Shoals Marine Lab Wind Turbine Construction, June 2007 William E. Bemis Kingsbury Director

Shoals Marine Lab Wind Turbine Construction, June 2007

Embed Size (px)

DESCRIPTION

Shoals Marine Lab Wind Turbine Construction, June 2007. William E. Bemis Kingsbury Director. Parts for the tower arrived in the evening of June 21. We transferred tower components to the barge. We barged them to the high tide pier for unloading. Ross Hansen is sitting on the counterweight. - PowerPoint PPT Presentation

Citation preview

Page 1: Shoals Marine Lab Wind Turbine Construction, June 2007

Shoals Marine LabWind Turbine Construction, June 2007

William E. BemisKingsbury Director

Page 2: Shoals Marine Lab Wind Turbine Construction, June 2007

Parts for the tower arrived in the evening of June 21.

Page 3: Shoals Marine Lab Wind Turbine Construction, June 2007

We transferred tower components to the barge.

Page 4: Shoals Marine Lab Wind Turbine Construction, June 2007

We barged them to the high tide pier for unloading.

Page 5: Shoals Marine Lab Wind Turbine Construction, June 2007

Ross Hansen is sitting on the counterweight.

Page 6: Shoals Marine Lab Wind Turbine Construction, June 2007

Kevin Carpenter on the tower during initial construction.

Page 7: Shoals Marine Lab Wind Turbine Construction, June 2007
Page 8: Shoals Marine Lab Wind Turbine Construction, June 2007

Frank, Kevin and Mike installing the stop for the mast.

Page 9: Shoals Marine Lab Wind Turbine Construction, June 2007

Bob Pechie describes how to install it.

Page 10: Shoals Marine Lab Wind Turbine Construction, June 2007

View of the SML campus from the top of the tower.

Page 11: Shoals Marine Lab Wind Turbine Construction, June 2007
Page 12: Shoals Marine Lab Wind Turbine Construction, June 2007

The first part of the mast is installed on its pivots.

Page 13: Shoals Marine Lab Wind Turbine Construction, June 2007

First section of mast being installed.

Page 14: Shoals Marine Lab Wind Turbine Construction, June 2007

Second section of mast and counterweight.

Page 15: Shoals Marine Lab Wind Turbine Construction, June 2007

Third section of mast being installed.

Page 16: Shoals Marine Lab Wind Turbine Construction, June 2007
Page 17: Shoals Marine Lab Wind Turbine Construction, June 2007
Page 18: Shoals Marine Lab Wind Turbine Construction, June 2007
Page 19: Shoals Marine Lab Wind Turbine Construction, June 2007
Page 20: Shoals Marine Lab Wind Turbine Construction, June 2007

Generating electricity on day one: June 29, 2007.

Page 21: Shoals Marine Lab Wind Turbine Construction, June 2007

Generating electricity on day one: June 29, 2007.

And that is not all…

Page 22: Shoals Marine Lab Wind Turbine Construction, June 2007

SML’s Engineering Interns installing solar panels: July 2007.