8
$ + $ + $ + $ + $ + $ + $ + $ + $ + $ + $ + $ + $ + $ + $ + $ + $ + $ + $ + MUDGEERABA NUMINBAH VALLEY CEDAR CREEK YATALA ORMEAU HILLS ORMEAU MERMAID WATERS TALLEBUDGERA VALLEY TALLEBUDGERA BENOWA RUNAWAY BAY SOUTH STRADBROKE OXENFORD COOMBABAH CURRUMBIN MIAMI MOUNT NATHAN GAVEN SPRINGBROOK ADVANCETOWN AUSTINVILLE GILSTON HIGHLAND PARK TALLAI MERRIMAC CARRARA LABRADOR WOONGOOLBA WONGAWALLAN UPPER COOMERA PACIFIC PINES VARSITY LAKES ARUNDEL BUNDALL SOUTHPORT MAIN BEACH PIMPAMA TUGUN BILINGA COOLANGATTA LUSCOMBE LOWER BEECHMONT STAPYLTON GILBERTON BROADBEACH CURRUMBIN VALLEY ELANORA WORONGARY CLEAR ISLAND WATERS HOLLYWELL HOPE ISLAND SOUTHERN MORETON BAY ISLANDS CURRUMBIN WATERS CLAGIRABA KINGSHOLME WILLOW VALE PARKWOOD BONOGIN BURLEIGH HEADS BIGGERA WATERS SURFERS PARADISE COOMERA JACOBS WELL PARADISE POINT PALM BEACH MERMAID BEACH ROBINA NERANWOOD NERANG HELENSVALE STEIGLITZ NATURAL BRIDGE GUANABA MAUDSLAND BROADBEACH WATERS MOLENDINAR ASHMORE REEDY CREEK NORWELL BURLEIGH WATERS ALBERTON Pimpama Staplyton Pimpama Pimpama Elanora Merrimac Elanora Coombabah 1,000 2,000 0 m Disclaimer: © Council of the City of Gold Coast, Queensland 2015 or © State of Queensland 2015. No warranty given in relation to the data (including accuracy, reliability, completeness or suitability) and no liability accepted (including without limitation, liability in negligence) for any loss, damage or costs (including consequential damage) relating to any use of the data. Data must not be used for direct marketing or be used in breach of the privacy laws. SEWAGE TREATMENT AND RECYCLED WATER RELEASE SYSTEMS ³ Service Call/Version: Produced By: Production Date: WSSIP 2019 14 Nov 2019 Water and Waste Projection: MGA94 Zone 56 Document Path: G:\SHARE\9 IP\01 TOOLS\03_GIS\Costing_tool_LGIP2_2019\06_MAPS\Planning_Assumptions_maps\Treatment_Release_20191113.mxd $ + Sewage Treatment Plant Future Upgrades Existing Recycled Water Release Major Road Coombabah Elanora Merrimac Pimpama Staplyton GCCC Boundary

Sewerage treatment plant and recycled water release system … · 2020-02-03 · Water Supply and Sewerage Infrastructure Plan 2019 21 Nov 2019 Gold Coast Water & Waste Drawing No:

  • Upload
    others

  • View
    8

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Sewerage treatment plant and recycled water release system … · 2020-02-03 · Water Supply and Sewerage Infrastructure Plan 2019 21 Nov 2019 Gold Coast Water & Waste Drawing No:

