SERBIA
The Company’s Biography• ”ML System” Ltd. was founded in 1992 with head office in Kragujevac, Serbia and it is 100%
private ownership.• The main field of work of our company is design and construction of thermo-technical installations,
ventilation, air-conditioning, gas installations, electrical installations, sprinkler installations,plumbing installations and all kind of steel constructions (production and mounting).
• In recent years we have worked with a number of investors and contractors, including: “MercuryEngineering” – Belgrade (GTC Blok 19a - Belgrade), “TPV Šumadija” - Kragujevac (car partsplant in Kragujevac), “NIS Energogas” - Belgrade (now “Srbijagas” – gas installations),“Montaža” a.d. - Belgrade (shopping center in Kragujevac), “Fund for Building and Roads ofMunicipality Velika Plana” - Velika Plana (city gas boiler room, district heating pipeline),“Stekos Inteko” - Smederevo (business and shopping center in Kragujevac, residental building inSmederevo), “Evaco International” – Belgrade (refrigerating units plant “Gorenje” in Valjevo),“Kronospan SRB” - Lapovo (plant in Lapovo), International Management Group (donationproject of Norway Kingdom), KRESTOTES Italy (Magneti Marelli plant in FIAT), FIAT Kragujevac(construction of factory in Kragujevac – various installations), INSO/Italiana Costruzioni (Clinicalcenter Nis – sprinkler and inergen installations)…
• We have 50 employers, among them there are 4 certified engineers and 12 certified welders.Furthermore we employ additional laborers, and also consultants depending on the quantity ofwork we are dealing with, as well as subcontractors.
• Our company owns all needed equipment, vertical platforms, forklifts, tools and transport vehiclesfor performance in our field of work.
• ”ML System” Ltd. was founded in 1992 with head office in Kragujevac, Serbia and it is 100%private ownership.
• The main field of work of our company is design and construction of thermo-technical installations,ventilation, air-conditioning, gas installations, electrical installations, sprinkler installations,plumbing installations and all kind of steel constructions (production and mounting).
• In recent years we have worked with a number of investors and contractors, including: “MercuryEngineering” – Belgrade (GTC Blok 19a - Belgrade), “TPV Šumadija” - Kragujevac (car partsplant in Kragujevac), “NIS Energogas” - Belgrade (now “Srbijagas” – gas installations),“Montaža” a.d. - Belgrade (shopping center in Kragujevac), “Fund for Building and Roads ofMunicipality Velika Plana” - Velika Plana (city gas boiler room, district heating pipeline),“Stekos Inteko” - Smederevo (business and shopping center in Kragujevac, residental building inSmederevo), “Evaco International” – Belgrade (refrigerating units plant “Gorenje” in Valjevo),“Kronospan SRB” - Lapovo (plant in Lapovo), International Management Group (donationproject of Norway Kingdom), KRESTOTES Italy (Magneti Marelli plant in FIAT), FIAT Kragujevac(construction of factory in Kragujevac – various installations), INSO/Italiana Costruzioni (Clinicalcenter Nis – sprinkler and inergen installations)…
• We have 50 employers, among them there are 4 certified engineers and 12 certified welders.Furthermore we employ additional laborers, and also consultants depending on the quantity ofwork we are dealing with, as well as subcontractors.
• Our company owns all needed equipment, vertical platforms, forklifts, tools and transport vehiclesfor performance in our field of work.
