1
Date S, M, T, W, T, F, S / / Master (signature) Crew (duties) Crew induction/training ( ) 1 (master) 2 3 4 5 6 Minimum crew requirement for area of operation Drills assembly ( ), person overboard ( ), fire ( ), collision ( ), abandon ship ( ), injury ( ) weather ( ) other ..............................................................................................................................................( ) Pre-departure/daily checks pre-start ( ), safety equipment ( ), anchoring equipment ( ), safety briefing ( ), propulsion ( ), steering ( ), trawl equipment ( ), navigation equipment ( ), navigation/trawl lights ( ), comm/alarm systems ( ), GPS equipment ( ), GPS position (lat ° . 'S, long ° . 'E), passenger no ( ) radios — contact channels .................................................. ( ) Harbour Control — contact channels ................. ( ) Running log Time / watch- keeper Port or location, type of activity, ship use recreation, commercial Details (activities of the vessel/position of the vessel/navigation track/weather experienced/ illness or injury of persons on board/safety training undertaken/recording of marine incidents/ assistance to other vessels/unusual occurrences/records of communication in relation to an emergency/arrival — departure/refuelling — bunkering/bilge levels/radio communications/ description of activities and incidents/other comments/passenger numbers Engine running log Time RPM Water temp Engine oil level & temp Engine oil press Gearbox oil level & temp Gearbox oil press Pyro- meters Battery volts Aux battery volts Radio battery volts p s p s p s Fuel Initial load Start level Engine hours Bunkered End level Port start Generator 1 start Total load Litres used Port finish Generator 1 finish Nautical miles travelled Starboard start Generator 2 start Hours travelled Starboard finish Generator 2 finish Waste disposal sewage/sullage ( ), oil ( ), garbage ( ), other ( ) .................................................... Maintenance/defect list Item 1 Defect Rectified (time/date) Parts serviced/replaced Item 2 Defect Rectified (time/date) Parts serviced/replaced Item 3 Defect Rectified (time/date) Parts serviced/replaced Incident marine ( ), medical ( ), pollution ( ), other event ( ) ..............................................

Ship Diary Log Book Ed6 Diary Table

Embed Size (px)

DESCRIPTION

Ship Log Book

Citation preview

Page 1: Ship Diary Log Book Ed6 Diary Table

Date S, M, T, W, T, F, S / / Master (signature)

Crew (duties) Crew induction/training ( ) 1 (master)

2 3

4 5

6 Minimum crew requirement for area of operation

Drills assembly ( ), person overboard ( ), fire ( ), collision ( ), abandon ship ( ), injury ( ) weather ( )other ..............................................................................................................................................( )

Pre-departure/daily checks pre-start ( ), safety equipment ( ), anchoring equipment ( ), safety briefing ( ),

propulsion ( ), steering ( ), trawl equipment ( ), navigation equipment ( ), navigation/trawl lights ( ),

comm/alarm systems ( ), GPS equipment ( ), GPS position (lat ° . 'S, long ° . 'E), passenger no ( )

radios — contact channels .................................................. ( ) Harbour Control — contact channels ................. ( )

Running log

Time / watch-keeper

Port or location, type of activity, ship use recreation, commercial

Details (activities of the vessel/position of the vessel/navigation track/weather experienced/illness or injury of persons on board/safety training undertaken/recording of marine incidents/assistance to other vessels/unusual occurrences/records of communication in relation to an emergency/arrival — departure/refuelling — bunkering/bilge levels/radio communications/description of activities and incidents/other comments/passenger numbers

Engine running log

Time RPM Water temp

Engine oil level & temp

Engine oil press

Gearbox oil level & temp

Gearbox oil press

Pyro-meters

Battery volts

Auxbattery volts

Radio battery volts

p

s

p

s

p

s

Fuel Initial load Start level Engine hours

Bunkered End level Port start Generator 1 start

Total load Litres used Port finish Generator 1 finish

Nautical miles travelled Starboard start Generator 2 start

Hours travelled Starboard finish Generator 2 finish

Waste disposal sewage/sullage ( ), oil ( ), garbage ( ), other ( ) ....................................................

Maintenance/defect list

Item 1 Defect Rectified (time/date) Parts serviced/replaced

Item 2 Defect Rectified (time/date) Parts serviced/replaced

Item 3 Defect Rectified (time/date) Parts serviced/replaced

Incident marine ( ), medical ( ), pollution ( ), other event ( ) ..............................................