4
> > > > > > > > > > > > PROJECT LOCATION MAP PROJECT LOCATION SHT. NO. DESCRIPTION 1. TITLE AND INDEX SHEET 2. SITE PLAN 3. GENERAL DETAILS AND NOTES 4. BID ITEMS AND NOTES North TWIN LAKES LAKE SINAI 215TH STREET 455TH AVENUE 4 1 NH0081(00)112 PCN 03CU 21295-06

SHT. NO. DESCRIPTION TWIN LAKES 215TH STREET1747.5 (navd88). drawdown operations would resume when lake sinai water elevation drops down to 1747.3 (navd88). 6.dot will monitor the

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: SHT. NO. DESCRIPTION TWIN LAKES 215TH STREET1747.5 (navd88). drawdown operations would resume when lake sinai water elevation drops down to 1747.3 (navd88). 6.dot will monitor the

>

>

>

>

> >>

>

>

>

>

>

PROJECT LOCATION MAP

PROJECT

LOCATION

SHT. NO. DESCRIPTION

1. TITLE AND INDEX SHEET

2. SITE PLAN

3. GENERAL DETAILS AND NOTES

4. BID ITEMS AND NOTES

North

TWIN LAKES

LAKE SINAI

215TH STREET

455T

H A

VE

NU

E

41

NH0081(00)112

PCN 03CU

21295-06

denniso
Group
denniso
Pen
denniso
Text Box
8-24-11
Page 2: SHT. NO. DESCRIPTION TWIN LAKES 215TH STREET1747.5 (navd88). drawdown operations would resume when lake sinai water elevation drops down to 1747.3 (navd88). 6.dot will monitor the

1

7

6

0

1

7

6

5

1

7

7

0

1

7

7

5

1

7

8

0

1

7

8

5

1790

1795

1

8

0

0

1

7

5

5

1760

1

7

6

5

1770

1775

1780

1785

1790

1

7

6

0

1

7

6

5

1

7

7

0

1

7

5

5

1760

1

7

6

5

1

7

7

0

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

0

+

0

0

1

+

0

0

2

+

0

0

3

+

0

0

4

+

0

0

5

+

0

0

6

+

0

0

7

+

0

0

8

+

0

0

9

+

0

0

1

0

+

0

0

1

1

+

0

0

1

2

+

0

0

1

3

+

0

0

1

4

+

0

0

1

5

+

0

0

1

6

+

0

0

1

7

+

0

0

1

8

+

0

0

1

9

+

0

0

2

0

+

0

0

2

1

+

0

0

2

2

+

0

0

2

3

+

0

0

2

4

+

0

0

2

5

+

0

0

2

6

+

0

02

6

+

4

8

B

P

=

0

+

0

0

.

0

0

P

I

=

1

1

+

0

4

.

1

5

P

I=

1

7

+

3

2

.2

2

P

I

=

2

0

+

1

8

.

9

5

P

I

=

2

1

+

0

5

.

4

3

P

I

=

2

1

+

8

5

.

3

5

E

P

=

2

6

+

4

7

.9

8

50' EASEMENT

FLOWLINE

1730

1740

1750

1760

1770

1780

1790

1730

1740

1750

1760

1770

1780

1790

0+00 1+00 2+00 3+00 4+00 5+00 6+00 7+00 8+00 9+00 10+00

1761.3

11+00

1761.0

1762.0

12+00

1762.7

1763.5

13+00

1763.2

1762.6

14+00

1762.2

1762.1

15+00

1761.8

1761.5

16+00

1761.2

1760.2

17+00

1759.1

1758.3

18+00

1758.0

1757.6

19+00

1756.8

1756.1

20+00

1755.4

1754.8

21+00

1753.9

1752.7

22+00

1751.7

1751.4

23+00 24+00 25+00 26+00 27+00

PARCEL T1

DON L. JOHNSON

SE1/4 OF SECTION 6-T109N-R52W,

BROOKINGS COUNTY, SOUTH DAKOTA.

1" = 250'

455T

H A

VE

NU

E

215TH STREET

SECTION LIN

E

SE

CT

IO

N LIN

E

33'

ROW

TWIN

LAKES

42

SE CORNER

SEC. 6-109-52

(FOUND 3/4" IRON PIN)

T1

NH0081(00)112

PCN03CU

T2

21295-06

T2A

STA. 0+00 TO 10+02

PROFILE PROJECTED OUT BASED

ON USGS CONTOUR DATA

STA. 22+65 TO 26+48

PROFILE PROJECTED OUT BASED

ON SINGLE SHOT NEAR STA. 26+48

STA. 10+02 - START OF

DETAILED SURVEY DATA

STA. 22+65 - END OF

DETAILED SURVEY DATA

STA. 12+52

HIGH POINT = 1763.60

1/4 LIN

E

SE 1/4 SECTION 6-T109N-R52W

TARGET DEWATERING

EL. = 1756.0'

MIN. DEWATERING

EL. = 1758.8'

APPROX. WATER

EL. (8-16-11) = 1761.8'

PARCEL T2

ALLAN R NEGSTAD

JOANNE NEGSTAD

NEGSTAD'S SUBD. TRACT A IN E1/2 SW1/4 OF SECTION

6-T109N-R52W, BROOKINGS COUNTY, SOUTH DAKOTA.

