192
GE 159 Plastics Avenue Pittsfield, MA 01201 USA Transmitted via Overnight Courier October 10,2011 Mr. Dean Tagliaferro Mr. Michael Gorski U.S. Environmental Protection Agency Regional Director Region I - New England Western Regional Office 10 Lyman Street, Suite 2 Department of Environmental Protection Pittsfield, MA 01201 436 Dwight Street Springfield, MA 01103 Re: GE-Pittsfield/Housatonic River Site Monthly Status Report Pursuant to Consent Decree for September 2011 (GECD900) Dear Mr. Tagliaferro and Mr. Gorski: Enclosed are copies of General Electric's (GE's) monthly progress report for September 2011 activities conducted by GE at the GE-Pittsfield/Housatonic River Site. This monthly report is submitted pursuant to Paragraph 67 of the Consent Decree (CD) for this Site, which was entered by the U.S. District Court on October 27,2000. The enclosed monthly report includes not only the activities conducted by GE under the CD, but also other activities conducted by GE at the GE-Pittsfield/Housatonic River Site (as defined in the CD). The report is formatted to apply to the various areas of the Site as defined in the CD, and to provide for each area, the information specified in Paragraph 67 of the CD. The activities conducted specifically pursuant to or in connection with the CD are marked with an asterisk. GE is submitting a separate monthly report to the Massachusetts Department of Environmental Protection (MDEP), with a copy to the United States Environmental Protection Agency (EPA), describing the activities conducted by GE at properties outside the CD Site pursuant to GE's November 2000 Administrative Consent Order from MDEP. The enclosed monthly repolt includes, where applicable, tables that list the samples collected during the subject month, summarize the analytical results received during that month from sampling or other testing activities, and summarize other groundwater monitoring and oil recovery information obtained during that month. Also, enclosed for each of you (and for Weston) is a CD-ROM that contains these same tables of the analytical data and monitoring information in electronic form. Please call me if you have any questions. Sincerely, Richard W. Gates Remediation Project Manager Enclosure Corporate E'Wlronmentoi [)rogroms

SEPTEMBER 2011 MONTHLY STATUS REPORT ...- Performed September 2011 dry weather flow inspection activities associated with Drainage Basin 005 under GE’s NPDES Permit. - Initiated

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

  • GE 159 Plastics Avenue Pittsfield, MA 01201 USA

    Transmitted via Overnight Courier

    October 10,2011

    Mr. Dean Tagliaferro Mr. Michael Gorski U.S. Environmental Protection Agency Regional Director Region I - New England Western Regional Office 10 Lyman Street, Suite 2 Department of Environmental Protection Pittsfield, MA 01201 436 Dwight Street

    Springfield, MA 01103

    Re: GE-Pittsfield/Housatonic River Site Monthly Status Report Pursuant to Consent Decree for September 2011 (GECD900)

    Dear Mr. Tagliaferro and Mr. Gorski:

    Enclosed are copies of General Electric's (GE's) monthly progress report for September 2011 activities conducted by GE at the GE-Pittsfield/Housatonic River Site. This monthly report is submitted pursuant to Paragraph 67 of the Consent Decree (CD) for this Site, which was entered by the U.S. District Court on October 27,2000.

    The enclosed monthly report includes not only the activities conducted by GE under the CD, but also other activities conducted by GE at the GE-Pittsfield/Housatonic River Site (as defined in the CD). The report is formatted to apply to the various areas of the Site as defined in the CD, and to provide for each area, the information specified in Paragraph 67 of the CD. The activities conducted specifically pursuant to or in connection with the CD are marked with an asterisk. GE is submitting a separate monthly report to the Massachusetts Department of Environmental Protection (MDEP), with a copy to the United States Environmental Protection Agency (EPA), describing the activities conducted by GE at properties outside the CD Site pursuant to GE's November 2000 Administrative Consent Order from MDEP.

    The enclosed monthly repolt includes, where applicable, tables that list the samples collected during the subject month, summarize the analytical results received during that month from sampling or other testing activities, and summarize other groundwater monitoring and oil recovery information obtained during that month. Also, enclosed for each of you (and for Weston) is a CD-ROM that contains these same tables of the analytical data and monitoring information in electronic form.

    Please call me if you have any questions.

    Sincerely,

    Richard W. Gates Remediation Project Manager

    Enclosure

    Corporate E'Wlronmentoi [)rogroms

  • Mr. Dean Tagliaferro and Mr. Michael Gorski October 10, 2011

    Page 2 of2

    cc: Richard Fisher, EPA Robert Cianciarulo, EPA (cover letter only) Tim Conway, EPA (cover letter only) Rose Howell, EPA (cover letter and CD-ROM of report) Holly Inglis, EPA (hard copy and CD-ROM of report) Susan Svirsky, EPA (Items 7, 15, and 20 only) R. Leitch, USACE (CD-ROM of report)

    John Ziegler, MDEP (hard copy and CD-ROM of report)

    Eva Tor, MDEP (cover letter and CD-ROM of report)

    Karen Pelto, MDEP (CD-ROM of report)

    Nancy E. Harper, MA AG

    Susan Peterson, CT DEP

    Field Supervisor, US FWS, DOl

    Kenneth Finkelstein, Ph.D., NOAA (Items 13, 14, and 15 only)

    Mayor James Ruberto, City of Pittsfield

    Corydon L. Thurston, Director, Pittsfield Economic Development Authority

    Linda Palmieri, Weston

    Jack Yablonsky, Berkshire Gas (CD-ROM of report)

