17
SHOE PALACE HUNTINGTON PARK M.200

SHOE PALACE HUNTINGTON PARK - sbscorp.ussbscorp.us/Plans/Shoe Palace/MEP Plans.pdf · shoe palace huntington park ... split system condensing unit schedule ... lav-1 lavatory 1/2"

  • Upload
    lamdan

  • View
    229

  • Download
    0

Embed Size (px)

Citation preview

Page 1: SHOE PALACE HUNTINGTON PARK - sbscorp.ussbscorp.us/Plans/Shoe Palace/MEP Plans.pdf · shoe palace huntington park ... split system condensing unit schedule ... lav-1 lavatory 1/2"

SHOE PALACEHUNTINGTON

PARK

M.200

Page 2: SHOE PALACE HUNTINGTON PARK - sbscorp.ussbscorp.us/Plans/Shoe Palace/MEP Plans.pdf · shoe palace huntington park ... split system condensing unit schedule ... lav-1 lavatory 1/2"

M.200

NOTES:1. MANUFACTURER IS JCI. ACCEPTABLE ALTERNATES: CARRIER, LENNOX, TRANE.2. UNIT ARRANGEMENT BACK-TO-FRONT: MEDIUM INLET PLENUM W/ 30% PRE-FILTERS (TOP INLET); MERV 14 CART. FILTERS; SMALL ACCESS; FAN AND COIL COMBINATION (TOP OUTLET)3. PROVIDE ONE (1) COMPLETE SET OF EXTRA FILTERS AND BELTS.4. PROVIDE ECONOMIZER FAULT DETECTION AS PER CEC 2013 SECT. 120.2.5. PROVIDED WITH SMOKE DETECTOR AND AUTOMATIC SHUT DOWN CONTROLS AS PER CMC 608.16. PROVIDE TEMPERATURE CONTROLS AS PER M4.00.

SHOE PALACEHUNTINGTON

PARK

AIR HANDLING UNIT SCHEDULEMARK SERVICE MODEL NO. SUPPLY FAN COOLING HEATING WEIGHT

(LBS)ELECTRICAL REMARKS

TOTALAIRFLOW

(CFM)

OUTSIDEAIRFLOW

(CFM)

ESP(IN WC)

POWER(HP)

CAPACITY TYPE EAT(DB/WB)

LAT(DB/WB)

COMPRESSOR VOLT/PHASE FLA MCA MOPTOTAL(MBH)

SENSIBLE(MBH)

AHU-1 RETAIL, STORAGE AMI-H10 4000 1300 0.5 3 118.3 87 DX 80/67 60.4/57.7 CU-1 EHC-1 1168 480/3 3.9 4.83 15 1, 2, 3, 4, 5, 6

SPLIT SYSTEM CONDENSING UNIT SCHEDULEMARK SERVICE MODEL NO. COOLING DIMENSIONS ELECTRICAL REMARKS

CAPACITY(MBH)

AMBIENT DB(DEG F)

REFRIGERANT LENGTH(IN)

WIDTH(IN)

HEIGHT(IN)

WEIGHT(LBS)

VOLT/PHASE MCA MOP

CU-1 AHU-1 J10YCC00 110.2 95 R-410A 59 32 50 499 480/3 23.5 30 1, 2, 3NOTES:1. MANUFACTURER IS JCI. ACCEPTABLE ALTERNATES: CARRIER, LENNOX, TRANE.2. PROVIDE WITH 14" ROOF CURB AND REFRIGERATION LINE SET.

NOTES:1. MANUFACTURER IS GREENHECK. ACCEPTABLE ALTERNATES: PENN, COOK.

GRILLE REGISTER AND DIFFUSER SCHEDULEMARK SERVICE MODEL NO. MOUNTING

TYPESIZE FINISH REMARKS

LENGTH(IN)

WIDTH(IN)

NECK SIZE(IN)

S-1 SUPPLY RCD DUCT 27 DIA -- SEE DWGS WHITE

S-2 SUPPLY 510 DUCT 14 10 SEE DWGS WHITES-3 SUPPLY 520 DUCT 18 16 SEE DWGS WHITER-1 RETURN 530 CEILING 46 18 SEE DWGS WHITER-2 RETURN 530 CEILING 20 16 SEE DWGS WHITE

NOTES:1. MANUFACTURER IS PRICE. ACCEPTABLE ALTERNATE: TITUS.

INTAKE, RELIEF AND EXHAUST HOOD SCHEDULEMARK SERVICE MODEL NO. CURB

HEIGHT(IN)

SIZE AIRFLOW WEIGHT(LBS)

REMARKSLENGTH

(IN)WIDTH

(IN)NECK SIZE

(IN)QUANTITY

(CFM)STATIC

PRESSURE(IN WG)

IH-1 INTAKE FGI 14 72 53 42x30 4000 0.05 131 1, 2

S-2 RELIEF FGR 14 60 42 42x30 3900 0.048 107 1, 2

S-3 EXHAUST FGR 14 24 18 8x8 200 0.049 37 1, 2NOTES:1. MANUFACTURER IS GREENHECK. ACCEPTABLE ALTERNATES: PENN, COOK.2. PROVIDE WITH GRAVITY BACKDRAFT DAMPER AND BIRD SCREEN.

