Data Sheet

DCD-Bever Decentral WasteWater Treatment

BouwCoach Engineering bvwww.bouwcoach.nl www.dcdr.euMail: [email protected] de Lange MSc: 0031-654223534

Page 2: Showtas Data Sheet ENG GENERAL rev B

DCD Mini Modular Wasterwaterplant

BouwCoach Engineering BV

Page 3: Showtas Data Sheet ENG GENERAL rev B

DCD Mini Modular WasterwaterplantPurifying SystemFor purifying the wastewater, the DCD-Bever works with the activated sludge process which is used worldwide (patented technology Afmitech Friesland bv). In this process the pollution is degraded biologically by micro organisms floating in the water. These micro organisms form a floc, which is the so-called activated sludge. Because this activated sludge is heavier than the water in the tank, it will sink down in the settling compartment from where it can be separated from the water flow. The installation is made vertically with a surface aerator which creates a vertical circulation by intermittent aeration. This vertical circulation makes denitrification possible.  The system itself signalizes the amount of wastewater coming in and automatically adjusts the oxygen input while the purification process continues; this means that the DCD-Bever has a continuous purification process with a discontinuous control. In this way, the wastewater treatment system can perform properly with changing seasonable loads. The excess growth of sludge is automatically thickened and periodically drained to the excess sludge sump. In this way the system keeps the concentration of excess sludge in the aeration compartment stable and prevents the wastewater treatment tank from becoming overgrown with sludge.

BouwCoach Engineering BV

Page 4: Showtas Data Sheet ENG GENERAL rev B

Test Results:Our Bever wastewater treatment system (patented technology Afmitech Friesland bv) is extensively tested for 26 weeks in 2002 by the Van Hall Larenstein Institute, Leeuwarden. During the attestation, only flux-proportional collect samples of the effluent were taken and analyzed by an accredited research laboratory.

Parameters Concentrations in any 24-hour aggregate

sample (mg/l)

Concentrations in any stitch sample (mg/l)

BOD5 < 20 < 40COD < 100 < 200

N-total < 30 < 60NH4+ < 2 < 4

SS < 30 < 60

The requirements at the effluent of an IBA-class IIIA were:

BouwCoach Engineering BV

Page 5: Showtas Data Sheet ENG GENERAL rev B

Parameters Average Value Maximal Value Minimal ValueBZV5 308,8 380,0 259,8CZV 783,3 1028,3 669,3

N-totaal 68,8 79,1 54,8SS 390,9 615,0 307,5

CZV : BZV 2,6 3,0 2,0

Parameters Average Value Maximal Value Minimal Value

BZV5 < 3,0 < 3,0 < 3,0

CZV 40 50 30

N-totaal 10,0 26,8 2,2

NH4+ 0,9 1,9 < 0,2

SS 2,7 7,7 < 2,0

Influent parameters for testing

Test results Effluent

BouwCoach Engineering BV

Page 6: Showtas Data Sheet ENG GENERAL rev B

These assumptions are based on conservative Key-Figures, nevertheless always discussable.But the results of the comparisation of average investment costs for DCD-Bever systems and traditional shows a factor 3 in lower costs for decentral systems!

To be able to compare the investment costs with a traditional (50.000-100.000ie) wastewater treatment plant, some assumptions are made: 1) investment costs for traditional plant are € 200,- per i.e. 2) investment in meter sewage pipe is € 100,- 3) the distance from “lowest” village to a traditional wwtp is 10km.

Cost Comparisation

For 25 communities in the Arad Area businesscases are established.These communities vary from 700 inhabitants spreaded over 3 towns to 3000 inhabitants in 10 villages . The calculated average cost of ownership for complete DCD-Bever community systems (excluded village-canalisation) go down to € 22,- per inhabitant per year (with EU funding included).When the investment costs are compared, the absence of inter-village sewers and main sewer to a traditional plant, cause a significant cost-difference in favour of decentralized units.