    Richard Nasman, P.E., Berkshire Gas (cover letter only)

    Michael Carroll GE (CD-ROM of report)

    Andrew Silfer, GE (cover letter only)

    Rod McLaren, GE (CD-ROM of report)

    James Nuss, ARCADIS

    James Bieke, Goodwin Procter

    Kevin Russell, Anchor QEA (narrative only)

    Teresa Bowers, Gradient

    Public Information Repositories (1 hard copy,S copies of CD-ROM)

    GE Internal Repository (1 hard copy)

    (WiD separate CD-ROM, except where noted)

    G:IGEIGE]ittsfield_General\Reports and PresentationslMonthly Reports1201 1109-1 llLetterdoc

  • September 2011

    MONTHLY STATUS REPORT

    PURSUANT TO CONSENT DECREE

    FOR

    GE-PITTSFIELD/HOUSATONIC RIVER SITE

    GENERAL ELECTRIC COMPANY

    PITTSFIELD, MASSACHUSETTS

    G:\GE\GE_Pittsfield_General\Reports and Presentations\Monthly Reports\2011\09-11\Monthly Background.doc

  • Background

    The General Electric Company (GE), the United States Environmental Protection Agency (EPA), the Massachusetts Department of Environmental Protection (MDEP), and other governmental entities have entered into a Consent Decree (CD) for the GE-Pittsfield/Housatonic River Site, which was entered by the U.S. Court on October 27, 2000. In accordance with Paragraph 67 of the CD, GE is submitting this monthly report, prepared on GE’s behalf by ARCADIS (formerly Blasland, Bouck & Lee, Inc.), which summarizes the status of activities conducted by GE at the GE-Pittsfield/Housatonic River Site ("Site") (as defined in the CD).

    This report covers activities in the areas listed below (as defined in the CD and/or the accompanying Statement of Work for Removal Actions Outside the River [SOW]). Only those areas that have had work activities for the month subject to reporting are included. The specific activities conducted pursuant to or in connection with the CD are noted with an asterisk.

    General Activities (GECD900)

    GE Plant Area (non-groundwater) 1. 20s, 30s, 40s Complexes (GECD120) 2. East Street Area 2 – South (GECD150) 3. East Street Area 2 – North (GECD140) 4. East Street Area 1 – North (GECD130) 5. Hill 78 and Building 71 Consolidation Areas (GECD210/220) 6. Hill 78 Area – Remainder (GECD160) 7. Unkamet Brook Area (GECD170)

    Former Oxbow Areas (non-groundwater) 8. Former Oxbow Areas A & C (GECD410) 9. Lyman Street Area (GECD430) 10. Newell Street Area I (GECD440) 11. Newell Street Area II (GECD450) 12. Former Oxbow Areas J & K (GECD420)

    Housatonic River 13. Upper ½-Mile Reach (GECD800) 14. 1½-Mile Reach (only for activities, if any, conducted by GE) (GECD820) 15. Rest of the River (GECD850)

    Housatonic River Floodplain 16. Current Residential Properties Adjacent to 1½-Mile Reach (Actual/Potential Lawns)

    (GECD710) 17. Non-Residential Properties Adjacent to 1½-Mile Reach (excluding banks)

    (GECD720) 18. Current Residential Properties Downstream of Confluence (Actual/Potential Lawns)

    (GECD730)

    Other Areas 19. Allendale School Property (GECD500) 20. Silver Lake Area (GECD600)

    G:\GE\GE_Pittsfield_General\Reports and Presentations\Monthly Reports\2011\09-11\Monthly Background.doc

  • Groundwater Management Areas (GMAs) 21. Plant Site 1 (GECD310) 22. Former Oxbows J & K (GECD320) 23. Plant Site 2 (GECD330) 24. Plant Site 3 (GECD340)

    24A. On-Plant Consolidation Areas, Post-Closure Program 25. Former Oxbows A&C (GECD350)

    G:\GE\GE_Pittsfield_General\Reports and Presentations\Monthly Reports\2011\09-11\Monthly Background.doc

  • GENERAL ACTIVITIES GE-PITTSFIELD/HOUSATONIC RIVER SITE

    (GECD900)

    SEPTEMBER 2011

    a. Activities Undertaken/Completed

    Continued GE-EPA electronic data exchanges for the Housatonic River Watershed.*

    b. Sampling/Test Results Received

    - Sample results were received for routine sampling conducted pursuant to GE’s NPDES Permit for the GE facility. Sampling records and results are provided in Attachment A to this report.

    c.

    - NPDES Discharge Monitoring Reports (DMRs) for the period of August 1 through August 31, 2011, are provided in Attachment B to this report.

    Work Plans/Reports/Documents Submitted

    None

    d. Upcoming Scheduled and Anticipated Activities (next six weeks)

    - Continue NPDES Permit-related sampling and monitoring activities.

    - Attend public and Citizens Coordinating Council (CCC) meetings, as appropriate.

