26
0 Copyright 2015 FUJITSU Fujitsu PRIMEFLEX reference architectures SharePoint, Exchange, Lync, OfficeMaster Gate

SharePoint, Exchange, Lync, OfficeMaster Gate Fujitsu …techcommunity.ts.fujitsu.com › media › files › tech_com_webcast › 20… · SharePoint Server 2013 architecture SharePoint

  • Upload
    others

  • View
    6

  • Download
    0

Embed Size (px)

Citation preview

Page 1: SharePoint, Exchange, Lync, OfficeMaster Gate Fujitsu …techcommunity.ts.fujitsu.com › media › files › tech_com_webcast › 20… · SharePoint Server 2013 architecture SharePoint

0 Copyright 2015 FUJITSU

Fujitsu PRIMEFLEX reference architectures

SharePoint, Exchange, Lync, OfficeMaster Gate

Page 2: SharePoint, Exchange, Lync, OfficeMaster Gate Fujitsu …techcommunity.ts.fujitsu.com › media › files › tech_com_webcast › 20… · SharePoint Server 2013 architecture SharePoint

1

Fujitsu PRIMEFLEX for SharePoint

based on Microsoft SharePoint 2013 SP1

on-premise solution

designed for 250 SharePoint users

Copyright 2015 FUJITSU

Page 3: SharePoint, Exchange, Lync, OfficeMaster Gate Fujitsu …techcommunity.ts.fujitsu.com › media › files › tech_com_webcast › 20… · SharePoint Server 2013 architecture SharePoint

2

SharePoint Server 2013 features

Feature Description

Sites Access to information via websites. Different design

options for Intranet, Extranet, and Internet.

Communities Social networking in companies using wikis, blogs, team

calendars and personal websites.

Content Document management within defined communities

Search Full-text seach, search suggestions, automatic indexing

Insights Preparation of SharePoint managed business

information in charts and graphs

Composites Interfaces to external data and business systems

Copyright 2015 FUJITSU

Page 4: SharePoint, Exchange, Lync, OfficeMaster Gate Fujitsu …techcommunity.ts.fujitsu.com › media › files › tech_com_webcast › 20… · SharePoint Server 2013 architecture SharePoint

3

SharePoint Server 2013 architecture

SharePoint Server

2013 roles:

Three-Tier Architecture

Web

Front

End

SharePoint

ApplicationDatabase

Farm Architecture

Web

Front

End

SharePoint

ApplicationDatabase

Two-Tier Architecture

Web Front End

&

SharePoint Application

Database

Web Front-End SharePoint Applications

Database

SharePoint Server

2013 topologies:

SharePoint Server 2013 roles

Copyright 2015 FUJITSU

Page 5: SharePoint, Exchange, Lync, OfficeMaster Gate Fujitsu …techcommunity.ts.fujitsu.com › media › files › tech_com_webcast › 20… · SharePoint Server 2013 architecture SharePoint

4

Two-tier architecture based on Hyper-V

PRIMEFLEX for SharePoint reference architecture

VM 1

(SharePoint

Server)

VM 2

(SQL Server

2014)

Hyper-V Host

2×300 GB SAS HDD

RAID 1 - OS

4×300 GB SAS HDD

RAID 10 – SQL Datafiles

2×300 GB SAS HDD

RAID 1 – Logfiles

2 × Xeon E5-2420 v2 (6 cores, 2.20 GHz)

32 GB Memory

2 x 1Gbit LAN (onboard)

HDDs via Cougar 3 RAID Controller:

8 × 300GB (2.5“ SAS 6G HDD 10k hot-plug)

PRIMERGY TX2540 M1

0

10

20

30

40

50

60

70

80

90

100

100 250 500 1000

RPS (Requests Per Second) on SharePoint Server

Avg. Requests/Sec (RPS)

Max. Requests/Sec (RPS)

(User)

(RPS)

0

0.2

0.4

0.6

0.8

1

1.2

100 250 500 1000

Avg. Page Time in seconds

Avg. Page Time (sec)

(User)

(Sec)

Copyright 2015 FUJITSU

Page 6: SharePoint, Exchange, Lync, OfficeMaster Gate Fujitsu …techcommunity.ts.fujitsu.com › media › files › tech_com_webcast › 20… · SharePoint Server 2013 architecture SharePoint

5

PRIMEFLEX for SharePoint additional topics

Sizing Guide for SharePoint Server 2013 envirnoments

Step-by-Step installation and configuration of…

SharePoint Server (application server & web server)

