Hosted by: Organized by: 1 SESSION 12: MV UNDERGROUND CABLE SYSTEM TNB’S EXPERIENCE by Ir. C. H. TAN Development of TNB MV Underground Cable Specification TNB MV Underground Cable Installation Practice Development of TNB Underground Cable Maintenance Practices Future Development in TNB MV Underground Cable System

SESSION 12: MV UNDERGROUND CABLE SYSTEM … 12 - TNB...Hosted by: Organized by: 1 SESSION 12: MV UNDERGROUND CABLE SYSTEM – TNB’S EXPERIENCE by Ir. C. H. TAN • Development of

  • Upload
    ngongoc

  • View
    973

  • Download
    180

Embed Size (px)

Citation preview

Page 1: SESSION 12: MV UNDERGROUND CABLE SYSTEM … 12 - TNB...Hosted by: Organized by: 1 SESSION 12: MV UNDERGROUND CABLE SYSTEM – TNB’S EXPERIENCE by Ir. C. H. TAN • Development of

Hosted by: Organized by:

1

SESSION 12: MV UNDERGROUND CABLE

SYSTEM – TNB’S EXPERIENCE by Ir. C. H. TAN

• Development of TNB MV Underground Cable

Specification

• TNB MV Underground Cable Installation Practice

• Development of TNB Underground Cable Maintenance

Practices

• Future Development in TNB MV Underground Cable

System

Page 2: SESSION 12: MV UNDERGROUND CABLE SYSTEM … 12 - TNB...Hosted by: Organized by: 1 SESSION 12: MV UNDERGROUND CABLE SYSTEM – TNB’S EXPERIENCE by Ir. C. H. TAN • Development of

Hosted by: Organized by:

2

Objective

• To enhance understanding on technical requirements

for TNB’s cables.

• To share TNB standard process & foster better

understanding.

• To inform public on TNB’s effort in developing high

reliability underground cable system

Page 3: SESSION 12: MV UNDERGROUND CABLE SYSTEM … 12 - TNB...Hosted by: Organized by: 1 SESSION 12: MV UNDERGROUND CABLE SYSTEM – TNB’S EXPERIENCE by Ir. C. H. TAN • Development of

Hosted by: Organized by:

3

Development of TNB MV Underground Cable

Specification

• Types of cables used in TNB

– Low Voltage Cables

• PILC (4 cores)

• PVC (1 core)

• XLPE (4 cores)

– Medium Voltage (11, 22&33kV)

• PILC (3 cores)

• Oil Filled (3 cores)

• XLPE (1 core & 3 cores)

Page 4: SESSION 12: MV UNDERGROUND CABLE SYSTEM … 12 - TNB...Hosted by: Organized by: 1 SESSION 12: MV UNDERGROUND CABLE SYSTEM – TNB’S EXPERIENCE by Ir. C. H. TAN • Development of

Hosted by: Organized by:

4

Development of TNB MV Underground Cable

Specification

• TNB uses two type of MVUG Cables

– PILCDSTA (PILC)

• Before mid 1980’s

• Ceased addition since 2007

– XLPE

• Starts mid 1980’s

• Now 100% new cables

Page 5: SESSION 12: MV UNDERGROUND CABLE SYSTEM … 12 - TNB...Hosted by: Organized by: 1 SESSION 12: MV UNDERGROUND CABLE SYSTEM – TNB’S EXPERIENCE by Ir. C. H. TAN • Development of

Hosted by: Organized by:

5

Typical Construction of PILC Cable

Page 6: SESSION 12: MV UNDERGROUND CABLE SYSTEM … 12 - TNB...Hosted by: Organized by: 1 SESSION 12: MV UNDERGROUND CABLE SYSTEM – TNB’S EXPERIENCE by Ir. C. H. TAN • Development of

Hosted by: Organized by:

6

Typical Construction of Single Core XLPE Cable

Page 7: SESSION 12: MV UNDERGROUND CABLE SYSTEM … 12 - TNB...Hosted by: Organized by: 1 SESSION 12: MV UNDERGROUND CABLE SYSTEM – TNB’S EXPERIENCE by Ir. C. H. TAN • Development of

Hosted by: Organized by:

7

Typical Construction of Three Cores XLPE Cable

Page 8: SESSION 12: MV UNDERGROUND CABLE SYSTEM … 12 - TNB...Hosted by: Organized by: 1 SESSION 12: MV UNDERGROUND CABLE SYSTEM – TNB’S EXPERIENCE by Ir. C. H. TAN • Development of

Hosted by: Organized by:

8

Specification Development Process

• Specification Development / Revision

– Major changes in reference standards

– New cable design is needed

• To keep up with technology advancement

• To introduce new requirements to enhance performance based on

feedback

– Diagnostic Test findings

– Failure investigation & analysis

Page 9: SESSION 12: MV UNDERGROUND CABLE SYSTEM … 12 - TNB...Hosted by: Organized by: 1 SESSION 12: MV UNDERGROUND CABLE SYSTEM – TNB’S EXPERIENCE by Ir. C. H. TAN • Development of

Hosted by: Organized by:

9

Characteristic of TNB Technical Specification

• Functional requirement

• Refers International / National Standards

• Specific requirements to suit local

environmental & operational condition.

