SHARING SUCCESSFUL EXPERIENCE 

‐ ESCONDIDA IN CHILE

1

CONTENTS

Introduction to Doosan Heavy Industries

Doosan’s Experience in Chile

Introduction of EWS

Future Plan for Chile

2

DOOSAN HEAVY INDUSTRIES & CONSTRUCTION PROFILE

WaterWater

PowerPower

Vision

Global Leader in Power & Water• Global Leader : Becoming a global top‐tier player in all businesses• Power & Water : Representing main businesses

Doosan Heavy Industries & Construction was established in 1962• Establishment Period (1962 ~ 1979) : Erected national power industries• State‐owned Period (1980 ~ 2000) : Technical development and Growth• After Privatization (2001 ~ now) : Going global

Employees• 17,787 persons (Korean 7,732 persons, Global Staff 10,055 persons)Head Office• Seoul, South Korea

History

General Information

Doosan Heavy Industries & Construction which was established in 1962 with over 50 year history has grown as a global power and water company

3

Doosan E&S(USA)

DPS India(India)

BusinessGroup

OverseasSubsidiary

Doosan ŠkodaPower (Czech)

Doosan Babcock(UK)

Doosan Power Systems (UK)

Doosan Lentjes(Germany)

Doosan VINA(Vietnam)

Doosan ChennaiWorks (India)

Doosan HydroTech. (USA)

Doosan Enpure(UK)

Doosan IMGB(Romania)

Doosan Heavy Industries & Construction 

BUSINESS OVERVIEW

Doosan HF Controls (USA)

EPC

Coal, Oil, Combined‐cycle, Simple‐cycle & Industrial Power 

Plant EPC

TurbineGenerator

Design & Fabricate Steam, Gas Turbine & 

ElectricalGenerators

Design & Fabricate Boilers

& Environ‐mental 

equipment

BoilerWater

Seawater Desalination Plant & WaterTreatment

Casting& Forging

IndustrialMaterials & Components

Nuclear

Nuclear Power Plant Equipment Manufacturing & 

Service

There are 6 business groups under Doosan Heavy Industries & Construction. Water, EPC, Boiler, Turbine Generator, Nuclear and Casting & forging business groups.

4

DOOSAN WATER BUSINESS OVERVIEW

Doosan VinaFactoryVietnam

Doosan Hydro 

TechnologyUSA

Doosan EnpureUnitedKingdom

Water Business GroupKorea

DesalinationProprietary technologies for all three main desalination processes Multi‐Stage Flash (MSF) Multi‐Effect Distillation (MED) Reverse Osmosis (RO)

Water & Wastewater TreatmentAdvanced treatment solutions for municipal and industrial end‐users Water Supply Advanced Wastewater Treatment Treatment for Industrial Usage

Water SystemsAdvanced systems for enhanced efficiency of water infrastructure based on proprietary  technologies Sonix TM

LENA MBR  DAF / DMF Zero Liquid Discharge (ZLD)

Operation & MaintenanceOptimized solutions based on know‐how, flexibility, and latest technology Desalination Plants Water & Wastewater Treatment Plants

R&D Centers Birmingham R&D Center Changwon R&D Center Dammam R&D Center Tampa R&D Center

Branch Offices Riyadh, Saudi Arabia Dubai, UAE Kuwait City, Kuwait New Delhi, India Tampa, Florida, USA Santiago, Chile

52015

1,000

500

100

1,500

ROThermal

1985

Desalination Ca

pacity (M

IGD)

Assir Ph.11985, Saudi Arabia

96,000m3/d 

Fujairah IWPP2001, UAE

455,000m3/dShuaibah Ph.21993, Saudi Arabia

455,000m3/d

Shuaibah Ph.32006, Saudi Arabia

194MIGD

Yanbu Ph.32012, Saudi Arabia

550,000m3/d

Ras Al Khair2010, Saudi Arabia1,037,000m3/d

Jeddah RO2009, Saudi Arabia

241,000m3/d

Escondida RO2013, Chile216,000m3/d

Shuaibah Ph.32006, Saudi Arabia

882,000m3/d

Total of 29 Projects :6.7 mil m3/d

For daily use by 17 mil people1

Awarded Year1. 300 liter/person

OVERSEAS EPC EXPERIENCE FOR DESALINATION PLANTIn addition to 772,000 m3/d  of capacity currently under construction, Doosan’s desalination plants are producing 5,902,000 m3/d of potable water around the globe.

6

RECORDS IN DESALINATION INDUSTRY

Desalination Company of the YearGlobal Water Awards 2012, 2011, 2008

Desalination Plant of the YearGlobal Water Awards 2010

[Shuaibah RO Expansion Project, KSA]

Desalination Deal of the YearGlobal Water Awards 2006

[Shuaibah IWPP Project, KSA]

‘Largest Desalination Plant in South America’

Escondida SWRO216,000m3/d, Chile, ’13

‘World’s Largest MED Unit Capacity’ 

Yanbu Ph.2 Exp.MED69,000m3/d, KSA, ’11

‘World’s Largest Desalination Plant’

Ras Al Khair Ph.11,037,000m3/d , KSA, ’10 

‘World’s 1ST Hybrid Desalination Plant’

Fujairah Hybrid  455,000m3/d , UAE, ’01

‘Middle East’s Largest RO Desalination Plant’

