13
Sewer System Master Plan Council Presentation September 14, 2010

Sewer System Master Plan

  • Upload
    burton

  • View
    48

  • Download
    0

Embed Size (px)

DESCRIPTION

Sewer System Master Plan. Council Presentation September 14, 2010. Clean Water Services. City Operates collection system (pipes up to 24”) Does utility billing Responsible for system integrity Provides for system extensions. CWS Provides treatment - PowerPoint PPT Presentation

Citation preview

Page 1: Sewer System Master Plan

Sewer System Master Plan

Council PresentationSeptember 14, 2010

Page 2: Sewer System Master Plan

Clean Water Services

City - Local Services CWS – Regional Services

City◦ Operates collection

system (pipes up to 24”)◦ Does utility billing◦ Responsible for system

integrity◦ Provides for system

extensions

CWS◦ Provides treatment◦ Owns and operates pipe

over 24 inch and larger ◦ Coordinates CIP◦ Sets maintenance

standards◦ Sets technical standards◦ Sets the sewer service

rates

Page 3: Sewer System Master Plan

Clean Water Act Requirements ◦ No overflows due to inadequate capacity

Assess capacity needs Assess areas where rain water intrusion is

high Not covered

◦ System preservation and replacement

Master Plan Scope

Page 4: Sewer System Master Plan

The Sewer System

Page 5: Sewer System Master Plan

Capacity sites (City responsibility)◦ East Tigard Trunk◦ SW Katherine lateral◦ 128th avenue lateral◦ Shore Drive Trunk

Cost Estimate◦ 1.7 Million

Capacity Findings

Page 6: Sewer System Master Plan

CWS Projects◦ 72nd Avenue Lateral◦ Scholl Trunk◦ Metzger Interceptor◦ Elmwood Lateral

Cost Estimate:◦ $ 10.6 million

Capacity Finding CWS

Page 7: Sewer System Master Plan

East Tigard Trunk

Page 8: Sewer System Master Plan

Shore Drive Project

Page 9: Sewer System Master Plan

Rain Water Intrusion Areas

Page 10: Sewer System Master Plan

Cost Estimate: $2.0 million City $2.0 million District

Rainwater intrusion

Page 11: Sewer System Master Plan

System is aging◦ parts over 60 years old

System length◦ 873,000 feet (165 miles)

Replacement value in 2010 dollars◦ $90 million

Annual investment to replace over 50 years◦ $1.8 million

System Preservation

Page 12: Sewer System Master Plan

5 year Cost Estimate SummaryCity investment Est. Cost

in millionsCapacity Improvements $1.7Rainwater Intrusion Rehabilitation 2.0System Preservation 9.0

Total $12.7

Page 13: Sewer System Master Plan

Continue operations◦ System preservation analysis

Adopt the plan CWS CIP Process City CIP process Project completion System preservation

Moving forward