    - Continue development of a 64G Method Limit (ML) Study Work Plan to study the laboratory limitations associated with use of Modified Method 8082 to analyze PCBs in discharge water from the Building 64G Groundwater Treatment Facility, and the repeatability of the MLs achieved during the 64G Optimization Study.

    e. General Progress/Unresolved Issues/Potential Schedule Impacts

    GE’s August 3, 2010 follow-up plan relating to the finding in October 2009 of residual oil in certain pipes located north of Building OP-2 remains under EPA review.

    f. Proposed/Approved Work Plan Modifications

    None

    G:\GE\GE_Pittsfield_General\Reports and Presentations\Monthly Reports\2011\09-11\FINAL CD Monthly Text - 09-11.doc

  • ITEM 1

    PLANT AREA

    20s, 30s, 40s COMPLEXES (GECD120)

    SEPTEMBER 2011

    a. Activities Undertaken/Completed

    - Activities relating to a Grant of Environmental Restriction and Easement (ERE) covering the portion of Woodlawn Avenue adjacent to the former 20s Complex, combined with the portion of that road within East Street Area 2-North, are discussed further under Item 3 (East Street Area 2-North).*

    - Performed the annual inspection of the temporary stockpile and embankments at the 40s Complex (September 15, 2011). This inspection also included observations of any damage resulting from Tropical Storm Irene.*

    b. Sampling/Test Results Received

    None

    c. Work Plans/Reports/Documents Submitted

    Submitted reports summarizing the annual ERE inspections performed at the former 20s, 30s, and 40s Complexes on August 16, 2011 (September 13, 2011).

    d. Upcoming Scheduled and Anticipated Activities (next six weeks)

    - Upcoming activities relating to the ERE covering the portion of Woodlawn Avenue adjacent to the former 20s Complex, combined with the portion of that road within East Street Area 2North, are discussed further under Item 3 (East Street Area 2-North).*

    - Submit report on the September 15, 2011 inspection of the temporary stockpile and embankments at the 40s Complex.*

    - The Pittsfield Economic Development Authority (PEDA) is working with MDEP and EPA on amended EREs for the former 20s Complex and the former 30s Complex.*

    - Execute subordination agreement for the amended ERE for the former 30s Complex.*

    e. General Progress/Unresolved Issues/Potential Schedule Impacts

    No issues.

    f. Proposed/Approved Work Plan Modifications

    None

    G:\GE\GE_Pittsfield_General\Reports and Presentations\Monthly Reports\2011\09-11\FINAL CD Monthly Text - 09-11.doc

  • ITEM 2

    PLANT AREA

    EAST STREET AREA 2-SOUTH

    (GECD150)

    SEPTEMBER 2011

    a. Activities Undertaken/Completed

    - Continued remediation activities.*

    - Performed ambient air monitoring for PCBs and particulate matter in conjunction with remediation actions, as indicated in Table 2-1.* Ambient air PCB sample results are not available for three of the four on-site samples collected during the September 13-14, 2011 sampling event due to a laboratory accident resulting in the loss of those samples (see Table 27). Based on discussions with EPA, GE does not intend to resample since no soil excavation was performed during the time period of collection of these samples.

    - Performed annual post-remediation inspection of cover at City Recreational Area on September 15, 2011. This inspection also included observations of any damage resulting from Tropical Storm Irene.*

    - Performed sampling of pond silt material for use as cover over certain existing building slabs/pavement, as indicated in Table 2-1.

    - Conducted Liquid Phase Carbon Absorption (LPCA) sampling at Building 64G Groundwater Treatment Facility, as indicated in Table 2-1.

    - Conducted sampling of overpack drum contents for analysis of PCBs and TCLP, as indicated in Table 2-1.

    - Performed September 2011 dry weather flow inspection activities associated with Drainage Basin 005 under GE’s NPDES Permit.

    - Initiated cleaning activities at Oil/Water Separators 64X, 64W, and 64Z in accordance with GE’s NPDES Permit.

    - Collected and transferred approximately 20,500 gallons of water generated during cleaning activities at Oil/Water Separator 64W to the Building 64G Groundwater Treatment Facility for treatment.

    b. Sampling/Test Results Received

    See attached tables.

    G:\GE\GE_Pittsfield_General\Reports and Presentations\Monthly Reports\2011\09-11\FINAL CD Monthly Text - 09-11.doc

  • ITEM 2

    (cont’d)

    PLANT AREA

    EAST STREET AREA 2-SOUTH

    (GECD150)

    SEPTEMBER 2011

    c. Work Plans/Reports/Documents Submitted

    None

    d. Upcoming Scheduled and Anticipated Activities (next six weeks)

    - Complete remediation activities and conduct tree planting.*

    - Submit report on annual post-remediation inspection of cover at City Recreational Area (including observations of any damage resulting from Tropical Storm Irene).*

    - Perform October 2011 dry weather flow inspection activities associated with Drainage Basins 005 and 006 under GE’s NPDES Permit.

    - Continue cleaning activities at Oil/Water Separators 64X, 64W, and 64Z in accordance with GE’s NPDES Permit.

    - Perform sampling and monitoring activities associated with GE’s Wet Weather Ambient Monitoring Plan.

