Upload
vuongnhan
View
215
Download
0
Embed Size (px)
Citation preview
Shepardson Concept Study
SIGNATURE ADDITIONON THE NORTH SIDE - 31,000 GSF
BRANDED MAIN ENTRY W/ 2/3 STORY VOLUMEON AXIS WITH ADMIN BUILDING AND OVAL
COURTYARD/ interpretiveGARDEN
ELEVATOR SILO
INDOOR/OUTDOOR GAS FIREPLACE
CLERESTORY ATRIUM ELEMENTSECONDARY STAIR/ ENTRY
MULTISTORYSECONDARY SOUTH ENTRYON AXIS WITH MAIN ENTRY
AUDITORIUM CLASSROOMIN THE ROUND W/ CLERESTORY NORTH DAYLIGHTING AND ELEVATED DECK.
PFA ACCESS/ ENHANCED BIKEWAY
REMAINING PROGRAMMED ADDITIONON THE SOUTH SIDE - 15,000 GSF
COURTYARDINTERPRETIVEGARDEN
EDGEEXISTINGCURB
ELEVATOR
TEACHINGINTHEROUNDTIEREDAUDITORIUMFIRESIDE
NORTHVESTIBULE<16'DEEP
OPENSTAIR
STORYTELLING‐SLIDINGBARNDOORTOPROTECTHISTORICMAINENTRYDOORS
CLASSROOMLABORATORYSEMINAR
CLASSROOMLABORATORYSEMINAR
CLASSROOMLABORATORYSEMINAR
CLASSROOMLABORATORYSEMINAR
CLASSROOMLABORATORYSEMINAR
CLASSROOMLABORATORYSEMINAR
PREFUN
CTION
PREFUNCTION PREFUNCTION
INTERIORPERSPECTIVECAMERALOCATION
OPENTOBELOW
ELEVATOROPENTOBELOW
UPPERAUDITORIUM
CLASSROOMLABORATORYSEMINAR
CLASSROOMLABORATORYSEMINAR
CLASSROOMLABORATORYSEMINAR
CLASSROOMLABORATORYSEMINAR
CLASSROOMLABORATORYSEMINAR
CLASSROOMLABORATORYSEMINAR
OPENTOBELOW
OFFICE
OFFICE
OFFICE
FIRESIDE
OFFICE OFFICE
OPENTOBELOW
PREFUN
CTION
WALKWAY
STUDYSTUDY
elev
FIRESIDE BOARDROOM
OPENTOBELOW
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICEOFFICEOFFICE OFFICE OFFICE OFFICE OFFICE
EXTERIORDECK/PATIO
CLERESTORYLIGHTTOBELOW
NEWROOFAREA
ROOFAREASEMINAR>50OCCUPANTS
OPENSTAIR
STUDY
Shepardson Concept Study
1" = 50'-0"1 MAIN1" = 50'-0"2 SECOND
1" = 50'-0"3 THIRD