Session 2: Trade‐Offs in the Central Section
of the Study Area
2
PURPOSE • Review the key issues and trade‐offs the project team has
identified in the central section of the GTA West study area
• Obtain your input on the key issues and trade‐offs
3
REFINED SHORT LIST OF ROUTE ALTERNATIVES AND POTENTIAL INTERCHANGE LOCATIONS
NOTE: POTENTIAL INTERCHANGE LOCATIONS BEING REFINED THROUGH MUNICIPAL INPUT NOW UNDERWAY
4
SHORT LIST OF ROUTE ALTERNATIVES AND POTENTIAL INTERCHANGE LOCATIONS ‐ CENTRAL SECTION
NOTE: POTENTIAL INTERCHANGE LOCATIONS BEING REFINED THROUGH MUNICIPAL INPUT
NOW UNDERWAY
5
EXAMPLES OF TRADE‐OFFS• Widening existing Highway 410/10 vs. new direct Highway 410 connection
– Access and community impacts to Valleywood, access for properties on HurontarioStreet, impacts to planned developments, natural environment
6
EXAMPLES OF TRADE‐OFFS• Road network in the Highway 50 / Coleraine Drive/Highway 427 area
– Compatibility with future municipal road network, interchange spacing, development
• Northern vs. southern routes– Agriculture and fragmentation of land, residences, sensitive environmental features,
compatibility with future municipal road network
7
FACILITATED GROUP DISCUSSION
8
1. Do you prefer the northerly or southerly routes through the areaand why?
2. Do you prefer Alternative 10G (utilizes existing Highway 10/410)or Alternatives 10B or 10C (new direct Highway 410 connection)and why?
3. What are your interchange option preferences in the Highway427 / Coleraine Drive / Highway 50 / Mayfield Road area andwhy?
FACILITATED GROUP DISCUSSION – CENTRAL SECTION