Shoreline Stabilization. Kitsap County SMP Work Group August 2, 2011. Shoreline Armoring - Outline. Welcome – Introductions Background reading materials Existing Permit Process (Kitsap County, WDFW) WAC Guidelines Photo Tour of County Shorelines Issues for Discussion: New bulkheads - PowerPoint PPT Presentation
Citation preview
Kitsap County SMP Work GroupAugust 2, 2011
Shoreline Armoring - OutlineWelcome – Introductions Background reading materialsExisting Permit Process (Kitsap County, WDFW)WAC GuidelinesPhoto Tour of County ShorelinesIssues for Discussion:
o New bulkheadso Repair / Replacemento Appurtenanceso Incentives
Breakwaters, Jetties, GroinsWrap up
Permit Process:Local Jurisdiction (Kitsap County)Washington Department of Fish and WildlifeArmy Corps (if at or below Mean High Water)
WAC Guidelines [WAC 173-26-231(3)(a)]
• Shoreline Stabilization• New development should be located to avoid need• New structural stabilization shall not be allowed except:• when necessary to protect existing primary structures• for new and existing development under specific conditions• ecological restoration projects, when determined necessary
• Geotechnical reports must address time frame (3 years)• Must consider soft shoreline stabilization measures• When allowed, must be at or near Ordinary High Water
Mark, replacements included.
Issues:New BulkheadsRepair and ReplacementAppurtenance ProtectionIncentives
Breakwaters, Jetties, Groins, and WeirsOnly allowed where necessary to protect
water dependent uses, public access, shoreline stabilization, or other specific public purpose.
Require a Conditional Use Permit, except where installed to protect or restore ecological functions
Provide for mitigation [WAC 173-26-201(2)(e)]
Wrap UpSummary will be e-mailed to Task ForceNext Meeting: August 16 – Buffers