ELECTRIC HEATING COIL SCHEDULEMARK SERVICE MODEL NO. DIMENSIONS ELECTRICAL REMARKS

WIDTH(IN)

HEIGHT(IN)

POWER(KW)

STAGES AMP VOLT PHASE

EHC-1 AHU-1 IDHC 30 16 15 1 18 480 3 1, 2NOTES:1. MANUFACTURER IS GREENHECK. ACCEPTABLE ALTERNATES: INDEECO.2. PROVIDE WITH 24V DC CONTROLS. SEE M.400 FOR TEMPERATURE CONTROLS.

FAN SCHEDULEMARK SERVICE MODEL NO. FAN TYPE DIMENSIONS WEIGHT

(LBS)NOISE(SONE)

ELECTRICAL REMARKSTOTAL

AIRFLOW(CFM)

ESP(IN WC)

FAN RPM MOTOR LxW(IN)

HEIGHT(IN)

VOLT/PHASE FLABRAKE

(HP)RATED

(HP)RPM

RF-1 AHU-1 BSQ-160HP 4000 0.75 2132 2.28 3 1750 INLINE 26x26 26 184 19.6 460/3 4.8 1

EF-1 TOILET RM 103 SP-A200 100 0.64 900 -- 46.2 W -- CEILING MTD 14x12 11 24 4 115/1 0.4 1EF-2 TOILET RM 102 SP-A200 100 0.64 900 -- 46.2 W -- CEILING MTD 14x12 11 24 4 115/1 0.4 1

Page 3: SHOE PALACE HUNTINGTON PARK - sbscorp.ussbscorp.us/Plans/Shoe Palace/MEP Plans.pdf · shoe palace huntington park ... split system condensing unit schedule ... lav-1 lavatory 1/2"

SHOE PALACEHUNTINGTON

PARK

M.300

Page 4: SHOE PALACE HUNTINGTON PARK - sbscorp.ussbscorp.us/Plans/Shoe Palace/MEP Plans.pdf · shoe palace huntington park ... split system condensing unit schedule ... lav-1 lavatory 1/2"

SHOE PALACEHUNTINGTON

PARK

M.400

Page 5: SHOE PALACE HUNTINGTON PARK - sbscorp.ussbscorp.us/Plans/Shoe Palace/MEP Plans.pdf · shoe palace huntington park ... split system condensing unit schedule ... lav-1 lavatory 1/2"

SHOE PALACEHUNTINGTON

PARK

E.100

Page 6: SHOE PALACE HUNTINGTON PARK - sbscorp.ussbscorp.us/Plans/Shoe Palace/MEP Plans.pdf · shoe palace huntington park ... split system condensing unit schedule ... lav-1 lavatory 1/2"

SHOE PALACEHUNTINGTON

PARK

PLUMBING FIXTURE SCHEDULEMARK FIXTURE TYPE PLUMBING CONNECTION MODEL DESCRIPTION

CW CFW HW SAN W&VDF-1 DRINKING

FOUNTAIN1/2" 3" 1-1/2" ELKAY

EZSTL8C8.0 GPH, 370 WATTS, 4.0 FLA, ADA COMPLIANT

LAV-1 LAVATORY 1/2" 1/2" 3" 1-1/2" AMERICANSTANDARDLUCERNE0355.015

WALL-HUNG, VITREOUS CHINA WITH FRONTOVERFLOW, FAUCET HOLES (4" APART), ANDSELF DRAINING BACKSPLASH. PROVIDE GRIDDRAIN (2411.015), FAUCET (5500.175), AERATER,WALL SUPPLY VALVES, ESCUTEONS, CARRIER,P-TRAP AND INSULATION KIT. LAVATORY ANDALL LISTED ACCESSORIES SHALL BE ADACOMPATABLE (MODEL NUMBERS LISTED AREAMERICAN STANDARD).

WC WATER CLOSET 3/4" 4" AMERICANSTANDARD

CADET2462.100

ELONGATED BOWL WITH TANK, 1.1 GPF, SUPPLYWITH 1/4 TURN STOPS & WHITE OPEN FRONTSEAT (BEMIS 9400CT).

WCO WALL CLEANOUT 3" ZURNZ1441

CAST IRON BODY WITH ABS PLUG, ROUND 5"STAINLESS STEEL COVER.

