Stalwart ConstructionBuilding our future

5 W. 37th St. Suite 200 New York, N.Y. 1001

(212) 557-0283 * www.stalwart-usa.com

Page 2: Short Version Stalwart Construction Powerpoint Presentation 2 (2)

Introduction

• Stalwart Construction, a New York based firm whose portfolio of construction projects spans from residential, hospitality and corporate interior sectors throughout the tri-state area. Our emergence as a company has come from our four major core values. These values reflect what the fundamentals to our company and is the backbone to being a respected industry leader.

www.STALWART-USA.com

Page 3: Short Version Stalwart Construction Powerpoint Presentation 2 (2)

Areas of Expertise

Project Management

• Project Orientation and team formation

• Due diligence & preliminary budget

• Schedule Control

• Project Evaluation

• Client Management

• Contractor Bidding & Negotiations

• Project Scheduling and Monitoring

Pre-Construction

• Build a database of relevant consultants

• Review Plans & Specifications

• Project Coordination

• Value Engineering

• Pre-Purchase of long-lead items

• Prepare contractors list

• Organize bid packages

www.STALWART-USA.com

Page 4: Short Version Stalwart Construction Powerpoint Presentation 2 (2)

Construction

• Scheduling control

• Cost control

• Quality control

• Project closeout

• Building/Site Evaluation

• Value Engineering

• Coordination of equipment

• Long lead Procurement

• Project Management & supervision

• Conceptual budgets & Estimates scheduling

• Project controls

• Site Safety

www.STALWART-USA.com

Page 5: Short Version Stalwart Construction Powerpoint Presentation 2 (2)

• Review documents with the owners representatives

• Provide drawings for permit filing purposes

• Attend walk-through of project site with the subcontractors

• Provide technical assistance to inquiries by subcontractors

• Assist in the evaluation of subcontractor and vendor bids

• Provide periodic punch-lists and job progress reports

• Review all shop drawings

• Assist in project close-out

www.STALWART-USA.com

Pre-Construction

Page 6: Short Version Stalwart Construction Powerpoint Presentation 2 (2)

Value Engineering

The steps Stalwart Construction typically follows during our Value-engineering program are as follows:

• The design is reviewed and items of potential cost savings are identified

• Items of largest potential of cost saving are based on high cost worth ratios are identified are selected for further analysis

• Additional alternatives are proposed for selected items

• Secondary functions that would be sacrificed by adopting less costly alternatives will be clearly identified

• A selection of those alternates are made by the team will result in substantial cost savings

While value engineering can take place throughout the duration of the project, the greatest benefits are realized early on, during the pre-construction phase. During this time our team will analyze the full scope of work and determine what level of cost savings can be realized through value engineering. As the project proceeds into schematic design, construction phasing and logistics plans will be analyzed thoroughly and alternate materials and equipment will be evaluated. As documentation proceeds into design development, additional value engineering suggestions will be made. The project team will review the advantages of pre-purchasing certain materials and equipment and will conduct a comprehensive study as to the availability of each item needed.

www.STALWART-USA.com

Page 7: Short Version Stalwart Construction Powerpoint Presentation 2 (2)

Pre-Construction

Organization of Bid Packages

• The contract documents are subdivided by Stalwart Construction into sequences of bid packages, allowing construction to proceed as quickly as possible as design drawings are completed. All work will be carefully analyzed to ensure that materials and labor are dispatched to the project site at the appropriate time.

Trade Requisitions

• Prior to bidding we will organize a specific list of qualifications, clarifications and operations that will be included with the bid documents sent to all bidders. This list contributes to a more comprehensive buyout, limits future change orders and describes the methods and procedures that all subcontractors must follow to coordinate their work on site. This activity sometimes ignored by other contractors, substantially increases effective communication between Stalwart Construction and subcontractors prior to award, thereby minimizing costly clarifications after contract awards and enhance the commissioning process.

www.STALWART-USA.com

Page 8: Short Version Stalwart Construction Powerpoint Presentation 2 (2)

Project Closeout As the project nears completion we will work to assure orderly project closeout and a smooth transition from construction to actual use of the facility by the client. The services we provide during project closeout include:

Quality Control – Stalwart will conduct inspections of the completed facility, then we will compile a list of (and expedite the completion of) punch-list items and monitor systems performance under the project guarantees.

