Page 1: Session II: Case Studies in Green Technology PPP Projects

UNECE Team of Specialists

for PPPs

Session II: Case Studies in Green Technology PPP Projects

Waste to EnergyPresented by:

Art SmithChairman, UNECE TOS-PPP

[email protected]

November 8, 2012

Page 2: Session II: Case Studies in Green Technology PPP Projects

Public-Private Partnerships Occupy The Spectrum of Shared Public and Private Sector Participation

2

Public Private

Increasing Private Sector Responsibility

Risks & Rewards to Public Sector

Range of Public‐Private Partnerships

Risks & Rewards to Private Sector

Medium ResponsibilityLow Responsibility High Responsibility

Private sector participation in infrastructure and service delivery can take many formsalong the continuum of public and private 

sector participation

Page 3: Session II: Case Studies in Green Technology PPP Projects

3

The Basic Structure of aPublic‐Private Partnership

Government Entity

Private Sector

Page 4: Session II: Case Studies in Green Technology PPP Projects

4

The Basic Structure of aPublic‐Private Partnership

Government Entity

Private Sector

contractualagreement

Page 5: Session II: Case Studies in Green Technology PPP Projects

Public-Private Partnerships Entail:• A contractual arrangement between the public sector

representing the public interest through the central, regional, or local government, or a state-owned entity and the private sector;

5

Page 6: Session II: Case Studies in Green Technology PPP Projects

The Basic Structure of aPublic-Private Partnership

6

Government Entity

Private Parties

contractualagreement

Legal Vehicle

A legal vehicle, which may be wholly private, or public and private, in nature, may be created to provide the desired 

infrastructure and/or services.

Page 7: Session II: Case Studies in Green Technology PPP Projects

The Basic Structure of aPublic-Private Partnership

7

Government Entity

Private Parties

Legal Vehicle

PPPs involve risk

Page 8: Session II: Case Studies in Green Technology PPP Projects

Public-Private Partnerships Entail:• A contractual arrangement between the public sector

representing the public interest through the central, regional, or local government, or a state-owned entity and the private sector;

• Risk transfer to the private sector for construction, operation, and/or maintenance of infrastructure and delivery of service

8

Page 9: Session II: Case Studies in Green Technology PPP Projects

Government Entity

DebtEquity

PrivateParties

The Basic Structure of aPublic-Private Partnership

9

Legal Vehicle

The legal vehicle receives funding from the private or the 

public and private sectors

LendersLenders

Page 10: Session II: Case Studies in Green Technology PPP Projects

DebtEquity

PrivateParties

The Basic Structure of aPublic-Private Partnership

10

Legal Vehicle

LendersLenders

Assets

Service Delivery

This funding is used to design, construct (or renovate/upgrade), 

operate and maintain, public infrastructure 

and/or to deliver a service to the service recipient

Service Recipient

Government Entity

Page 11: Session II: Case Studies in Green Technology PPP Projects

Public-Private Partnerships Entail:• A contractual arrangement between the public sector

representing the public interest through the central, regional, or local government, or a state-owned entity and the private sector;

• Risk transfer to the private sector for construction, operation, and/or maintenance of infrastructure and delivery of service;

• Private sector participation in the design, construction (or renovation/upgrade), operation and maintenance of public infrastructure and/or delivery of a service

11

Page 12: Session II: Case Studies in Green Technology PPP Projects

DebtEquity

Private Parties

The Basic Structure of aPublic-Private Partnership

12

Legal Vehicle

LendersLenders

Assets

Service Delivery

Service Recipient

Operations & Maintenance Contractor

Supplies

Construction Company

Government Entity

Page 13: Session II: Case Studies in Green Technology PPP Projects

DebtEquity

Private Parties

The Basic Structure of aPublic-Private Partnership

13

Legal Vehicle

LendersLenders

Assets

Service Delivery

Service Recipient

Operations & Maintenance Contractor

Supplies

Construction Companyuser

fees

The Public:Pays for the services through user fees and/or government outlays 

Budget payments

Government Entity

Page 14: Session II: Case Studies in Green Technology PPP Projects

Government Entity

DebtEquity

Private Parties

The Basic Structure of aPublic-Private Partnership

14

Legal Vehicle

LendersLenders

Assets

Service Delivery

Service Recipient

Operations & Maintenance Contractor

Supplies

Construction Companyuser

fees

The Public:Pays for the services through user fees and/or government outlays 

Budget payments

Page 15: Session II: Case Studies in Green Technology PPP Projects

DebtEquity

Private Parties

The Basic Structure of aPublic-Private Partnership

15

Legal Vehicle

LendersLenders

Assets

Service Delivery

Service Recipient

Operations & Maintenance Contractor

Supplies

Construction Company

The Public SectorProvides continuingOversight to ensureQuality of service

Oversight

Government Entity

Page 16: Session II: Case Studies in Green Technology PPP Projects

Public-Private Partnerships Entail:• A contractual arrangement between the public sector

representing the public interest through the central, regional, or local government, or a state-owned entity and the private sector;

• Risk transfer to the private sector for construction, operation, and/or maintenance of infrastructure and delivery of service;

• Private sector participation in the design, construction (or renovation/upgrade), operation and maintenance of public infrastructure and delivery of service;

• Public sector interest remaining focused on quality of service, pricing, and compliance with contract.