Basic Data
• Name: “ML System” Ltd
• Head office: Srbija, 34000 Kragujevac, 1 Hercegovačkih brigada street
• Phone/fax: +381 (0)34 63 00 098, 63 57 098, 334 558
• e-mail: [email protected], [email protected]
• web: www.mlsystem.co.rs
• Registrationnumber: 07931140
• TIN: 101576886
• Director: Nikola Lugomirski
• Mob.tel.: +381 (0)60 0 334 558
• Name: “ML System” Ltd
• Head office: Srbija, 34000 Kragujevac, 1 Hercegovačkih brigada street
• Phone/fax: +381 (0)34 63 00 098, 63 57 098, 334 558
• e-mail: [email protected], [email protected]
• web: www.mlsystem.co.rs
• Registrationnumber: 07931140
• TIN: 101576886
• Director: Nikola Lugomirski
• Mob.tel.: +381 (0)60 0 334 558
REFERENC LIST2007 - 2017
REFERENC LIST2007 - 2017
GTC Business ParkBelgrade
• GTC Business Park is situatedin Belgrade (Blok 19a) nearSava Centre and highway
• It contains of 2 businessbuildings with 10 floor high,block of apartments, 2 levelgarage
• Total area 60.000 m2
• GTC Business Park is situatedin Belgrade (Blok 19a) nearSava Centre and highway
• It contains of 2 businessbuildings with 10 floor high,block of apartments, 2 levelgarage
• Total area 60.000 m2
CHS – Central Heating Station
• In very tight place issituated central hittingroom capacity of 1.6 MW
• Owing to our engineersand chief manager wesucceed to assemble allthe equipment in smallroom
• In very tight place issituated central hittingroom capacity of 1.6 MW
• Owing to our engineersand chief manager wesucceed to assemble allthe equipment in smallroom
Heating and Cooling SubstationsBoilers, Fan Coil
• Mounting of nine heat substations withinstalled heat exchangers: 2x750 kW,2x1.175kW,
• Mounting of boilers for preparing of therunning water 3x5.000lit
• Mounting of two cooling substations withinstalled cooling machines 3x500kW and aheating pump 1x500kW
• Piping of warm and cold water in businesspremises, mounting, connecting and startingfan cool machines (cca 600 pieces)
• Piping of warm and returnable water forheating in residential area to the heat-metersin the hallways
• Mounting of nine heat substations withinstalled heat exchangers: 2x750 kW,2x1.175kW,
• Mounting of boilers for preparing of therunning water 3x5.000lit
• Mounting of two cooling substations withinstalled cooling machines 3x500kW and aheating pump 1x500kW
• Piping of warm and cold water in businesspremises, mounting, connecting and startingfan cool machines (cca 600 pieces)
• Piping of warm and returnable water forheating in residential area to the heat-metersin the hallways
Sprinkler installations in a two-level garagespace with three pump stations
Roda Centre - Kragujevac
Thermo technical installations: heating and cooling, heating substation1.6 MW, Cooling substation 1.8 MW, ventilation installation
TPV Šumadija – Kragujevaccar parts plant
Delivering of equipment and material and installationMECHANICAL and ELECTRICAL, on construction of factory for car-parts
production “TPV Šumadija” in Kragujevac
MAIN CITY BOILER ROOM – Velika Plana3x3 MW
Factory PIONIR – Paracinconfectionery industry
• Construction of natural gasinstallation in the factory,supply and installation ofmeasuring - regulation gasstations
Factory GORENJE – Valjevorefrigerating units industry “Gorenje” - Slovenia
• heavy oil installation• liquid gas installation• azoth installation• cyclopentane installation• isobutane installation• compressed air installation• mounting of the boiler room
• heavy oil installation• liquid gas installation• azoth installation• cyclopentane installation• isobutane installation• compressed air installation• mounting of the boiler room
Factory KRONOSPAN – Lapovowood refinement industry
• Thermotechnical-installationsof heating
• Gas boilers• Ventilation installation• Air conditioning installation• Compressed air
• Thermotechnical-installationsof heating
• Gas boilers• Ventilation installation• Air conditioning installation• Compressed air
DELTA PARK - Kragujevac
FIAT Automobili Srbija• Dismantling of HVAC installations in
building 1, 2, 3, 4, 5, 6, 7 and 10• Dismantling of electrical installations
in building 2, 6, 7 and 10• Dismantling of cooling station• Dismantling of conveyor belts in
basement of building 2 (press shop)
• Dismantling of HVAC installations inbuilding 1, 2, 3, 4, 5, 6, 7 and 10
• Dismantling of electrical installationsin building 2, 6, 7 and 10
• Dismantling of cooling station• Dismantling of conveyor belts in
basement of building 2 (press shop)
Dismantling of steel construction
Dismantling of cranetotal weight 46 t
Installation of bridge cranes CERRATO – 8 pc.
CPM – FIAT Installing of steel construction,ventilation system and platforms
Sprinkler system Building 5 (44000m2) – FIAT Automobili Srbija
Various works in FCA
FCA – Kragujevaccompressed air station
MAGNETI MARELLIMechanical installation
Electrical installation
PLANT ROOM
VESCOVINI GROUP Italy - SBE Serbia – Šabac
VOPACHEL SabacElectrical, mechanical and plumbing
MILANOVIC INZENJERINGInstalation of crane rails and cranes
CLINICAL CENTRE – NIŠsprinkler and inergen fire extinguishing systems
MAINTENANCE
Mintenace of cranes and cooling system in Press shop FAS
• Mintenace of cranes CERRATO;
• Maintenace of cooling system forelectrical panel boards;
• Maintenace of split system
ML SYSTEM – WORKSHOP
Manufacture and installation of fences, floor grilles and ducts
THANK YOU