Page 10: SESSION 12: MV UNDERGROUND CABLE SYSTEM … 12 - TNB...Hosted by: Organized by: 1 SESSION 12: MV UNDERGROUND CABLE SYSTEM – TNB’S EXPERIENCE by Ir. C. H. TAN • Development of

Hosted by: Organized by:

10

Functional Requirements

• System voltage

– Nominal voltage

– Maximum voltage

• System frequency

• Impulse withstand voltage level (BIL)

• Maximum continuous conductor operating

temperature

• 3 Phase Symmetrical Fault Level

Page 11: SESSION 12: MV UNDERGROUND CABLE SYSTEM … 12 - TNB...Hosted by: Organized by: 1 SESSION 12: MV UNDERGROUND CABLE SYSTEM – TNB’S EXPERIENCE by Ir. C. H. TAN • Development of

Hosted by: Organized by:

11

Reference Standards

1. IEC – International Electrotechnical Commission

2. BS – British Standard (UK)

3. IEEE – Institute of Electrical and Electronics Engineers

(USA)

4. ICEA – Insulated Cable Engineering Association (USA)

5. NEMA – National Electrical Manufacturers Association

(USA)

Page 12: SESSION 12: MV UNDERGROUND CABLE SYSTEM … 12 - TNB...Hosted by: Organized by: 1 SESSION 12: MV UNDERGROUND CABLE SYSTEM – TNB’S EXPERIENCE by Ir. C. H. TAN • Development of

Hosted by: Organized by:

12

Common Reference Standards

IEC 60502 -1 : Power cables with extruded insulation

and their accessories for rated voltage from 1kV

(Um = 1.2kV) up to 30kv (Um=36kV)

Part 1:

Cables for rated voltages of 1kV (Um = 1.2kV) and

3kV (Um = 3.6kV).

Page 13: SESSION 12: MV UNDERGROUND CABLE SYSTEM … 12 - TNB...Hosted by: Organized by: 1 SESSION 12: MV UNDERGROUND CABLE SYSTEM – TNB’S EXPERIENCE by Ir. C. H. TAN • Development of

Hosted by: Organized by:

13

Common Reference Standards

IEC 60502 -2 : Power cables with extruded insulation

and their accessories for rated voltage from 1kV

(Um = 1.2kV) up to 30kv (Um=36kV)

Part 2:

Cables for rated voltages of 6kV (Um = 7.2kV) and

30kV (Um = 36kV).

Page 14: SESSION 12: MV UNDERGROUND CABLE SYSTEM … 12 - TNB...Hosted by: Organized by: 1 SESSION 12: MV UNDERGROUND CABLE SYSTEM – TNB’S EXPERIENCE by Ir. C. H. TAN • Development of

Hosted by: Organized by:

14

Common Reference Standards

IEC 60228 : Conductors of insulated cables

BS 2627 : Wrought aluminum for electrical purposes.

Page 15: SESSION 12: MV UNDERGROUND CABLE SYSTEM … 12 - TNB...Hosted by: Organized by: 1 SESSION 12: MV UNDERGROUND CABLE SYSTEM – TNB’S EXPERIENCE by Ir. C. H. TAN • Development of

Hosted by: Organized by:

15

Specific TNB’s Requirements

• Conductor screen

– Minimum thickness

– Minimum volume resistivity

• Insulation screen

– Minimum thickness

– Minimum volume resistivity

– Bonded or Striptable

• XLPE Insulation Free from voids & impurities

Page 16: SESSION 12: MV UNDERGROUND CABLE SYSTEM … 12 - TNB...Hosted by: Organized by: 1 SESSION 12: MV UNDERGROUND CABLE SYSTEM – TNB’S EXPERIENCE by Ir. C. H. TAN • Development of

Hosted by: Organized by:

16

Specific TNB’s Requirements

• Triple extrusion (Method of application)

– Conductor screen

– Insulation

– Insulation screen

Metallic screen

– Type (tape / wire)

– Thickness

– Method of application

Page 17: SESSION 12: MV UNDERGROUND CABLE SYSTEM … 12 - TNB...Hosted by: Organized by: 1 SESSION 12: MV UNDERGROUND CABLE SYSTEM – TNB’S EXPERIENCE by Ir. C. H. TAN • Development of

Hosted by: Organized by:

17

Specific TNB’s Requirements

• XLPE curing method (Dry)

• Type & grade of sheathing material

– MDPE ST7

– PVC ST2 (ABC)

– UV resistance

– Termite repellant

– Graphite outer coating (single core)

Page 18: SESSION 12: MV UNDERGROUND CABLE SYSTEM … 12 - TNB...Hosted by: Organized by: 1 SESSION 12: MV UNDERGROUND CABLE SYSTEM – TNB’S EXPERIENCE by Ir. C. H. TAN • Development of

Hosted by: Organized by:

18

Specific TNB’s Requirements

• Filler material

– Non hydroscopic

• Moisture barrier

– Longitudinal

• Water swell-able tape

– Radial

• Lead sheath (PILC & Submarine)

• Laminated aluminum foil

Page 19: SESSION 12: MV UNDERGROUND CABLE SYSTEM … 12 - TNB...Hosted by: Organized by: 1 SESSION 12: MV UNDERGROUND CABLE SYSTEM – TNB’S EXPERIENCE by Ir. C. H. TAN • Development of

Hosted by: Organized by:

19

Quality Control Testing

• Type Test

– Design verification test

• Based on IEC Standard

• Tested by Independent Approved Laboratory

• Routine Test

– Manufacturing quality control test

• Based on IEC Standard

• 100% finished product

Page 20: SESSION 12: MV UNDERGROUND CABLE SYSTEM … 12 - TNB...Hosted by: Organized by: 1 SESSION 12: MV UNDERGROUND CABLE SYSTEM – TNB’S EXPERIENCE by Ir. C. H. TAN • Development of

Hosted by: Organized by:

20

Quality Control Testing

• Sample Test

– Based on IEC Standard

– Every 10kM produced

– Commencement of contract & before Factory Acceptance

Test (FAT)

• Factory Acceptance Test

– Based on IEC Standard (Routine Test)

