Session 1: Progress and Status of Implementation and Standardisation CASCADE & RFG. ASAS-TN2 5 th Workshop Toulouse 17 September 2007 Jörg Steinleitner CASCADE Infrastructure WP Leader, EUROCONTROL. European Organisation for the Safety of Air Navigation. Overview. CASCADE Programme: - PowerPoint PPT Presentation
Citation preview
Session 1: Progress and Status of Implementation and Standardisation
CASCADE & RFG
ASAS-TN2 5th WorkshopToulouse17 September 2007
Jörg Steinleitner
CASCADE Infrastructure WP Leader, EUROCONTROL
European Organisation for the Safety of Air Navigation
Overview
CASCADE Programme: Scope, Implementation Policy, Worldwide Co-ordination
CASCADE Validation: Status: ADS-B out & ADS-B in, Pioneer Airlines, Monitoring
Requirements Focus Group: Within CASCADE, Status, Planning
Timeline: Standardisation, Certification, Rulemaking
CASCADE Programme
CASCADE Scope
Ground Surveillance Applications (ADS-B-out)
ADS-B Receiver
In a non-radar environment In a radar environment On the airport surface Airborne Derived Data
Airborne Surveillance Applications (ADS-B-in & TIS-B) Situational awareness on the surface Airborne situational awareness Visual separation on approach In Trail Procedure
20082008
20112011
The Bigger Picture
2015
IR based implementation
in wider areas
upgraded equipage
voluntary implementation
in pocket areas
certified existing equipage
The ADS-B Implementation Policy
ADS-B in other ContinentsWorldwide Co-ordination
CASCADE Validation
First “ADS-B out” Implementation Sites
• LVNL (Netherlands) implements ADS-B NRA with WAM (2009 in N. Sea)
• LFV Sweden implements
•ADS-B NRA (2008, Kiruna)
•ADS-B RAD (2009, Ostgota)
• 7 ANSPs (CRISTAL MED:Cyprus, France, Greece, Italy, Malta, Portugal, Turkey) validate ADS-B NRA & RAD towards implementation decision by 2008
• DFS has included ADS-B (and WAM) in its SUR Strategy
•Target date is 2015
ADS-B-in: Emerging implementation
CRISTAL ATSAW (simulations of ATSA VSA, SURF, AIRB) to be completed in Oct 2007
CRISTAL ITP (simulations and trial in N. Atlantic) ongoing
CRISTAL Germany (TIS-B feasibility for ATSAW) ongoing
CRISTAL Sweden (ATSAW trials for GA) completed:
Implementation by 2009 (Ostgota)
Certification target date: 2009
ADS-B Implementation Roadmap
2007 2008 2009 2010 2011
ADS-B-NRA Pre-ops Validation Implementation
ADS-B-RADATSAW-VSAATSAW-ITP
Initial Validation Pre-ops Validation Implementation
ADS-B-APTADS-B-ADD
ATSAW-AIRBATSAW-SURF
Initial Validation Pre-ops Validation Implementation
NRA: In Non-Radar AirspaceRAD: In Radar AirspaceVSA: Visual Separation on ApproachITP: In Trail Procedure
APT or SURF: On the Airport SurfaceADD: Aircraft Derived Data for ground toolsAIRB: During flight operations
ADS-B Pioneer Airline ProjectTarget: “ADS-B out” Certification
17 Airlines - 400 Aircraft – 500.000+ flights/year
Pioneer Airline ProjectMonitoring & Certification
Airworthiness Approval
AvionicsVendors
Airframers
Airlines
CASCADE Avionics
Design
Statistical
Evidence
Possibly supporting means of compliance demonstration
(in-flight statistics)
Primary means of compliance demonstration(design assurance, tests)
