CUT SLOPESThe soil & rock are cut & excavated stability content
decrease.
meanwhile
The renovating done the slope cutting ready & safe.
Slope excavation takes place- original soil level higher
then level of new road formation to built.
Cut slope for equivalent soil strata.
7/29/2019 Side Slope Operation
3/15
Cut slope
for variablesoil strata
Type of soil Cutting depth Sloping
Solid rock 1:0.3 -1:0.0
Rock 1:0.5 -1:1.2
Sand 1:0.5 -1:1.0
Sandy soil 0-5 1:0.8 -1:1.2
Compact earth 5-10 1:1.0-1:1.2
Sand, loose 5-10 1:1.2-1:1.5
Clay soil 0-10 1:0.8-1:1.2
Clay-stone 5-10 1:1.2-1:1.5
Table for safely slope cutting
7/29/2019 Side Slope Operation
4/15
Problem in cut slope
Ways to overcomethe problem
i) Prepare slope-suitable slantingdegrees.
ii) Turfing slope areas-maintain soil stability.
iii) Hydro seeding use toplant the plant on alkalisoil.
iv) Use Geofabric orgeotextileavoid diffusionof ground water.
Method toovercome the
problem
i)Build the fencingalong slope areas.
ii)Use a net.
iii) Gabion block.
> in soil also
influences stability of
soil.
> Storey & soil
drainage- important.
> Sub-soil drains used
to control the flow of
infiltration.
landslide Water infiltration
7/29/2019 Side Slope Operation
5/15
Embankmentslope
Equivalent
materials
Different materials
7/29/2019 Side Slope Operation
6/15
LandslideWays to
overcome the
problem:
Turfing- Planting the
plants for slope
protection.
Prepare the slope with
suitable degrees.
Use gefabric & geotextile
avoid diffusion of
ground water.
Problems in slope
banking
Prepare the drainage
system- let the water
flow easily. Grow plants- cover
the slope surface.
7/29/2019 Side Slope Operation
7/15
DeterminationOf R.O.W(Itincludes roadwidth, shoulder
width & spare
area of road)
7/29/2019 Side Slope Operation
8/15
Site clearing
operationCutting
grubbing
Discard
Top soil
Cutting trees in R.O.W waste of trees is shifted
Stump and root are being strippedwith a depth of 500-1000mm fromproposed level sub grade
Backfill holes before starting anembankment works
Discard bushed
Machinery:-i. Bulldozerii. Excavatoriii. scrapper
Top soil- only suitable for crop
Could not bearing load
Need to be discarded until fixeddepth
A good soil will be kept forgrass/tree cultivation
Machinery:-
i. Bulldozer
ii. Excavator
iii. Transporters, e.t.c.
7/29/2019 Side Slope Operation
9/15
. If road formation level under soil
origin level
.Cutting also can occur in area of soil
borrow pit for embankment purpose
.if road formation level higher
than soil origin level
. Clearing works should be
done first if :-
Embankment < 3m
Origin soil surface rugged
Sloping soil surface
SOIL
WORK
7/29/2019 Side Slope Operation
10/15
> Slope will beformed by cutting
works orembankment works
for formation level ofroad
< Slope failure cause
. Unperfect works
. Increasing ofmoisture content
. Increasing ofapplied load
OPERAT
ION OFSIDE
SLOPE
7/29/2019 Side Slope Operation
11/15
CUTTING SLOPE PROBLEMS
LANDSLIDE
SCREE
WATER
ASORPTION
Cutting at safe slant
Plant grass
Install geofabric/geotextile
Mortar cement rendering
Build retaining wall
Install steel netting
Build safety fence
Mortar cement rendering
Build stone mooring
Drainage system:-
Bypass drain, shelf drain, roadside drain and
underground drain
PROBLEMS SOLUTION
7/29/2019 Side Slope Operation
12/15
CUTTING SLOPE
SOLUTION
7/29/2019 Side Slope Operation
13/15
EMBANKMENT SLOPE PROBLEMS
PROBLEMS
Landslide
Erosion
Deposition
Perfect compaction
Plant grass Install geofabric/geotextile
Build retainingwall
Plant grass
Surface Drainage System
(e.g: toe drain , dike drain , roadshoulder drain and culvert)
Perfect compaction
Discard top soil
Use a selected fill material
SOLUTION
7/29/2019 Side Slope Operation
14/15
EMBANKMENT SLOPE
SOLUTION
7/29/2019 Side Slope Operation