– 10% sample

Page 21: SESSION 12: MV UNDERGROUND CABLE SYSTEM … 12 - TNB...Hosted by: Organized by: 1 SESSION 12: MV UNDERGROUND CABLE SYSTEM – TNB’S EXPERIENCE by Ir. C. H. TAN • Development of

Hosted by: Organized by:

21

Request for New Tech Spec

Prepare Draft

Get Feedback

Feedback Prepare Final Draft

Technical Working

Committee

Comments

Distribution Technical

Committee Approve

Distribute to

End Users

Yes

Yes

No

No

END

Yes

No

Page 22: SESSION 12: MV UNDERGROUND CABLE SYSTEM … 12 - TNB...Hosted by: Organized by: 1 SESSION 12: MV UNDERGROUND CABLE SYSTEM – TNB’S EXPERIENCE by Ir. C. H. TAN • Development of

Hosted by: Organized by:

22

TNB UG Cable Installation Practice

• Direct buried

– Open trench

• Laid in Duct

– Busy & congested areas (HDPE / PVC pipes)

– Road / railway / stream / river crossing (HDD)

• Laid in Duct bank

– No dig policy

– Putrajaya

Page 23: SESSION 12: MV UNDERGROUND CABLE SYSTEM … 12 - TNB...Hosted by: Organized by: 1 SESSION 12: MV UNDERGROUND CABLE SYSTEM – TNB’S EXPERIENCE by Ir. C. H. TAN • Development of

Hosted by: Organized by:

23

TNB UG Cable Installation Practice

• Laid in dedicated precast concrete trench

– No Dig Policy

• Medini – Iskandar Malaysia

• Utility tunnel

– Laid on cable tray

– No Dig Policy

• Putrajaya

Page 24: SESSION 12: MV UNDERGROUND CABLE SYSTEM … 12 - TNB...Hosted by: Organized by: 1 SESSION 12: MV UNDERGROUND CABLE SYSTEM – TNB’S EXPERIENCE by Ir. C. H. TAN • Development of

Hosted by: Organized by:

24

Direct Buried (Before 2008)

Page 25: SESSION 12: MV UNDERGROUND CABLE SYSTEM … 12 - TNB...Hosted by: Organized by: 1 SESSION 12: MV UNDERGROUND CABLE SYSTEM – TNB’S EXPERIENCE by Ir. C. H. TAN • Development of

Hosted by: Organized by:

25

Direct Buried (After 2008)

Page 26: SESSION 12: MV UNDERGROUND CABLE SYSTEM … 12 - TNB...Hosted by: Organized by: 1 SESSION 12: MV UNDERGROUND CABLE SYSTEM – TNB’S EXPERIENCE by Ir. C. H. TAN • Development of

Hosted by: Organized by:

26

Direct Buried (After 2008)

Page 27: SESSION 12: MV UNDERGROUND CABLE SYSTEM … 12 - TNB...Hosted by: Organized by: 1 SESSION 12: MV UNDERGROUND CABLE SYSTEM – TNB’S EXPERIENCE by Ir. C. H. TAN • Development of

Hosted by: Organized by:

27

Direct Buried

Page 28: SESSION 12: MV UNDERGROUND CABLE SYSTEM … 12 - TNB...Hosted by: Organized by: 1 SESSION 12: MV UNDERGROUND CABLE SYSTEM – TNB’S EXPERIENCE by Ir. C. H. TAN • Development of

Hosted by: Organized by:

28

Cross-section of direct buried LV, 11, 22kV Cables

Page 29: SESSION 12: MV UNDERGROUND CABLE SYSTEM … 12 - TNB...Hosted by: Organized by: 1 SESSION 12: MV UNDERGROUND CABLE SYSTEM – TNB’S EXPERIENCE by Ir. C. H. TAN • Development of

Hosted by: Organized by:

29

uPVC Cable Protection Slab

Page 30: SESSION 12: MV UNDERGROUND CABLE SYSTEM … 12 - TNB...Hosted by: Organized by: 1 SESSION 12: MV UNDERGROUND CABLE SYSTEM – TNB’S EXPERIENCE by Ir. C. H. TAN • Development of

Hosted by: Organized by:

30

Mechanical Protection for Cables

11& 22kV Cables 33kV Cables

Page 31: SESSION 12: MV UNDERGROUND CABLE SYSTEM … 12 - TNB...Hosted by: Organized by: 1 SESSION 12: MV UNDERGROUND CABLE SYSTEM – TNB’S EXPERIENCE by Ir. C. H. TAN • Development of

Hosted by: Organized by:

31

Mechanical Protection for Cables

Page 32: SESSION 12: MV UNDERGROUND CABLE SYSTEM … 12 - TNB...Hosted by: Organized by: 1 SESSION 12: MV UNDERGROUND CABLE SYSTEM – TNB’S EXPERIENCE by Ir. C. H. TAN • Development of

Hosted by: Organized by:

32

River Crossing – Cable Bridge

Page 33: SESSION 12: MV UNDERGROUND CABLE SYSTEM … 12 - TNB...Hosted by: Organized by: 1 SESSION 12: MV UNDERGROUND CABLE SYSTEM – TNB’S EXPERIENCE by Ir. C. H. TAN • Development of

Hosted by: Organized by:

33

Class B PVC Ducts

Page 34: SESSION 12: MV UNDERGROUND CABLE SYSTEM … 12 - TNB...Hosted by: Organized by: 1 SESSION 12: MV UNDERGROUND CABLE SYSTEM – TNB’S EXPERIENCE by Ir. C. H. TAN • Development of

Hosted by: Organized by:

34

Exposed Duct : PE Vs PVC

Source : BICC Electric Cables Handbook, 3rd edition, Pg 95

Page 35: SESSION 12: MV UNDERGROUND CABLE SYSTEM … 12 - TNB...Hosted by: Organized by: 1 SESSION 12: MV UNDERGROUND CABLE SYSTEM – TNB’S EXPERIENCE by Ir. C. H. TAN • Development of