$+

$+

$+$+$+

$+$+$+$+

$+

$+$+$+$+

$+

$+

$+

$+

$+

MUDGEERABA

NUMINBAHVALLEY

CEDAR CREEK

YATALA

ORMEAU HILLS

ORMEAU

MERMAIDWATERS

TALLEBUDGERAVALLEY

TALLEBUDGERA

BENOWA

RUNAWAYBAY

SOUTHSTRADBROKE

OXENFORDCOOMBABAH

CURRUMBIN

MIAMI

MOUNTNATHAN

GAVEN

SPRINGBROOK

ADVANCETOWN

AUSTINVILLE

GILSTON

HIGHLANDPARK

TALLAI

MERRIMAC

CARRARA

LABRADOR

WOONGOOLBA

WONGAWALLAN

UPPER COOMERA

PACIFIC PINES

VARSITYLAKES

ARUNDEL

BUNDALL

SOUTHPORT

MAINBEACH

PIMPAMA

TUGUN

BILINGACOOLANGATTA

LUSCOMBE

LOWERBEECHMONT

STAPYLTON

GILBERTON

BROADBEACH

CURRUMBINVALLEY

ELANORA

WORONGARY CLEARISLANDWATERS

HOLLYWELL

HOPE ISLAND

SOUTHERNMORETON BAY

ISLANDS

CURRUMBINWATERS

CLAGIRABA

KINGSHOLME

WILLOW VALE

PARKWOOD

BONOGIN

BURLEIGHHEADS

BIGGERAWATERS

SURFERSPARADISE

COOMERA

JACOBS WELL

PARADISEPOINT

PALMBEACH

MERMAID BEACH

ROBINA

NERANWOOD

NERANG

HELENSVALE

STEIGLITZ

NATURALBRIDGE

GUANABAMAUDSLAND

BROADBEACHWATERS

MOLENDINAR

ASHMORE

REEDYCREEK

NORWELL

BURLEIGHWATERS

ALBERTON

Pimpama

Staplyton

Pimpama

Pimpama

Elanora

Merrimac

Elanora

Coombabah

1,000 2,0000m

Disclaimer: © Council of the City of Gold Coast, Queensland 2015 or © State of Queensland 2015. No warranty given in relation to the data (including accuracy, reliability, completeness or suitability) and no liability accepted (including without limitation, liability in negligence) for any loss, damage or costs (including consequential damage) relating to any use of the data. Data must not be used for direct marketing or be used in breach of the privacy laws.

SEWAGE TREATMENT AND RECYCLED WATER RELEASE SYSTEMS ³ Service Call/Version:

Produced By: Production Date:

WSSIP 201914 Nov 2019Water and Waste

Projection: MGA94 Zone 56

Doc

umen

t Pat

h: G

:\SH

AR

E\9

IP\0

1 TO

OLS

\03_

GIS

\Cos

ting_

tool

_LG

IP2_

2019

\06_

MA

PS

\Pla

nnin

g_A

ssum

ptio

ns_m

aps\

Trea

tmen

t_R

elea

se_2

0191

113.

mxd

$+ Sewage Treatment Plant

Future Upgrades

Existing Recycled Water Release

Major Road

Coombabah

Elanora

Merrimac

Pimpama

Staplyton

GCCC Boundary

Page 2: Sewerage treatment plant and recycled water release system … · 2020-02-03 · Water Supply and Sewerage Infrastructure Plan 2019 21 Nov 2019 Gold Coast Water & Waste Drawing No:

$$$$$$

PI_ST2

PI_ST3

PI_ST4

UPPER COOMERA

PIMPAMA

HOPE ISLAND

SOUTHERNMORETON

BAY ISLANDS

SOUTHERNMORETON BAY

ISLANDS

COOMERA

JACOBS WELLJACOBS WELL

NORWELL

Pimpama

Pimpama

Coombabah

PI_CO_OPT4A_ST2_PCPI_CO_OPT4A_ST3_PC

PI_CO_OPT4A_ST4_PC

PI_CO_OPT4A_STAGE5

Pimpama

Stapylton

1

2

3 4

Disclaimer: © Council of the City of Gold Coast, Queensland 2014 or © State of Queensland 2014. No warranty given in relation to the data (including accuracy, reliability, completeness or suitability) and no liability accepted (including without limitation, liability in negligence) for any loss, damage or costs (including consequential damage) relating to any use of the data. Data must not be used for direct marketing or be used in breach of the privacy laws.

Project:

Produced By:

Production Date: Water Supply and SewerageInfrastructure Plan 2019

21 Nov 2019

Gold Coast Water & Waste

Drawing No:

SEWAGE TREATMENT PLANT AND RECYCLED WATER RELEASE

SYSTEM UPGRADES

New/ Augmented Infrastructure

$ 2021

$ 2026

$ 2031

$ 2036

$ 2041

$ 2066Future_Release

2021

2026

2031

2036

2041

2066Existing ReleaseMajor RoadGCCC BoundarySuburbWaterway

Map No: Page 1 of 7

Version:

Catchment Map Index

0 0.3 0.6 0.9 1.2 1.5

Kilometres

Doc

umen

t Pat

h: G

:\SH

AR

E\9

IP\0

1 TO

OLS

\03_

GIS

\Cos

ting_

tool

_LG

IP2_

2019

\06_

MAP

S\P

lann

ing_

Ass

umpt

ions

_map

s\Tr

eatm

ent_

Rel

ease

_DD

P_2

0191

121.

