Sequence of Events Recording for Kardia Power Station Greece Ian Loudon Omniflex International Marketing and Sales

Sequence of Events Recording for Kardia Power Station Greece Ian Loudon Omniflex International Marketing and Sales

Embed Size (px)

Citation preview

Sequence of Events Recording for Kardia Power Station Greece

Ian LoudonOmniflex International Marketing and Sales

Omniflex

► Omniflex South African Manufacturer of Industrial Electronic Products

► Founded 1965 as Conlog became Omniflex 1996

► 50% of Turnover exported► Sales Office JHB, UK, Australia Head

Office Durban► Wonderware and Sequence of Events

recording since 1988 ESKOM, Sasol, Natref

Introduction

This Project improves an ageing Coal Fired Power Station Root Cause Analysis by 90%

Kardia Power Station Greece

Agenda

IntroductionIntroductionIntroductionIntroduction

Project SolutionProject SolutionProject SolutionProject Solution

BenefitsBenefitsBenefitsBenefits

ConsiderationsConsiderationsConsiderationsConsiderations

SummarySummarySummarySummary

Kardia Power Station Greece

Up to 50% of Greece’s Electricity from Coal (Lignite)

6 Lignite Fired Stations

Agios DimitriosAmyntaioFlorinaKardiaMegalopolisPtolemais

How much coal is required to run a 100-watt light bulb 24 hours a day for a year?

Background to the Project

Location : GreeceOperator : Public Power CorpConfiguration : 4 X 300 MWOperation : Since 1975 ……Fuel : LigniteBoiler : Stein, Ganz-RockT/G supplier : Alstom, LMZ,

TeploenergoEPC: Zarubezhenergoproekt

T/G Turbine GeneratorEPC Engineering Procurement Construction

Business Objective

► Plant Optimization► Reduce Downtime► Effective Alarm Localization► Nuisance Alarm Identification► High Availability► Cost effective Solution

Operational Objectives

► Root Cause Analysis► Alarm History ► Local Alarm Indication► Fast and Reliable Event Capture► Redundancy of I/O Processors

Agenda

IntroductionIntroductionIntroductionIntroduction

Project SolutionProject SolutionProject SolutionProject Solution

BenefitsBenefitsBenefitsBenefits

ConsiderationsConsiderationsConsiderationsConsiderations

SummarySummarySummarySummary

Selection of Solution

► Local SI for Local Support► Wonderware SCADA selected for► Ease of configuration ► Minimal effort to integrate Date and Time

Stamp at source event streams through OPC server

Sequence of Events Recording System

System Implementation

► 960 Relay Contact Inputs COS monitoring► 960 Alarm Statuses Annunciated► Input discrimination to 200μseconds► Minimum Pulse Width 500μseconds► Time Stamping Accuracy 200μseconds

System Diagnostics

Historical Alarms

Alarm Summary

Time Synchronization

► GPS Station Time► OPC server Service

Controller Redundancy

► Dual Controller► Includes Queue Services

Topology

Field Inputs

Marsh

alling

Pan

elEthernet

Conet

CAN

SCADA

OPC

OPC

Modbus

Primary

Secondary

Disadvantages of Poll Response

Disadvantages of a poll/response network · Poll/Response uses %100 of available bandwidth.· The data "Transport" is the "Application". You can't break them apart.· One protocol for all field equipment limits deployment of new technology & impedes migration to new topologies.· It is not a "managed" network.· One-to-One data relationship between the Host and field equipment Master Slave

Producer Consumer Subscription

Producer eg SOE SystemMiddleware Message BrokerEg Queue Service

Consumer Application 1

Consumer Application 2

Consumer Application 3

Subscribe

Subscribe Publish

Advantages:•Network Traffic Minimized•Efficient use of Network Bandwidth•Multiple consumers

System Implementation

► In House Engineering and Testing and Configuration, SCADA, OPC, Maxiflex 1 week

► Local Panel Alarm Annunciators via Modbus RS485

► Wonderware SCADA Final Configuration On Site

► Copy Paste for Second System 2 Days In House Engineering and Testing

Agenda

IntroductionIntroductionIntroductionIntroduction

Project SolutionProject SolutionProject SolutionProject Solution

BenefitsBenefitsBenefitsBenefits

ConsiderationsConsiderationsConsiderationsConsiderations

SummarySummarySummarySummary

Benefits / Goals Achieved

► Plant Optimization ► Reduce Downtime ► Effective Alarm Localization ► Nuisance Alarm Identification ► High Availability

Benefits / Goals Achieved

► Root Cause Analysis ► Alarm History ► Local Alarm Indication ► Fast and Reliable Event Capture ► Redundancy of I/O Processors

Realised Benefits

► 90% improvement in Root cause analysis► 25% improvement in Generating Availability► 40 to 50% time saving in Maintenance► Huge Saving on Hard Wired Annunciation► Project Implementation Short► End User Empowerment on system usage,

migration and on going improvement► Rapid Deployment of next Generator

system

Agenda

IntroductionIntroductionIntroductionIntroduction

Project SolutionProject SolutionProject SolutionProject Solution

BenefitsBenefitsBenefitsBenefits

ConsiderationsConsiderationsConsiderationsConsiderations

SummarySummarySummarySummary

Lessons Learned

► Learn to Speak Greek ! Real Greek

► Partnering with local Wonderware SI’s essential► Preconfigured Wonderware for Front end

Hardware from Factory simplifies field work

Agenda

IntroductionIntroductionIntroductionIntroduction

Project SolutionProject SolutionProject SolutionProject Solution

BenefitsBenefitsBenefitsBenefits

ConsiderationsConsiderationsConsiderationsConsiderations

SummarySummarySummarySummary

Conclusions

► Wonderware was a good choice for seamless integration of Date and Time stamped events into an HMI for management of Alarm and Events.

► Wonderware Presence worldwide presented this opportunity for us from a South African and UK Base.

Project summary

► “The system works well and enables incidents to be tracked very efficiently”. Ilias Kalaitzis ,Project Engineer, Control Systems

Project Summary

► Project Delivered in 2008 on time during Shut Down of Generator Unit Period 16 Weeks Entirety

► Second Unit simple Copy and Paste for SOE Configuration. Completed Dec 2008

► We are expecting orders for the balance of

2 Generator Sets