SHEQ- summary Report BY Alpha and BH

SHEQ- summary Report BY Alpha and BH. 1 2011 2 nd & 3 rd Quarter. In the 2 nd and 3 rd quarter of 2011, TNMC recorded 2 Lost Time Injuries (LTIs). The

Embed Size (px)

Citation preview

Page 1: SHEQ- summary Report BY Alpha and BH. 1 2011 2 nd & 3 rd Quarter.  In the 2 nd and 3 rd quarter of 2011, TNMC recorded 2 Lost Time Injuries (LTIs). The

SHEQ- summary Report

BY Alpha and BH

Page 2: SHEQ- summary Report BY Alpha and BH. 1 2011 2 nd & 3 rd Quarter.  In the 2 nd and 3 rd quarter of 2011, TNMC recorded 2 Lost Time Injuries (LTIs). The

2

2011 2nd & 3rd Quarter.

In the 2nd and 3rd quarter of 2011, TNMC recorded 2 Lost Time Injuries (LTIs). The 2nd LTI was also a reportable injury. 5 dangerous occurrences were recorded. There were no RWI reported while 3 MTI’s and 2 FAI’s were reported.

At the end of September LTIFR was 0.11 with a severity rate of 1.59.

Page 3: SHEQ- summary Report BY Alpha and BH. 1 2011 2 nd & 3 rd Quarter.  In the 2 nd and 3 rd quarter of 2011, TNMC recorded 2 Lost Time Injuries (LTIs). The

3

2010 4th Quarter, 2011 1st Quarter

Safety Indices 2nd Quarter 2011 3rd Quarter 2011 YTD 2011

April May June July August Sept

Fatal 0 0 0 0 0 0 0

LTI 1 0 0 0 0 1 2

RWI

2 0 0

0 0 0 2

MTI 0 1 0 4

FAI 1 1 0 12

Days Lost LTI 2 0 0 0 0 13 15

Days Lost RWI 5 0 0 0 26

Exposure Hours 455693 424693 424860 405425 419139 384775 4389017

Reportable injuries 0 0 0 0 0 1 1

Dangerous Occurrence

0 1 4 0 0 0 14

12 Months Rolling LTIFR

0.1 0.1 0.1 0.1 0.09 0.11

12 Months Rolling Severity Rare

1.34 1.35 1.37 1.39 1.11 1.59

Page 4: SHEQ- summary Report BY Alpha and BH. 1 2011 2 nd & 3 rd Quarter.  In the 2 nd and 3 rd quarter of 2011, TNMC recorded 2 Lost Time Injuries (LTIs). The

4

Significant Incidents Highlights (LTIs)

On 7th April 2011 at around 14:00hrs Ofentse Monikaso. a semiskilled fitter and colleagues were aligning agitator motor at DMS module 1. The motor slipped from the chain block and hit Ofentse on the right leg resulting in a laceration and muscle contusion.

On 20th September 2011 at around 0830hrs, Mr. Seabelo Sekwati - a semi-skilled boilermaker - and his colleagues were turning a chute to lay it flat on the workshop floor. In the process, Seabelo's right index finger got trapped between the chute base and the floor, and there was an avulsion of the finger tip up to the first digit.

Page 5: SHEQ- summary Report BY Alpha and BH. 1 2011 2 nd & 3 rd Quarter.  In the 2 nd and 3 rd quarter of 2011, TNMC recorded 2 Lost Time Injuries (LTIs). The

5

12 months rolling safety performance

0.14

0.14

0.14

0.14

0.14

0.14

0.14

0.14

0.14

0.14

0.14

0.14

0.09 0.09 0.13 0.13 0.10 0.10 0.10 0.10 0.10 0.10 0.07 0.11

0.00

0.02

0.04

0.06

0.08

0.10

0.12

0.14

0.16

0.00

0.50

1.00

1.50

2.00

2.50

3.00

0.09 0.09

0.13 0.13

0.10 0.10 0.10 0.10 0.10 0.10

0.07

0.11

12 Months Rolling Safety Performance Averages

SR LTIFR 2011 Target LTIFR Strech Target

LT

IFR

(

Ba

se

d o

n 2

00

00

0 M

hs

)

(S

R)

Se

ve

ity R

ate

Page 6: SHEQ- summary Report BY Alpha and BH. 1 2011 2 nd & 3 rd Quarter.  In the 2 nd and 3 rd quarter of 2011, TNMC recorded 2 Lost Time Injuries (LTIs). The

6

Environment

2 incidents were recorded during the last 2 quarters. The first incident was a slime spillage while the second incident was a water spillage which resulted in water flowing outside mine lease area. The latter incident was reported as a dangerous occurrence.

TNMC is currently developing a Mine Closure plan

Page 7: SHEQ- summary Report BY Alpha and BH. 1 2011 2 nd & 3 rd Quarter.  In the 2 nd and 3 rd quarter of 2011, TNMC recorded 2 Lost Time Injuries (LTIs). The

7

TNMC SHEQms

TNMC continues to maintain its SHEQms.

An internal audit was conducted in July as planned. Areas of concern included document control and poor house keeping.

A surveillance audit was conducted by DQS in September. 16 findings were raised during this audit. A follow up audit will be conducted in December.

Pinagare campaign activities focused on Sustaining TNMC through resilience, External stakeholder engagement, Adherence and compliance.