mxd

Page 3: Sewerage treatment plant and recycled water release system … · 2020-02-03 · Water Supply and Sewerage Infrastructure Plan 2019 21 Nov 2019 Gold Coast Water & Waste Drawing No:

$CO_ST10

OXENFORD

COOMBABAH

UPPER COOMERA

HOPE ISLAND

SOUTHERNMORETON BAY

ISLANDS

COOMERA

COOMERA

PARADISEPOINT

HELENSVALE

Pimpama

Pimpama

Coombabah

Coombabah

PI_CO_OPT4A_STAGE4

PI_CO_OPT4A_STAGE4

PI_CO_OPT4A_STAGE5

PI_CO_OPT4A_STAGE5

Pimpama

Stapylton

1

2

3 4

56

Disclaimer: © Council of the City of Gold Coast, Queensland 2014 or © State of Queensland 2014. No warranty given in relation to the data (including accuracy, reliability, completeness or suitability) and no liability accepted (including without limitation, liability in negligence) for any loss, damage or costs (including consequential damage) relating to any use of the data. Data must not be used for direct marketing or be used in breach of the privacy laws.

Project:

Produced By:

Production Date: Water Supply and SewerageInfrastructure Plan 2019

21 Nov 2019

Gold Coast Water & Waste

Drawing No:

SEWAGE TREATMENT PLANT AND RECYCLED WATER RELEASE

SYSTEM UPGRADES

New/ Augmented Infrastructure

$ 2021

$ 2026

$ 2031

$ 2036

$ 2041

$ 2066Future_Release

2021

2026

2031

2036

2041

2066Existing ReleaseMajor RoadGCCC BoundarySuburbWaterway

Map No: Page 2 of 7

Version:

Catchment Map Index

0 0.3 0.6 0.9 1.2 1.5

Kilometres

Doc

umen

t Pat

h: G

:\SH

AR

E\9

IP\0

1 TO

OLS

\03_

GIS

\Cos

ting_

tool

_LG

IP2_

2019

\06_

MAP

S\P

lann

ing_

Ass

umpt

ions

_map

s\Tr

eatm

ent_

Rel

ease

_DD

P_2

0191

121.

mxd

Page 4: Sewerage treatment plant and recycled water release system … · 2020-02-03 · Water Supply and Sewerage Infrastructure Plan 2019 21 Nov 2019 Gold Coast Water & Waste Drawing No:

$$$

$

$

$

LTR_STG1_01

LTR_STG4_01

CO_ST6CO_ST7CO_ST8

CO_BIO

CO_ST9

CO_ST10

RUNAWAY BAY

OXENFORD

COOMBABAH

GAVEN

LABRADOR

PACIFIC PINES

ARUNDEL

SOUTHPORT

HOLLYWELL

PARKWOOD

BIGGERAWATERS

HELENSVALE

Coombabah

PI_CO_OPT4A_STAGE4

PI_CO_OPT4A_STAGE4

PI_CO_OPT4A_STAGE4PI_CO_OPT4A_STAGE2

Pimpama1

2

3 4

5

6

Disclaimer: © Council of the City of Gold Coast, Queensland 2014 or © State of Queensland 2014. No warranty given in relation to the data (including accuracy, reliability, completeness or suitability) and no liability accepted (including without limitation, liability in negligence) for any loss, damage or costs (including consequential damage) relating to any use of the data. Data must not be used for direct marketing or be used in breach of the privacy laws.

Project:

Produced By:

Production Date: Water Supply and SewerageInfrastructure Plan 2019

21 Nov 2019

Gold Coast Water & Waste

Drawing No:

SEWAGE TREATMENT PLANT AND RECYCLED WATER RELEASE

SYSTEM UPGRADES

New/ Augmented Infrastructure

$ 2021

$ 2026

$ 2031

$ 2036

$ 2041

$ 2066Future_Release

2021

2026

2031

2036

2041

2066Existing ReleaseMajor RoadGCCC BoundarySuburbWaterway

Map No: Page 3 of 7

Version:

