Sheet1(2008)

  • Upload
    shimymb

  • View
    218

  • Download
    0

Embed Size (px)

Citation preview

  • 8/13/2019 Sheet1(2008)

    1/2

    Ain Shams UniversityFaculty of EngineeringElect. Power & MachinesDept.

    4thear Power SectionPower System Analysis !""

    #$$%!#$$

    Sheet '()

    Electromechanical *ransient in SEPS'E+ual Area ,riterion)

    Appreviations:

    EPS : Electrical power system.

    IB : Infinite bus.

    TSM: Transient stability margin.

    CA : Clearing angle.

    CCA: Critical clearing angle.TL : Transmission line.

    Simplified EPS:

    . !i"e t#e general formulation of t#e met#o$ of e%ual areas.

    &. A generator is $eli"ering '() of power w#ic# it is capable of $eli"ering

    t#roug# a TL to an IB. a fault occurs w#ic# increases t#e reactance between

    t#e generator an$ t#e IB to *(() of t#e "alue before fault. +#en t#e fault

    is isolate$ t#e ma,imum power w#ic# can be $eli"ere$ is -') of t#e

    original ma,. "alue. etermine t#e CCA for t#e con$itions $escribe$.

    /. 0or t#e system s#own in 0ig. 1 Calculate t#e CCA if a /2p# S.C. occurs at

    t#e beginning of one of t#e TL. All parameters are gi"en in p.u. as follows:

    T3 T&3 T/3 T*3 (.45 TL 3 (.&*5 63 (.&75 6&3 (.4

  • 8/13/2019 Sheet1(2008)

    2/2

    *. A simplifie$ EPS is sub8ecte$ to a /2p#. 0ault. etermine t#e fault CA

    maintaining a TSM of ( )1 also fin$ t#e ma,imum "alue of t#e rotor

    angle in t#e process of oscillations. System power2angle c#aracteristics are

    pure sinusoi$al at all operating con$itions. System capacities are *1 1 an$ /

    p.u. at pre2fault. fault an$ post2fault con$itions. Two p.u. power is

    transmitte$ to t#e IB in normal operating con$itions.

    '. A generator is $eli"ering (.&' of Pma,to an IB t#roug# a T.L. A fault occurs

    suc# t#at t#e reactance between t#e generator an$ t#e IB is increase$ to two

    times its pre2fault "alue. 0in$ t#e ma,imum "alue of t#e rotor angle in t#e

    process of oscillations in t#e case of sustaine$ fault.

    4. A simplifie$ EPS is sub8ecte$ to a &2p# S.C. at t#e beginning of one of t#e

    TL at instant to 9'o 3 /(;1 $uring an inter"al t1 at t93 '&;1 t#e &2p#

    S.C. $e"elope$ to a /2p# one1 an$ t#en at instant t&9&3 -/;1 t#e faulty line

    is $isconnecte$. If t#e ma,imum power t#at can be transmitte$ in pre2fault1

    fault an$ post2fault con$itions are &1 (.7 an$ .4 p.u. respecti"ely. C#ec