Database Server

Monitoring and performance measurements

Expandability

Data security and backup

Copyright 2015 FUJITSU

Page 7: SharePoint, Exchange, Lync, OfficeMaster Gate Fujitsu …techcommunity.ts.fujitsu.com › media › files › tech_com_webcast › 20… · SharePoint Server 2013 architecture SharePoint

6 Copyright 2015 FUJITSU

PRIMEFLEX for Exchange

based on Microsoft Exchange 2013

on-premise solution

designed for 500 Exchange users

Page 8: SharePoint, Exchange, Lync, OfficeMaster Gate Fujitsu …techcommunity.ts.fujitsu.com › media › files › tech_com_webcast › 20… · SharePoint Server 2013 architecture SharePoint

7

PRIMEFLEX for Exchange Characteristics

Exchange 2013 solution for up to 500 mailboxes (users)

High availability via DAG (Database Access Group)

Group of Exchange servers with local disks – no shared storage

Each server: active mailbox database + replicated database copies from other

servers

Virtualized Exchange servers for flexibility

Mailbox assumptions:

mailbox size limit 2000 MB

up to 200 sent or received messages per user per day

Copyright 2015 FUJITSU

Page 9: SharePoint, Exchange, Lync, OfficeMaster Gate Fujitsu …techcommunity.ts.fujitsu.com › media › files › tech_com_webcast › 20… · SharePoint Server 2013 architecture SharePoint

8

PRIMEFLEX for Exchange Architecture

2 x PRIMERGY

RX2520 M1

DNS round-robin load

balancing

virtualized combined

MBX and CAS server

roles

DAG based high-

availability

Copyright 2015 FUJITSU

PRIMERGY RX2520 M1with Hyper-V role

• VM EXCHANGE1 (CAS + MBX)

PRIMERGY RX2520 M1with Hyper-V role

• VM EXCHANGE2 (CAS + MBX)

VHD 1 (OS)

VHD 3 (backup)

private network for DAG

company network

Active Directory services

DNS services

DAG witness file share

PRIMEFLEX for Exchange

VHD 2 (DAG)

• Database 1 (active)

• Database 2 (passive)

VHD 1 (OS)

VHD 3 (backup)

VHD 2 (DAG)

• Database 1 (passive)

• Database 2 (active)

Page 10: SharePoint, Exchange, Lync, OfficeMaster Gate Fujitsu …techcommunity.ts.fujitsu.com › media › files › tech_com_webcast › 20… · SharePoint Server 2013 architecture SharePoint

9

PRIMEFLEX for Exchange Configuration

Copyright 2015 FUJITSU

1200GB Hot Spare

300GB Hot Spare 300GB 300GB 1200GB

1200GB 1200GB 1200GB 1200GB 1200GB

10 SAS HDDs:

Hot Spares

OS RAID1

DAG Databases RAID10

Backup Space RAID1

Per PRIMERGY RX2520 M1 running Windows Server 2012 R2:

1 × Xeon E5-2420 v2 (6 Cores, 2.2 GHz, 15 MB L3 Cache)

36 GB Memory

1 × 1Gbit LAN Controller dual-port (in addition to on-board LAN ports)

10 × 2.5“ SAS 6G HDD 10k Hot-Plug (via Cougar 3 RAID Controller)

Page 11: SharePoint, Exchange, Lync, OfficeMaster Gate Fujitsu …techcommunity.ts.fujitsu.com › media › files › tech_com_webcast › 20… · SharePoint Server 2013 architecture SharePoint

10

PRIMEFLEX for Exchange Expandability

Copyright 2015 FUJITSU

Limit Upgrade Path

500 Users PRIMEFLEX for Exchange as specified

1500 Users

Upgrade of both PRIMERGY RX2520 M1:

• 2 × Xeon E5-2470 v2 (10 Cores, 2.4 GHz, 25 MB L3 Cache)

• 96 GB Memory in Performance Mode Installation

• 1 × 1Gbit LAN Controller dual-port

• 16 × 2.5“ SAS HDD

2500 Users DAG with 3 × PRIMERGY RX2520 M1 (upgraded configuration)

3000 Users DAG with 4 × PRIMERGY RX2520 M1 (upgraded configuration)

Page 12: SharePoint, Exchange, Lync, OfficeMaster Gate Fujitsu …techcommunity.ts.fujitsu.com › media › files › tech_com_webcast › 20… · SharePoint Server 2013 architecture SharePoint

11

PRIMEFLEX for Exchange Additional Topics

Step-by-step installation guide for

Windows server host with Hyper-V role (hypervisor)

