Kitsap County SMP Work Group August 2, 2011

Shoreline Stabilization

Embed Size (px)

DESCRIPTION

Shoreline Stabilization. Kitsap County SMP Work Group August 2, 2011. Shoreline Armoring - Outline. Welcome – Introductions Background reading materials Existing Permit Process (Kitsap County, WDFW) WAC Guidelines Photo Tour of County Shorelines Issues for Discussion: New bulkheads - PowerPoint PPT Presentation

Citation preview

Page 1: Shoreline Stabilization

Kitsap County SMP Work GroupAugust 2, 2011

Page 2: Shoreline Stabilization

Shoreline Armoring - OutlineWelcome – Introductions Background reading materialsExisting Permit Process (Kitsap County, WDFW)WAC GuidelinesPhoto Tour of County ShorelinesIssues for Discussion:

o New bulkheadso Repair / Replacemento Appurtenanceso Incentives

Breakwaters, Jetties, GroinsWrap up

Page 3: Shoreline Stabilization

Permit Process:Local Jurisdiction (Kitsap County)Washington Department of Fish and WildlifeArmy Corps (if at or below Mean High Water)

Page 4: Shoreline Stabilization

WAC Guidelines [WAC 173-26-231(3)(a)]

• Shoreline Stabilization• New development should be located to avoid need• New structural stabilization shall not be allowed except:• when necessary to protect existing primary structures• for new and existing development under specific conditions• ecological restoration projects, when determined necessary

• Geotechnical reports must address time frame (3 years)• Must consider soft shoreline stabilization measures• When allowed, must be at or near Ordinary High Water

Mark, replacements included.

Page 5: Shoreline Stabilization

Issues:New BulkheadsRepair and ReplacementAppurtenance ProtectionIncentives

Page 6: Shoreline Stabilization

Breakwaters, Jetties, Groins, and WeirsOnly allowed where necessary to protect

water dependent uses, public access, shoreline stabilization, or other specific public purpose.

Require a Conditional Use Permit, except where installed to protect or restore ecological functions

Provide for mitigation [WAC 173-26-201(2)(e)]

Page 7: Shoreline Stabilization

Wrap UpSummary will be e-mailed to Task ForceNext Meeting: August 16 – Buffers