    - Perform sampling and monitoring activities associated with GE’s Dry Weather Ambient Monitoring Plan.

    e. General Progress/Unresolved Issues/Potential Schedule Impacts

    No issues.

    f. Proposed/Approved Work Plan Modifications

    None

    G:\GE\GE_Pittsfield_General\Reports and Presentations\Monthly Reports\2011\09-11\FINAL CD Monthly Text - 09-11.doc

  • TABLE 2-1 DATA RECEIVED AND/OR SAMPLES COLLECTED DURING SEPTEMBER 2011

    EAST STREET AREA 2 - SOUTH GENERAL ELECTRIC COMPANY - PITTSFIELD MASSACHUSETTS

    Date Received by Project Name Field Sample ID Sample Date Matrix Laboratory Analyses GE or ARCADIS

    Building 64G LPCA Monitoring I11-64G-01 9/25/11 Water Columbia VOC Building 64G LPCA Monitoring I11-64G-02 9/25/11 Water Columbia VOC Building 64G LPCA Monitoring I11-64G-03 9/25/11 Water Columbia VOC Building 64G LPCA Monitoring I11-64G-04 9/25/11 Water Columbia VOC Building 64G LPCA Monitoring I11-64G-05 9/25/11 Water Columbia SVOC Building 64G LPCA Monitoring I11-64G-06 9/25/11 Water Columbia SVOC Building 64G LPCA Monitoring I11-64G-07 9/25/11 Water Columbia SVOC Building 64G LPCA Monitoring I11-64G-08 9/25/11 Water Columbia SVOC Building 64G LPCA Monitoring I11-64G-09 9/25/11 Water Columbia VOC Building 64G LPCA Monitoring I11-64G-10 9/25/11 Water Columbia VOC Building 64G LPCA Monitoring I11-64G-11 9/25/11 Water Columbia VOC Building 64G LPCA Monitoring I11-64G-12 9/25/11 Water Columbia VOC Building 64G LPCA Monitoring I11-64G-PC-13 9/25/11 Water SGS PCB Building 64G LPCA Monitoring I11-64G-PC-13 8/28/11 Water SGS PCB 9/12/11 Building 64G LPCA Monitoring I11-64G-PC-14 9/25/11 Water SGS PCB Building 64G LPCA Monitoring I11-64G-PC-14 8/28/11 Water SGS PCB 9/12/11 Building 64G LPCA Monitoring I11-64G-PC-15 9/25/11 Water SGS PCB Building 64G LPCA Monitoring I11-64G-PC-15 8/28/11 Water SGS PCB 9/12/11 Building 64G LPCA Monitoring I11-64G-PC-16 8/28/11 Water SGS PCB 9/12/11 Building 64G LPCA Monitoring I11-64G-PC-16 9/25/11 Water SGS PCB Building 64G LPCA Monitoring I11-64G-PC-17 9/25/11 Water SGS PCB Building 64G LPCA Monitoring I11-64G-PC-17 8/28/11 Water SGS PCB 9/12/11

    NPDES Related Wet Weather Ambient HOU-DOWNSTREAM-080911 8/9/11 Water Columbia TSS 9/1/11 NPDES Related Wet Weather Ambient HOU-DOWNSTREAM-080911-25 8/9/11 Water Columbia Oil & Grease 9/1/11 NPDES Related Wet Weather Ambient HOU-DOWNSTREAM-080911-50 8/9/11 Water Columbia Oil & Grease 9/1/11 NPDES Related Wet Weather Ambient HOU-DOWNSTREAM-080911-75 8/9/11 Water Columbia Oil & Grease 9/1/11 NPDES Related Wet Weather Ambient HOU-UPSTREAM-080911 8/9/11 Water Columbia TSS 9/1/11 NPDES Related Wet Weather Ambient HOU-UPSTREAM-080911-25 8/9/11 Water Columbia Oil & Grease 9/1/11 NPDES Related Wet Weather Ambient HOU-UPSTREAM-080911-50 8/9/11 Water Columbia Oil & Grease 9/1/11 NPDES Related Wet Weather Ambient HOU-UPSTREAM-080911-75 8/9/11 Water Columbia Oil & Grease 9/1/11

    Pittsfield Sand & Gravel Pond Silt Backfill PSG-PONDSILT-C1 9/21/11 Soil SGS PCB, VOC, SVOC, Metals 9/23/11 Sampling Of Overpack Drum Contents DRUM A5194 9/20/11 Soil SGS PCB, TCLP Sampling Of Overpack Drum Contents DRUM D0731 9/8/11 Soil SGS PCB, TCLP 9/21/11 Sampling Of Overpack Drum Contents DRUM D0733 9/20/11 Soil SGS PCB, TCLP

    Ambient Air Particulate Matter Sampling ES2S-2R 9/1/2011 Air Berkshire Environmental Particulate Matter 9/6/2011 Ambient Air Particulate Matter Sampling ES2S-3 9/1/2011 Air Berkshire Environmental Particulate Matter 9/6/2011 Ambient Air Particulate Matter Sampling ES2S-6 9/1/2011 Air Berkshire Environmental Particulate Matter 9/6/2011 Ambient Air Particulate Matter Sampling ES2S-7 9/1/2011 Air Berkshire Environmental Particulate Matter 9/6/2011 Ambient Air Particulate Matter Sampling Background Location 9/1/2011 Air Berkshire Environmental Particulate Matter 9/6/2011 Ambient Air Particulate Matter Sampling ES2S-2R 9/2/2011 Air Berkshire Environmental Particulate Matter 9/6/2011

    G:\GE\GE_Pittsfield_General\Reports and Presentations\Monthly Reports\2011\09-11\Tracking Logs\ Tracking.xlsm - TABLE 2-1 1 of 4 10/10/2011

  • TABLE 2-1 DATA RECEIVED AND/OR SAMPLES COLLECTED DURING SEPTEMBER 2011

    EAST STREET AREA 2 - SOUTH GENERAL ELECTRIC COMPANY - PITTSFIELD MASSACHUSETTS

    Date Received by Project Name Field Sample ID Sample Date Matrix Laboratory Analyses GE or ARCADIS