16

Page 17: Session II: Case Studies in Green Technology PPP Projects

DebtEquity

Private Parties

The Basic Structure of aPublic-Private Partnership

17

Legal Vehicle

LendersLenders

Assets

Service Delivery

Service Recipient

Operations & Maintenance Contractor

Supplies

Construction Company

Advisors

•Financial•Legal•Technical•Other

Advisors

•Financial•Legal•Technical•Other

Advisors

•Financial•Legal•Technical•Other

Advisors

•Financial•Legal•Technical•Other

Government Entity

Page 18: Session II: Case Studies in Green Technology PPP Projects

Wenzhou, PRC Case Study• The City of Wenzhou, in Zhejiang Province, generates

about 400,000 tons of household waste annually.• The volume of waste is increasing at the rate of eight to

ten percent per year.• Early last decade, the City operated two municipal

landfills, both of which were nearing capacity.• No additional sites satisfactory for landfills could be

identified within the City.

18

Page 19: Session II: Case Studies in Green Technology PPP Projects

Wenzhou, PRC Case Study• In 2002, the City entered into a contract with a local

company, Wei Ming Environmental Protection Engineering, to build and operate a PPP waste-to-energy incinerator plant.

• The private partner would design, finance, build, operate, and maintain the incinerator plant, which had an estimated construction cost of CNY90 million.

• The contract term was two years to complete construction, followed by 25 years of operation and maintenance.

• At the end of the contract, the incinerator plant is turned over to the City government, at no cost.

19

Page 20: Session II: Case Studies in Green Technology PPP Projects

Wenzhou, PRC Case Study• The incinerator plant has a design capacity of 320 tons of

solid waste per day and electricity generation capacity of up to 25 million kilowatts (kWh) annually.

• The plant began operation in 2003. The first phase of the plant was able to treat 160 tons per day.

• At 160 tons per day, the plant could generate nine million kWh a year, of which seven million kWh would be available for sale.

• The plant also receive a waste disposal fee from the City government at the rate of CNY73.8 per ton.

20

Page 21: Session II: Case Studies in Green Technology PPP Projects

Wenzhou, PRC Case Study• Solid waste management is a growing challenge in the

PRC, and encouraging private sector participation is a key strategic approach.

• To encourage PPP investments, the PRC has also exempted waste-to-energy incineration facilities from corporate income tax for the first five years of operation and made them eligible for immediate refund of value-added taxes.

• Electricity network operators are also required to purchase electricity generated by qualified energy producers using renewable energy sources, when available.

21

Page 22: Session II: Case Studies in Green Technology PPP Projects

Organization of the Wenzhou PPP

22

Page 23: Session II: Case Studies in Green Technology PPP Projects

Vancouver CogenerationCase Study

• The City of Vancouver, British Columbia owns and operates one of the largest landfill sites in Canada. The site serves approximately 900,000 residents and receives approximately 400,000 tons of solid waste annually.

• The site produces landfill gases as a byproduct of waste decomposition, including methane, a greenhouse gas that contributes to global climate change.

• Since 1991, the City collected and burned (flared) the landfill gases to control odors and reduce the gases’ environmental impact. This burning created significant heat energy. In 2000, the City began to consider ways to make beneficial use of the landfill gases and heat energy, and to further reduce greenhouse gas emissions, in keeping with Canada’s commitment under the Kyoto Protocol.

23

Page 24: Session II: Case Studies in Green Technology PPP Projects

Vancouver CogenerationCase Study – cont. The City considered building a power plant itself to use the gas.

They decided to solicit private proposals in order to evaluate a broader array of project concepts and maximize the economic, environmental, and social benefits to the City.

The City decided to implement a Public-Private Partnership-based solution. It pursued a competitive tender process under which potential partners could propose their own solutions for the beneficial use of the landfill gas.

A request for tender was released in January 2001, for a private partner to finance, design, build, own, and operate a beneficial use facility.

Five varied proposals were received.

24

Page 25: Session II: Case Studies in Green Technology PPP Projects

Following a detailed and structured proposal evaluation and negotiation process, a 20-year Public-Private Partnership contract, based on the most highly-evaluated proposal, was approved by the City Council in February 2002.

Under the approved PPP structure, the City continues to operate the landfill, and a 2.9 kilometer pipeline was constructed by the private partner to take the gas from the landfill to a nearby agricultural complex, where they built the cogeneration power plant.

Vancouver CogenerationCase Study – cont.

25

Page 26: Session II: Case Studies in Green Technology PPP Projects

Vancouver CogenerationCase Study – cont.

26

Page 27: Session II: Case Studies in Green Technology PPP Projects

The private partner selected by the City designed, financed and constructed the cogeneration plant, which uses the landfill gas as fuel to generate enough electricity (7.4 MW per year) to supply 4,000 to 5,000 local homes. The power is sold by the private partner to a provincial utility, BC Hydro.

Proceeds from the sales of power and thermal energy go to the private partner, minus a 10 percent royalty paid to the City.

Waste heat from the power generation process is recovered as hot water, which is sold by the private partner to a large (32 acre) tomato greenhouse complex adjacent to the plant, where the water is used for heating purposes.

Vancouver CogenerationCase Study – cont.

27

Page 28: Session II: Case Studies in Green Technology PPP Projects

• The City of Vancouver makes no payments to the private partner, but guarantees provision of landfill gases for the twenty-year duration of the PPP contract.

• The private partner’s investment was approximately $10 million.

• Construction of the power plant was completed in September 2003, and it was operating at full capacity by November of that year. (Initial capacity was 5.55 MW per year, increasing to 7.4 MW per year with the installation of a fourth engine in late 2004.)

• Together, the power plant and greenhouse complex employ 300 people.

Vancouver CogenerationCase Study – cont.

28

Page 29: Session II: Case Studies in Green Technology PPP Projects

• Instead of paying to flare the gas, the City now receives net revenues of $150,000 per year.

• Using the landfill gases in this manner, rather than burning them, results in further reduction of greenhouse gases, equating to the removal of 6,000 vehicles from Canada’s roads.

• New jobs and more available power were created for the greater Vancouver area.

Vancouver CogenerationCase Study – Outcomes