WH-1 WATER HEATER 3/8" 3/8" AO SMITHMT004120T

ELECTRIC, TANKLESS TYPE WATER HEATER, 0.3GPM ACTIVATION, 3.5 KW INPUT, 29 A,120V/1PH, 48 DEG F TEMP RISE @ 0.5 GPM.

P.100

Page 7: SHOE PALACE HUNTINGTON PARK - sbscorp.ussbscorp.us/Plans/Shoe Palace/MEP Plans.pdf · shoe palace huntington park ... split system condensing unit schedule ... lav-1 lavatory 1/2"

SHOE PALACEHUNTINGTON

PARK

E.110

Page 8: SHOE PALACE HUNTINGTON PARK - sbscorp.ussbscorp.us/Plans/Shoe Palace/MEP Plans.pdf · shoe palace huntington park ... split system condensing unit schedule ... lav-1 lavatory 1/2"

SHOE PALACEHUNTINGTON

PARK

E.120

2E120

SALES FLOOR LIGHTING CONTROLNTS

1E120

STOCK ROOM LIGHTING CONTROLNTS

Page 9: SHOE PALACE HUNTINGTON PARK - sbscorp.ussbscorp.us/Plans/Shoe Palace/MEP Plans.pdf · shoe palace huntington park ... split system condensing unit schedule ... lav-1 lavatory 1/2"

SHOE PALACEHUNTINGTON

PARK

SYMBOL LEGEND

ABBREVIATIONS

GENERAL NOTES

E.200

Page 10: SHOE PALACE HUNTINGTON PARK - sbscorp.ussbscorp.us/Plans/Shoe Palace/MEP Plans.pdf · shoe palace huntington park ... split system condensing unit schedule ... lav-1 lavatory 1/2"

SHOE PALACEHUNTINGTON

PARK

E.210

Page 11: SHOE PALACE HUNTINGTON PARK - sbscorp.ussbscorp.us/Plans/Shoe Palace/MEP Plans.pdf · shoe palace huntington park ... split system condensing unit schedule ... lav-1 lavatory 1/2"

SHOE PALACEHUNTINGTON

PARK

1E220

RISER DIAGRAMNTS E.220

Page 12: SHOE PALACE HUNTINGTON PARK - sbscorp.ussbscorp.us/Plans/Shoe Palace/MEP Plans.pdf · shoe palace huntington park ... split system condensing unit schedule ... lav-1 lavatory 1/2"

E.230

Page 13: SHOE PALACE HUNTINGTON PARK - sbscorp.ussbscorp.us/Plans/Shoe Palace/MEP Plans.pdf · shoe palace huntington park ... split system condensing unit schedule ... lav-1 lavatory 1/2"

SHOE PALACEHUNTINGTON

PARK

4,554.4

E.300

Page 14: SHOE PALACE HUNTINGTON PARK - sbscorp.ussbscorp.us/Plans/Shoe Palace/MEP Plans.pdf · shoe palace huntington park ... split system condensing unit schedule ... lav-1 lavatory 1/2"

SHOE PALACEHUNTINGTON

PARK

E.310

Page 15: SHOE PALACE HUNTINGTON PARK - sbscorp.ussbscorp.us/Plans/Shoe Palace/MEP Plans.pdf · shoe palace huntington park ... split system condensing unit schedule ... lav-1 lavatory 1/2"

SHOE PALACEHUNTINGTON

PARK

4,890

E.320

Page 16: SHOE PALACE HUNTINGTON PARK - sbscorp.ussbscorp.us/Plans/Shoe Palace/MEP Plans.pdf · shoe palace huntington park ... split system condensing unit schedule ... lav-1 lavatory 1/2"

SHOE PALACEHUNTINGTON

PARK

SHOE PALACESPACE 320 SOUTHLAND MALL, HAYWARD, CA.

10/23/2015 SHOE PALACE 10/23/201510/23/2015

10/23/2015

10/23/2015

SHOE PALACE

SHOE PALACE

SHOE PALACE

E.330

Page 17: SHOE PALACE HUNTINGTON PARK - sbscorp.ussbscorp.us/Plans/Shoe Palace/MEP Plans.pdf · shoe palace huntington park ... split system condensing unit schedule ... lav-1 lavatory 1/2"

SHOE PALACEHUNTINGTON

PARK

SHOE PALACESPACE 320 SOUTHLAND MALLHAYWARD, CA

10/23/20157,711 S.F.

LP-L80.2

41.1

LP-L80.241.1

SHOE PALACE 320 SOUTHLAND MALL, HAYWARD, CA

SHOE PALACE #1074 NEWPARK MALL, NEWARK, CA

10/23/2015

10/23/20159-15-2015

10/23/201510/23/2015SHOE PALACE 320 SOUTHLAND MALL, HAYWARD, CA SHOE PALACE 320 SOUTHLAND MALL, HAYWARD, CA

SHOE PALACE 320 SOUTHLAND MALL, HAYWARD, CA

E.340