View
215
Download
0
Tags:
Embed Size (px)
Citation preview
Bid/RFP InformationCurrent Bid, Request for Proposal, Request for Qualification Information
SEARCH CRITERIA PARAMETERS:
Agency:
Bid/RFP InformationCurrent Bid, Request for Proposal, Request for Qualification Information
GENERAL BID INFORMATION:To see more specific information regarding a particular bid, click on Bid Number.
Agency Type Number Project NameIssue Date
Due DateContract
Type
City of Bellevue
Bid 9059 2009 Somerset Woods AC Water Main Replacement
4/23/2009 5/7/2009 10:00 AM
Public Works
SPECIFIC BID INFORMATION
Number Project Name Contact Information Planholders List Documents
9059 2009 Somerset Woods AC Water Main Replacement
Abe Santos view view
PLANHOLDER’S LIST
Agency: City of Bellevue Bid Number: 9059
Bid Due Date: 05/07/09 Bid Time: 10:00am
Bid Opening Location: Bellevue City Hall 1E-109
Project Title: 2009 Somerset Woods AC Water Main Replacement
Contact Name: Abe Santos
Date Company Name Contact Name Contact EmailContact Phone
04/15/09 Talakai Construction Pete Talakie ptalakai@talakaiconst 123-456-7890
04/16/09 Redside Construction Bob Smith [email protected] 123-456-7890
04/17/09 Merlino Brothers John Doe [email protected] 123-456-7890
BID RESULTS
Agency: City of Bellevue Bid Number: 9059
Bid Due Date: 05/07/09 Bid Time: 10:00am
Bid Opening Location: Bellevue City Hall 1E-109
Project Title: 2009 Somerset Woods AC Water Main Replacement
Contact Name: Abe Santos
Apparent Low
Company Name Total Bid PriceRelated
Documents
1. Talakai Construction $100,028.25 view
2. Redside Construction $106,712.86 view
3. Merlino Brothers $108,339.90 view
BID AWARD:
Agency: City of Bellevue Bid Number: 9059
Bid Due Date: 05/07/09 Bid Time: 10:00am
Bid Opening Location: Bellevue City Hall 1E-109
Project Title: 2009 Somerset Woods AC Water Main Replacement
Contact Name: Abe Santos
Date of Award Contractor Name Award Amount
05/15/09 Talakai Construction $100,028.25
Date of Notification
Agency Type Number Project Name
4/23/09 City of Bellevue Bid 90592009 Somerset Woods AC Watermain Replacement
3/15/09 City of Bothell Bid 0001123 Main Street
VENDOR APPLICATION MODIFICATION:
Vendor Name
Date Notified/Emailed
Date Obtained Plans or
DocumentsDate
RespondedRespond Amount
Award Amount
Award Date
Redside Construction 4/7/2009 4/8/2009 4/21/2009 $106,712.86
Talakai Construction 4/7/2009 4/10/2009 4/21/2009 $100,028.25 $100,028.25 5/8/2009
Merlino Brothers 4/7/2009
COMPETITIVE PROCESS TRACKING:
Agency: City of Bellevue Bid Number: 9059
Bid Due Date: 05/07/09 Bid Time: 10:00am
Bid Opening Location: Bellevue City Hall 1E-109
Project Title: 2009 Somerset Woods AC Water Main Replacement
Contact Name: Abe Santos