    Ambient Air Particulate Matter Sampling ES2S-3 9/2/2011 Air Berkshire Environmental Particulate Matter 9/6/2011 Ambient Air Particulate Matter Sampling ES2S-6 9/2/2011 Air Berkshire Environmental Particulate Matter 9/6/2011 Ambient Air Particulate Matter Sampling ES2S-7 9/2/2011 Air Berkshire Environmental Particulate Matter 9/6/2011 Ambient Air Particulate Matter Sampling Background Location 9/2/2011 Air Berkshire Environmental Particulate Matter 9/6/2011 Ambient Air Particulate Matter Sampling ES2S-2R 9/6/2011 Air Berkshire Environmental Particulate Matter 9/12/2011 Ambient Air Particulate Matter Sampling ES2S-3 9/6/2011 Air Berkshire Environmental Particulate Matter 9/12/2011 Ambient Air Particulate Matter Sampling ES2S-6 9/6/2011 Air Berkshire Environmental Particulate Matter 9/12/2011 Ambient Air Particulate Matter Sampling ES2S-7 9/6/2011 Air Berkshire Environmental Particulate Matter 9/12/2011 Ambient Air Particulate Matter Sampling Background Location 9/6/2011 Air Berkshire Environmental Particulate Matter 9/12/2011 Ambient Air Particulate Matter Sampling ES2S-2R 9/7/2011 Air Berkshire Environmental Particulate Matter 9/12/2011 Ambient Air Particulate Matter Sampling ES2S-3 9/7/2011 Air Berkshire Environmental Particulate Matter 9/12/2011 Ambient Air Particulate Matter Sampling ES2S-6 9/7/2011 Air Berkshire Environmental Particulate Matter 9/12/2011 Ambient Air Particulate Matter Sampling ES2S-7 9/7/2011 Air Berkshire Environmental Particulate Matter 9/12/2011 Ambient Air Particulate Matter Sampling Background Location 9/7/2011 Air Berkshire Environmental Particulate Matter 9/12/2011 Ambient Air Particulate Matter Sampling ES2S-2R 9/8/2011 Air Berkshire Environmental Particulate Matter 9/12/2011 Ambient Air Particulate Matter Sampling ES2S-3 9/8/2011 Air Berkshire Environmental Particulate Matter 9/12/2011 Ambient Air Particulate Matter Sampling ES2S-6 9/8/2011 Air Berkshire Environmental Particulate Matter 9/12/2011 Ambient Air Particulate Matter Sampling ES2S-7 9/8/2011 Air Berkshire Environmental Particulate Matter 9/12/2011 Ambient Air Particulate Matter Sampling Background Location 9/8/2011 Air Berkshire Environmental Particulate Matter 9/12/2011 Ambient Air Particulate Matter Sampling ES2S-2R 9/9/2011 Air Berkshire Environmental Particulate Matter 9/12/2011 Ambient Air Particulate Matter Sampling ES2S-3 9/9/2011 Air Berkshire Environmental Particulate Matter 9/12/2011 Ambient Air Particulate Matter Sampling ES2S-6 9/9/2011 Air Berkshire Environmental Particulate Matter 9/12/2011 Ambient Air Particulate Matter Sampling ES2S-7 9/9/2011 Air Berkshire Environmental Particulate Matter 9/12/2011 Ambient Air Particulate Matter Sampling Background Location 9/9/2011 Air Berkshire Environmental Particulate Matter 9/12/2011 Ambient Air Particulate Matter Sampling ES2S-2R 9/10/2011 Air Berkshire Environmental Particulate Matter 9/12/2011 Ambient Air Particulate Matter Sampling ES2S-3 9/10/2011 Air Berkshire Environmental Particulate Matter 9/12/2011 Ambient Air Particulate Matter Sampling ES2S-7 9/10/2011 Air Berkshire Environmental Particulate Matter 9/12/2011 Ambient Air Particulate Matter Sampling Background Location 9/10/2011 Air Berkshire Environmental Particulate Matter 9/12/2011 Ambient Air Particulate Matter Sampling ES2S-2R 9/12/2011 Air Berkshire Environmental Particulate Matter 9/19/2011 Ambient Air Particulate Matter Sampling ES2S-3 9/12/2011 Air Berkshire Environmental Particulate Matter 9/19/2011 Ambient Air Particulate Matter Sampling ES2S-7 9/12/2011 Air Berkshire Environmental Particulate Matter 9/19/2011 Ambient Air Particulate Matter Sampling Background Location 9/12/2011 Air Berkshire Environmental Particulate Matter 9/19/2011 Ambient Air Particulate Matter Sampling ES2S-2R 9/13/2011 Air Berkshire Environmental Particulate Matter 9/19/2011 Ambient Air Particulate Matter Sampling ES2S-3 9/13/2011 Air Berkshire Environmental Particulate Matter 9/19/2011 Ambient Air Particulate Matter Sampling ES2S-7 9/13/2011 Air Berkshire Environmental Particulate Matter 9/19/2011 Ambient Air Particulate Matter Sampling Background Location 9/13/2011 Air Berkshire Environmental Particulate Matter 9/19/2011 Ambient Air Particulate Matter Sampling ES2S-2R 9/14/2011 Air Berkshire Environmental Particulate Matter 9/19/2011 Ambient Air Particulate Matter Sampling ES2S-3 9/14/2011 Air Berkshire Environmental Particulate Matter 9/19/2011 Ambient Air Particulate Matter Sampling ES2S-7 9/14/2011 Air Berkshire Environmental Particulate Matter 9/19/2011