Catchment Map Index

0 0.3 0.6 0.9 1.2 1.5

Kilometres

Doc

umen

t Pat

h: G

:\SH

AR

E\9

IP\0

1 TO

OLS

\03_

GIS

\Cos

ting_

tool

_LG

IP2_

2019

\06_

MAP

S\P

lann

ing_

Ass

umpt

ions

_map

s\Tr

eatm

ent_

Rel

ease

_DD

P_2

0191

121.

mxd

Page 5: Sewerage treatment plant and recycled water release system … · 2020-02-03 · Water Supply and Sewerage Infrastructure Plan 2019 21 Nov 2019 Gold Coast Water & Waste Drawing No:

LTR_STG1_03

LTR_STG3_02LTR_STG6_02

LTR_STG6_01

LTR_STG1_02

LTR_STG1_04LTR_STG1_01

LTR_STG3_01

LTR_STG5_01

LTR_STG2_01

LTR_STG6_03

RUNAWAY BAY

SOUTHSTRADBROKE

LABRADOR

SOUTHPORT

MAIN BEACH

BIGGERAWATERS

Coombabah

Coombabah

Pimpama

1

2

3 4

5

6

Disclaimer: © Council of the City of Gold Coast, Queensland 2014 or © State of Queensland 2014. No warranty given in relation to the data (including accuracy, reliability, completeness or suitability) and no liability accepted (including without limitation, liability in negligence) for any loss, damage or costs (including consequential damage) relating to any use of the data. Data must not be used for direct marketing or be used in breach of the privacy laws.

Project:

Produced By:

Production Date: Water Supply and SewerageInfrastructure Plan 2019

21 Nov 2019

Gold Coast Water & Waste

Drawing No:

SEWAGE TREATMENT PLANT AND RECYCLED WATER RELEASE

SYSTEM UPGRADES

New/ Augmented Infrastructure

$ 2021

$ 2026

$ 2031

$ 2036

$ 2041

$ 2066Future_Release

2021

2026

2031

2036

2041

2066Existing ReleaseMajor RoadGCCC BoundarySuburbWaterway

Map No: Page 4 of 7

Version:

Catchment Map Index

0 0.3 0.6 0.9 1.2 1.5

Kilometres

Doc

umen

t Pat

h: G

:\SH

AR

E\9

IP\0

1 TO

OLS

\03_

GIS

\Cos

ting_

tool

_LG

IP2_

2019

\06_

MAP

S\P

lann

ing_

Ass

umpt

ions

_map

s\Tr

eatm

ent_

Rel

ease

_DD

P_2

0191

121.

mxd

Page 6: Sewerage treatment plant and recycled water release system … · 2020-02-03 · Water Supply and Sewerage Infrastructure Plan 2019 21 Nov 2019 Gold Coast Water & Waste Drawing No:

LTR_BTSP_03

LTR_BTSP_02

LTR_BTSP_01

BENOWA

CARRARA

BUNDALL

SOUTHPORT

MAIN BEACH

BROADBEACH

SURFERSPARADISE

BROADBEACHWATERS

BROADBEACHWATERS

ASHMORE

MerrimacMerrimac

Coombabah

3 4

5

7

6

Disclaimer: © Council of the City of Gold Coast, Queensland 2014 or © State of Queensland 2014. No warranty given in relation to the data (including accuracy, reliability, completeness or suitability) and no liability accepted (including without limitation, liability in negligence) for any loss, damage or costs (including consequential damage) relating to any use of the data. Data must not be used for direct marketing or be used in breach of the privacy laws.

Project:

Produced By:

Production Date: Water Supply and SewerageInfrastructure Plan 2019

21 Nov 2019

Gold Coast Water & Waste

Drawing No:

SEWAGE TREATMENT PLANT AND RECYCLED WATER RELEASE

SYSTEM UPGRADES

New/ Augmented Infrastructure

$ 2021

$ 2026

$ 2031

$ 2036

$ 2041

$ 2066Future_Release

2021

2026

2031

2036

2041

2066Existing ReleaseMajor RoadGCCC BoundarySuburbWaterway

Map No: Page 5 of 7

Version:

Catchment Map Index

0 0.3 0.6 0.9 1.2 1.5

Kilometres

Doc

umen

t Pat

h: G

:\SH

AR

E\9

IP\0

1 TO

OLS

\03_

GIS

\Cos

ting_

tool

_LG

IP2_

2019

\06_

MAP

S\P

lann

ing_

Ass

umpt

ions

_map

s\Tr

eatm

ent_

Rel

ease

_DD

P_2

0191

121.

