PROGRAMMING PAVEMENT
PROJECTS
Session 3
1-1
8/17/2019 Session 3 - Programming Pavement Projects.pdf
2/56
Programming PavementProjects Manage Assets
Protect investment
Enhance cost-effectiveness of treatments
Preventive Maintenance (PM) Extend Pavement Life
Retard future deterioration
Enhance Pavement Performance Improve functional condition (friction, etc.)
Reduce User Delays
1-2
8/17/2019 Session 3 - Programming Pavement Projects.pdf
3/56
Our Lifeline $1 trillion investment in US highway
infrastructure
84% of all goods shipped travel on USroad system
Just-in-time inventory:
highways = warehouses
1-3
8/17/2019 Session 3 - Programming Pavement Projects.pdf
4/56
“It was not our wealth that made ourhighways possible; rather it was our
highways that made our wealthpossible”Thomas MacDonald,
former U.S. Commissioner
of Public Roads
1-4
8/17/2019 Session 3 - Programming Pavement Projects.pdf
5/56
Our Economic Health
1-5
8/17/2019 Session 3 - Programming Pavement Projects.pdf
6/56
Roadway and Population
1-6
8/17/2019 Session 3 - Programming Pavement Projects.pdf
7/56
Users Delay Congestion = $78 billion
wasted time & fuel
Freight shipments expected
to double in next 20 years
1-7
8/17/2019 Session 3 - Programming Pavement Projects.pdf
8/56
Traffic and Load Growth
1-8
8/17/2019 Session 3 - Programming Pavement Projects.pdf
9/56
Road Funding
1-9
8/17/2019 Session 3 - Programming Pavement Projects.pdf
10/56
One of the Solutions
1-10
8/17/2019 Session 3 - Programming Pavement Projects.pdf
11/56
Effective PreventiveMaintenance
1-11
8/17/2019 Session 3 - Programming Pavement Projects.pdf
12/56
Type of PavementMaintenance Preventive (Proactive)
Arrest light deterioration
Retard progressive failures
Reduce need for corrective maintenance
“Right” treatment at the “right” time!
Corrective (Reactive)
After deficiency occurs
More expensive
1-12
8/17/2019 Session 3 - Programming Pavement Projects.pdf
13/56
When Do We Have to Fix Our Pavements? Pavement Preservation
preserves good condition pavement
Corrective maintenance When the pavement loses load carrying ability
(excessive deflection)
Waterproofing (cracks)
Surface slope (rutting) Surface roughness (too slick)
Ride quality (bumps)
1-13
8/17/2019 Session 3 - Programming Pavement Projects.pdf
14/56
Strategy to minimize costs
1-14
8/17/2019 Session 3 - Programming Pavement Projects.pdf
15/56
Success Story
1-15
8/17/2019 Session 3 - Programming Pavement Projects.pdf
16/56
Success Story
1-16
8/17/2019 Session 3 - Programming Pavement Projects.pdf
17/56
Success Story
1-17
8/17/2019 Session 3 - Programming Pavement Projects.pdf
18/56
8/17/2019 Session 3 - Programming Pavement Projects.pdf
19/56
Success Story
1-19
8/17/2019 Session 3 - Programming Pavement Projects.pdf
20/56
Success Story
1-20
8/17/2019 Session 3 - Programming Pavement Projects.pdf
21/56
A ROADMAP TO SUCCESS
How can we get there?
1-21
8/17/2019 Session 3 - Programming Pavement Projects.pdf
22/56
Asset Management . . . is a systematic process of
maintaining, upgrading, and operatingphysical assets cost-effectively
. . . Combines the use of soundengineering principles, accepted businesspractices, and economic theory to improve
the decision-making process
1-22
8/17/2019 Session 3 - Programming Pavement Projects.pdf
23/56
Motivation for AssetManagement Funding Constraints
Aging System
Increasing User Demands Loss of Senior Experienced Staff
Public Demands on Government
Accountability Return-on-Investment
1-23
8/17/2019 Session 3 - Programming Pavement Projects.pdf
24/56
Data Driven Decision
1-24
8/17/2019 Session 3 - Programming Pavement Projects.pdf
25/56
Data Driven Decision
1-25
8/17/2019 Session 3 - Programming Pavement Projects.pdf
26/56
Decision Tool
1-26
8/17/2019 Session 3 - Programming Pavement Projects.pdf
27/56
Deterioration Curve
1-27
8/17/2019 Session 3 - Programming Pavement Projects.pdf
28/56
Budget Requirement Provide an estimate of budget
requirements
At prescribed levels of performance
8/17/2019 Session 3 - Programming Pavement Projects.pdf
29/56
Asset Management at $0 vs$200 Million Budget
1-29
8/17/2019 Session 3 - Programming Pavement Projects.pdf
30/56
Performance Measures
1-30
8/17/2019 Session 3 - Programming Pavement Projects.pdf
31/56
Performance Measures
1-31
8/17/2019 Session 3 - Programming Pavement Projects.pdf
32/56
Pavement Preservation
2-32
8/17/2019 Session 3 - Programming Pavement Projects.pdf
33/56
Pavement Preservation
1-33
8/17/2019 Session 3 - Programming Pavement Projects.pdf
34/56
Pavement Preservation
1-34
8/17/2019 Session 3 - Programming Pavement Projects.pdf
35/56
Pavement Maintenance Preventive (Proactive)
Arrest light deterioration
Retard progressive failures
Reduce need for corrective maintenance
“Right” treatment at the “right” time!
