SESSION D “TAKT TIME and LOGISTICS”:

PROCESS and MILESTONE PLANNING

& SYSTEMATIC COMPLETIONGeometry and Function / Experiences and Next Steps

Hans Thomas Holm

Head of Project Life Science

Statsbygg, Oslo, Norway

[email protected]

@ Linked In

@ Instagram

Page 2: SESSION D “TAKT TIME and LOGISTICS”: PROCESS and …lci.fi/wp-content/uploads/2018/05/16_Session-D_Holm.pdf · SESSION D “TAKT TIME and LOGISTICS”: PROCESS and MILESTONE PLANNING

Page 2

FROM: TO:

ACADEMY of ART and DESIGN LIFE SCIENCEin BERGEN (KHiB), 2013-2017 in OSLO, 2018-2024

EXPERIENCES, WHAT WE DID & NEXT STEPS &

LESSONS LEARNED IMPROVING FURTHER

Rev: 09.May.2018

Page 3: SESSION D “TAKT TIME and LOGISTICS”: PROCESS and …lci.fi/wp-content/uploads/2018/05/16_Session-D_Holm.pdf · SESSION D “TAKT TIME and LOGISTICS”: PROCESS and MILESTONE PLANNING

Page 3

Rev: 09.May.2018

ACADEMY of ART and DESIGNin BERGEN (KHiB), 2013-2017

EXPERIENCES, WHAT WE DID &

LESSONS LEARNED

About Academy of Art and Design:

- All works completed by May 1.st 2017

- 1 100 000 000 NOK (incl. VAT, 2017)

Construction Project

- 14 800 sqm

- Passive house

- 11x Design Bid Build

Just ahead of time

Just below budget

On quality

Page 4: SESSION D “TAKT TIME and LOGISTICS”: PROCESS and …lci.fi/wp-content/uploads/2018/05/16_Session-D_Holm.pdf · SESSION D “TAKT TIME and LOGISTICS”: PROCESS and MILESTONE PLANNING

Page 4

Rev: 09.May.2018

ACADEMY of ART and DESIGNin BERGEN (KHiB), 2013-2017

Lean Strategy

Lean Process Planning

Lean Design

Systematic Completion

Lean Construction

Takt Planning & 14-10-6-4-1

BIM

Main Success Factor:

Geometry and Function Takted together

Page 5: SESSION D “TAKT TIME and LOGISTICS”: PROCESS and …lci.fi/wp-content/uploads/2018/05/16_Session-D_Holm.pdf · SESSION D “TAKT TIME and LOGISTICS”: PROCESS and MILESTONE PLANNING

Page 5

Rev: 09.May.2018

ACADEMY of ART and DESIGNin BERGEN (KHiB), 2013-2017

MAIN PROCESS PLAN MANAGEMENT

(aka Milestone Planning)

Defining Main Processes

Defining Milestones (Keypoints)

Identifying Dependencies

Identifying Constraints

Page 6: SESSION D “TAKT TIME and LOGISTICS”: PROCESS and …lci.fi/wp-content/uploads/2018/05/16_Session-D_Holm.pdf · SESSION D “TAKT TIME and LOGISTICS”: PROCESS and MILESTONE PLANNING

Page 6

Rev: 09.May.2018

ACADEMY of ART and DESIGNin BERGEN (KHiB), 2013-2017

LEAN DESIGN

Defining Milestones (Keypoints)

Splitting up in many small pieces

Defining Topics

Defining Topic Owners

Identifying Dependencies

Identifying Constraints

Page 7: SESSION D “TAKT TIME and LOGISTICS”: PROCESS and …lci.fi/wp-content/uploads/2018/05/16_Session-D_Holm.pdf · SESSION D “TAKT TIME and LOGISTICS”: PROCESS and MILESTONE PLANNING

Page 7

Rev: 09.May.2018

ACADEMY of ART and DESIGNin BERGEN (KHiB), 2013-2017

TAKT PLANNING

& «14-10-6-4-1»

7 conditions for a sound activity

Page 8: SESSION D “TAKT TIME and LOGISTICS”: PROCESS and …lci.fi/wp-content/uploads/2018/05/16_Session-D_Holm.pdf · SESSION D “TAKT TIME and LOGISTICS”: PROCESS and MILESTONE PLANNING