BouwCoach Engineering BV

Page 7: Showtas Data Sheet ENG GENERAL rev B

Modular ApproachThe Bever-DCD system is a modular system of decentral wastewater-treatment for communities from 50i.e., 100i.e. and 175i.e in steps up to 2500/5000 i.e.This modularity guarantees flexibility in phasing, providing any needed growth of connected population and/or availability of canalization.Also innovation in purification technologies develops fast. This modular approach guarantees, (in combination with 15 or 25 years administrative life-time) the flexibility of replacing systems or system-parts at any time.Waste and wastewater become more and more a source of energy and raw materials (as for example phosphorus). Modular units can be added for extraction of specific substances and exploiting the energy sources in near future.At last but not least, the awareness of health-threatening pollutions, as for example medicine and metals, will demand purification on these substances in near future. Our modular systems can be expanded at any time with the newest technology.

BouwCoach Engineering BV

Page 8: Showtas Data Sheet ENG GENERAL rev B

mww0250 i.e.

mww03 100 i.e.

mww04 175 i.e.

mww05 225 i.e.

Mww06 350 i.e.

1 family = approximately 3 i.e.

BouwCoach Engineering BV

Page 9: Showtas Data Sheet ENG GENERAL rev B

BouwCoach Engineering BV

Page 10: Showtas Data Sheet ENG GENERAL rev B

BouwCoach Engineering BV

Page 11: Showtas Data Sheet ENG GENERAL rev B

BouwCoach Engineering BV

Page 12: Showtas Data Sheet ENG GENERAL rev B

Capacity in IE min. flow /day average flow/day max. flow/day sludge buffer influent bufferR10,67x7 2500 140 m3 281 m3 439 m3 100 m3 200 m3

total Energy: 350 kWh/day Compl. Investment: (coarse screen, influent buffer and sludgepit included)

Sludge: 4 times/year total € 662.454 per m3 max load: € 1.509Sludgecosts (estimated) excl tva per IE € 265

€ 26.000 per year Total operational costs (indicative)

Maintenance costs (estimated) per Year € 60.220€ 20.000 per year excl tva per IE per Year € 24

Unforseen: € 4.000 per year

DCD-2500 2015

BouwCoach Engineering BV

Page 13: Showtas Data Sheet ENG GENERAL rev B

Capacity in IE min. flow /day average flow/day max. flow/day sludge buffer influent bufferR9,38/5,7 1500 86,0 m3 216,0 m3 324 m3 75 m3 100 m3

total Energy: 240 kWh/day Compl. Investment: (coarse screen, influent buffer and sludgepit included)

Sludge: 4 times/year total € 606.945 per m3 max load: € 1.873Sludgecosts (estimated) excl tva per IE € 405

€ 16.000 per year Operational costs

Maintenance costs (estimated) per Year € 45.008€ 18.000 per year excl tva per IE per Year € 30

Unforseen: € 4.000 per year

DCD-1500 2015

BouwCoach Engineering BV

Page 14: Showtas Data Sheet ENG GENERAL rev B

DCD-Bever 2015

est. daily energy kWh

est. annual energy costs

included! included!

Sizetarget prices

annual service costs

construction area (m2)

building area (m2)

min. flow m3/day

av. flow m3/day

max. flow m3/day

influent buffer m3

sludge buffer m3

to empty (in days)

25-75 p.e. 50 MWW02 € 60.500 € 2.000 5,5 € 161 58 13 4,0 8,0 12 11,5 8,5 218,8

50-150 p.e. 100 MWW03 € 79.500 € 2.500 8,0 € 234 58 13 6,0 13,0 20 11,5 8,5 132,8

90-250 p.e. 175 MWW04 € 123.000 € 3.000 16,0 € 467 85 26 11,0 22,0 34 20,75 20,75 177,4115-330 p.e. 225 MWW05 € 159.500 € 3.500 24,0 € 701 85 26 23,0 30,0 38 20,75 20,75 144,0

175-525 p.e. 350 MWW06 € 195.000 € 4.000 32,0 € 934 85 26 22,0 44,0 68 20,75 20,75 93,0

350-1050 p.e. 700 2xMWW06 € 380.000 € 7.500 64,0 € 1.869 125 52 44,0 88,0 136 41,5 41,5 93,0

750-2250 p.e. 1500 DCD1500 € 610.000 € 22.500 138,0 € 4.030 175 90 86,0 216,0 324 100 100 90,0