Timeline
D3: 1st PioneersCertified
EASA AMCJAA NPAED-126 EASA NPA
NPA: Notice of Proposed AmendmentAMC: Acceptable Means of Compliance
Comments Deadline: 7 Sep
2006 2007 2008Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan
D1: high-levelfleet info
D2: detailedfleet info
Certification Application
“ADS-B Certification Workshop”
21+22 Nov in Palma
(hosted by Air Europa)
Requirements Focus Group
High-level RFG Planning
Dec 06 Apr 07 Aug 07 Dec 07 Apr 08 Aug 08 Dec 08 Apr 09 Aug 09
ADS-B-NRA (ED-126, DO-303)Enhanced ATS in Non-Radar Areas
TBD:• ASPA-S&M Enhanced Sequencing & Merging Operations (advanced as background task – feasibility check in Jan 08)• ADS-B-ADD – Aircraft Derived Data for Ground Tools
ADS-B-RADATSA-ITPATSA-VSAADS-B-RAD: Enhanced ATS in Radar Areas
ATSA-ITP: In-trail Procedure in Oceanic AirspaceATSA-VSA: Enhanced Visual Separation on Approach
ADS-B-APTATSA-AIRBATSA-SURFATSA-APT: Airport Surface Surveillance
ATSA-AIRB: Enhanced TSA During Flight OperationsATSA-SURF: Enhanced TSA on the Airport Surface
Application StatusADS-B-RAD, ATSA-VSA & ATSA-ITP
OSEDs are “frozen”: Apart from ATSA-VSA “enhanced procedure”
Assessments are concluding: Safety (incl. surveillance risk modelling), Performance & Interoperability
SPR/INTEROP document Integration to commence Critical step to facilitate wider review
Target dates for EUROCAE/RTCA approval: ATSA-ITP – April 2008 ATSA-VSA – April 2008 (tbc) ADS-B-RAD – July 2008
RFG – 2007/2008 Meetings
Week of 15 October 2007 (Europe, Toulouse)
Week of 21 January 2008 (USA, Melbourne)
Week of 07 April 2008 (Europe, Brussels)
Overall Timeline:Standardisation, Certification & Rulemaking
Overall Timeline:Standardisation, Certification & Rulemaking Overall Timeline:
Standardisation, Certification & SES Rulemaking
RFG SPR/INTEROP
RAD,VSA, ITP
APT, other ?AIRB, SURF
FAATSO C166A
>20152008 2009 2010 2011 2012<2007
Implementation
EC SES IRRulemaking
EUROCAE/RTCA1090 ES Transponder MOPS
NRA
EASA/FAA(E)TSO-166x
Towards Joint Transponder TSO
EASA‘RFG’ AMC
ED102/DO260DO260A
EASANRA AMC EASA/FAA
Rulemaking
Initial Implementations – Pioneer Phase
existingavionics
ADS-B out Mandate
avionicsupgrade
SPI IRMoC
ED102ADO260A+
Towards Joint MOPS
INTEROPValidation
ADS-B in (voluntary)
Summary
“ADS-B” out rulemaking on its way
World-wide co-ordination
ADS-B Pioneer Airlines & Monitoring Projects …
… ED102/DO260 certification for early deployment
RFG key to rulemaking baseline
Thanks
Backup
Scope of ADS-B Airborne Monitoring 1090 ES “ADS-B out“
Extended Squitter
BDS 0,5BDS 0,8
(BDS 0.9)(BDS 6,1)(BDS 6,5)
TransponderControl Panel
Callsign SPI-ES
GNSS
PositionHPL
HFOMVelocity
BarometricAltimeter
FL
Mode STransponder24-bit addressNUC-NIC/NAC
Consistency(Mode A/C/S)
Consistency(Performance)
Correctness
PerformanceAnalysis
(incl. latency)
ALL:“counting” statistics
RFG within the CASCADE Context
ASA/GSASPR-INTEROP
Simulations, Trials &
Monitoring
Procedures
ATC ManualAircrew Manual
Ground Infrastructure
Avionics
SystemStandards
PreliminarySafety Case
EASA & JAARegulation
Airworthiness Approval
Operational Approval
EC SESRegulation