Jeddah Ph.3 RO241,000m3/d, KSA, ’09 

7

CONTENTS

Introduction to Doosan Heavy Industries

Doosan’s Experience in Chile

Introduction of EWS

Future Plan for Chile

8

[Kelar]• Order Date : Nov.2013• Capacity : 540MW, CCPP• Scope : STG x 1, HRSG x 2• Owner : BHP Billiton

[Red Dragon]• Order Date : Mar.2015• Capacity : 375MW, Coal• Scope : Boiler, STG, FGD• Owner : E‐CL(GDF Suez)

[Chile Branch]• Location: Santiago • Work Scope: Business Development of Power & Water 

PowerPower

BranchBranch

DOOSAN’S PERFORMANCE IN CHILE

[Water]‐ Escondida RO 

[Power]‐ Red Dragon‐ Kelar‐ Cochrane ‐ Angamos

[Escondida RO]• Order Date : Sep.2013• Capacity : 216,000m3/d• Scope : SWRO Plant Engineering, Procurement, Tech. Support• Owner : Minera Esdondida Limitada, operated by BHP Billiton

WaterWater

[Angamos]• Order Date : Oct.2007• Capacity : 544MW, Coal• Scope : BLR x 2 • Owner : AES Gener

[Cochrane]• Order Date : Aug.2013• Capacity : 532MW, Coal• Scope : FGD• Owner : AES Gener

[Nueva Ventanas]• Order Date : Dec.2006• Capacity : 272MW, Coal• Scope : BLR• Owner : AES Gener

[Campiche]• Order Date : Oct.2007• Capacity : 272MW, Coal• Scope : BLR• Owner : AES Gener

[Power]‐ Campiche‐ Nueva Ventanas

Doosan Branch

9

CONTENTS

Introduction to Doosan Heavy Industries

Doosan’s Experience in Chile

Introduction of EWS

Future Plan for Chile

1. PROJECT SUMMARY & OVERVIEW (1/2)

• Owner• Scope of Supply• Capacity• Site• PJT Period• EP contractor• EPC3  Contract• Engineering consultant

• Project History 

:  Minera Escondida Limitada, operated by  BHP Billiton:  Engineering, procurement  and technical support:  216,000 m3/day (47.5 MIGD1), SWRO2 Plant:  Antofagasta, Chile:  2013.09 ~ 2015.12 (28 months):  Doosan Heavy Industries & Construction :  Bechtel (USA):  Black & Veatch (USA)

• Notice to proceed: Aug. 22. 2013.• Contract signing: Sep. 04. 2013• Delivery completion of CO2 sys’, ERS4: Dec. 2014• Delivery completion of RO rack (9 trains): Feb.2015• Delivery completion of DMF5 (60 units): Mar. 2015• Installation start – RO rack & HP pump6: Apr. 2015

1. MIGD: Million Imperial Gallon per Day2. SWRO: Sea Water Reverse Osmosis3. EPC: Engineering, Procurement, Construction 

104. ERS: Energy Recovery System5. DMF: Dual Media Filter6. HP Pump: High Pressure Pump

1. PROJECT SUMMARY & OVERVIEW (2/2)

11

To supply 216,000 m3/day of water for Escondida Copper Mining (the Largest RO Plant in Latin America)The plant is consist of 60 DMFs and 9 SWRO trains.

Process Flow Diagram Plant Overview

DMF 60 UNITS

CHEM. FEED SYS’

RO BUILDING

PERMEATE TANK

2. PROJECT SCHEDULE & PROGRESS MANAGEMENT

12

Engineering : 98.00 %

Procurement : 86.50 %

Manufacturing : 100.00 %

Test & Transport : 75.84 %

Overall : 89.14 %

Progress Achieved (Mar 2015)

Overall project period is 28 months from Contract signing. 

Work scope is  Engineering, Procurement and Technical Consulting for construction & commissioning.

NTP‘13.08.22

Final Delivery‘15.12.16

DCS‘15.05

Cartridge filter‘15.03

Engineering‘13.09

DMF‘15.2

RO Membrane‘15.11

Tech. DocumentSubmission

‘13.11

RO Rack‘15.2

RO Feed Pump‘15.02

SW Screen Sys’‘15.4

Commercial Operation‘17.1

Const. & Commissioning‘16.2

[Expected schedule]

3. SHARING EXPERIENCE & KNOWLEDGE

13

• Water Industry in Chilean market Mostly, infrastructure for mining

• Strict environmental regulation Environment‐friendly plant

• An earthquake country, Chile Seismic design against earthquake

• Operation & maintenance Minimum maintenance during plant lifecycle

• Understanding different cultures Various countries in the project. Comes from Australia, USA, Chile, Korea and others

14

CONTENTS

Introduction to Doosan Heavy Industries

Doosan’s Experience in Chile

Introduction of EWS

Future Plan for Chile

FUTURE PLAN FOR CHILEFUTURE PLAN FOR CHILE

15

Doosan will contribute developing the Chilean desalination market, relieving the drought crisis through DHI technologies and transferring the Know‐how of its experience.  

Chilean SuppliersDevelopment

Equipment Suppliers

DHI(Contractor)

Government(Owner)

CHILEKOREA

Securing Local Equipment supplier

DesalinationConstruction 

Local Construction

ConstructionPartnering

Reliable Water Supplier to 

Solve Drought

Mining Industries

Supply Mining Process Water  

Enhancing Cooper Production

16

THANK YOU