Page 8

Rev: 09.May.2018

ACADEMY of ART and DESIGNin BERGEN (KHiB), 2013-2017

SYSTEMATIC COMPLETION

(Takt Planned)

Page 9: SESSION D “TAKT TIME and LOGISTICS”: PROCESS and …lci.fi/wp-content/uploads/2018/05/16_Session-D_Holm.pdf · SESSION D “TAKT TIME and LOGISTICS”: PROCESS and MILESTONE PLANNING

Page 9

Rev: 09.May.2018

ACADEMY of ART and DESIGNin BERGEN (KHiB), 2013-2017

KHiB BOOKLETS #1-5

#4 Lean Design (in progress)

#5 BIM@KHiB (in progress) All free pdf available

Page 10: SESSION D “TAKT TIME and LOGISTICS”: PROCESS and …lci.fi/wp-content/uploads/2018/05/16_Session-D_Holm.pdf · SESSION D “TAKT TIME and LOGISTICS”: PROCESS and MILESTONE PLANNING

Page 10

Rev: 09.May.2018

Page 11: SESSION D “TAKT TIME and LOGISTICS”: PROCESS and …lci.fi/wp-content/uploads/2018/05/16_Session-D_Holm.pdf · SESSION D “TAKT TIME and LOGISTICS”: PROCESS and MILESTONE PLANNING

Page 11

Rev: 09.May.2018

LIFE SCIENCEin OSLO, 2018-2024

NEXT STEPS &

IMPROVING FURTHER

About Life Science:

- Highly advanced multi research facility

- Planned completed by Dec 1.st 2024

- 5 670 000 000 NOK (incl. VAT, 2018)

Construction Project

- Approx. 70 000 sqm

- «Footprint» 17 000 sqm

- 3-5 Design Build contracts (TBD)

- 1 140 000 000 NOK (incl. VAT, 2018)

User Equipment

Objectives:

Lean Extreme / Process Planning / Takt /

Systematic Completion / Logistics / BIM

Page 12: SESSION D “TAKT TIME and LOGISTICS”: PROCESS and …lci.fi/wp-content/uploads/2018/05/16_Session-D_Holm.pdf · SESSION D “TAKT TIME and LOGISTICS”: PROCESS and MILESTONE PLANNING

Page 12

Rev: 09.May.2018

LIFE SCIENCEin OSLO, 2018-2024

IMPROVING FURTHER

SYNERGY:

CONSTRUCTION («GEOMETRY»)

SYSTEMATIC COMPLETION («FUNCTION»)

USER EQUIPMENT («THINGS»)

DIGITALSTRATEGY

LEANSTRATEGY

LOGISTICSSTRATEGY

SYSTEMATICCOMPLETION

STRATEGYAs Built

MaintenanceOperations

BIMJan. 2018 Dec. 2024

Involving subcontractors and suppliers much earlier.Taking ‘7 conditions for a sound activity’ further.

Page 13: SESSION D “TAKT TIME and LOGISTICS”: PROCESS and …lci.fi/wp-content/uploads/2018/05/16_Session-D_Holm.pdf · SESSION D “TAKT TIME and LOGISTICS”: PROCESS and MILESTONE PLANNING

Page 13

Rev: 09.May.2018

LIFE SCIENCEin OSLO, 2018-2024

MAIN PROCESS PLAN MANAGEMENT

«LOD-1»

LLI

«LOD-2»

LLI

«LOD-3»

LLI

«LOD-4»

LLI

«LOD-5»

LLI

«LOD-6»

LLI«LOD-1» «LOD-2» «LOD-3» «LOD-4» «LOD-5» «LOD-6»

Pr-1 (Project Management)

Pr-2 (Quality Management)

Pr-3 (Design)

Pr-4 (Procurement)

Pr-5 (Construction)

Pr-6 (User Equipment)

Pr-7 (Systematic Completion)

Pr-8 (Public Permissions)

Pr-9 (Facility Management)

MANAGEMENT- & MAIN PROCESS PLAN w/ Keypoints

Design Construction

Infra/Demolition Foundations Structure Enveloping Completed Handover

LOD = Level of Development ~ Freeze Level for changes ~ Scope Check Points / LLI = Long Lead Items

(2 W Takt) (1 W Takt)

Roles

(LODs to be defined.)

