Shooting and Planning Schedule

Date Plan4th October ‘11 - Deadline for most pre-production

including magazine textual analysis (micro and macro), equipment list,

project proposal, flat plans, audience questionnaire & results, production

of copy, analysis of the institution that would publish my magazine

- Photo shoot for contents page – photograph the different models in the studio with using guitars and/or

drum kit.

7th October ‘11 - Photo shoot with Daniel for the front cover and double page

spread. Outdoors shoot with the use of props such as a guitar.

- Deadline for all pre-production including all of the above and

evidence of original images, design of masthead and fonts. Everything will be on my blog.

11th October ‘11 - Start of production – front cover, contents page and double page

spread.

21st October ‘11 - Deadline for all production work, everything must be on the blog.

28th October ‘11 - Deadline for evaluation, audio presentation, everything

completed and on the blog.