Shed1800 installation guide. ®

Shed1800 installation guide. · LM30-181-SPG 1. Step 3. 1. Ensure the base is level in each direction. 2. Reuse the wrap under the base for damp prooÞng. Tips: 28mm 28mm. Step 4

  • Upload
    hamien

  • View
    214

  • Download
    0

Embed Size (px)

Citation preview

Shed1800 installation guide.

®

Material list.

UI Code:

Quantity:

BR75-181-0

3

CP01-181-LR

1

CP01-181-RR

1

CP01-181-LF

1

CP01-181-RF

1

LM30-181-0

30

UI Code:

Quantity:

LM30-181-AC

2

IN01-181-SC

2

LM30-181-SPG

3

LM30-181-SPS

1

TR02-181-ST

2

TR02-181-FT

2

UI Code:

Quantity:

TR01-181-SB

2

TR01-181-FB

1

TR01-181-SJ

2

TR01-181-WB

1

PRE MADE DOOR

2

SC50

1 box (100)

UI Code:

Quantity:

SC75

1 box (50)

H200

4

PB150

1

PB100

1

SC40

1 box (100)

WPM-181-0

1

Step 1.

1. Prepare your workspace.2. Unpack and carefully stack components to one side to free up base for the shed.

Before you start building, you will need to:

Step 2.

28mm

Front flush

Fix LM30-181-SPG to BR75-181-0. Position the flush at the front and al-low for side and rear walls to sit on the BR75-181-0. Refer to the Shed1800 base construction guide.

Tip:

BR75-181-0 3

UI Code: Quantity:

LM30-181-0 6

SC75 21

LM30-181-SPG 1

Step 3.

1. Ensure the base is level in each direction.

2. Reuse the wrap under the base for damp proofing.

Tips:

28mm

28m

m

Step 4.

Secure first layer of MiniCLT planks with bugle screws to the pallet base.

Tip:

LM30-181-0 3

UI Code: Quantity:

SC75 9

LM30-181-0 LM30-181-0LM30-181-0

LR181

LF181

RR181

RF181

CP01-181-LR 1

CP01-181-RR 1

CP01-181-LF 1

CP01-181-RF 1

SC75 6

UI Code: Quantity:

Refer to fixing guide for more information.

Ensure the bottom of the posts are level with the bottom base planks. Refer to fixing guide for further information on how to secure the corner posts.

Tip:Step 5.

25mmFixing groove

Step 6.

2

6

5

4

3

1

2

6

5

4

3

1

LAM30SP90

AC90

LM30-181-AC 2

LM30-181-0 18

LM30-181-SP 10

SC50 36

SC75 14

UI Code: Quantity:

Fixing groove

Stack up MiniCLT planks and skew screw with SC50 screws. Once all planks are in place, secure SC75 screws at the top, middle and bottom of corner posts. Refer to fixing guide.

Tip:

Step 7.

Refer to fixing guide for more information on attaching the IN01-181-SC.

LM30-181-SPG 1

SC50 10

IN01-181-SC 2

UI Code: Quantity:

IN01-181-SC

LM30-181-SPG

LM30-181-SPGIN01-181-SC

30mm

Step 8.

LM30-181-SPS 1

SC75 2

UI Code: Quantity:

LM30-181-SPS

Refer to fixing guide for more information.

Step 9.

LAM30-181-0 6

SC50 14

LM30-181-SPG 1

UI Code: Quantity:

TR02-181-ST

TR01-181-FT

TR02-181-ST 2

TR02-181-FT 2

SC40 16

UI Code: Quantity:

Step 10.

Step 11. WPM roll to overhang around perimeter and screw fix at 300mm centres.

Tip:

WPM02 1

SC40 45

UI Code: Quantity:

TR01-181-SB 2

TR01-181-FB 1

TR01-181-SJ 2

UI Code: Quantity:

SC50 35

TR01-181-FB

TR01-181-SB

Step 12.

Step 13.

UI Code: Quantity:

H200 4

PRE MADE DOORS 2

SC40 28

PB150 1

PB100 1

1. Use PB100 to secure the doors. Refer to fixing guide.2. Ensure there is an even gap around the doors.

Tip:

7-10mm gap

Step 14. Even up the gap in the doors by adjusting the base if required.

Tip:

TR03-181-DE 1

UI Code: Quantity:

Shed1800 fixing guide.

Step 6.

4525mm

Fixing groove

Steps 5&6.

Step 10.

Step 7.

28mm

Shed1800 base construction.Birds eye view. Side section.

Front section.

100 100 100773773

1,8461,790 2828

2875

1,846

2828 1,790

1790

1846

BR75

CE65

100 100 100773773

28

100

BR75

LM30-SPG

138

179028

laminata.nz

®