mxd

Page 7: Sewerage treatment plant and recycled water release system … · 2020-02-03 · Water Supply and Sewerage Infrastructure Plan 2019 21 Nov 2019 Gold Coast Water & Waste Drawing No:

$$

$$ $

LTR_STG2_03

ME_ST6ME_ST7ME_UPG

ME_ST8 ME_ST9

MUDGEERABA

MERMAIDWATERS

BENOWA

MIAMI

MERRIMAC

CARRARA

VARSITY LAKES

BUNDALL

BROADBEACH

CLEARISLAND

WATERS

MERMAID BEACH

ROBINA

SURFERSPARADISE SURFERS

PARADISE

BROADBEACHWATERS

BURLEIGHWATERS

Merrimac

Coombabah

Coombabah

Coombabah

23 4

5

7

6

Disclaimer: © Council of the City of Gold Coast, Queensland 2014 or © State of Queensland 2014. No warranty given in relation to the data (including accuracy, reliability, completeness or suitability) and no liability accepted (including without limitation, liability in negligence) for any loss, damage or costs (including consequential damage) relating to any use of the data. Data must not be used for direct marketing or be used in breach of the privacy laws.

Project:

Produced By:

Production Date: Water Supply and SewerageInfrastructure Plan 2019

21 Nov 2019

Gold Coast Water & Waste

Drawing No:

SEWAGE TREATMENT PLANT AND RECYCLED WATER RELEASE

SYSTEM UPGRADES

New/ Augmented Infrastructure

$ 2021

$ 2026

$ 2031

$ 2036

$ 2041

$ 2066Future_Release

2021

2026

2031

2036

2041

2066Existing ReleaseMajor RoadGCCC BoundarySuburbWaterway

Map No: Page 6 of 7

Version:

Catchment Map Index

0 0.3 0.6 0.9 1.2 1.5

Kilometres

Doc

umen

t Pat

h: G

:\SH

AR

E\9

IP\0

1 TO

OLS

\03_

GIS

\Cos

ting_

tool

_LG

IP2_

2019

\06_

MAP

S\P

lann

ing_

Ass

umpt

ions

_map

s\Tr

eatm

ent_

Rel

ease

_DD

P_2

0191

121.

mxd

Page 8: Sewerage treatment plant and recycled water release system … · 2020-02-03 · Water Supply and Sewerage Infrastructure Plan 2019 21 Nov 2019 Gold Coast Water & Waste Drawing No:

$$EL_ST2

EL_ST3

MERMAIDWATERS

TALLEBUDGERAVALLEY

TALLEBUDGERA

MIAMI

VARSITY LAKES

ELANORA

BURLEIGHHEADS

PALM BEACH

ROBINA

REEDY CREEK

BURLEIGHWATERS

Merrimac

Elanora

5

7

6

Disclaimer: © Council of the City of Gold Coast, Queensland 2014 or © State of Queensland 2014. No warranty given in relation to the data (including accuracy, reliability, completeness or suitability) and no liability accepted (including without limitation, liability in negligence) for any loss, damage or costs (including consequential damage) relating to any use of the data. Data must not be used for direct marketing or be used in breach of the privacy laws.

Project:

Produced By:

Production Date: Water Supply and SewerageInfrastructure Plan 2019

21 Nov 2019

Gold Coast Water & Waste

Drawing No:

SEWAGE TREATMENT PLANT AND RECYCLED WATER RELEASE

SYSTEM UPGRADES

New/ Augmented Infrastructure

$ 2021

$ 2026

$ 2031

$ 2036

$ 2041

$ 2066Future_Release

2021

2026

2031

2036

2041

2066Existing ReleaseMajor RoadGCCC BoundarySuburbWaterway

Map No: Page 7 of 7

Version:

Catchment Map Index

0 0.3 0.6 0.9 1.2 1.5

Kilometres

Doc

umen

t Pat

h: G

:\SH

AR

E\9

IP\0

1 TO

OLS

\03_

GIS

\Cos

ting_

tool

_LG

IP2_

2019

\06_

MAP

S\P

lann

ing_

Ass

umpt

ions

_map

s\Tr

eatm

ent_

Rel

ease

_DD

P_2

0191

121.

mxd