SFFD Ambulance Deployment FacilityCivic Design Review Updated Phase 1 Presentation

June 19th 2017

Page 2: SFFD Ambulance Deployment Facility - sfgov.org · Civic Design Review Updated Phase 1 Presentation June 19th 2017. 1 LOCATION AND ... Burger King Rescino Performance Earl’s Organic

1 LOCATION AND MASSING

Page 3: SFFD Ambulance Deployment Facility - sfgov.org · Civic Design Review Updated Phase 1 Presentation June 19th 2017. 1 LOCATION AND ... Burger King Rescino Performance Earl’s Organic

SFFD AMBULANCE DEPLOYMENT FACILITY | CIVIC DESIGN REVIEW UPDATED PHASE 1 PRESENTATION | JUNE 19TH 2017 3Site Location

N

Proposed Future Ambulance Deployment Facility

Highway 101

SFPD Bayview Station

Cesar Chavez St

Highway 280

AT&T Park

Zuckerberg San Francisco General Hospital

Islais Creek

Page 4: SFFD Ambulance Deployment Facility - sfgov.org · Civic Design Review Updated Phase 1 Presentation June 19th 2017. 1 LOCATION AND ... Burger King Rescino Performance Earl’s Organic

SFFD AMBULANCE DEPLOYMENT FACILITY | CIVIC DESIGN REVIEW UPDATED PHASE 1 PRESENTATION | JUNE 19TH 2017 4Site Location & Long Section

Highway 101 Barneveld Avenue

Bayshore Boulevard

McKinnon Avenue

Jerrold Avenue

N

Page 5: SFFD Ambulance Deployment Facility - sfgov.org · Civic Design Review Updated Phase 1 Presentation June 19th 2017. 1 LOCATION AND ... Burger King Rescino Performance Earl’s Organic

SFFD AMBULANCE DEPLOYMENT FACILITY | CIVIC DESIGN REVIEW UPDATED PHASE 1 PRESENTATION | JUNE 19TH 2017 5Proposed Site Plan

Barneveld Avenue

Kel-Toy, Inc.

J Scott Co

Blood Centers of the Pacific

Payless Plumbing & Fire Sprinkler Supply

Stop N Stor

Academy of Art

First Student

BevMo!

Burger King

Rescino Performance

Earl’s Organic Produce

National Cab

Alioto’s Garage

Bayshore Boulevard

Highway 101

McKinnon Avenue

Jerrold Avenue

N

Page 6: SFFD Ambulance Deployment Facility - sfgov.org · Civic Design Review Updated Phase 1 Presentation June 19th 2017. 1 LOCATION AND ... Burger King Rescino Performance Earl’s Organic

SFFD AMBULANCE DEPLOYMENT FACILITY | CIVIC DESIGN REVIEW UPDATED PHASE 1 PRESENTATION | JUNE 19TH 2017 6Proposed Site Plan

Proposed Parking Structure

ProposedAmbulance Deployment

Facility

Existing Fire Station 9

N

Barneveld Avenue

McKinnon Avenue

213’ 156’ 95’

ROOF @15’

EXISTING BUILDING TOP @31.9’

EXISTING BUILDING TOP @43.0’

EXISTING BUILDING TOP @41.4’ EXISTING BUILDING

TOP @34.7’EXISTING BUILDING TOP @32.5’

EXISTING BUILDING TOP @42.4’

ROOF @54’

STAIR PENTHOUSE @64’100’

213’

Jerrold Avenue

Page 7: SFFD Ambulance Deployment Facility - sfgov.org · Civic Design Review Updated Phase 1 Presentation June 19th 2017. 1 LOCATION AND ... Burger King Rescino Performance Earl’s Organic

SFFD AMBULANCE DEPLOYMENT FACILITY | CIVIC DESIGN REVIEW UPDATED PHASE 1 PRESENTATION | JUNE 19TH 2017 7Neighborhood Vantage Points

Barneveld Avenue

McKinnon Avenue

Jerrold Avenue

FUTURE ADF

Page 8: SFFD Ambulance Deployment Facility - sfgov.org · Civic Design Review Updated Phase 1 Presentation June 19th 2017. 1 LOCATION AND ... Burger King Rescino Performance Earl’s Organic

SFFD AMBULANCE DEPLOYMENT FACILITY | CIVIC DESIGN REVIEW UPDATED PHASE 1 PRESENTATION | JUNE 19TH 2017 8Proposed Building Massing from Jerrold Avenue

Page 9: SFFD Ambulance Deployment Facility - sfgov.org · Civic Design Review Updated Phase 1 Presentation June 19th 2017. 1 LOCATION AND ... Burger King Rescino Performance Earl’s Organic

SFFD AMBULANCE DEPLOYMENT FACILITY | CIVIC DESIGN REVIEW UPDATED PHASE 1 PRESENTATION | JUNE 19TH 2017 9Proposed Building Massing from Barneveld Avenue

Page 10: SFFD Ambulance Deployment Facility - sfgov.org · Civic Design Review Updated Phase 1 Presentation June 19th 2017. 1 LOCATION AND ... Burger King Rescino Performance Earl’s Organic

SFFD AMBULANCE DEPLOYMENT FACILITY | CIVIC DESIGN REVIEW UPDATED PHASE 1 PRESENTATION | JUNE 19TH 2017 10Proposed Building Massing from Bayshore Boulevard

Page 11: SFFD Ambulance Deployment Facility - sfgov.org · Civic Design Review Updated Phase 1 Presentation June 19th 2017. 1 LOCATION AND ... Burger King Rescino Performance Earl’s Organic

2 SD PHASE UPDATE

Page 12: SFFD Ambulance Deployment Facility - sfgov.org · Civic Design Review Updated Phase 1 Presentation June 19th 2017. 1 LOCATION AND ... Burger King Rescino Performance Earl’s Organic

SFFD AMBULANCE DEPLOYMENT FACILITY | CIVIC DESIGN REVIEW UPDATED PHASE 1 PRESENTATION | JUNE 19TH 2017 12Proposed Site Plan Comparison