Exchange server VM and Database Availability Group

Sizing process with Exchange 2013 requirements calculator

Stress test results and comparison to sizing assumptions

Jetstress 2013

Exchange Load Generator 2013

Simple Exchange backups with Windows Server Backup

Transition from previous versions to Exchange 2013

Copyright 2015 FUJITSU

Page 13: SharePoint, Exchange, Lync, OfficeMaster Gate Fujitsu …techcommunity.ts.fujitsu.com › media › files › tech_com_webcast › 20… · SharePoint Server 2013 architecture SharePoint

12

Fujitsu PRIMEFLEX for Lync

based on Microsoft Lync Server 2013 Standard Edition

on-premise solution

designed for 1000 Lync users

Copyright 2015 FUJITSU

Page 14: SharePoint, Exchange, Lync, OfficeMaster Gate Fujitsu …techcommunity.ts.fujitsu.com › media › files › tech_com_webcast › 20… · SharePoint Server 2013 architecture SharePoint

13

Lync network requirements

QoS (Quality of Service)

Prioritization of Voice by all LAN endpoints (Switches w/ QoS required)

Make use of the Lync feature: Call Admission Control (CAC)

Latency and bandwidth requirements

Monitoring of the LAN environment before implementing Lync

Perimeter network (DMZ)

Is highly recommended when using Edge features (external Lync user)

Active Directory

Domain and forest functional level must be at least Windows Server 2003

Copyright 2015 FUJITSU

Page 15: SharePoint, Exchange, Lync, OfficeMaster Gate Fujitsu …techcommunity.ts.fujitsu.com › media › files › tech_com_webcast › 20… · SharePoint Server 2013 architecture SharePoint

14

Lync Server 2013 topology

External Lync Users

Reverse Proxy

Edge Server (Pool)

PSTN-Cloud

Exchange Unified Messaging Server

PSTN Gateway

Active Directory

Perimiter NetworkInternet

Internal Lync Users

Intranet

Edge Server Architecture

Director Office Web Apps

Back-End

Front-End

Mediation

ArchivingMonitoring

Persistent Chat

?

Copyright 2015 FUJITSU

Page 16: SharePoint, Exchange, Lync, OfficeMaster Gate Fujitsu …techcommunity.ts.fujitsu.com › media › files › tech_com_webcast › 20… · SharePoint Server 2013 architecture SharePoint

15

External Lync Users

Reverse Proxy

Edge Server (Pool)

PSTN-Cloud

Exchange Unified Messaging Server

PSTN Gateway

Primary Lync SE Server

Active Directory

Perimiter NetworkInternet

Backup Lync SE Server

Internal Lync Users

Intranet

Lync Paired Standard Edition Pool

Edge Server Architecture

Office Web Apps Farm

Collocated Roles & FeaturesFront EndBack EndArchiving

MonitoringMediation Server

Quality of Experience

PRIMEFLEX for Lync reference architecture

2 x PRIMERGY RX2520 M1

2 x PRIMERGY RX2520 M1

1 x PRIMERGY RX1330 M1

Copyright 2015 FUJITSU

Page 17: SharePoint, Exchange, Lync, OfficeMaster Gate Fujitsu …techcommunity.ts.fujitsu.com › media › files › tech_com_webcast › 20… · SharePoint Server 2013 architecture SharePoint

16

Lync SE Pool with OWA

Hardware configuration overview

2 x PRIMERGY RX2520 M1

2 × Xeon E5-2450 v2 (8 cores, 2.50 GHz)

48 GB Memory

2 x 1Gbit LAN (onboard) configured for NIC teaming

HDDs via Cougar 3 RAID Controller:

5 × 300GB (2.5“ SAS 6G HDD 10k hot-plug)

3 × 100GB (2.5“ SATA 6G SSD hot-plug)

Edge Server architecture

2 x PRIMERGY RX2520 M1

2 × Xeon E5-2420 v2 (6 cores, 2.20 GHz)

24 GB Memory

2 x 1Gbit (onboard) + 2 x 1Gbit (PCIe adapter card)

respectively configured for NIC teaming

HDDs via Cougar 3 RAID Controller:

7 × 300GB (2.5“ SAS 6G HDD 10k hot-plug)

Each: Each:

Copyright 2015 FUJITSU

Page 18: SharePoint, Exchange, Lync, OfficeMaster Gate Fujitsu …techcommunity.ts.fujitsu.com › media › files › tech_com_webcast › 20… · SharePoint Server 2013 architecture SharePoint

