ITU-D Forum Cairo, Egypt, 13 to 15 December 2010 Session 9_IS - 1
SessionSession 99
Case Study on Economic Impact Case Study on Economic Impact of Broadband Implementationof Broadband Implementation
Ignat StanevIgnat StanevHCTP/ITC, BulgariaHCTP/ITC, Bulgaria
ITUITU --D Regional Development Forums 2010 on D Regional Development Forums 2010 on
NGN and Broadband NGN and Broadband for the Arab Regionfor the Arab Region
““ NGN and Broadband, Opportunities and ChallengesNGN and Broadband, Opportunities and Challenges””
ITU-D Forum Cairo, Egypt, 13 to 15 December 2010 Session 9_IS - 2
Content of the presentation :Content of the presentation :
� Economic Impact of Broadband Implementation
� Problem 1 – Service bandwidth upgrade� on FTTH broadband access network
� on xDSL broadband access network
� Problem 2 – Selection of broadband access technology
� xDSL vs. FTTH for urban brownfield area
� FTTH vs. WiMAX for urban greenfield area
� xDSL vs. WiMAX for rural area
2
ITU-D Forum Cairo, Egypt, 13 to 15 December 2010 Session 9_IS - 3
Problem 1 – Service bandwidth upgrade
There is a need to model the impact of upgrading the service bandwidth bandwidth, the service take rate and the service mix on the access network.
For a given market, the access network planners want to perform Bandwidth Upgrade Scenarios, Uptake Growth Scenarios, and Service Mix Scenarios
The access network planners have to dimension the required capacity of the access nodes, to optimize the access network and to calculate related costs to upgrade it.
ITU-D Forum Cairo, Egypt, 13 to 15 December 2010 Session 9_IS - 4
Speed and Speed and bandwidthstatistics related to statistics related to service upgrade service upgrade
Average advertised vs. actual download speed
Offered broadband connection – by price and speed
Source : OECD, TeleGeography,
Point Topic
Source : OECD 2009
3
ITU-D Forum Cairo, Egypt, 13 to 15 December 2010 Session 9_IS - 5
Service bandwidth upgrade – example I
Normal :
Upgraded:
Service:
Service:
Service:
Service:
Service utilization is presented by the Contention Ratio
ITU-D Forum Cairo, Egypt, 13 to 15 December 2010 Session 9_IS - 6
Service bandwidth upgrade – example I
<- Normal
Upgraded:
Bandwidth per service ( Mbit/s )
0
500
1000
1500
2000
2500
3000
3500
FTTH1
FTTH3
FTTH5
FTTH7
FTTH_2
FTTH_4
FTTH_6
FTTH_8
FTTH_10
FTTH_12
FTTH-BUS
FTTH-RES
Bandwidth per service ( Mbit/s )
0
1000
2000
3000
4000
5000
60007000
FTTH1
FTTH3
FTTH5
FTTH7
FTTH_2
FTTH_4
FTTH_6
FTTH_8
FTTH_10
FTTH_12
FTTH-BUS
FTTH-RES
FTTH – Home locations
4
ITU-D Forum Cairo, Egypt, 13 to 15 December 2010 Session 9_IS - 7
Service bandwidth upgrade - example I
Upgraded:
<- Normal
Bandwidth increase :
100 %
164622080
6000FTTH_12
0600FTTH_11
0400FTTH_10
3000FTTH_9
6000FTTH_8
0200FTTH_7
0400FTTH_6
6000FTTH_5
4500FTTH_4
0200FTTH_3
3000FTTH_2
1500FTTH_1
80500FTTH7
204100FTTH6
019000FTTH5
377500FTTH4
281900FTTH3
297200FTTH2
375000FTTH1
FTTH-ResFTTH-Bus
Data connectivity
Service Areas and Sites
329234160
12000FTTH_12
01200FTTH_11
0800FTTH_10
6000FTTH_9
12000FTTH_8
0400FTTH_7
0800FTTH_6
12000FTTH_5
9000FTTH_4
0400FTTH_3
6000FTTH_2
3000FTTH_1
160900FTTH7
408100FTTH6
038000FTTH5
755100FTTH4
563800FTTH3
594400FTTH2
750000FTTH1
FTTH-Res Upgraded
FTTH-Bus Upgraded
Data connectivity
Service Areas and Sites