DN

FDFD FD

RAMP DN 6�RAMP DN 12�

ELEV 1

01 02 03 04 05 06 07

08 09 10 11 12

RC01

RC02

EV02

STAN

DARD

VAN

02

STAN

DARD 01

STANDARD

03

VISITOR

01 VISITOR

02 VISITOR

03 VISITOR

04 STANDARD

05 STANDARD

06 STANDARD

07 STANDARD

08EV03 EV

04 EV05

FUEL EFFICIENT 01

FUEL EFFICIENT 02

FUEL EFFICIENT 03

FUEL EFFICIENT 04

STANDARD 09

STANDARD 10

STANDARD 11

STANDARD 12

STANDARD 13

STANDARD 14

STANDARD 15

STANDARD 16

STANDARD 45

STANDARD18

STANDARD19

STANDARD20

STANDARD21

STANDARD22

STANDARD23

STANDARD24

STANDARD25

STANDARD26

STANDARD27

STANDARD28

STANDARD17

STANDARD

29 STANDARD

30 STANDARD

31 STANDARD

32 STANDARD

33 STANDARD

34 STANDARD

35 STANDARD

36 STANDARD

37 STANDARD

38 STANDARD

39 STANDARD

40 STANDARD

41 STANDARD

42

STANDARD43

STANDARD

44

EV VAN 01

STANDARD

04

STAIR 2(OPEN)

STAIR 1(OPEN)

DN

E�ISTING BUILDING

E�ISTINGBUILDING

5286A � LOT 005

HEIGHT� 31�-11"

E�ISTINGBUILDING

HEIGHT� 43�-0"

E�ISTINGBUILDING

5286A � LOT 017

HEIGHT� 41�-5"

E�ISTINGBUILDING

E�ISTINGBUILDING

E�ISTINGBUILDING

E�ISTINGBUILDING

E�ISTINGBUILDING

E�ISTINGBUILDING

5286A � LOT 019

HEIGHT� 34�-7"

E�ISTING BUILDING

LOT 019 � HEIGHT� 32��5"

E�ISTINGFIRE STATION 09

240'-2"

5286A � LOT 003

LOT 004

5286A � LOT 020

HEIGHT�

5286A � LOT 0075286A �LOT 18

5286A � LOT 007

5286A � 006HEIGHT 31�-5"

20'-0"

12'-0"MIN.

10'-6"

17'-7"±

UPTON STREET

BARNEVELD AVENUE

JAR

RO

LD A

VE

NU

E

McK

INN

ON

AV

EN

UE

HEIGHT�29�-2"

HEIGHT�22�-1"

FPFH

FPFH

FH

FH

UPTON STREET

BARNEVELD AVENUE

JAR

RO

LD A

VE

NU

E

McK

INN

ON

AV

EN

UE

10'-1

"80

'-0"

24'-4

"16

'-10"

112'-10" 52'-0" 213'-8" 61'-7" 79'-10" 10'-3"52'-0"

216'-

11"

335'-

0"

FDFD FD

RAMP DN 6�RAMP DN 12�

ELEV 1

01 02 03 04 05 06 07

08 09 10 11 12

RC01

RC02

EV02

STAN

DARD

VAN

02

STAN

DARD 01

STANDARD

03

VISITOR

01 VISITOR

02 VISITOR

03 VISITOR

04 STANDARD

05 STANDARD

06 STANDARD

07 STANDARD

08EV03 EV

04 EV05

FUEL EFFICIENT 01

FUEL EFFICIENT 02

FUEL EFFICIENT 03

FUEL EFFICIENT 04

STANDARD 09

STANDARD 10

STANDARD 11

STANDARD 12

STANDARD 13

STANDARD 14

STANDARD 15

STANDARD 16

STANDARD 45

STANDARD18

STANDARD19

STANDARD20

STANDARD21

STANDARD22

STANDARD23

STANDARD24

STANDARD25

STANDARD26

STANDARD27

STANDARD28

STANDARD17

STANDARD

29 STANDARD

30 STANDARD

31 STANDARD

32 STANDARD

33 STANDARD

34 STANDARD

35 STANDARD

36 STANDARD

37 STANDARD

38 STANDARD

39 STANDARD

40 STANDARD

41 STANDARD

42

STANDARD43

STANDARD

44

EV VAN 01

STANDARD

04

STAIR 2(OPEN)

STAIR 1(OPEN)

Orig

inal

Dra

win

g S

ize:

30"

x 4

2"D

raw

ing

nam

e: P

:\871

5A�A

DF\

5.0�

Des

ign\

5.01

�C�r

rent

\AC

AD

\Plo

t\AD

F A

1.30

SIT

E P

LAN

.dw

g

Plo

tted

on:

Nov

21,

201

6 - 5

:16�

m

Sheet No.

Drawing Title

Job No.

Proj. Arch.

Proj. Mgr.

Drawn

Project

Scale

Section Head

RevisionsNo. Date

Issue

Consultant

100% SCHEMATIC DESIGN11.18.2016

30 Van Ness AvenueSan Francisco, CA94102-6028 Fax (415) 557-4701

(415) 557-4700Suite 4100

BUILDING DESIGN ANDCONSTRUCTION DIVISION

Phase

8715A

Edgar Lopez - City Architect

Julia Laue - Principal Architect & Manager

10.07.16 50% SCHEMATIC DESIGN

RS/JD

SD

TK

SCALE:12 SITE PLAN

1�32" � 1�-0"

1

2

SITE ENTRANCE - ONE WAY TRAFFIC. SEE SHEET NOTE #5 FOR ADDITIONALINFORMATION. PROVIDE NEW VEHICULAR CURB DRIVEWAY

GENERAL NOTES

3

4

SITE PLANPROPOSED

A1.30

SITE EXIT - ONE WAY TRAFFIC. PROVIDE NEW VEHICULAR CURB DRIVEWAY, STEELBI-FOLD TRACKLESS CHAIN LINK W/ PRIVACY INFILL & SENSOR MOTION FOR EXITING.