17

PRIMEFLEX for Lync additional topics

Step-by-Step installation and configuration of…

Lync Paired Standard Edition Pool

Edge Server and Reverse Proxy

PSTN gateway (PRIMEFLEX for OfficeMaster Gate)

Enterprise Voice

Lync archiving and monitoring function

Backup of Lync Server 2013

HA and site resilience

Expandability (more users or a branch office)

Copyright 2015 FUJITSU

Page 19: SharePoint, Exchange, Lync, OfficeMaster Gate Fujitsu …techcommunity.ts.fujitsu.com › media › files › tech_com_webcast › 20… · SharePoint Server 2013 architecture SharePoint

18

FUJITSU Integrated System PRIMEFLEX for OfficeMaster Gate

Copyright 2015 FUJITSU

Page 20: SharePoint, Exchange, Lync, OfficeMaster Gate Fujitsu …techcommunity.ts.fujitsu.com › media › files › tech_com_webcast › 20… · SharePoint Server 2013 architecture SharePoint

19

Four steps to connect Lync/Skype for Business with public switched telephone network

Copyright 2015 FUJITSU

Step 1: Unwrap, connect, power on

Step 2: Insert license keys and let Lync/Skype

for Business know the availability of

PRIMEFLEX for OfficeMaster Gate

Use your unified communication!

Page 21: SharePoint, Exchange, Lync, OfficeMaster Gate Fujitsu …techcommunity.ts.fujitsu.com › media › files › tech_com_webcast › 20… · SharePoint Server 2013 architecture SharePoint

20

Appliance is deployed ex-factory

Box „ready to run“

Software already

deployed to disks

1. Power on

2. Booting

3. Restarting

4. Booting again

5. Ready

Copyright 2015 FUJITSU

Page 22: SharePoint, Exchange, Lync, OfficeMaster Gate Fujitsu …techcommunity.ts.fujitsu.com › media › files › tech_com_webcast › 20… · SharePoint Server 2013 architecture SharePoint

21

Check Network Configuration

Check for network configuration

1. Select „i“ for info

a) No DHCP address provided

• Select „n“ to set a temporary network

address, netmask and gateway

(attention: this settings are only valid until

the next reboot!)

• Configure the network permanently

(see next slide)

b) DHCP address provided

• Note the address for further use

Copyright 2015 FUJITSU

Page 23: SharePoint, Exchange, Lync, OfficeMaster Gate Fujitsu …techcommunity.ts.fujitsu.com › media › files › tech_com_webcast › 20… · SharePoint Server 2013 architecture SharePoint

22

Adapt Network to your environment

If not already installed, download and install

configuration tool from http://www.ferrari-

electronic.de/fileadmin/download_center_org/OfficeMa

sterHardware/Setup-OfficeMaster-Gate-Config.exe

(Make sure to use the configuration tool for changes!)

Connect to the gateway using the IP address noted

before (password is „omc“)

Select „Change IP Address“

Enter the correct IP configuration

Press <OK> to save the settings

Copyright 2015 FUJITSU

Page 24: SharePoint, Exchange, Lync, OfficeMaster Gate Fujitsu …techcommunity.ts.fujitsu.com › media › files › tech_com_webcast › 20… · SharePoint Server 2013 architecture SharePoint

23

Complete SNMP settings

Fujitsu ServerView components e.g. SNMP

are preinstalled

To receive SNMP traps, the configuration

needs to be adjusted to your need

This is done by the configuration tool

Edit

Logging

• enter the address of the management machine receiving the

traps

• Enter other information as it is needed

• Press <OK> to save the changes

Copyright 2015 FUJITSU

Page 25: SharePoint, Exchange, Lync, OfficeMaster Gate Fujitsu …techcommunity.ts.fujitsu.com › media › files › tech_com_webcast › 20… · SharePoint Server 2013 architecture SharePoint

24

Activate/register and install your License

OfficeMaster Gate needs to be registered

This can be done with the configuration tool

Help

Register Office Master

In the „Product Activation Wizzard“ select the preferred method for

your envrionment (by Email or by Internet Connection),

press <Next> and complete the following forms

Once you received the license file, it has to be

installed with the configuration tool

Edit

Manage Licenses

Install

Copyright 2015 FUJITSU

Page 26: SharePoint, Exchange, Lync, OfficeMaster Gate Fujitsu …techcommunity.ts.fujitsu.com › media › files › tech_com_webcast › 20… · SharePoint Server 2013 architecture SharePoint

25