Hosted by: Organized by:

35

HDD – Road, Railway, Small river crossing

Page 36: SESSION 12: MV UNDERGROUND CABLE SYSTEM … 12 - TNB...Hosted by: Organized by: 1 SESSION 12: MV UNDERGROUND CABLE SYSTEM – TNB’S EXPERIENCE by Ir. C. H. TAN • Development of

Hosted by: Organized by:

36

HDPE Grade PN10 Ducts

Page 37: SESSION 12: MV UNDERGROUND CABLE SYSTEM … 12 - TNB...Hosted by: Organized by: 1 SESSION 12: MV UNDERGROUND CABLE SYSTEM – TNB’S EXPERIENCE by Ir. C. H. TAN • Development of

Hosted by: Organized by:

37

Cable Laying (MEDINI – Iskandar Malaysia)

No Dig Policy

Page 38: SESSION 12: MV UNDERGROUND CABLE SYSTEM … 12 - TNB...Hosted by: Organized by: 1 SESSION 12: MV UNDERGROUND CABLE SYSTEM – TNB’S EXPERIENCE by Ir. C. H. TAN • Development of

Hosted by: Organized by:

38

Pre-Cast Concrete Trench Turf

Page 39: SESSION 12: MV UNDERGROUND CABLE SYSTEM … 12 - TNB...Hosted by: Organized by: 1 SESSION 12: MV UNDERGROUND CABLE SYSTEM – TNB’S EXPERIENCE by Ir. C. H. TAN • Development of

Hosted by: Organized by:

39

Cable Laying (Putrajaya)

No Dig Policy

Page 40: SESSION 12: MV UNDERGROUND CABLE SYSTEM … 12 - TNB...Hosted by: Organized by: 1 SESSION 12: MV UNDERGROUND CABLE SYSTEM – TNB’S EXPERIENCE by Ir. C. H. TAN • Development of

Hosted by: Organized by:

40

• Single core cable installation

– LV cable

• Limitation on length allowed

• Safety / Fault current return path

– MV cable

• Single point bonding

• Both end bonding

• Cross bonding

Page 41: SESSION 12: MV UNDERGROUND CABLE SYSTEM … 12 - TNB...Hosted by: Organized by: 1 SESSION 12: MV UNDERGROUND CABLE SYSTEM – TNB’S EXPERIENCE by Ir. C. H. TAN • Development of

Hosted by: Organized by:

41

• Single core cable installation

– MV cable

• Single point bonding

– Sheath induce voltage - <50V

– Fault current return path

• Both end bonding

– Sheath circulation current

– De-rating of cable current carrying capacity

• Cross bonding

– Link box maintenance

– Sheath voltage management

– Sheath current monitoring

Page 42: SESSION 12: MV UNDERGROUND CABLE SYSTEM … 12 - TNB...Hosted by: Organized by: 1 SESSION 12: MV UNDERGROUND CABLE SYSTEM – TNB’S EXPERIENCE by Ir. C. H. TAN • Development of

Hosted by: Organized by:

42

Sheath voltage α Load Current & Length of Cable

Page 43: SESSION 12: MV UNDERGROUND CABLE SYSTEM … 12 - TNB...Hosted by: Organized by: 1 SESSION 12: MV UNDERGROUND CABLE SYSTEM – TNB’S EXPERIENCE by Ir. C. H. TAN • Development of

Hosted by: Organized by:

43

Single core cable sheath Bonding

Cross Bonding System

Page 44: SESSION 12: MV UNDERGROUND CABLE SYSTEM … 12 - TNB...Hosted by: Organized by: 1 SESSION 12: MV UNDERGROUND CABLE SYSTEM – TNB’S EXPERIENCE by Ir. C. H. TAN • Development of

Hosted by: Organized by:

44

Effect of Bonding Types Cable Laid in Trefoil Formation

Trefoil Direct buried in backfill (native soil = 1.5, backfill=1.2), cable depth = 3.5 ft, trench width = 1.64 ft

No Cable Bonding typeAmpacity

(A)

Induced

sheath

current

(A)

Induced

sheath

voltage (V/km)

Both end 485 28.4 -

Single end 493 - 28.6

Both end 488 278.6 -

Single end 570 - 32.6

Perfect cross bond 570 - 0

11 kV 1C 500

33 kV 1C 630

1

2

Page 45: SESSION 12: MV UNDERGROUND CABLE SYSTEM … 12 - TNB...Hosted by: Organized by: 1 SESSION 12: MV UNDERGROUND CABLE SYSTEM – TNB’S EXPERIENCE by Ir. C. H. TAN • Development of

Hosted by: Organized by:

45

Laying of Single Core Cables

Flat Formation Trefoil Formation

•Higher Ampacity (Flat non

touching)

•Voltage unbalance must kept

<2%

•Need to transpose core at each

cross bonding joint

•Lower Ampacity

•No voltage unbalance

•No need for core transpose at

cross bonding joint

•Simple and easy to manage

•No confusion during fault

location

Page 46: SESSION 12: MV UNDERGROUND CABLE SYSTEM … 12 - TNB...Hosted by: Organized by: 1 SESSION 12: MV UNDERGROUND CABLE SYSTEM – TNB’S EXPERIENCE by Ir. C. H. TAN • Development of

Hosted by: Organized by:

46

Do not lay single core cable in GI pipe !