INSTALL DRIVEWAY, STEEL BI-FOLD TRACKLESS CHAIN LINK WITH PRIVACY INFILL ATFIRE STATION 9 ENTRANCE/EXIT

EXISTING FIRE STATION 9 WORKSHOP

SHEET NOTES

2

3

5 PROVIDE NEW VEHICULAR CURB DRIVEWAY, STEEL BI-FOLD TRACKLESS CHAIN LINKWITH PRIVACY INFILL . SEE SHEET NOTE #6 FOR ADDITIONAL INFORMATION

6

PROVIDE NEW PAVEMENT ASPHALT, SCD

5

1. VERIFY THAT EXISTING CONDITIONS ARE AS INDICATED ON THE DRAWINGS ANDSPECIFICATIONS. NOTIFY THE CITY REPRESENTATIVE IMMEDIATELY OF VARIATIONSOR DISCREPANCIES. DO NOT PROCEED WITH AFFECTED WORK UNTIL THE VARIATIONSOR DISCREPANCIES ARE RESOLVED BY THE CITY REPRESENTATIVE.

2. NEW CURBS, GUTTERS, SITE DRAINAGE AND SIDEWALK INCLUDED IN SCOPE OF WORK,SCD.

3. COORDINATE ALL WORK W/ MECHANICAL, ELECTRICAL, STRUCTURAL AND CIVILDISCIPLINES.

4. VERIFY SITE DRAINAGE AT REAR YARD OF FIRE STATION 09. PROVIDE NEW CATCHBASIN AS REQUIRED, SCD

7 PROVIDE SIDE WALK

8 PROVIDE ACCESSIBLE CURB CUT. SCD FOR EXTEND OF WORK

9 PROVIDE STRIPING AREA FOR PEDESTRIAN ACCESS, SEE A2.01 AND A2.11

10 INSTALL 7'-0" TALL FENCE WITH PRIVACY INFILL OVER CONCRETE CURB

11 PROVIDE DETECTABLE WARNING

8

7

8

8

LEGEND

PROPERTY LINE

NEW FENCE

EXISTING BUILDING TO REMAIN

14

13

7

8

14

15

16

169

EXISTING CELL TOWER AT NEIGHBOR PROPERTY

10

17

17 17

INSTALL PEDESTRIAN ACCESS, STEEL MAN GATE, WITH KEY CARD ACCESS ANDAUDIO-VISUAL SYSTEM

INSTALL GENERATOR, LOCATED ON GARAGE FACILITY18

PLANTING POCKET WITH VINES, TRELLIS AND DIP IRRIGATION19

INSTALL TRANSFORMER20

20

13

INSTALL METERED SWITCHGEAR21

22

15

1

INSTALL GAS METER FOR ADF BUILDINGS

INSTALL BACK FLOW PREVENTER AND FIRE DEPARTMENT CONNECTION

INSTALL FUEL PUMPING STATIONS OVER CONCRETE CURB

4

21

EXISTING FIRE HYDRANT

12 INSTALL UNDERGROUND FUEL TANK, (1) 3,000 GA GASOLINE AND (1) 1,000 DIESEL,SMD

FIRE PRESSURE HYDRANT FPFH

FIRE HYDRANT FH

23 EXISTING FIRE PRESSURE HYDRANT

23

23

22

22

24

18

24

PROVIDE FIRE DEPARTMENT CONNECTION, STANDPIPE TYP.

17911

EXTERIOR BICYCLE PARKING. SEE A2.01 SHEET NOTE 125

INSTALL 4" DIAM. STEEL CONCRETE FILLED BOLLARD26

PROVIDE "AMBULANCE DEPLOYMENT FACILITY" SIGN27

BUILDING SITE PATH EGRESS. SEEA0.31 THROUGH A0.34 AND A0.41 THROUGH A0.43

SECOND EXIT - VEHICLES EMERGENCY EXIT28

28

INSTALL UNDERGROUND FUEL TANK FOR EMERGENCY GENERATOR29

12

29

10

19 19

10 10

DN

FDFD FD

RAMP DN 6�RAMP DN 12�

ELEV 1

01 02 03 04 05 06 07

08 09 10 11 12

RC01

RC02

EV02

STAN

DARD

VAN

02

STAN

DARD 01

STANDARD

03

VISITOR

01 VISITOR

02 VISITOR

03 VISITOR

04 STANDARD

05 STANDARD

06 STANDARD

07 STANDARD

08EV03 EV

04 EV05

FUEL EFFICIENT 01

FUEL EFFICIENT 02

FUEL EFFICIENT 03

FUEL EFFICIENT 04

STANDARD 09

STANDARD 10

STANDARD 11

STANDARD 12

STANDARD 13

STANDARD 14

STANDARD 15

STANDARD 16

STANDARD 45

STANDARD18

STANDARD19

STANDARD20

STANDARD21

STANDARD22

STANDARD23

STANDARD24

STANDARD25

STANDARD26

STANDARD27

STANDARD28

STANDARD17

STANDARD

29 STANDARD

30 STANDARD

31 STANDARD

32 STANDARD

33 STANDARD

34 STANDARD

35 STANDARD

36 STANDARD

37 STANDARD

38 STANDARD

39 STANDARD

40 STANDARD

41 STANDARD

42

STANDARD43

STANDARD

44

EV VAN 01

STANDARD

04

STAIR 2(OPEN)

STAIR 1(OPEN)

DN

E�ISTING BUILDING

E�ISTINGBUILDING

5286A � LOT 005

HEIGHT� 31�-11"

E�ISTINGBUILDING

HEIGHT� 43�-0"

E�ISTINGBUILDING

5286A � LOT 017

HEIGHT� 41�-5"

E�ISTINGBUILDING

E�ISTINGBUILDING

E�ISTINGBUILDING

E�ISTINGBUILDING

E�ISTINGBUILDING

E�ISTINGBUILDING

5286A � LOT 019

HEIGHT� 34�-7"

E�ISTING BUILDING

LOT 019 � HEIGHT� 32��5"

E�ISTINGFIRE STATION 09

240'-2"

5286A � LOT 003

LOT 004

5286A � LOT 020

HEIGHT�

5286A � LOT 0075286A �LOT 18

5286A � LOT 007

5286A � 006HEIGHT 31�-5"

20'-0"

12'-0"MIN.