Commissioning – At the universities and hospitals, it is crucial that a “commission team” be established. Commissioning of a building system is process of achieving, verifying and documenting the performance of systems to meet the operational needs of that specific building. Stalwart Construction will establish the following standards:

• Verify all warranties

• Establish test ports for water and air

• Balancing record locations of all balancing valves

• Confirm all pressure tests, hydro to help minimize leaking pipe joints and coils

• Review all balancing reports

• Review all document drawings

• Verify operation of Temperature Control system

• Prepare and train operating personnel to ensure that operating and parts manuals are turned over to owner along with all attic stock.

These are just some areas in which we perform commissioning. In hospitals and universities, MEP consists of 40% - 60% of total building costs.

www.STALWART-USA.com

Page 9: Short Version Stalwart Construction Powerpoint Presentation 2 (2)

Projects

Page 10: Short Version Stalwart Construction Powerpoint Presentation 2 (2)

Langham PlaceLocation: 400 Fifth Avenue - Pacific Langham New York Corporation-

• Role: General Contractor/ Construction Managers - CM

• Project: Rebranding of the HotelFront Lobby/ Conference Room Areas/Back of House & Suites

• Architect: Callison

• Interior Design: Meyer Davis

• Budget: 10 - 15 Million dollars

www.STALWART-USA.com

Page 11: Short Version Stalwart Construction Powerpoint Presentation 2 (2)

Loft 14 Location: W. 14th Street

• Role: Project Managers/ Construction Managers

• Project: New construction of Mio block condo building with cantilever 9 loft style apartment with ground floor retail

• Architect: Architect: William Q. Brothers

• Budget: 9 Million dollars

www.STALWART-USA.com

Projects

Page 12: Short Version Stalwart Construction Powerpoint Presentation 2 (2)

Loft 14 Location: W. 14th Street

www.STALWART-USA.com

Page 13: Short Version Stalwart Construction Powerpoint Presentation 2 (2)

Loft 44 Location: W. 44th Street

• Role: Project Managers/ Construction Managers

• Project: 20 story new structures, Mid-block condominium building 23 condos

• Architect: Richard Jenson

• Budget: 14 Million dollars

www.STALWART-USA.com

Page 14: Short Version Stalwart Construction Powerpoint Presentation 2 (2)

The Marriott HotelLocation: North Bergen, New Jersey

• Role: General Contractors/ Construction Managers

• Project: Demolition/ excavation/ out of ground build out/ 7 story building

• Architect: Architectura

• Budget: 11 Million dollars

www.STALWART-USA.com

Page 15: Short Version Stalwart Construction Powerpoint Presentation 2 (2)

The Mark HotelLocation: 25 E. 77th Street

• Role: Owner’s Representative

• Project: Five Star Hotel and Private Residencesrenovation of existing hotel

• Budget: 100 Million dollars

www.STALWART-USA.com

Page 16: Short Version Stalwart Construction Powerpoint Presentation 2 (2)

Hilson ManagementMultiple Locations

• Role: Building Maintenance

• Project: Repairs, Mechanical Upgrades, Tenant Build out, Building Code Compliance

www.STALWART-USA.com

Page 17: Short Version Stalwart Construction Powerpoint Presentation 2 (2)

Clients and Strategic Partners • Suzuki Capital LLC

• Hilson Management Corp

• Ursus Management Corp

• Intercontinental Hotel

• Penn Club Hotel

• Stephen Gaynor School

• Yankee Stadium

• Worth & Company

• Citi Bank

• Matthew Adams Properties

• Lancaster Realty

• Astoria Realty

www.STALWART-USA.com

575 Lexington Avenue , NY (Lobby Restoration)