PARCEL T2A

UNITED STATES OF AMERICA

PARCEL 2 OF SW1/4 OF SECTION 6-T109N-R52W,

BROOKINGS COUNTY, SOUTH DAKOTA.

denniso
Group
denniso
Pen
denniso
Text Box
8-24-11
Page 3: SHT. NO. DESCRIPTION TWIN LAKES 215TH STREET1747.5 (navd88). drawdown operations would resume when lake sinai water elevation drops down to 1747.3 (navd88). 6.dot will monitor the

43

NH0081(00)112

PCN 03CU

4

1

RIPRAP REQUIREMENTS (SDDOT CLASS)

12" TO 24" 8 TO 12 CY CL. A

27" TO 33" 14 TO 20 CY CL. A

36" TO 48" 23 TO 28 CY CL. A

54" AND UP 62 CY AND UP CL. B

(ONE CUBIC YARD IS APPROXIMATELY 2,800 LBS.)

NOTES;

1. RIPRAP MATERIAL & QUALITY SHALL BE IN

ACCORDANCE WITH SDDOT STANDARD

SPECIFICATIONS FOR .RIPRAP.

2. PROVIDE RIPRAP AT ALL STORMWATER &

DRAINAGE PIPE OUTLETS.

PLAN

5D

1

4

RIPRAP

2

'

2

'

B

A

D

SCALE: NONE

SECTIONA

SCALE: NONE

SECTIONB

RIPRAP

2'

12

"

RIPRAP

12

"

GEOTEXTILE FILTER FABRIC,

SDDOT TYPE B

GEOTEXTILE FILTER FABRIC,

SDDOT TYPE B

RIPRAP DETAIL

SCALE: NONE

21295-06

PROJECT: NH 0081(00)112, BROOKINGS COUNTY - PCN 03CU

EMERGENCY DRAWDOWN OF TWIN LAKES

WORK WILL INVOLVE DEWATERING THE LAKES AT AN APPROXIMATE SUSTAINED RATE OF 35 CUBIC FEET PER SECOND (MAXIMUM) FOR 90 TO 100 DAYS. WORK MAY BE INHIBITED DUE

TO WEATHER CONDITIONS OR OTHER CIRCUMSTANCES - THUS THE STANDBY TIME. CHANNEL/SADDLE MODIFICATION WILL NOT BE ALLOWED TO ACCOMPLISH THE WORK. THE

EXISTING CHANNEL/SADDLE IS TO REMAIN UNCHANGED.

1. CONTRACTOR SHALL PROVIDE MEANS AND METHOD FOR A SUSTAINED DRAWDOWN OF 35 CFS FROM TWIN LAKES. THIS FLOW RATE SHALL BE VERIFIED BY AN APPROVED

METHOD OF MEASUREMENT. THE FLOW SHALL BE MEASURED AND RECORDED TWICE WEEKLY, BY THE CONTRACTOR. THE PRELIMINARY ENGINEERING REPORT PRESENTED

ALTERNATIVES FOR THIS DRAWDOWN AND CAN BE EXAMINED AND DOWNLOADED FROM THE SOUTH DAKOTA DEPARTMENT OF TRANSPORTATION WEB SITE

HTTP://WWW.SDDOT.COM/PE/PROJDEV/PLANNING_PUBMEET_US81.ASP OR USE THE LINK ON THE HOME PAGE OF THE WEBSITE WWW.SDDOT.COM.

THE TOTAL FLOW WILL BE MONITORED BY DOT AT THE 4 - 48" CMP CULVERTS INSTALLED IN THE TOWNSHIP ROAD (455TH AVENUE). CONTRACTOR WILL BE RESPONSIBLE TO

INCREASE OR DECREASE THE SUSTAINED DRAWDOWN FLOW TO ACCOUNT FOR THE NATURAL FLOW THAT MAY OCCUR AT THE SADDLE DUE TO RAIN FALL EVENTS.