10'-6"

17'-7"±

UPTON STREET

BARNEVELD AVENUE

JAR

RO

LD A

VE

NU

E

McK

INN

ON

AV

EN

UE

HEIGHT�29�-2"

HEIGHT�22�-1"

FPFH

FPFH

FH

FH

UPTON STREET

BARNEVELD AVENUE

JAR

RO

LD A

VE

NU

E

McK

INN

ON

AV

EN

UE

10'-1

"80

'-0"

24'-4

"16

'-10"

112'-10" 52'-0" 213'-8" 61'-7" 79'-10" 10'-3"52'-0"

216'-

11"

335'-

0"

FDFD FD

RAMP DN 6�RAMP DN 12�

ELEV 1

01 02 03 04 05 06 07

08 09 10 11 12

RC01

RC02

EV02

STAN

DARD

VAN

02

STAN

DARD 01

STANDARD

03

VISITOR

01 VISITOR

02 VISITOR

03 VISITOR

04 STANDARD

05 STANDARD

06 STANDARD

07 STANDARD

08EV03 EV

04 EV05

FUEL EFFICIENT 01

FUEL EFFICIENT 02

FUEL EFFICIENT 03

FUEL EFFICIENT 04

STANDARD 09

STANDARD 10

STANDARD 11

STANDARD 12

STANDARD 13

STANDARD 14

STANDARD 15

STANDARD 16

STANDARD 45

STANDARD18

STANDARD19

STANDARD20

STANDARD21

STANDARD22

STANDARD23

STANDARD24

STANDARD25

STANDARD26

STANDARD27

STANDARD28

STANDARD17

STANDARD

29 STANDARD

30 STANDARD

31 STANDARD

32 STANDARD

33 STANDARD

34 STANDARD

35 STANDARD

36 STANDARD

37 STANDARD

38 STANDARD

39 STANDARD

40 STANDARD

41 STANDARD

42

STANDARD43

STANDARD

44

EV VAN 01

STANDARD

04

STAIR 2(OPEN)

STAIR 1(OPEN)

Orig

inal

Dra

win

g S

ize:

30"

x 4

2"D

raw

ing

nam

e: P

:\871

5A�A

DF\

5.0�

Des

ign\

5.01

�C�r

rent

\AC

AD

\Plo

t\AD

F A

1.30

SIT

E P

LAN

.dw

g

Plo

tted

on:

Nov

21,

201

6 - 5

:16�

m

Sheet No.

Drawing Title

Job No.

Proj. Arch.

Proj. Mgr.

Drawn

Project

Scale

Section Head

RevisionsNo. Date

Issue

Consultant

100% SCHEMATIC DESIGN11.18.2016

30 Van Ness AvenueSan Francisco, CA94102-6028 Fax (415) 557-4701

(415) 557-4700Suite 4100

BUILDING DESIGN ANDCONSTRUCTION DIVISION

Phase

8715A

Edgar Lopez - City Architect

Julia Laue - Principal Architect & Manager

10.07.16 50% SCHEMATIC DESIGN

RS/JD

SD

TK

SCALE:12 SITE PLAN

1�32" � 1�-0"

1

2

SITE ENTRANCE - ONE WAY TRAFFIC. SEE SHEET NOTE #5 FOR ADDITIONALINFORMATION. PROVIDE NEW VEHICULAR CURB DRIVEWAY

GENERAL NOTES

3

4

SITE PLANPROPOSED

A1.30

SITE EXIT - ONE WAY TRAFFIC. PROVIDE NEW VEHICULAR CURB DRIVEWAY, STEELBI-FOLD TRACKLESS CHAIN LINK W/ PRIVACY INFILL & SENSOR MOTION FOR EXITING.

INSTALL DRIVEWAY, STEEL BI-FOLD TRACKLESS CHAIN LINK WITH PRIVACY INFILL ATFIRE STATION 9 ENTRANCE/EXIT

EXISTING FIRE STATION 9 WORKSHOP

SHEET NOTES

2

3

5 PROVIDE NEW VEHICULAR CURB DRIVEWAY, STEEL BI-FOLD TRACKLESS CHAIN LINKWITH PRIVACY INFILL . SEE SHEET NOTE #6 FOR ADDITIONAL INFORMATION

6

PROVIDE NEW PAVEMENT ASPHALT, SCD

5

1. VERIFY THAT EXISTING CONDITIONS ARE AS INDICATED ON THE DRAWINGS ANDSPECIFICATIONS. NOTIFY THE CITY REPRESENTATIVE IMMEDIATELY OF VARIATIONSOR DISCREPANCIES. DO NOT PROCEED WITH AFFECTED WORK UNTIL THE VARIATIONSOR DISCREPANCIES ARE RESOLVED BY THE CITY REPRESENTATIVE.

2. NEW CURBS, GUTTERS, SITE DRAINAGE AND SIDEWALK INCLUDED IN SCOPE OF WORK,SCD.

3. COORDINATE ALL WORK W/ MECHANICAL, ELECTRICAL, STRUCTURAL AND CIVILDISCIPLINES.

4. VERIFY SITE DRAINAGE AT REAR YARD OF FIRE STATION 09. PROVIDE NEW CATCHBASIN AS REQUIRED, SCD

7 PROVIDE SIDE WALK

8 PROVIDE ACCESSIBLE CURB CUT. SCD FOR EXTEND OF WORK

9 PROVIDE STRIPING AREA FOR PEDESTRIAN ACCESS, SEE A2.01 AND A2.11

10 INSTALL 7'-0" TALL FENCE WITH PRIVACY INFILL OVER CONCRETE CURB

11 PROVIDE DETECTABLE WARNING

8

7

8

8

LEGEND

PROPERTY LINE

NEW FENCE

EXISTING BUILDING TO REMAIN

14

13

7

8

14

15

16

169

EXISTING CELL TOWER AT NEIGHBOR PROPERTY

10

17

17 17

INSTALL PEDESTRIAN ACCESS, STEEL MAN GATE, WITH KEY CARD ACCESS ANDAUDIO-VISUAL SYSTEM

INSTALL GENERATOR, LOCATED ON GARAGE FACILITY18

PLANTING POCKET WITH VINES, TRELLIS AND DIP IRRIGATION19

INSTALL TRANSFORMER20

20

13

INSTALL METERED SWITCHGEAR21

22

15

1

INSTALL GAS METER FOR ADF BUILDINGS

INSTALL BACK FLOW PREVENTER AND FIRE DEPARTMENT CONNECTION

INSTALL FUEL PUMPING STATIONS OVER CONCRETE CURB

4

21

EXISTING FIRE HYDRANT

12 INSTALL UNDERGROUND FUEL TANK, (1) 3,000 GA GASOLINE AND (1) 1,000 DIESEL,SMD

FIRE PRESSURE HYDRANT FPFH

FIRE HYDRANT FH

23 EXISTING FIRE PRESSURE HYDRANT

23

23

22

22

24

18

24

PROVIDE FIRE DEPARTMENT CONNECTION, STANDPIPE TYP.