    G:\GE\GE_Pittsfield_General\Reports and Presentations\Monthly Reports\2011\09-11\Tracking Logs\ Tracking.xlsm - TABLE 2-1 2 of 4 10/10/2011

  • TABLE 2-1 DATA RECEIVED AND/OR SAMPLES COLLECTED DURING SEPTEMBER 2011

    EAST STREET AREA 2 - SOUTH GENERAL ELECTRIC COMPANY - PITTSFIELD MASSACHUSETTS

    Date Received by Project Name Field Sample ID Sample Date Matrix Laboratory Analyses GE or ARCADIS

    Ambient Air Particulate Matter Sampling Background Location 9/14/2011 Air Berkshire Environmental Particulate Matter 9/19/2011 Ambient Air Particulate Matter Sampling ES2S-2R 9/15/2011 Air Berkshire Environmental Particulate Matter 9/19/2011 Ambient Air Particulate Matter Sampling ES2S-3 9/15/2011 Air Berkshire Environmental Particulate Matter 9/19/2011 Ambient Air Particulate Matter Sampling ES2S-7 9/15/2011 Air Berkshire Environmental Particulate Matter 9/19/2011 Ambient Air Particulate Matter Sampling Background Location 9/15/2011 Air Berkshire Environmental Particulate Matter 9/19/2011 Ambient Air Particulate Matter Sampling ES2S-2R 9/16/2011 Air Berkshire Environmental Particulate Matter 9/19/2011 Ambient Air Particulate Matter Sampling ES2S-3 9/16/2011 Air Berkshire Environmental Particulate Matter 9/19/2011 Ambient Air Particulate Matter Sampling ES2S-7 9/16/2011 Air Berkshire Environmental Particulate Matter 9/19/2011 Ambient Air Particulate Matter Sampling Background Location 9/16/2011 Air Berkshire Environmental Particulate Matter 9/19/2011 Ambient Air Particulate Matter Sampling ES2S-2R 9/19/2011 Air Berkshire Environmental Particulate Matter 9/26/2011 Ambient Air Particulate Matter Sampling ES2S-3 9/19/2011 Air Berkshire Environmental Particulate Matter 9/26/2011 Ambient Air Particulate Matter Sampling ES2S-7 9/19/2011 Air Berkshire Environmental Particulate Matter 9/26/2011 Ambient Air Particulate Matter Sampling Background Location 9/19/2011 Air Berkshire Environmental Particulate Matter 9/26/2011 Ambient Air Particulate Matter Sampling ES2S-2R 9/20/2011 Air Berkshire Environmental Particulate Matter 9/26/2011 Ambient Air Particulate Matter Sampling ES2S-3 9/20/2011 Air Berkshire Environmental Particulate Matter 9/26/2011 Ambient Air Particulate Matter Sampling ES2S-7 9/20/2011 Air Berkshire Environmental Particulate Matter 9/26/2011 Ambient Air Particulate Matter Sampling Background Location 9/20/2011 Air Berkshire Environmental Particulate Matter 9/26/2011 Ambient Air Particulate Matter Sampling ES2S-2R 9/21/2011 Air Berkshire Environmental Particulate Matter 9/26/2011 Ambient Air Particulate Matter Sampling ES2S-3 9/21/2011 Air Berkshire Environmental Particulate Matter 9/26/2011 Ambient Air Particulate Matter Sampling ES2S-7 9/21/2011 Air Berkshire Environmental Particulate Matter 9/26/2011 Ambient Air Particulate Matter Sampling Background Location 9/21/2011 Air Berkshire Environmental Particulate Matter 9/26/2011 Ambient Air Particulate Matter Sampling ES2S-2R 9/22/2011 Air Berkshire Environmental Particulate Matter 9/26/2011 Ambient Air Particulate Matter Sampling ES2S-3 9/22/2011 Air Berkshire Environmental Particulate Matter 9/26/2011 Ambient Air Particulate Matter Sampling ES2S-7 9/22/2011 Air Berkshire Environmental Particulate Matter 9/26/2011 Ambient Air Particulate Matter Sampling Background Location 9/22/2011 Air Berkshire Environmental Particulate Matter 9/26/2011 Ambient Air Particulate Matter Sampling ES2S-2R 9/23/2011 Air Berkshire Environmental Particulate Matter 9/26/2011 Ambient Air Particulate Matter Sampling ES2S-3 9/23/2011 Air Berkshire Environmental Particulate Matter 9/26/2011 Ambient Air Particulate Matter Sampling ES2S-7 9/23/2011 Air Berkshire Environmental Particulate Matter 9/26/2011 Ambient Air Particulate Matter Sampling Background Location 9/23/2011 Air Berkshire Environmental Particulate Matter 9/26/2011 Ambient Air Particulate Matter Sampling ES2S-2R 9/26/2011 Air Berkshire Environmental Particulate Matter 10/3/2011 Ambient Air Particulate Matter Sampling ES2S-3 9/26/2011 Air Berkshire Environmental Particulate Matter 10/3/2011 Ambient Air Particulate Matter Sampling ES2S-7 9/26/2011 Air Berkshire Environmental Particulate Matter 10/3/2011 Ambient Air Particulate Matter Sampling Background Location 9/26/2011 Air Berkshire Environmental Particulate Matter 10/3/2011 Ambient Air Particulate Matter Sampling ES2S-2R 9/27/2011 Air Berkshire Environmental Particulate Matter 10/3/2011 Ambient Air Particulate Matter Sampling ES2S-3 9/27/2011 Air Berkshire Environmental Particulate Matter 10/3/2011 Ambient Air Particulate Matter Sampling ES2S-7 9/27/2011 Air Berkshire Environmental Particulate Matter 10/3/2011 Ambient Air Particulate Matter Sampling Background Location 9/27/2011 Air Berkshire Environmental Particulate Matter 10/3/2011 Ambient Air Particulate Matter Sampling ES2S-2R 9/28/2011 Air Berkshire Environmental Particulate Matter 10/3/2011 Ambient Air Particulate Matter Sampling ES2S-3 9/28/2011 Air Berkshire Environmental Particulate Matter 10/3/2011

