Upload
others
View
2
Download
0
Embed Size (px)
Citation preview
STANDARDHARDSCAPE
LANDSCAPE FEATURES SFO FH3 -SCHEMATIC SITE PLAN - 1/64” = 1’-0”
N
0’ 16’ 32’ 128’64’
LANDSCAPE
1
5 6 7 10
9
8
2 3 4
1. LANDSCAPE HARDENING - ROCK SCULPTURE2. GROUNDCOVER - ARCTOSTAPHYLOS UVA-URSI3. BIOTREATMENT - DESCHAMPSIA CESPITOSA4. LANDSCAPE HARDENING - WALLS5. LANDSCAPE HARDENING - BOULDERS
6. LANDSCAPE HARDENING - BENCHES7. LANDSCAPE BERMS8. SUCCULENT - AGAVE ATTENUATA ‘VARIEGATA’9. SHRUB - LEUCADENDRON DISCOLOR ‘POM’10. SHRUB - LEUCOSPERMUM CORDIFOLIUM
WallBike Path
SECTION B-BBiotreatment Landscape Berm Curb Checkpoint Driveway Curb Planting Area
+6’
+3’
+0’
+6’
+3’
+0’
SECTION A-APlanting Area Walkway Landscape
HardeningLandscape Hardening
Landscape Berm
Sidewalk Bike Path
LANDSCAPE SECTIONS 0’ 2’ 4’ 16’8’
UP UP
26' - 8" 19' - 0" 19' - 0" 22' - 6" 24' - 0" 24' - 0" 23' - 2"
158' - 4"
101'
- 7"
116' - 0"
19' - 0" 19' - 0" 19' - 0" 19' - 0" 19' - 0" 21' - 0"7' - 8"
6' -
0"34
' - 4
"21
' - 0
"21
' - 0
"19
' - 3
"
EMERGENCYGENERATORFUEL TANK(1500 GAL)
EMERGENCYGENERATOR
(12'X25')
PAD MTD.TRANSFORMER
(12'X25')
APPARATUS BAY
RECYCLE
S.C.B.A.
MEDICAL
FOAM
PPE CLEAN
SHOP
STORAGE STORAGE
TRAININGWOMEN'S MEN'S
STAIR 1
HALL 2 HALL 1
LOBBYRECEPT. CAPTAIN BC CHIEF
JAN.
BATHBC DORM
EXERCISE
ELECTRICALE.M.R.ELEV.
STAIR 2S.S.R.STORAGEBREAK/COPY
CONFERENCE
87654321
F
E
D
C
B
A
6.67.58.44322.1
ADMINISTRATION
LIVING QUARTERS
APPARATUS BAY
CIRCULATION
APPPPARRRRRRRAAAAAAAAAARRRR TTTTTTTAAAA UUUUUUSSSSSSSSSS BBBBBAAYYAAAA
RECYCLE
S.C.B.A.
MEDICAL
FOAM
PPE CLEAN
SHOP
EXERCISE
BC DORMM
ELECTRICALE.M.. R.ELEV.
S.S.R.STORRARR GAA EBREAK/KKCOPY
CONFERREENCN E
REEEECEEEPT. CAPTAIN BBC CHIEF
JANN.
BATAA H
STSTORARR GAA E STORARR GGA EE
TRARR ININGWWWOMENNN'S MMMEN'S
UP UPSTAIR 1
HALL 2 HALL 1
LOBBY
STAIR 2
SFO FH3 -GROUND FLOOR PLAN - 1/16” = 1’-0”
N
0’ 4’ 8’ 32’16’
DN DN
26' - 8" 19' - 0" 19' - 0" 22' - 6" 24' - 0" 24' - 0" 23' - 2"
158' - 4"
101'
- 7"
116' - 0"
OPENTO
BELOW
CONDENSER
AHU
19' - 0" 19' - 0" 19' - 0" 19' - 0" 19' - 0" 21' - 0"
6' -
0"34
' - 4
"21
' - 0
"21
' - 0
"19
' - 3
"
1 2 3 4 5 6 7 8
F
E
D
C
B
A
1.2 2 3 4 4.8 5.7 6.6
DAY ROOM
HC RESTPANTRY STAIR 1
WATCH ROOM STUDY
MECH
UTILITY T.W.C. STAIR 2
ELEVDORM 9
HALL 3
DORM 1 DORM 2 DORM 3 DORM 4 DORM 5 DORM 6 DORM 7 DORM 8
KITCHEN
MECHANICALMEZZANINE
DAY ROOMOM
HC RESTSTTTTSTPANTRY
KITCHENNE
DN
STAIR 2
ELEV
HALL 3
ADMINISTRATION
LIVING QUARTERS
APPARATUS BAY
CIRCULATION
DORM 4DORM 3DORM 2DORM 1 D DORM 7DORM 6DORM 5 7 DORM 8
DORM 9WATCH ROOM STUDY
MECH
T.W.C.UTILITYYL
DN
STAIR 1
SFO FH3 -SECOND FLOOR PLAN - 1/16” = 1’-0”
N
0’ 4’ 8’ 32’16’
SFO FH3 -SECTION DIAGRAM - 1/8” = 1’-0”
Level 10"
Level 214' - 6"
ROOF27' - 0"
PARAPET31' - 6"
LOBBY CONFERENCE
WATCH
APPARATUS BAY
9' - 0
"9'
- 6"
4' - 6
"12
' - 6"
14' -
6"
ADMINISTRATION
LIVING QUARTERS
APPARATUS BAY
CIRCULATION
0’ 4’ 8’ 32’16’
DESIGN PROGRESSION
DESIGN PROGRESSION
DESIGN PROGRESSION
SOUTH ELEVATION
Dynamic Glazing
Existing Blast Fence
Rainscreen Panel System
Landscape Berm
CorrugatedPerforatedScreenWall
Landscape Hardening
Corrugated PerforatedScreenwall
EAST ELEVATION
Drought TolerantLandscaping
MechanicalEquipment
Rainscreen Panel System
Insulated Corrugated Metal Panel
EAST ELEVATION
Existing Blast Fence
Existing Blast Fence
NORTH ELEVATION
Insulated Corrugated
MetalPanel
Bifold Apparatus Bay
Door
ClerestoryGlazing
Existing Electrical SubstationMechanical
EquipmentCorrugatedPerforatedScreenwall
NORTH ELEVATION
Existing Blast Fence
WEST ELEVATION
RainscreenPanel System
MechanicalLouvers
Existing Blast Fence
Landscape Berm
Existing Blast Fence
WEST ELEVATION
Corrugated PerforatedScreenwall
AOAFence
Existing Electrical Substation
SOUTHWEST PERSPECTIVE
SOUTHEAST PERSPECTIVE
EVENING RENDER