17911

EXTERIOR BICYCLE PARKING. SEE A2.01 SHEET NOTE 125

INSTALL 4" DIAM. STEEL CONCRETE FILLED BOLLARD26

PROVIDE "AMBULANCE DEPLOYMENT FACILITY" SIGN27

BUILDING SITE PATH EGRESS. SEEA0.31 THROUGH A0.34 AND A0.41 THROUGH A0.43

SECOND EXIT - VEHICLES EMERGENCY EXIT28

28

INSTALL UNDERGROUND FUEL TANK FOR EMERGENCY GENERATOR29

12

29

10

19 19

10 10

Proposed Parking Structure

ProposedADF

ProposedADF

Existing Fire Station 9

N

Proposed Parking Structure

2016 Bridging Documents Site Plan

June 2017 Schematic Design Site Plan

1

3

3

2

2

1

4

Project Information

Project Information

Building Area 32,100 SF

Building Height T.O. Roof 48’-0”

Garage Area 82,680 SFGarage Height T.O. Roof 36’-6”

Site Work Area 60,000 SF

Building Area 23,980 SF

Building Height T.O. Roof 54’-0”

Garage Area 21,016 SFGarage Height T.O. Roof 15’-0”

Site Work Area 60,000 SF

*All square footages are gross.

Page 13: SFFD Ambulance Deployment Facility - sfgov.org · Civic Design Review Updated Phase 1 Presentation June 19th 2017. 1 LOCATION AND ... Burger King Rescino Performance Earl’s Organic

SFFD AMBULANCE DEPLOYMENT FACILITY | CIVIC DESIGN REVIEW UPDATED PHASE 1 PRESENTATION | JUNE 19TH 2017 13Proposed Elevation Comparison

FIRST LEVEL T.O. SLAB0'-0" (14'-4" SURVEY

DATUM)

SECOND LEVEL T.O. SLAB21'-0"

THIRD LEVEL T.O. SLAB34'-6"

T.O. PARAPET52'-8"

ROOF LEVEL T.O. SLAB48'-0"

PENTHOUSE T.O. SLAB59'-6"

OBLIQUEELEVATION

FIRST LEVEL T.O. SLAB0'-0" (14'-4" SURVEY

DATUM)

SECOND LEVEL T.O. SLAB21'-0"

THIRD LEVEL T.O. SLAB34'-6"

ROOF LEVEL T.O. SLAB48'-0"

T.O. PARAPET52'-8"

PENTHOUSE T.O. SLAB59'-6"

OBLIQUEELEVATION

Orig

inal

Dra

win

g S

ize:

30"

x 4

2"D

raw

ing

nam

e: P

:\871

5A�A

DF\

5.0�

Des

ign\

5.01

�C�r

rent

\AC

AD

\Plo

t\AD

F A

3.00

BU

ILD

ING

ELE

VA

TIO

NS

- FA

CIL

ITY

.dw

g

Plo

tted

on:

Nov

21,

201

6 - 5

:17�

m

Sheet No.

Drawing Title

Job No.

Proj. Arch.

Proj. Mgr.

Drawn

Project

Scale

Section Head

RevisionsNo. Date

Issue

Consultant

100% SCHEMATIC DESIGN11.18.2016

30 Van Ness AvenueSan Francisco, CA94102-6028 Fax (415) 557-4701

(415) 557-4700Suite 4100

BUILDING DESIGN ANDCONSTRUCTION DIVISION

Phase

8715A

Edgar Lopez - City Architect

Julia Laue - Principal Architect & Manager

10.07.16 50% SCHEMATIC DESIGN

RS/JD

SD

TK

SCALE:12 EAST ELEVATION - FACILITY

1�8" � 1�-0"

ELEVATIONSFACILITY

A3.00

SCALE:8 NORTH ELEVATION - FACILITY

1�8" � 1�-0"

1 METAL SIDING, TYPE 1

SHEET NOTES

2 METAL SIDING, TYPE 2

3 GALVANIZED SHEET METAL PARAPET COPING, TYP.

14

STAIR AND ELEVATOR EQUIPMENT ROOM12

METAL PIPE BOLLARD, TYP.

4 ALUMINUM WINDOWS. TYP.

5 ALUMINUM SPANDREL PANEL

10 METAL ENTRANCE CANOPY

8 METAL DOOR, TYP.

11 METAL OVERHEAD COILING DOOR

7 PASS THROUGH WINDOW AND SERVICE COUNTER

15 TRASH AND RECEYCLING ENCLOSURE, SEE SITE PLAN

6 EMERGENCY RESCUE WINDOWS

2

1

1

1

3

4 5

4 5

66

77

9 ALUMINUM STOREFRONT

CONCRETE BASE, TYP.13

8 910

11

12

1314

15

12

32

1

2

45

9 1314

1

5

2016 Bridging Documents North Elevation June 2017 SD North Elevation

Cantileverd canopy replaces two-story void space for covered ambulance restocking.

64’-0” STAIR PENTHOUSE59’-6” STAIR PENTHOUSE T.O. SLAB

52’-8” T.O. PARAPET

11

2016 Bridging Documents West Elevation

Added & enlarged fenestration for work spaces.

Parapet angled to conceal stair tower.