Page 47: SESSION 12: MV UNDERGROUND CABLE SYSTEM … 12 - TNB...Hosted by: Organized by: 1 SESSION 12: MV UNDERGROUND CABLE SYSTEM – TNB’S EXPERIENCE by Ir. C. H. TAN • Development of

Hosted by: Organized by:

47

Flat formation with Core Transposition & Cross

Bonding

Page 48: SESSION 12: MV UNDERGROUND CABLE SYSTEM … 12 - TNB...Hosted by: Organized by: 1 SESSION 12: MV UNDERGROUND CABLE SYSTEM – TNB’S EXPERIENCE by Ir. C. H. TAN • Development of

Hosted by: Organized by:

48

Trefoil formation with cross bonding

Page 49: SESSION 12: MV UNDERGROUND CABLE SYSTEM … 12 - TNB...Hosted by: Organized by: 1 SESSION 12: MV UNDERGROUND CABLE SYSTEM – TNB’S EXPERIENCE by Ir. C. H. TAN • Development of

Hosted by: Organized by:

49

Cross Bonding Joint & Link Box

Page 50: SESSION 12: MV UNDERGROUND CABLE SYSTEM … 12 - TNB...Hosted by: Organized by: 1 SESSION 12: MV UNDERGROUND CABLE SYSTEM – TNB’S EXPERIENCE by Ir. C. H. TAN • Development of

Hosted by: Organized by:

50

Link Box

33kV Link Box

Page 51: SESSION 12: MV UNDERGROUND CABLE SYSTEM … 12 - TNB...Hosted by: Organized by: 1 SESSION 12: MV UNDERGROUND CABLE SYSTEM – TNB’S EXPERIENCE by Ir. C. H. TAN • Development of

Hosted by: Organized by:

51

Link Box

11&22kV Link Box

Page 52: SESSION 12: MV UNDERGROUND CABLE SYSTEM … 12 - TNB...Hosted by: Organized by: 1 SESSION 12: MV UNDERGROUND CABLE SYSTEM – TNB’S EXPERIENCE by Ir. C. H. TAN • Development of

Hosted by: Organized by:

52

Single Core Cable Maintenance Test

Sheath Voltage & Current Measurment

Page 53: SESSION 12: MV UNDERGROUND CABLE SYSTEM … 12 - TNB...Hosted by: Organized by: 1 SESSION 12: MV UNDERGROUND CABLE SYSTEM – TNB’S EXPERIENCE by Ir. C. H. TAN • Development of

Hosted by: Organized by:

53

TNB’s MV System Breakdown Statistic

1613, 12%

3880, 29% 7935, 59%

Overhead Substation Underground

MV INTERRUPTIONS BY COMPONENTS FOR FY 0910

Underground System contributes 59% of MV Interruptions

Page 54: SESSION 12: MV UNDERGROUND CABLE SYSTEM … 12 - TNB...Hosted by: Organized by: 1 SESSION 12: MV UNDERGROUND CABLE SYSTEM – TNB’S EXPERIENCE by Ir. C. H. TAN • Development of

Hosted by: Organized by:

54

MVUG Cable Failure FY2010/2011

3299, 42%

2868, 36%

787, 10%

980, 12%

Cable Joint Termination Third Party

Page 55: SESSION 12: MV UNDERGROUND CABLE SYSTEM … 12 - TNB...Hosted by: Organized by: 1 SESSION 12: MV UNDERGROUND CABLE SYSTEM – TNB’S EXPERIENCE by Ir. C. H. TAN • Development of

Hosted by: Organized by:

55

Page 56: SESSION 12: MV UNDERGROUND CABLE SYSTEM … 12 - TNB...Hosted by: Organized by: 1 SESSION 12: MV UNDERGROUND CABLE SYSTEM – TNB’S EXPERIENCE by Ir. C. H. TAN • Development of

Hosted by: Organized by:

56

TNB MVUG Cable Maintenance Practices

• Maintenance required for MVUG cable?

– 3 cores cable

– 1 core cable

• What maintenance do you do for MVUG cable

system?

Page 57: SESSION 12: MV UNDERGROUND CABLE SYSTEM … 12 - TNB...Hosted by: Organized by: 1 SESSION 12: MV UNDERGROUND CABLE SYSTEM – TNB’S EXPERIENCE by Ir. C. H. TAN • Development of

Hosted by: Organized by:

57

TNB MVUG Cable Maintenance Practices

• Insulation integrity

• Sheath Integrity

• Connection Integrity

• Tier 1 (common test)

• Tier 2 (Special test)

Page 58: SESSION 12: MV UNDERGROUND CABLE SYSTEM … 12 - TNB...Hosted by: Organized by: 1 SESSION 12: MV UNDERGROUND CABLE SYSTEM – TNB’S EXPERIENCE by Ir. C. H. TAN • Development of

Hosted by: Organized by:

58

TNB MVUG Cable Maintenance Practices

• Insulation Integrity

– IR, PI , DAR – Tier 1

– Tan Delta – Tier 2

– PD Mapping –Tier 2

– Dielectric Spectroscopy – Tier 2

– HVDC* - Tier 1 (PILC)

Page 59: SESSION 12: MV UNDERGROUND CABLE SYSTEM … 12 - TNB...Hosted by: Organized by: 1 SESSION 12: MV UNDERGROUND CABLE SYSTEM – TNB’S EXPERIENCE by Ir. C. H. TAN • Development of

Hosted by: Organized by:

59

TNB MVUG Cable Maintenance Practices

• Sheath Integrity

– Sheath test – Tier 1

• Commissioning

• Maintenance (In service)

• After repair

• Connection Integrity

– Contact resistance – Tier 1

• New & after repair (connector)

• Thermography (Bad contact)

Page 60: SESSION 12: MV UNDERGROUND CABLE SYSTEM … 12 - TNB...Hosted by: Organized by: 1 SESSION 12: MV UNDERGROUND CABLE SYSTEM – TNB’S EXPERIENCE by Ir. C. H. TAN • Development of