Bandwidth per service ( Mbit/s )
ITU-D Forum Cairo, Egypt, 13 to 15 December 2010 Session 9_IS - 8
Service bandwidth upgrade - example I
<- Normal
(3 OLT, 17 Splitter 1:8,
89 Splitter 1:4)
Upgraded:
(3 OLT, 28 Splitter 1:8, 93 Splitter 1:4)
Access Network Dimensioning/ Optimization
5
ITU-D Forum Cairo, Egypt, 13 to 15 December 2010 Session 9_IS - 9
Service bandwidth upgrade – example I
Costs :
Costs increase :
(relative to all costs) %1.16
10631547188824942809Maintenance
-971-682-1210-6295650Installation
12737-2388-10189-1779100082Acquisition
10/1/201210/1/201110/1/201010/1/200910/1/2008
Difference :
1429314256142081419814172Maintenance
74100255632651Installation
23187543721655072814089Acquisition
10/1/201210/1/201110/1/201010/1/200910/1/2008
Upgraded services :
1323012709123201170411364Maintenance
1045783123568527001Installation
104507825123546851714006Acquisition
10/1/201210/1/201110/1/201010/1/200910/1/2008
Normal services :
ITU-D Forum Cairo, Egypt, 13 to 15 December 2010 Session 9_IS - 10
Service bandwidth upgrade – example I
Costs :
CAPEX
0
100000200000
300000
400000500000
600000
700000800000
900000
2008 2009 2010 2011 2012
Normal
Upgraded
OPEX
0
2000
4000
6000
8000
10000
12000
14000
16000
2008 2009 2010 2011 2012
Normal
Upgraded
Difference Upgraded-Normal
-20000
0
20000
40000
60000
80000
100000
120000
2008 2009 2010 2011 2012
CAPEX
OPEX
6
ITU-D Forum Cairo, Egypt, 13 to 15 December 2010 Session 9_IS - 11
Service bandwidth upgrade – example II
Normal
Upgraded: Upgraded
Service:Service:
Service:
Service:
BUS
RES
ITU-D Forum Cairo, Egypt, 13 to 15 December 2010 Session 9_IS - 12
Service bandwidth upgrade – example IIAverage Bandw idth per Service (for 10/1/2008)
0
20
40
60
80
100
120
CC_01
CC_02
CC_03
CC_04
CC_05
CC_06
CC_07
CC_08
CC_09
CC_10
Service Areas and Sites
in M
bit/
s Data connectivity
Internet-bus
Internet-res
IPTV
POTS
POTS (ADSL)
VoIP
Average Bandwidth per Service (for 10/1/2008)
0
50
100
150
200
250
300
350
400
450
500
CC_01
CC_02
CC_03
CC_04
CC_05
CC_06
CC_07
CC_08
CC_09
CC_10
Service Areas and Sites
in M
bit/
s
Data connectivity
Data connectivity upgradex 2
Internet-bus
Internet-res
IPTV
IPTV Upgrade x 2
POTS
POTS (ADSL)
VoIP
<- Normal
Upgraded:
CC – Copper Cabinets
7
ITU-D Forum Cairo, Egypt, 13 to 15 December 2010 Session 9_IS - 13
Service bandwidth upgrade - example II
1.4792.13354.2585401.6200.878.3104.4Total :
0.918000048.664.8CC_10
0.561000029.739.6CC_09
00.089250.178516.88.400CC_08
00.0510.097759.64.800CC_07
00.344250.688564.832.400CC_06
00.28050.56152.826.400CC_05
00.403750.80325763800CC_04
00.5781.156108.854.400CC_03
00.233750.4675442200CC_02
00.1530.30628.814.400CC_01
VoIPPOTS (ADSL)POTSIPTVInternet-resInternet-bus
Data connectivity
Service Areas and Sites
1.4792.13354.25851606.4200.878.3469.8Total :
0.918000048.6291.6CC_10
0.561000029.7178.2CC_09
00.089250.178567.28.400CC_08
00.0510.0977538.44.800CC_07
00.344250.6885259.232.400CC_06
00.28050.561211.226.400CC_05
00.403750.803253043800CC_04
00.5781.156435.254.400CC_03
00.233750.46751762200CC_02
00.1530.306115.214.400CC_01
VoIPPOTS (ADSL)POTS
IPTV Upgrade x 2Internet-resInternet-bus
Data connectivity upgrade x 2
Service Areas and SitesUpgraded:
<- Normal
298.0%
Bandwidth per service ( Mbit/s )
Bandwidth increase :
ITU-D Forum Cairo, Egypt, 13 to 15 December 2010 Session 9_IS - 14