June 2017 SD West Elevation

FIRST LEVEL T.O. SLAB0'-0" (14'-4" SURVEY

DATUM)

SECOND LEVEL T.O. SLAB21'-0"

THIRD LEVEL T.O. SLAB34'-6"

ROOF LEVEL T.O. SLAB48'-0"

T.O. PARAPET52'-8"

OBLIQUEELEVATION

SECOND LEVEL T.O. SLAB21'-0"

THIRD LEVEL T.O. SLAB34'-6"

T.O. PARAPET52'-8"

ROOF LEVEL T.O. SLAB48'-0"

OBLIQUEELEVATION

SECOND LEVEL T.O. SLAB21'-0"

THIRD LEVEL T.O. SLAB34'-6"

T.O. PARAPET39'-2"

Orig

inal

Dra

win

g S

ize:

30"

x 4

2"D

raw

ing

nam

e: P

:\871

5A�A

DF\

5.0�

Des

ign\

5.01

�C�r

rent

\AC

AD

\Plo

t\AD

F A

3.01

BU

ILD

ING

ELE

VA

TIO

NS

- FA

CIL

ITY

.dw

g

Plo

tted

on:

Nov

21,

201

6 - 5

:17�

m

Sheet No.

Drawing Title

Job No.

Proj. Arch.

Proj. Mgr.

Drawn

Project

Scale

Section Head

RevisionsNo. Date

Issue

Consultant

100% SCHEMATIC DESIGN11.18.2016

30 Van Ness AvenueSan Francisco, CA94102-6028 Fax (415) 557-4701

(415) 557-4700Suite 4100

BUILDING DESIGN ANDCONSTRUCTION DIVISION

Phase

8715A

Edgar Lopez - City Architect

Julia Laue - Principal Architect & Manager

10.07.16 50% SCHEMATIC DESIGN

RS/JD

SD

TK

SCALE:12 WEST ELEVATION - FACILITY

1�8" � 1�-0"

ELEVATIONSFACILITY

A3.01

1 METAL SIDING, TYPE 1

SHEET NOTES

2 METAL SIDING, TYPE 2

3 GALVANIZED SHEET METAL PARAPET COPING, TYP.

STAIR AND ELEVATOR EQUIPMENT ROOM6

4 ALUMINUM WINDOWS. TYP.

5 ALUMINUM SPANDREL PANEL

8 NEIGHBORING BUILDINGS BEHIND

CONCRETE BASE, TYP.7

1

22

3

3

3

5

6

7

8

SCALE:1 WEST COURTYARD ELEVATION - FACILITY

1�8" � 1�-0"

13

3

SCALE:2 NORTH COURTYARD ELEVATION - FACILITY

1�8" � 1�-0"

22

1

2

N

Page 14: SFFD Ambulance Deployment Facility - sfgov.org · Civic Design Review Updated Phase 1 Presentation June 19th 2017. 1 LOCATION AND ... Burger King Rescino Performance Earl’s Organic

SFFD AMBULANCE DEPLOYMENT FACILITY | CIVIC DESIGN REVIEW UPDATED PHASE 1 PRESENTATION | JUNE 19TH 2017 14Proposed Elevation Comparison

2016 Bridging Documents East Elevation w/Parking Structure

*2016 Bridging Documents South Elevation Not Available

June 2017 SD East Elevation w/Parking Structure

June 2017 SD East Elevation w/Parking Structure

Green screen / planting opportunity

Cantilever canopy may hold Solar PV

57’-6” T.O. PARAPET

17’-6” T.O. PARKING STRUCTURE PARAPET

FIRST LEVEL T.O. SLAB0'-0" (14'-4" SURVEY

DATUM)

SECOND LEVEL T.O. SLAB21'-0"

THIRD LEVEL T.O. SLAB34'-6"

T.O. PARAPET52'-8"

ROOF LEVEL T.O. SLAB48'-0"

PENTHOUSE T.O. SLAB59'-6"

OBLIQUEELEVATION

FIRST LEVEL T.O. SLAB0'-0" (14'-4" SURVEY

DATUM)

SECOND LEVEL T.O. SLAB21'-0"

THIRD LEVEL T.O. SLAB34'-6"

ROOF LEVEL T.O. SLAB48'-0"

T.O. PARAPET52'-8"

PENTHOUSE T.O. SLAB59'-6"

OBLIQUEELEVATION

Orig

inal

Dra

win

g S

ize:

30"

x 4

2"D

raw

ing

nam

e: P

:\871

5A�A

DF\

5.0�

Des

ign\

5.01

�C�r

rent

\AC

AD

\Plo

t\AD

F A

3.00

BU

ILD

ING

ELE

VA

TIO

NS

- FA

CIL

ITY

.dw

g

Plo

tted

on:

Nov

21,

201

6 - 5

:17�

m

Sheet No.

Drawing Title

Job No.

Proj. Arch.

Proj. Mgr.

Drawn

Project

Scale

Section Head

RevisionsNo. Date

Issue

Consultant

100% SCHEMATIC DESIGN11.18.2016

30 Van Ness AvenueSan Francisco, CA94102-6028 Fax (415) 557-4701

(415) 557-4700Suite 4100

BUILDING DESIGN ANDCONSTRUCTION DIVISION

Phase

8715A

Edgar Lopez - City Architect

Julia Laue - Principal Architect & Manager

10.07.16 50% SCHEMATIC DESIGN

RS/JD

SD

TK

SCALE:12 EAST ELEVATION - FACILITY

1�8" � 1�-0"

ELEVATIONSFACILITY

A3.00

SCALE:8 NORTH ELEVATION - FACILITY

1�8" � 1�-0"

1 METAL SIDING, TYPE 1

SHEET NOTES

2 METAL SIDING, TYPE 2

3 GALVANIZED SHEET METAL PARAPET COPING, TYP.

14

STAIR AND ELEVATOR EQUIPMENT ROOM12

METAL PIPE BOLLARD, TYP.