    G:\GE\GE_Pittsfield_General\Reports and Presentations\Monthly Reports\2011\09-11\Tracking Logs\ Tracking.xlsm - TABLE 2-1 3 of 4 10/10/2011

  • TABLE 2-1 DATA RECEIVED AND/OR SAMPLES COLLECTED DURING SEPTEMBER 2011

    EAST STREET AREA 2 - SOUTH GENERAL ELECTRIC COMPANY - PITTSFIELD MASSACHUSETTS

    Date Received by Project Name Field Sample ID Sample Date Matrix Laboratory Analyses GE or ARCADIS

    Ambient Air Particulate Matter Sampling ES2S-7 9/28/2011 Air Berkshire Environmental Particulate Matter 10/3/2011 Ambient Air Particulate Matter Sampling Background Location 9/28/2011 Air Berkshire Environmental Particulate Matter 10/3/2011 Ambient Air Particulate Matter Sampling ES2S-2R 9/29/2011 Air Berkshire Environmental Particulate Matter 10/3/2011 Ambient Air Particulate Matter Sampling ES2S-3 9/29/2011 Air Berkshire Environmental Particulate Matter 10/3/2011 Ambient Air Particulate Matter Sampling ES2S-7 9/29/2011 Air Berkshire Environmental Particulate Matter 10/3/2011 Ambient Air Particulate Matter Sampling Background Location 9/29/2011 Air Berkshire Environmental Particulate Matter 10/3/2011

    PCB Ambient Air Sampling ES2S-2R 09/13/11-09/14/11 Air NEA PCB 9/23/2011 PCB Ambient Air Sampling ES2S-2RCO (colocated) 09/13/11-09/14/11 Air NEA PCB 9/23/2011 PCB Ambient Air Sampling ES2S-3 09/13/11-09/14/11 Air NEA PCB 9/23/2011 PCB Ambient Air Sampling ES2S-7 09/13/11-09/14/11 Air NEA PCB 9/23/2011 PCB Ambient Air Sampling Background - East of Building 9B 09/13/11-09/14/11 Air NEA PCB 9/23/2011

    G:\GE\GE_Pittsfield_General\Reports and Presentations\Monthly Reports\2011\09-11\Tracking Logs\ Tracking.xlsm - TABLE 2-1 4 of 4 10/10/2011

  • TABLE 2-2 DATA RECEIVED DURING SEPTEMBER 2011

    NPDES RELATED WET WEATHER AMBIENT MONITORING EAST STREET AREA 2 SOUTH

    GENERAL ELECTRIC COMPANY - PITTSFIELD, MASSACHUSETTS (Results are presented in parts per million, ppm)

    Sample ID: Parameter Date Collected:

    HOU-Downstream-080911 08/09/11

    HOU-Downstream-080911-25 08/09/11

    HOU-Downstream-080911-50 08/09/11

    HOU-Downstream-080911-75 08/09/11

    Conventional Oil & Grease NA ND(4.1) ND(4.1) ND(4.1) Total Suspended Solids 4.10 NA NA NA

    Sample ID: Parameter Date Collected:

    HOU-Upstream-080911 08/09/11

    HOU-Upstream-080911-25 08/09/11

    HOU-Upstream-080911-50 08/09/11

    HOU-Upstream-080911-75 08/09/11

    Conventional Oil & Grease NA ND(3.9) ND(4.1) ND(3.9) Total Suspended Solids 3.60 NA NA NA

    Notes: 1. Samples were collected by ARCADIS and submitted to Columbia Analytical Services, Inc. for analysis of total suspended solids and oil & grease. 2. NA - Not Analyzed. 3. ND - Analyte was not detected. The number in parentheses is the associated detection limit.

