Company Profile

● Largest Mexican EPC integrated services company

● Permanent association between ICA and Fluor

● Full support from parents

● EPC proven experience:

22 years of operations

Over 190 projects executed

95% LS or LSTK

● Solid Finances

● Safety & Quality leader

Proven world-class project execution capabilities in the Mexico / Central America / Caribbean region

Page 3: Sergio Oviedo - ICA Fluor Mexico

FEL,

FEE

D

Engi

neer

ing

Proc

urem

ent

Mod

ular

Fabr

icat

ion

Con

stru

ctio

n

Com

mis

sion

ing

&

Sta

rt-U

p

Ope

ratio

ns

& M

aint

enan

ce

Project Services

Full in-house capabilities Seamless transitions in all phases

Risk Management Certainty in the results

Page 4: Sergio Oviedo - ICA Fluor Mexico

HSE Performance

Unmatched performance

comparable with Global Industry

Leaders

Page 5: Sergio Oviedo - ICA Fluor Mexico

Worldwide Network

Safety • Integrity • Teamwork • Excellence

Calgary

Vancouver

San Francisco

Long Beach

Mexico City

San Juan

Johannesburg

Perth

Melbourne Buenos Aires

Abu Dhabi

Singapore

New Delhi London

Gliwice Antwerp Bergen-op-Zoom Rotterdam Haarlem

Santiago

Moscow

Pittsburgh

Washington, D.C.

Lima

Al Khobar

Kuwait

Beijing

Shanghai

Richland

Gardena

Greenville

Arlington

Charlotte

Jakarta

Manila

Houston

Asturias

Aliso Viejo

Dallas

Austin

Baton Rouge

Trinidad

corporate offices major offices

Madrid

Tarragona

Farnborough

Dublin

Brisbane

Caracas

Sao Paolo

Page 6: Sergio Oviedo - ICA Fluor Mexico

Industry Sectors

Gas

Pro

cess

ing

Ref

inin

g

Pow

er

Min

ing

& M

etal

s

Mod

ular

izat

ion

Pip

elin

es

LNG

Che

mic

als

Pet

roch

emic

als

Page 7: Sergio Oviedo - ICA Fluor Mexico

12+ million engineering man-hours during the last 15 years

Relevant Experience with Pemex

Page 8: Sergio Oviedo - ICA Fluor Mexico

Fabrication Yards

● Two fabrication yards:

Mata Redonda – 23,000 MT/yr

El Empalme – 20,000 MT/yr

● Located on the Pánuco River

● Direct access to the Gulf of Mexico Port of Altamira

El Empalme

Tampico

Mata Redonda

Page 9: Sergio Oviedo - ICA Fluor Mexico

Mata Redonda Fabrication Yard

Page 10: Sergio Oviedo - ICA Fluor Mexico

El Empalme Fabrication Yard

Page 11: Sergio Oviedo - ICA Fluor Mexico

51 process & interconnection modules Integration pipe racks (coke, sulfur recovery and diesel) 50 to 450 tons Up to 100 X 30 X 42 ft

Marathon Detroit Heavy Oil Upgrade Program

Scope: Basic & Detailed Engineering, Procurement Services and Fabrication

Execution period: Aug 2009 – Sep 2010

Page 12: Sergio Oviedo - ICA Fluor Mexico

Jacket Substructure: 6,000 Ton Deck Superstructure: 2,400 Ton Piles: 3,350 Ton Pemex’s largest offshore structure:

132 m deep draft

Scope: EPC, pre commissioning, load out and sea fastening

Execution period May 2012 – December 2014

Ayatsil C Drilling Platform

Page 13: Sergio Oviedo - ICA Fluor Mexico

Jacket Substructure Deck Superstructure PDMS Model

Scope: EPC, pre commissioning, load out and sea fastening

Execution period October 2010 - April 2012

Tsimin B Drilling Platform