4 ALUMINUM WINDOWS. TYP.

5 ALUMINUM SPANDREL PANEL

10 METAL ENTRANCE CANOPY

8 METAL DOOR, TYP.

11 METAL OVERHEAD COILING DOOR

7 PASS THROUGH WINDOW AND SERVICE COUNTER

15 TRASH AND RECEYCLING ENCLOSURE, SEE SITE PLAN

6 EMERGENCY RESCUE WINDOWS

2

1

1

1

3

4 5

4 5

66

77

9 ALUMINUM STOREFRONT

CONCRETE BASE, TYP.13

8 910

11

12

1314

15

12

32

1

2

45

9 1314

1

5

3

4

3

FIRST LEVEL T.O. SLAB0'-0" (13.5' SURVEY DATUM)

SECOND LEVEL T.O. SLAB17'-6"

THIRD LEVEL T.O. SLAB31'-6"

T.O. PARAPET35'-6"

FIRST LEVEL T.O. SLAB0'-0" (13.5' SURVEY DATUM)

SECOND LEVEL T.O. SLAB17'-6"

THIRD LEVEL T.O. SLAB31'-6"

⅊⅊

T.O. PARAPET35'-6"

Orig

inal

Dra

win

g S

ize:

30"

x 4

2"D

raw

ing

nam

e: P

:\871

5A�A

DF\

5.0�

Des

ign\

5.01

�C�r

rent

\AC

AD

\Plo

t\AD

F A

3.02

BU

ILD

ING

ELE

VA

TIO

NS

- G

AR

AG

E.d

wg

P

lotte

d on

: N

ov 2

1, 2

016

- 5:1

7�m

Sheet No.

Drawing Title

Job No.

Proj. Arch.

Proj. Mgr.

Drawn

Project

Scale

Section Head

RevisionsNo. Date

Issue

Consultant

100% SCHEMATIC DESIGN11.18.2016

30 Van Ness AvenueSan Francisco, CA94102-6028 Fax (415) 557-4701

(415) 557-4700Suite 4100

BUILDING DESIGN ANDCONSTRUCTION DIVISION

Phase

8715A

Edgar Lopez - City Architect

Julia Laue - Principal Architect & Manager

10.07.16 50% SCHEMATIC DESIGN

RS/JD

SD

TK

SCALE:20 SECTION - GARAGE

1�8" � 1�-0"

GENERAL NOTES

ELEVATIONSGARAGE

A3.02

SHEET NOTES

SCALE:19 SECTION - GARAGE

1�8" � 1�-0"

1

2

8" THICK CONCRETE GUARDRAIL. T.O. GUARDRAIL 44" AFF, SSD

3

4

5

CONCRETE BEAM, SSD

CMU WALL INFILL, TYP., SSD

CONCRETE COLUMN TYP., SSD

CONCRETE WALL, TYP., SSD

6 FIRE STATION 9 WORKSHOP, BEHIND

7 ADJACENT NEIGHBOR'S BUILDING

8 3"X3" HSS FRAMES, PTD, USED FOR FIRE FIGHTER TRAINING

9

10 TRAINING BALCONY WITH 44" HIGH METAL PIPE GUARD RAIL

4

2

1

1

1

1

1

1

5

6

7

10

8

6

PLANTING POCKET WITH VINES AND DRIP IRRIGATION ALONG CONCRETE WALL

11 OPEN AIR METAL FENCE ENCLOSURE

12 STEEL BI-FOLD VEHICULAR DOORS FOR SECONDARY EMERGENCY EXIT

1112 11

OPEN TO BEYOND OPEN TO BEYOND

OPEN TO BEYOND

OPEN TO BEYOND

4

13 ELEVATOR WALL BEYOND

13

7

3

3

7

7

555

14

14 PHOTOVOLTAIC CANOPY SYSTEM WITH STEEL TUBE STRUCTURE, TYP.

15 PROVIDE RESILIENT SURFACE FOR LADDER TRAINING, RUBBER OR EQUAL

15 15

15

5

5555

4

3

N

Page 15: SFFD Ambulance Deployment Facility - sfgov.org · Civic Design Review Updated Phase 1 Presentation June 19th 2017. 1 LOCATION AND ... Burger King Rescino Performance Earl’s Organic

SFFD AMBULANCE DEPLOYMENT FACILITY | CIVIC DESIGN REVIEW UPDATED PHASE 1 PRESENTATION | JUNE 19TH 2017 15Planting Opportunities

Mesh Screen PlanterEgress Drive Planting Mesh Screen Planter Wire Trellis

UP

MC

KIN

NO

N A

VEN

UE JE

RR

OLD

AVE

NU

E

(EV)

MOTO

(E) FIRE STATION #9

(N) 4 STORYAMBULANCE

DEPLOYMENTFACILITY

(N) 2 STORY PARKINGSTRUCTURE

C R T

ELEC. EQUIP. AREA

FUELING STATIONDECONTAMINATION AREA

(EV)

(EV)

(EV)

(EV)

PEDESTRIANACCESS STRIPING

DETECTABLEWARNING STRIP

C

DETECTABLE WARNING STRIP

A0-23

A0-21

A0-22

N

Page 16: SFFD Ambulance Deployment Facility - sfgov.org · Civic Design Review Updated Phase 1 Presentation June 19th 2017. 1 LOCATION AND ... Burger King Rescino Performance Earl’s Organic

3 FACADE & FENESTRATION

Page 17: SFFD Ambulance Deployment Facility - sfgov.org · Civic Design Review Updated Phase 1 Presentation June 19th 2017. 1 LOCATION AND ... Burger King Rescino Performance Earl’s Organic

SFFD AMBULANCE DEPLOYMENT FACILITY | CIVIC DESIGN REVIEW UPDATED PHASE 1 PRESENTATION | JUNE 19TH 2017 17

Page 18: SFFD Ambulance Deployment Facility - sfgov.org · Civic Design Review Updated Phase 1 Presentation June 19th 2017. 1 LOCATION AND ... Burger King Rescino Performance Earl’s Organic

SFFD AMBULANCE DEPLOYMENT FACILITY | CIVIC DESIGN REVIEW UPDATED PHASE 1 PRESENTATION | JUNE 19TH 2017 18Daylight Access

D E F H

1

2

10

S

G

4

5

8

R1

106

RESTOCKSTORAGE

ROOM

105

LOGISTICS104

CONTROLLEDSUBSTANCE

103

TOILET(UNISEX)

102

TOILET(UNISEX)

EL101

EMR

EL1-101

ELEVATOR

101

AMBULANCERESUPPLY

ST1 - 101

STAIR 1

ST2 - 101

STAIR 2

E102

IT

E101

ELECTRICAL

107

GURNEYREPAIR/

STORAGE

108

OCR UTILITY

1 First Floor

FULL HEIGHT GLAZING

CLERESTORY GLAZING

D E F H

1

2

10

S

G

4

5

8

R1

OPEN BELOW

207

EQUIPMENTROOM 208

MCI

209

BIOMEDICALREPAIR

210

STATIONOFFICE

E210

IT

SHAFT

206

TOILET(UNISEX)

205

TOILET(UNISEX)

204

JAN

203

MAIL

EL1-201

ELEVATOR

ST1-201

STAIR 1

E202

ELEC.