Hosted by: Organized by:

60

Condition Monitoring

Technologies XLPE PILC LV

Purpose Technologies 1Commissio

ning

2In-

Service

3After

Repair

Commission

ing

In-

Service

After

Repair

Commission

ing

In-

Service

After

Repair

Insulation

Integrity

Insulation

Resistance

PI test

DAR test

Tan-delta

Partial

Discharge

Mapping

Dielectric

Spectroscopy

HVDC 4

Page 61: SESSION 12: MV UNDERGROUND CABLE SYSTEM … 12 - TNB...Hosted by: Organized by: 1 SESSION 12: MV UNDERGROUND CABLE SYSTEM – TNB’S EXPERIENCE by Ir. C. H. TAN • Development of

Hosted by: Organized by:

61

Condition Monitoring

Technologies XLPE PILC LV

Purpose Technologies 1Commi

ssioning

2In-

Service

3After

Repair

Commi

ssioning

In-

Service

After

Repair

Commis

sioning

In-

Service

After

Repair

Sheath

Integrity5

HVDC Sheath

Test 6

Integrity of

Connections

Contact

Resistance Test

Metallic Sheath

Continuity

Thermography

Page 62: SESSION 12: MV UNDERGROUND CABLE SYSTEM … 12 - TNB...Hosted by: Organized by: 1 SESSION 12: MV UNDERGROUND CABLE SYSTEM – TNB’S EXPERIENCE by Ir. C. H. TAN • Development of

Hosted by: Organized by:

62

Insulation Resistance Test (IR)

This test is done on cables at regular interval of 24

months for MV cables and 60 months for LV cables

under normal condition. This test results are considered

for condition assessment while the cable is in service.

Page 63: SESSION 12: MV UNDERGROUND CABLE SYSTEM … 12 - TNB...Hosted by: Organized by: 1 SESSION 12: MV UNDERGROUND CABLE SYSTEM – TNB’S EXPERIENCE by Ir. C. H. TAN • Development of

Hosted by: Organized by:

63

Insulation Resistance Test (IR)

• Insulation Resistance Test

is the specific resistivity of the cable insulation

(Ωm)

is the length of cable (m)

is the external radii of insulation

is the internal radii of insulation

•Insulation resistance is temperature sensitive

•Long test time is needed to allow for charging current to ceased

•Reading is length dependent

•Difficult to make decision

Page 64: SESSION 12: MV UNDERGROUND CABLE SYSTEM … 12 - TNB...Hosted by: Organized by: 1 SESSION 12: MV UNDERGROUND CABLE SYSTEM – TNB’S EXPERIENCE by Ir. C. H. TAN • Development of

Hosted by: Organized by:

64

Insulation Resistance Test (IR)

Page 65: SESSION 12: MV UNDERGROUND CABLE SYSTEM … 12 - TNB...Hosted by: Organized by: 1 SESSION 12: MV UNDERGROUND CABLE SYSTEM – TNB’S EXPERIENCE by Ir. C. H. TAN • Development of

Hosted by: Organized by:

65

Insulation Resistance Test (IR)

PI = Polarization Index = R10 / R1

Insulation resistance measurement values are recorded at 1

minute and 10 minutes of voltage application.

The ratio at 10 minutes to 1 minute will determine the

polarization index value.

Page 66: SESSION 12: MV UNDERGROUND CABLE SYSTEM … 12 - TNB...Hosted by: Organized by: 1 SESSION 12: MV UNDERGROUND CABLE SYSTEM – TNB’S EXPERIENCE by Ir. C. H. TAN • Development of

Hosted by: Organized by:

66

Results Classification Action

PI value ≥ 3.0

Excellent

Normal. The monitoring periodicity of 24

months for MV cables and 60 months for

LV cables can be maintained.

1.5< PI value < 3.0

Good

The monitoring periodicity should be

revised to 6 months for MV cables and 24

months for LV cables.

1.0< PI value < 1.5

Moderate

The monitoring periodicity should be

revised to 3 months for MV cables and 12

months for LV cables.

PI value < 1.0

Bad / Dangerous

Remove the Cable from service and

perform Tier 2 tests (if applicable)

immediately for MV cable. Replace LV

cables.

Page 67: SESSION 12: MV UNDERGROUND CABLE SYSTEM … 12 - TNB...Hosted by: Organized by: 1 SESSION 12: MV UNDERGROUND CABLE SYSTEM – TNB’S EXPERIENCE by Ir. C. H. TAN • Development of

Hosted by: Organized by:

67

Insulation Resistance Test (IR)

DAR = Dielectric Absorption Ratio = R60 / R30

Insulation resistance measurement values are recorded at 30

second and 60 second of voltage application.

The ratio at 60 Second to 30 second will determine the

Dielectric Absorption Ratio value.

Page 68: SESSION 12: MV UNDERGROUND CABLE SYSTEM … 12 - TNB...Hosted by: Organized by: 1 SESSION 12: MV UNDERGROUND CABLE SYSTEM – TNB’S EXPERIENCE by Ir. C. H. TAN • Development of

Hosted by: Organized by:

68

Results Classification Action

DAR value ≥ 1.6

Excellent

Normal. The monitoring periodicity

of 24 months for MV cables and 60

months for LV cables can be

maintained.

1.< DAR value <

1.5

Good

The monitoring periodicity should

be revised to 6 months for MV

cables and 24 months for LV cables.

1.0 < DAR value <

1.1

Moderate

The monitoring periodicity should

be revised to 3 months for MV

cables and 12 months for LV cables.

DAR value < 1.0

Bad / Dangerous

Remove the Cable from service and

perform Tier 2 tests (if applicable)

immediately for MV cable. Replace

LV cables.