1250-3750 p.e. 2500 DCD2500 € 660.000 € 24.500 210,0 € 6.132 225 125 140,0 281,0 439 150 100 57,0

Prices Included: Specifications:- complete plug&play system included housing and buffertanks - Closed housing, close to buildings (MWW)

Prices Excluded: no noise

- tva - Closed process-tank, close to buildings (MWW)

- piping towards and away from installation(s) no smell

- electricity towards installation(s) - insulated housing, secured operation (MWW)

- emptying sludge tank frost protection in winter

- energy costs (over)heat protection in summer

- 2 monthly filter cleaning - Plug&Play, short construction timeestimated total construction time 2-3- weeks

- Combined remote and on-site service

break even km sewage: (€200/m)

unmanned operation, only occasional inspection

max. flow m3/day Costs per m3

- Low energy consumption€2,5 to €3,6 per p.e. per year

25-75 p.e. 50 MWW02 € 60.500 12,0 € 5.042 19,0 - Sludge buffering50-150 p.e. 100 MWW03 € 79.500 26,0 € 3.058 9,0 sludge buffer to be emptied (by client) 3-4 times per year

90-250 p.e. 175 MWW04 € 123.000 46,0 € 2.674 7,1 - Adjustable, sizeable115-330 p.e. 225 MWW05 € 159.500 68,0 € 2.346 5,5 flexible towards Increasing or decreasing populations connected

175-525 p.e. 350 MWW06 € 195.000 92,0 € 2.120 4,3 1 or more modules can be added, removed or temporarely shut down

350-1050 p.e. 700 2xMWW06 € 380.000 184,0 € 2.065 4,1 - Decentral750-2250 p.e. 1500 DCD1500 € 610.000 324,0 € 1.883 3,2 no more expensive piping and sewage pumping then strictly needed

1250-3750 p.e. 2500 DCD2500 € 660.000 439,0 € 1.503 1,3 - Large loading scale

Costs per m3DCD-Bevers can be loaded from -50% to +50% of nominal capacity

- flexible capacity Traditional wwtp 50.000 i.e. € 1.250 In a group of 2 and more modules, one or some modules can be shut down

if needed for maintenance or at calamities. Guaranteed continuous operation!

- extreme small building area (MWW)of 13m2 per modular MWW unit

fits everywhere!

BouwCoach Engineering BV

Page 15: Showtas Data Sheet ENG GENERAL rev B

Comparisation Traditional versus Decentral:

Results of 23 Business cases

BouwCoach Engineering BV

Page 16: Showtas Data Sheet ENG GENERAL rev B

Costs per km of sewage pipe: € 100 (minimal costs, at free fall sewage)

Partial costs per ie for traditional wwtp: € 200 (minimal costs for large wwt plants)

57399 € 20.964.938

Community nr of villages inhabitants I.e. total costs dcd-bever partial costs for trad.wwtp total km transport -sewage (10km to wwtp)

total costs traditional

Hasmas 6 1278 1000 € 631.917 € 200.000 21 € 2.100.000 € 2.300.000

Bocsig 4 3200 2550 € 1.306.199 € 510.000 20 € 2.000.000 € 2.510.000

Dieci 4 1509 1450 € 804.231 € 290.000 25 € 2.500.000 € 2.790.000

Gurahont 10 3949 3000 € 1.980.389 € 600.000 39 € 3.900.000 € 4.500.000

Plescuta 7 1263 955 € 708.373 € 191.000 41 € 4.100.000 € 4.291.000Secas 6 1210 950 € 664.469 € 190.000 22 € 2.200.000 € 2.390.000

Birsa 4 1799 1400 € 775.000 € 280.000 17 € 1.700.000 € 1.980.000

Halmagel 3 848 675 € 438.175 € 135.000 18 € 1.800.000 € 1.935.000

Taut 2 1980 1400 € 764.399 € 280.000 18 € 1.800.000 € 2.080.000

Archis 5 1635 1430 € 795.346 € 286.000 23,3 € 2.330.000 € 2.616.000Sandra 2 2700 2025 € 820.000 € 405.000 23 € 2.300.000 € 2.705.000