211

RESCUECAPTAINOFFICE

ST2-201

STAIR 2

SHAFT

C201

CORRIDOR

M207

MECH

2 Second Floor

Page 19: SFFD Ambulance Deployment Facility - sfgov.org · Civic Design Review Updated Phase 1 Presentation June 19th 2017. 1 LOCATION AND ... Burger King Rescino Performance Earl’s Organic

SFFD AMBULANCE DEPLOYMENT FACILITY | CIVIC DESIGN REVIEW UPDATED PHASE 1 PRESENTATION | JUNE 19TH 2017 19Daylight Access

FULL HEIGHT GLAZING

CLERESTORY GLAZING

D E F H

1

2

10

S

G

4

5

8

C301

CORRIDOR

ST1-301

STAIR 1

E301

ELEC.

304

DAY ROOM

303

KITCHEN/DININGEL1-301

ELEVATOR

306

TOILET(UNISEX)

308

SHOWER(UNISEX)

307

MENSLOCKER

ROOM (234LOCKERS) 315

WOMENSLOCKER

ROOM (66LOCKERS)

310

MENSSHOWER

309

MENSRESTROOM

311

WOMENSRESTROOM

312

WOMENSSHOWER

316

SHOWER(UNISEX)

E302

IT

SHAFT

ST2-301

STAIR 2

314

STAFF ROOM

305

EXERCISE

313

JAN

SHAFT

3 Third Floor

D E F H

1

2

10

S

G

4

5

8

E401

ELEC

AV402

AV

C401

CORRIDOR

SHAFT

ST1-401

STAIR 1

402

CLASSROOMEL1-401

ELEVATOR

403

JAN

404

MENS TOILET

406

TOILET(ALL-GENDER)

407

BREAK ROOM409

IN-SERVICETRAINING

410

EMS 6

408

COM STAFFASST/

RECEPTION411

WORK ROOM

405

CONFERENCE

412

OPEN OFFICE

413

MEDICALDIRECTOR

414

MEDICALRECORDS

E402

IT

415

EMS1COMMAND

STAFF OFFICE

416

EMS 2SECTION

CHIEF

417

ESO STAFF

418

CQI

SHAFT

ST2-401

STAIR 2

4 Fourth Floor

Page 20: SFFD Ambulance Deployment Facility - sfgov.org · Civic Design Review Updated Phase 1 Presentation June 19th 2017. 1 LOCATION AND ... Burger King Rescino Performance Earl’s Organic

SFFD AMBULANCE DEPLOYMENT FACILITY | CIVIC DESIGN REVIEW UPDATED PHASE 1 PRESENTATION | JUNE 19TH 2017 20

N

Perspective from Fire Station 9

Page 21: SFFD Ambulance Deployment Facility - sfgov.org · Civic Design Review Updated Phase 1 Presentation June 19th 2017. 1 LOCATION AND ... Burger King Rescino Performance Earl’s Organic

SFFD AMBULANCE DEPLOYMENT FACILITY | CIVIC DESIGN REVIEW UPDATED PHASE 1 PRESENTATION | JUNE 19TH 2017 21Perspective from Jerrold Avenue

N

Page 22: SFFD Ambulance Deployment Facility - sfgov.org · Civic Design Review Updated Phase 1 Presentation June 19th 2017. 1 LOCATION AND ... Burger King Rescino Performance Earl’s Organic

SFFD AMBULANCE DEPLOYMENT FACILITY | CIVIC DESIGN REVIEW UPDATED PHASE 1 PRESENTATION | JUNE 19TH 2017 22South Facade Perspective Views

N

Page 23: SFFD Ambulance Deployment Facility - sfgov.org · Civic Design Review Updated Phase 1 Presentation June 19th 2017. 1 LOCATION AND ... Burger King Rescino Performance Earl’s Organic

SFFD AMBULANCE DEPLOYMENT FACILITY | CIVIC DESIGN REVIEW UPDATED PHASE 1 PRESENTATION | JUNE 19TH 2017 23Perspective from McKinnon Avenue

N

Page 24: SFFD Ambulance Deployment Facility - sfgov.org · Civic Design Review Updated Phase 1 Presentation June 19th 2017. 1 LOCATION AND ... Burger King Rescino Performance Earl’s Organic

SFFD AMBULANCE DEPLOYMENT FACILITY | CIVIC DESIGN REVIEW UPDATED PHASE 1 PRESENTATION | JUNE 19TH 2017 24Perspective from Visitor Entrance

N

Page 25: SFFD Ambulance Deployment Facility - sfgov.org · Civic Design Review Updated Phase 1 Presentation June 19th 2017. 1 LOCATION AND ... Burger King Rescino Performance Earl’s Organic

SFFD AMBULANCE DEPLOYMENT FACILITY | CIVIC DESIGN REVIEW UPDATED PHASE 1 PRESENTATION | JUNE 19TH 2017 25Material Palette Options

A B Planar Metal PanelCorrugated Metal Panel

Page 26: SFFD Ambulance Deployment Facility - sfgov.org · Civic Design Review Updated Phase 1 Presentation June 19th 2017. 1 LOCATION AND ... Burger King Rescino Performance Earl’s Organic

SFFD AMBULANCE DEPLOYMENT FACILITY | CIVIC DESIGN REVIEW UPDATED PHASE 1 PRESENTATION | JUNE 19TH 2017 26Material Palette Options

B Planar Metal Panel - Regular vs Ashlar / Barcode

Uniform Pattern Uniform Pattern with Scattered Color Variation

Running Bond Punctuated Uniform Pattern

Unidirectional Modular Pattern

Bidirectional Modular Pattern

Page 27: SFFD Ambulance Deployment Facility - sfgov.org · Civic Design Review Updated Phase 1 Presentation June 19th 2017. 1 LOCATION AND ... Burger King Rescino Performance Earl’s Organic

THANKYOUProject Contact

San Francisco Public Works

Kathleen O’DayProject [email protected]

MEI / YamaMar

Michael WangProject [email protected]