Pr-10 (User Involvement)

Reverse Planning

Systematically

Page 14: SESSION D “TAKT TIME and LOGISTICS”: PROCESS and …lci.fi/wp-content/uploads/2018/05/16_Session-D_Holm.pdf · SESSION D “TAKT TIME and LOGISTICS”: PROCESS and MILESTONE PLANNING

Page 14

Rev: 09.May.2018

LIFE SCIENCEin OSLO, 2018-2024

SYSTEMATIC COMPLETION

Likely more than 650 different systems.

An extremely complex building.

Page 15: SESSION D “TAKT TIME and LOGISTICS”: PROCESS and …lci.fi/wp-content/uploads/2018/05/16_Session-D_Holm.pdf · SESSION D “TAKT TIME and LOGISTICS”: PROCESS and MILESTONE PLANNING

Page 15

Rev: 09.May.2018

LIFE SCIENCEin OSLO, 2018-2024

SYSTEMATIC COMPLETION as a PROCESS

FOUNDATIONS for SYSTEMATIC

COMPLETION

Functional specifications

- System by system

- Integrated

System Diagrams

Test Procedures

Integrated tests

System function

testsArea tests

TESTING

CONSTRUCTION

Full-scale test

User testsTabletest

DETAIL ENGINEERING

Project phase

Testing

Training Theoretical Inspection and testing Building Management System (BMS)

Verification of Screenshots (BMS) Verification of screenshots (BMS)

Hand over

BMS

Page 16: SESSION D “TAKT TIME and LOGISTICS”: PROCESS and …lci.fi/wp-content/uploads/2018/05/16_Session-D_Holm.pdf · SESSION D “TAKT TIME and LOGISTICS”: PROCESS and MILESTONE PLANNING

Page 16

Rev: 09.May.2018

Complete Systems List

- Defined acceptance criteria

- Finished AND Accepted test

By using measureable milestones and

actively relate to the acceptance criteria can

one impose KPI’s adapted to the project.

LIFE SCIENCEin OSLO, 2018-2024

SYSTEMATIC COMPLETION as a PROCESS

Testing

Training

Foundations

TABLE TESTS:

- Theoretical talk through test

- All stakeholders attend

- All systems

- system by system, or

- in naturally associated groups

- Executed before ordering

Page 17: SESSION D “TAKT TIME and LOGISTICS”: PROCESS and …lci.fi/wp-content/uploads/2018/05/16_Session-D_Holm.pdf · SESSION D “TAKT TIME and LOGISTICS”: PROCESS and MILESTONE PLANNING

Page 17

Rev: 09.May.2018

LIFE SCIENCEin OSLO, 2018-2024

CHALLENGES

- Creating a good and inspiring project mentality and culture

- Thinking and creating flow along all processes

- Efficient logistic systems for all products

- Integrating all digital systems

- Early involvement of subcontractors and suppliers

- Industrialising the construction site as much as possible

- Creating value in every step, reducing waste

- Influencing the industry enough to make it change

- Complete works on time with all systems working according to plan

Page 18: SESSION D “TAKT TIME and LOGISTICS”: PROCESS and …lci.fi/wp-content/uploads/2018/05/16_Session-D_Holm.pdf · SESSION D “TAKT TIME and LOGISTICS”: PROCESS and MILESTONE PLANNING

Page 18

Rev: 09.May.2018

QUESTIONS?

THANKS!

Hans Thomas Holm / Statsbygg

Statsbygg 2007 –

The LEAN way at Statsbygg 2010 – #1 Domus Medica, #2 KHiB, #3 Life Science

Torino 2006 Olympic Winter Games 2004 – 2006 TOROC Transportation

Lillehammer 1994 Olympic Winter Games 1992 – 1994 LOOC Transportation

Various Project Management 1991 –

MSc Chalmers Technical University 1991

Karlsruhe Technische Hochschule 1987

Christian August / Halden 1982

5 languages

(* 1964)