARC BAER Institute July 17, 2008

Pace TRH-160 Humidity SensorMounted to front of Lower ShelfMachined from 1” 6061 T6 Bar Stock

Page 42: SIERRA Payload Preliminary Design Review Lesli Monforton NASA ARC BAER Institute July 17, 2008

Microspectrometer Zenith MountMachined from Delrin

Page 43: SIERRA Payload Preliminary Design Review Lesli Monforton NASA ARC BAER Institute July 17, 2008

Modification Additional Notes

Upper Shelf reinforced with fiberglass where its bonded to nose fiberglass shell

Old Gimbal Hole: Glassed & reinforced with Aeromat; same as existing glass work

Page 44: SIERRA Payload Preliminary Design Review Lesli Monforton NASA ARC BAER Institute July 17, 2008

Weight & Balance

Nose before Modification = 4.625 lbs. Modifications plus Instruments = 42.575 lbs Total Estimated Payload Nose = 47.2 lbs Estimated CG of Nose at Station 91 Rear of Nose is Station 100