Lovrin 1 3750 2800 € 750.000 € 560.000 18 € 1.800.000 € 2.360.000

Satchinez 3 4600 3450 € 1.496.601 € 690.000 21 € 2.100.000 € 2.790.000

Sanp.Mare 2 3300 2475 € 1.080.860 € 495.000 24,7 € 2.470.000 € 2.965.000

Brazii 6 1210 950 € 664.469 € 190.000 16,5 € 1.650.000 € 1.840.000

Carand 2 933 800 € 449.169 € 160.000 14 € 1.400.000 € 1.560.000Joia Mare 1 200 150 € 117.773 € 30.000 10 € 1.000.000 € 1.030.000

Chisindia 1 935 700 € 360.000 € 140.000 10 € 1.000.000 € 1.140.000

Avrig 5 18500 13625 € 2.587.794 € 2.725.000 29 € 2.900.000 € 5.625.000

Saravale 1 2600 1950 € 704.700 € 390.000 10 € 1.000.000 € 1.390.000

Craiva 10 2880 2156 € 1.658.500 € 431.200 15 € 1.500.000 € 1.931.200

C. Alexa 1 1200 900 € 380.000 € 180.000 4,1 € 410.000 € 590.000

cheveresu 3 2230 1670 € 1.026.573 € 334.000 10 € 1.000.000 € 1.334.000

Average investment per i.e. DCD-Bever € 433 Average investment per i.e. traditional wwtp € 1.128* calculation data: - village sewage the same for both options, not included

BouwCoach Engineering BV

Page 17: Showtas Data Sheet ENG GENERAL rev B

Community nr of villages inhabitant

s I.e. Cost of ownership excl funding per inh

Cost of ownership incl funding per inh

Hasmas 6 1278 1000 € 68,41 € 33,02Bocsig 4 3200 2550 € 51,61 € 22,92Dieci 4 1509 1450 € 55,08 € 26,26Gurahont 10 3949 3000 € 49,97 € 29,67Plescuta 7 1263 955 € 79,47 € 37,93Secas 6 1210 950 € 75,36 € 36,19Birsa 4 1799 1400 € 46,87 € 22,13Halmagel 3 848 675 € 55,81 € 26,87Taut 2 1980 1400 € 39,86 € 18,75Archis 5 1635 1430 € 59,00 € 27,86Sandra 2 2700 2025 € 17,27 € 11,39Lovrin 1 3750 2800 € 13,02 € 9,82Satchinez 3 4600 3450 € 32,59 € 14,34Sanp.Mare 2 3300 2475 € 33,41 € 15,04Brazii 6 1210 950 € 38,44 € 28,42Carand 2 933 800 € 51,40 € 24,44Joia Mare 1 200 150 € 62,95 € 29,97Chisindia 1 935 700 € 35,51 € 13,95Avrig 5 18500 13625 € 12,56 € 4,23Saravale 1 2600 1950 € 29,13 € 13,92Craiva 10 2880 2156 € 57,88 € 25,60C. Alexa 1 1200 900 € 30,11 € 12,35cheveresu 3 2230 1670 € 44,52 € 18,71

Average c.o.o. per inhabitant DCD-Bever per year € 45,23 € 21,90

BouwCoach Engineering BV

Page 18: Showtas Data Sheet ENG GENERAL rev B

10KM

Example Comparing Decentral versus Traditional

43

12

2

6

4

Sewage to traditional wwtp (10km)Canalisation between villages

Plescuta 7 1263 955 41 4.100.000€ € 4.386.500

€ 4.593

Plescuta 7 1263 955 31 3.100.000€ € 3.386.500

€ 3.546

total costs traditional

Average investment per i.e. DCD-Bever Average investment per i.e. traditional wwtp

Average investment per i.e. DCD-Bever € 742 Average investment per i.e. traditional wwtp

Community nr of villages inhabitants I.e. total costs dcd-bever partial costs for trad.wwtp

total km transport -sewage (0 km to wwtp)

€ 708.373 € 286.500

€ 742

€ 708.373 € 286.500

partial costs for trad.wwtp

total km transport -sewage (10km to wwtp)

total costs traditional

Community nr of villages inhabitants I.e. total costs dcd-bever