Page 69: SESSION 12: MV UNDERGROUND CABLE SYSTEM … 12 - TNB...Hosted by: Organized by: 1 SESSION 12: MV UNDERGROUND CABLE SYSTEM – TNB’S EXPERIENCE by Ir. C. H. TAN • Development of

Hosted by: Organized by:

69

Tangent Delta (Tan ∂) Test

This test is done on cables at regular interval of 24 months

under normal condition. This test results are considered for

condition assessment while the cable is in service.

Page 70: SESSION 12: MV UNDERGROUND CABLE SYSTEM … 12 - TNB...Hosted by: Organized by: 1 SESSION 12: MV UNDERGROUND CABLE SYSTEM – TNB’S EXPERIENCE by Ir. C. H. TAN • Development of

Hosted by: Organized by:

70

Results Action

XLPE:

tan δ (2 U0) < 1.2 E-3 and

[tan δ (2 U0) - tan δ (U0)] < 0.6 E-3

PILC:

tan δ (50Hz) < 2.3 E-3

Normal. The monitoring periodicity of all Tier 1 tests

can be maintained at 24 months. Practice Tan delta

test if necessary.

XLPE:

1.2 E-3 ≥ tan δ (2 U0) < 2.2 E-3 and

0.6 E-3 ≥ [tan δ (2 U0) - tan δ (U0)] < 1.0 E-3

PILC:

2.3 E-3 < tan δ (50Hz) < 3.0 E-3

Retest the cable for Tan delta test after 6 months.

The monitoring periodicity of all Tier 1 tests should

be revised to 6 months.

XLPE:

2.2 E-3 ≥ tan δ (2 U0) < 2.8 E-3 and

1.0 E-3 ≥ [tan δ (2 U0) - tan δ (U0)] < 1.5 E-3

PILC:

3.0 E-3 < tan δ (50Hz) < 3.5 E-3

Retest the cable for Tan delta test after 3 months.

Arrange for replacement of defective section(s).

XLPE:

tan δ (2 U0) ≥ 2.8 E-3 or

[tan δ (2 U0) - tan δ (U0)] ≥ 1.5 E-3

PILC:

tan δ (50Hz) ≥ 3.5 E-3

Indicates serious problem requiring immediate

evaluation, additional testing and consultation with

experts. Recommendation is to remove from service

immediately and replace the cable..

Page 71: SESSION 12: MV UNDERGROUND CABLE SYSTEM … 12 - TNB...Hosted by: Organized by: 1 SESSION 12: MV UNDERGROUND CABLE SYSTEM – TNB’S EXPERIENCE by Ir. C. H. TAN • Development of

Hosted by: Organized by:

71

Tan ∂ Measurement

Page 72: SESSION 12: MV UNDERGROUND CABLE SYSTEM … 12 - TNB...Hosted by: Organized by: 1 SESSION 12: MV UNDERGROUND CABLE SYSTEM – TNB’S EXPERIENCE by Ir. C. H. TAN • Development of

Hosted by: Organized by:

72

PD Mapping

High Voltage Part Operator Desk

Page 73: SESSION 12: MV UNDERGROUND CABLE SYSTEM … 12 - TNB...Hosted by: Organized by: 1 SESSION 12: MV UNDERGROUND CABLE SYSTEM – TNB’S EXPERIENCE by Ir. C. H. TAN • Development of

Hosted by: Organized by:

73

Page 74: SESSION 12: MV UNDERGROUND CABLE SYSTEM … 12 - TNB...Hosted by: Organized by: 1 SESSION 12: MV UNDERGROUND CABLE SYSTEM – TNB’S EXPERIENCE by Ir. C. H. TAN • Development of

Hosted by: Organized by:

74

Joint

Page 75: SESSION 12: MV UNDERGROUND CABLE SYSTEM … 12 - TNB...Hosted by: Organized by: 1 SESSION 12: MV UNDERGROUND CABLE SYSTEM – TNB’S EXPERIENCE by Ir. C. H. TAN • Development of

Hosted by: Organized by:

75

PD Mapping

Results Action

Severity Index < 2 Normal. The monitoring periodicity of all Tier 1 tests can be maintained

at 24 months. Practice partial discharge test if necessary.

2 < Severity Index < 5 Retest the cable for partial discharge after 6 months. The monitoring

periodicity of all Tier 1 tests should be revised to 6 months.

5 < Severity Index < 7 Retest the cable for partial discharge after 3 months. Arrange for

replacement of defective section(s).

Severity Index > 7 Indicates serious problem requiring immediate evaluation, additional

testing and consultation with experts. Recommendation is to remove from

service immediately and replace the cable.

Page 76: SESSION 12: MV UNDERGROUND CABLE SYSTEM … 12 - TNB...Hosted by: Organized by: 1 SESSION 12: MV UNDERGROUND CABLE SYSTEM – TNB’S EXPERIENCE by Ir. C. H. TAN • Development of

Hosted by: Organized by:

76

Sheath Integrity Test

Page 77: SESSION 12: MV UNDERGROUND CABLE SYSTEM … 12 - TNB...Hosted by: Organized by: 1 SESSION 12: MV UNDERGROUND CABLE SYSTEM – TNB’S EXPERIENCE by Ir. C. H. TAN • Development of

Hosted by: Organized by:

77

VLF Withstand Test

• Replacement test system for HV DC for XLPE cables

• Destructive test

• To proactively flush out weak spot in cable system

• Also used as High Voltage Source for PD Mapping

Page 78: SESSION 12: MV UNDERGROUND CABLE SYSTEM … 12 - TNB...Hosted by: Organized by: 1 SESSION 12: MV UNDERGROUND CABLE SYSTEM – TNB’S EXPERIENCE by Ir. C. H. TAN • Development of