Corrective (Reactive)
After deficiency occurs
More expensive
1-35
8/17/2019 Session 3 - Programming Pavement Projects.pdf
36/56
Pavement Preservation
1-36
Preservation and Asset Management won’t bring short-term
glory, but they will bring long-term satisfaction!
8/17/2019 Session 3 - Programming Pavement Projects.pdf
37/56
PROGRAMMING PROJECTS
How to program pavement projects with emphasis on PavementPreservation and Long Life Pavement
1-37
8/17/2019 Session 3 - Programming Pavement Projects.pdf
38/56
A Step by Step Process Responsible parties to submit project
nominations Hold coordination meetings to develop
proposals Draft list of projects developed and submit for
review Hold public meetings on projects under their
jurisdiction to be included in the STIP Draft constrained list of projects published for
public comment
1-38
8/17/2019 Session 3 - Programming Pavement Projects.pdf
39/56
Project Scoring 50%
Related to some form of direct transportationpreservation or enhancement criteria
25%
Projects which improve the safety of thetransportation system
25% Economy along with customer input
1-39
8/17/2019 Session 3 - Programming Pavement Projects.pdf
40/56
Program Goals System Preservation and Management
Economic Development and Quality ofLife
Cooperative Planning Process andTransportation Efficiency
Transportation Safety and Convenience Stable Funding
1-40
8/17/2019 Session 3 - Programming Pavement Projects.pdf
41/56
Typical Scores
1-41
8/17/2019 Session 3 - Programming Pavement Projects.pdf
42/56
Typical Scores
1-42
8/17/2019 Session 3 - Programming Pavement Projects.pdf
43/56
8/17/2019 Session 3 - Programming Pavement Projects.pdf
44/56
Completion Criteria The corridor
completion criteria
Evaluates each,
individual project interms of how much itcontributes to finishingthe overall plan foreach planning corridor.
1-44
8/17/2019 Session 3 - Programming Pavement Projects.pdf
45/56
Road Classifications Importance in
providing connectivityand the functions they
provide. The basic principal is
that roads serve twodistinct functions:
Mobility (the movementof goods and people)and
Access to land
1-45
8/17/2019 Session 3 - Programming Pavement Projects.pdf
46/56
Mobility Build, operate and
maintain atransportation system
that will Reduce traffic
congestion and
Improve travel
reliability (Volume toCapacity ratio)
1-46
8/17/2019 Session 3 - Programming Pavement Projects.pdf
47/56
Mobility Level of Service (LOS)
Improvement
LOS serves as a
measure of a road’sperformance/congestionlevel that utilizes agrading scale
A LOS of “A” representsno congestion and LOS“F” represents severe
congestion
1-47
8/17/2019 Session 3 - Programming Pavement Projects.pdf
48/56
Inter-government Agreements Cooperative
agreements havebeen reached in
which both statesagree to complete thefacility
1-48
8/17/2019 Session 3 - Programming Pavement Projects.pdf
49/56
Percent Complete The amount of design
and engineering workcompleted on a
project is representedas a percent of thetotal preliminaryengineering and
design work required
1-49
8/17/2019 Session 3 - Programming Pavement Projects.pdf
50/56
Safety Crash density is the number
of crashes per mile occurringalong a section of highway
Relative severity indexrepresents the relative cost tosociety by estimating theannual cost of crashes for a
section of road
1-50
8/17/2019 Session 3 - Programming Pavement Projects.pdf
51/56
Safety Fatality rate of the
section divided by the2003 fatality rate of
1.12 fatalities per 100Million Vehicle Milesof Travel
1-51
8/17/2019 Session 3 - Programming Pavement Projects.pdf
52/56
Economic Development To measure a project’s influence on future
economic development,
Job Creation,
Job Retention,
Level of Investment,
Cost Effectiveness and
Economic Distress of the surrounding county.
1-52
8/17/2019 Session 3 - Programming Pavement Projects.pdf
53/56
Economic Development
1-53
E i D l t
8/17/2019 Session 3 - Programming Pavement Projects.pdf
54/56
Economic Development
1-54
8/17/2019 Session 3 - Programming Pavement Projects.pdf
55/56
Local Inputs The value of local input from a variety of
stakeholders is significant enough to warrantadditional points for projects
Input will be broken down into three distinctsources: Local Planning Agency input up to 4 points
(MPO’s & RPO’s)
Mayors & County Commissioners up to 3 points(local elected officials)
Citizen and Legislative input up to 3 points
1-55