2. FISH SCREENING SHALL BE PROVIDED BY THE CONTRACTOR. SD GAME FISH AND PARKS STATED THAT THE GOAL IS TO PREVENT TRANSFER OF FISH FROM ONE LAKE TO THE

OTHER BY DOWNWARD MIGRATION OR UPWARD MIGRATION. PLACING A PIPE UNDER OVERSIZED ROCK IS AN ACCEPTABLE MEANS OF PREVENTING FISH FROM TRANSFERRING

FROM ONE LAKE TO THE OTHER AS LONG AS BOTH ENDS OF THE PIPE ARE THUS PROTECTED. THE DEPTH OF THE ROCK MUST BE GREAT ENOUGH TO CREATE A MATRIX THAT

THE FISH CANNOT NAVIGATE THROUGH AND GET CAUGHT IN THE FLOW. MECHANICAL SCREENS WOULD ALSO BE ALLOWED. THE SLOT SIZE SHALL BE EQUIVALENT TO A #40

SIEVE SIZE OR APPROXIMATELY 0.0165 INCHES OR 0.425 MM. SCREENS SHALL BE SIZED SO THAT THE TOTAL OPEN AREA ALLOWS FOR A MAXIMUM SLOT VELOCITY OF 0.5 FT PER

SEC. THE FISH SCREENING FACILITY PLANNED FOR THIS PROJECT MUST BE APPROVED BY SD DOT AND SD GAME FISH AND PARKS.

3. EROSION PROTECTION SHALL BE PROVIDED BY THE CONTRACTOR AT THE ENDS OF THE PIPE TO PREVENT A SCOUR HOLE AND EROSION OF SOIL PARTICLES.

4. THE WATER WITHDRAWAL SHALL END WHEN ANY OF THE FOLLOWING CRITERIA HAS BEEN MET:

A.THE TWIN LAKES WATER ELEVATION REACHES AN ELEVATION OF 1756.00 MEAN SEA LEVEL (NAVD88). THIS ELEVATION WILL BE MONITORED AND DOCUMENTED BY DOT AT

THE US HIGHWAY 81 MRM 113. AN ELEVATION ROD WILL BE SET IN PLACE AT THE EDGE OF THE SHOULDER.

B. WEATHER CONDITIONS CAUSE FREEZING IN THE DRAINAGE THAT RESTRICTS FLOW AND BACKS WATER UP IN THE CHANNEL. DOT WILL MONITOR AND IN MUTUAL

AGREEMENT WITH BROOKINGS COUNTY DETERMINE WHEN THE FLOW RESTRICTIONS IS GREAT ENOUGH TO REQUIRE THE OPERATIONS TO CEASE.

C.OPERATIONS WILL CEASE NO LATER THAN DECEMBER 16, 2011

5. THE WATER SURFACE ELEVATION OF LAKE SINAI WILL ALSO BE MEASURE BY DOT. DRAWDOWN OPERATION MAY BE PUT ON STANDBY IF LAKE SINAI WATER ELEVATIONS REACH

1747.5 (NAVD88). DRAWDOWN OPERATIONS WOULD RESUME WHEN LAKE SINAI WATER ELEVATION DROPS DOWN TO 1747.3 (NAVD88).

6. DOT WILL MONITOR THE RIVER STAGES USING THE USGS GAGING STATION #06480000. IF THE BIG SIOUX RIVER FLOWS INCREASE TO 1900 CFS THEN THE DRAWDOWN

OPERATIONS WILL TEMPORARILY CEASE UNTIL THE BIG SIOUX RIVER FLOWS HAVE DROPPED DOWN TO 1500 CFS.

7. SURFACE RESTORATION SHALL BE COMPLETED BY THE CONTRACTOR IN THE SPRING OF 2012. WORK SHALL INCLUDE THE RE-SEEDING OF THE CRP ACREAGE AS REQUIRED TO

RESTORE THE AREA TO THE EXISTING CONDITION PRIOR TO THIS PROJECT.

8. ALL WORK SHALL BE COMPLETED IN ACCORDANCE WITH THE BROOKING COUNTY TEMPORARY DRAINAGE PERMIT AND THE ATTACHED FINDINGS OF FACT, CORP OF ENGINEERS

404 PERMIT AND THE SD GAME FISH AND PARKS PERMIT.

denniso
Group
denniso
Pen
denniso
Text Box
8-24-11
Page 4: SHT. NO. DESCRIPTION TWIN LAKES 215TH STREET1747.5 (navd88). drawdown operations would resume when lake sinai water elevation drops down to 1747.3 (navd88). 6.dot will monitor the

44

NH0081(00)112

PCN 03CU

21295-06

denniso
Group
denniso
Pen
denniso
Text Box
8-24-11