Hosted by: Organized by:

78

VLF Withstand Test

Before 2007

• Commissioning Test &

• Routine Maintenance Test

– Test Voltage 3Uo

– Test Duration 60 min

– Test Frequency 0.1Hz, 0.05Hz, 0.02Hz

Page 79: SESSION 12: MV UNDERGROUND CABLE SYSTEM … 12 - TNB...Hosted by: Organized by: 1 SESSION 12: MV UNDERGROUND CABLE SYSTEM – TNB’S EXPERIENCE by Ir. C. H. TAN • Development of

Hosted by: Organized by:

79

VLF Withstand Test

Since 2007/8

• Commissioning Test

– New cables

• Test voltage 2.0Uo

• Test duration 30min

• Test Frequency 0.1Hz

– After fault repaired

• Test voltage 1.6Uo

• Test duration 15min

• Test Frequency 0.1Hz

Alternative to VLF Withstand

Test – 24 hour system voltage

SOAK Test

Page 80: SESSION 12: MV UNDERGROUND CABLE SYSTEM … 12 - TNB...Hosted by: Organized by: 1 SESSION 12: MV UNDERGROUND CABLE SYSTEM – TNB’S EXPERIENCE by Ir. C. H. TAN • Development of

Hosted by: Organized by:

80

Page 81: SESSION 12: MV UNDERGROUND CABLE SYSTEM … 12 - TNB...Hosted by: Organized by: 1 SESSION 12: MV UNDERGROUND CABLE SYSTEM – TNB’S EXPERIENCE by Ir. C. H. TAN • Development of

Hosted by: Organized by:

81

Page 82: SESSION 12: MV UNDERGROUND CABLE SYSTEM … 12 - TNB...Hosted by: Organized by: 1 SESSION 12: MV UNDERGROUND CABLE SYSTEM – TNB’S EXPERIENCE by Ir. C. H. TAN • Development of

Hosted by: Organized by:

82

TNB’s Experience

Duration

(Minutes)

Nos. of failure %

0-12 1472 67.62

13-30 496 21.54

31-45 129 5.93

46-60 107 4.92

Page 83: SESSION 12: MV UNDERGROUND CABLE SYSTEM … 12 - TNB...Hosted by: Organized by: 1 SESSION 12: MV UNDERGROUND CABLE SYSTEM – TNB’S EXPERIENCE by Ir. C. H. TAN • Development of

Hosted by: Organized by:

83

IEEE Std 400.2–2004

IEEE Guide for Field Testing of Shielded Power Cable Systems Using

Very Low Frequency (VLF)

• The results of field tests on over 15000 XLPE cable circuits

tested showed that ~68% of the recorded failures occurred

within 12 minutes, ~89% within 30 minutes, ~95% after 45

minutes, and 100% after 60 minutes (Moh [B17]).

• The recommended testing time varies between 15 and 60

minutes, although the data in Moh [B17] suggest a testing

time of 30 minutes.

Page 84: SESSION 12: MV UNDERGROUND CABLE SYSTEM … 12 - TNB...Hosted by: Organized by: 1 SESSION 12: MV UNDERGROUND CABLE SYSTEM – TNB’S EXPERIENCE by Ir. C. H. TAN • Development of

Hosted by: Organized by:

84

Future Development

• Cable Design & Construction

– Tree Retardant (TR-XLPE)

– Stringent requirement on insulation compound cleanliness

– Strict requirement on eccentricity of cable core

– Fully bonded insulation screen

– Water tight cable construction

Page 85: SESSION 12: MV UNDERGROUND CABLE SYSTEM … 12 - TNB...Hosted by: Organized by: 1 SESSION 12: MV UNDERGROUND CABLE SYSTEM – TNB’S EXPERIENCE by Ir. C. H. TAN • Development of

Hosted by: Organized by:

85

Future Development

• Cable Operation & Maintenance

– Sheath Integrity test for 3 core cables

– Advance CBM diagnostic test

• On-line PD Detection & Location

– Monitoring of Water Tree in MVUG Cables

• Dielectric Spectroscopy test

• Polarization & Depolarization Current Measurement

Page 86: SESSION 12: MV UNDERGROUND CABLE SYSTEM … 12 - TNB...Hosted by: Organized by: 1 SESSION 12: MV UNDERGROUND CABLE SYSTEM – TNB’S EXPERIENCE by Ir. C. H. TAN • Development of

Hosted by: Organized by:

86

Dielectric Spectroscopy

Page 87: SESSION 12: MV UNDERGROUND CABLE SYSTEM … 12 - TNB...Hosted by: Organized by: 1 SESSION 12: MV UNDERGROUND CABLE SYSTEM – TNB’S EXPERIENCE by Ir. C. H. TAN • Development of

Hosted by: Organized by:

87

Dielectric Spectroscopy (DS) Test

Page 88: SESSION 12: MV UNDERGROUND CABLE SYSTEM … 12 - TNB...Hosted by: Organized by: 1 SESSION 12: MV UNDERGROUND CABLE SYSTEM – TNB’S EXPERIENCE by Ir. C. H. TAN • Development of

Hosted by: Organized by:

88

Conclusion

• TNB continuously seek to improve its MVUG cable system performance via

– Improve quality of cable and its accessories

– Adopt new Accessories technology

– Adopt new methodology for

• Installation method

• Condition based maintenance practice

• New diagnostic tools

Page 89: SESSION 12: MV UNDERGROUND CABLE SYSTEM … 12 - TNB...Hosted by: Organized by: 1 SESSION 12: MV UNDERGROUND CABLE SYSTEM – TNB’S EXPERIENCE by Ir. C. H. TAN • Development of