Service bandwidth upgrade - example II
<- Normal
(3 MSAN)
Upgraded:
(5 MSAN)
Access Network Dimensioning/ Optimization
8
ITU-D Forum Cairo, Egypt, 13 to 15 December 2010 Session 9_IS - 15
Service bandwidth upgrade – example II
1589527332943305334233743Maintenance
5466-410-230-730-6507486Installation
41524-4830-3250-8050-739065044Acquisition
Total:10/1/201210/1/201110/1/201010/1/200910/1/2008
Difference :
1376893276947276247275347274547273807Maintenance
53423137017601570144047283Installation
2030593130701686015070137201971873Acquisition
Total:10/1/201210/1/201110/1/201010/1/200910/1/2008
Upgraded services :
1360998274214273304272294271124270064Maintenance
47957178019902300209039797Installation
1989069179002011023120211101906829Acquisition
Total:10/1/201210/1/201110/1/201010/1/200910/1/2008
Normal services :
Costs :
Costs increase : (relative to all costs) %1.85
ITU-D Forum Cairo, Egypt, 13 to 15 December 2010 Session 9_IS - 16
Service bandwidth upgrade – example II
Costs :
CAPEX
0
500000
1000000
1500000
2000000
2500000
2008 2009 2010 2011 2012
Normal
Upgraded
OPEX
0
200000
400000
600000
800000
1000000
1200000
1400000
1600000
2008 2009 2010 2011 2012
Normal
Upgraded
Difference Upgraded-Normal
-20000
-10000
010000
20000
30000
40000
5000060000
70000
80000
2008 2009 2010 2011 2012
CAPEX
OPEX
9
ITU-D Forum Cairo, Egypt, 13 to 15 December 2010 Session 9_IS - 17
Extension of the service bandwidthupgrade studies
There is a need also to assess the cost for services in order to price products. Such study facilitatescomparison of multiple service costing scenarios for strategic decisions on product pricing.
Additional parameters are:• price per service/bundle of services• growth in customers from each service class• growth in customers from each speed package
The planner have to dimension the access network, to calculate all related costs and based on the expected revenue to providing insight into the Return-on-Investment and the profitability.
ITU-D Forum Cairo, Egypt, 13 to 15 December 2010 Session 9_IS - 18
Problem 2 – Selection of AccessTechnology
Aim is to investigate the techno-economical impact of various access technologies on the network for a given market
Multiple techno-economical studies are carrier out for the purpose to determine the optimum access technology for the network
Selection is done by comparison of the economical parameters for each access technology
10
ITU-D Forum Cairo, Egypt, 13 to 15 December 2010 Session 9_IS - 19
BroadbandBroadband access technologiesaccess technologies
Source : OESD 2008
IP
Application of different broadband technologies
ITU-D Forum Cairo, Egypt, 13 to 15 December 2010 Session 9_IS - 20
Broadband access Broadband access –– market share by technologymarket share by technology
Source : Japan MIC
Broadband subscriptions in France
Source : ARCEP
Broadband subscriptions in Japan
11
ITU-D Forum Cairo, Egypt, 13 to 15 December 2010 Session 9_IS - 21
Planning guidelines for broadband access Planning guidelines for broadband access technologytechnology
Low subscriber
base
*Wireless
Is area Greenfield
pocket within Brownfield?
OLT exists or planned?
FTTH
Is there high growth for
service demand?
Y
Y
Y
N
Extend network from MSAN
Y
N
Y
N
N
Temp BB wireless / Plan
OLT
N
Is existing MSAN
capacity &BB reach?
* *
Source : STC
Access Network Planning Roadmap
Access Network Planning Guidelines
Sample guidelinesSample guidelines
ITU-D Forum Cairo, Egypt, 13 to 15 December 2010 Session 9_IS - 22
Example I – urban area brownfield
xDSLxDSL vs. FTTH brownfield
12
ITU-D Forum Cairo, Egypt, 13 to 15 December 2010 Session 9_IS - 23
Example I – urban area brownfield
FTTH
October 01,20127901
October 01,20111800
October 01,20107601
October 01,20091500
October 01,200830505Splitter 1:32 costSplitter 1:32 _3
October 01,2012900
October 01,2011900
October 01,20106701
October 01,2009600
October 01,200812202Splitter 1:32 costSplitter 1:32 _2
October 01,2012600
October 01,2011600
October 01,2010600
October 01,2009600
October 01,200812202Splitter 1:32 costSplitter 1:32 _1
October 01,20122504000
October 01,20112504000
October 01,20102504000
October 01,20092504000
October 01,200819226001OLTCO_Ubhur
DateTotal New Cost
Total Number Existing
Total Number NewDescriptionPart Number
Node DescriptionNode Name
List of material :
ITU-D Forum Cairo, Egypt, 13 to 15 December 2010 Session 9_IS - 24
Example I – urban area brownfield
UC_1_9a UC_1_1-3Net Present Value
-1000000
-500000
0
500000
1000000
1500000
2000000
2500000
3000000
10/1/2008 10/1/2009 10/1/2010 10/1/2011 10/1/2012
US
D UC_1_9a
UC_1_1-3
xDSL vs. FTTH brownfield
FTTHxDSL
13
ITU-D Forum Cairo, Egypt, 13 to 15 December 2010 Session 9_IS - 25
Example II – urban area greenfield
FTTH
FTTH vs. WiMAX greenfield
ITU-D Forum Cairo, Egypt, 13 to 15 December 2010 Session 9_IS - 26
Example II – urban area greenfield
WiMAX
14
ITU-D Forum Cairo, Egypt, 13 to 15 December 2010 Session 9_IS - 27
Example II – urban area greenfield
FTTH vs. WiMAX greenfield
UC_1_9c UC_1_9bNet Present Value
-200000
-100000
0
100000
200000
300000
400000
500000
10/1/2008 10/1/2009 10/1/2010 10/1/2011 10/1/2012
US
D UC_1_9c
UC_1_9bWiMAXFTTH
ITU-D Forum Cairo, Egypt, 13 to 15 December 2010 Session 9_IS - 28
Example III (a) – rural area
xDSLxDSL vs. WiMAX rural area
15
ITU-D Forum Cairo, Egypt, 13 to 15 December 2010 Session 9_IS - 29
Example III (a) – rural area
WiMAX
ITU-D Forum Cairo, Egypt, 13 to 15 December 2010 Session 9_IS - 30
Example III (a) – rural area
xDSL vs.
WiMAX
rural area
Net Present Value
Rural area -Tskneti-WiMAX-b-Year2; IRR=86.4%; Rural area -Tskneti-xDSL-Year2; IRR=0%
-100000
-80000
-60000
-40000
-20000
0
20000
1 2
in E
uro Rural area -Tskneti-WiMAX-b-Year2
Rural area -Tskneti-xDSL-Year2
16
ITU-D Forum Cairo, Egypt, 13 to 15 December 2010 Session 9_IS - 31
Example III (b) – rural area
xDSLxDSL vs. WiMAX rural area
ITU-D Forum Cairo, Egypt, 13 to 15 December 2010 Session 9_IS - 32
Example III (b) – rural area
WiMAX
17
ITU-D Forum Cairo, Egypt, 13 to 15 December 2010 Session 9_IS - 33
Example III (b) – rural area
xDSL vs.
WiMAX
rural area
ITU-D Forum Cairo, Egypt, 13 to 15 December 2010 Session 9_IS - 34
Improvement of the selection of access technology studies
Present core network portion in the network expenses :• as additional average cost per customer• as total additional cost, related to the
uppermost access network node
Present additional costs related to running the business ( marketing of services, customer care, etc.) :• as additional average cost per customer• as total additional cost, related to the
uppermost access network node