    Page 1 of 1

    G:\GE\GE_Pittsfield_General\Reports and Presentations\Monthly Reports\2011\09-11\Analytical Data Tables\ Tables.xlsx - 2-2 10/10/2011

  • TABLE 2-3 PCB DATA RECEIVED DURING SEPTEMBER 2011

    BUILDING 64G LPCA MONITORING EAST STREET AREA 2-SOUTH

    GENERAL ELECTRIC COMPANY - PITTSFIELD, MASSACHUSETTS (Results are presented in parts per million, ppm)

    Sample ID Date

    Collected Aroclor-1016, 1221,

    -1232, -1242 Aroclor-1248 Aroclor-1254 Aroclor-1260 Total PCBs I11-64G-PC-13 8/28/2011 ND(0.00015) 0.00029 0.00045 0.0013 0.00204 I11-64G-PC-14 8/28/2011 ND(0.000015) 0.000084 ND(0.000015) ND(0.000015) 0.000084 I11-64G-PC-15 8/28/2011 ND(0.000015) ND(0.000015) ND(0.000015) ND(0.000015) ND(0.000015) I11-64G-PC-16 8/28/2011 ND(0.000015) ND(0.000015) ND(0.000015) ND(0.000015) ND(0.000015) I11-64G-PC-17 8/28/2011 ND(0.0077) 0.0094 0.039 0.14 0.188

    Notes: 1. Samples were collected by General Electric Company and submitted to SGS Environmental Services, Inc. for

    analysis of PCBs. 2. ND - Analyte was not detected. The number in parentheses is the associated detection limit.

    Page 1 of 1

    G:\GE\GE_Pittsfield_General\Reports and Presentations\Monthly Reports\2011\09-11\Analytical Data Tables\ Tables.xlsx - 2-3 10/10/2011

  • TABLE 2-4 PCB DATA RECEIVED DURING SEPTEMBER 2011

    SAMPLING OF OVERPACK DRUM CONTENTS EAST STREET AREA 2 - SOUTH

    GENERAL ELECTRIC COMPANY - PITTSFIELD, MASSACHUSETTS (Results are presented in dry weight parts per million, ppm)

    Sample ID Date

    Collected Aroclor-1016 Aroclor-1221 Aroclor-1232 Aroclor-1242 Aroclor-1248 Aroclor-1254 Aroclor-1260 Total PCBs Drum D0731 9/8/2011 ND(19) ND(19) ND(19) ND(19) ND(19) ND(19) 110 110

    Notes: 1. Sample was collected by Veolia ES Technical Solutions, L.L.C. and submitted to SGS Environmental Services, Inc. for analysis of PCBs and TCLP

    constituents. 2. Please refer to Table 2-5 for a summary of TCLP constituents. 3, ND - Analyte was not detected. The number in parentheses is the associated detection limit.

    Page 1 of 1

    G:\GE\GE_Pittsfield_General\Reports and Presentations\Monthly Reports\2011\09-11\Analytical Data Tables\ Tables.xlsx - 2-4 10/10/2011

  • TABLE 2-5 TCLP DATA RECEIVED DURING SEPTEMBER 2011

    SAMPLING OF OVERPACK DRUM CONTENTS EAST STREET AREA 2 - SOUTH

    GENERAL ELECTRIC COMPANY - PITTSFIELD, MASSACHUSETTS (Results are presented in parts per million, ppm)

    Sample ID: Parameter Date Collected:

    TCLP Regulatory

    Limits Drum D0731

    9/8/2011 Semivolatile Organics 1,4-Dichlorobenzene 7.5 ND(0.050) 2,4,5-Trichlorophenol 400 ND(0.050) 2,4,6-Trichlorophenol 2 ND(0.050) 2,4-Dinitrotoluene 0.13 ND(0.050) 2-Methylphenol 200 ND(0.050) 3&4-Methylphenol 200 ND(0.050) Hexachlorobenzene 0.13 ND(0.050) Hexachlorobutadiene 0.5 ND(0.050) Hexachloroethane 3 ND(0.050) Nitrobenzene 2 ND(0.050) Pentachlorophenol 100 ND(0.050) Pyridine 5 ND(0.050) Inorganics Arsenic 5 ND(0.100) Barium 100 0.149 B Cadmium 1 0.0238 B Chromium 5 1.09 Lead 5 34.8 Mercury 0.2 ND(0.000300) Selenium 1 ND(0.200) Silver 5 ND(0.100)

    Notes: 1. Sample was collected by Veolia ES Technical Solutions, L.L.C. and submitted to SGS Environmental

    Services Inc for analysis of PCBs and TCLP constituents Services, Inc. for analysis of PCBs and TCLP constituents. 2. Please refer toTable 2-5 for a summary of PCBs. 3. ND - Analyte was not detected. The number in parentheses is the associated detection limit. 4. Shading indicates that value exceeds the TCLP Regulatory Limit.

    Data Qualifiers:

    Inorganics B - Indicates an estimated value between the instrument detection limit (IDL) and PQL.

    Page 1 of 1

    G:\GE\GE_Pittsfield_General\Reports and Presentations\Monthly Reports\2011\09-11\Analytical Data Tables\ Tables.xlsx - 2-5 10/10/2011

  • TABLE 2-6 DATA RECEIVED DURING SEPTEMBER 2011

    PITTSFIELD SAND & GRAVEL POND SILT BACKFILL SAMPLING EAST STREET AREA 2 - SOUTH

    GENERAL ELECTRIC COMPANY - PITTSFIELD, MASSACHUSETTS (Results are presented in dry weight parts per million, ppm)

    Sample ID: Parameter Date Collected:

    PSG-PONDSILT-C1 09/21/11

    Volatile Organics Methylene Chloride 0.0067 J PCBs None Detected --Semivolatile Organics None Detected --Inorganics Arsenic 3.96 Barium 36.6 Cadmium 0.662 Chromium 9.85 Cobalt 8.24 Copper 17.4 Lead 8.50 Mercury 0.0155 B Nickel 14.6 Selenium 0.659 B Vanadium 10.4 Zinc 43.0

    Notes: 1. Sample was collected by ARCADIS and submitted to SGS Environmental Services,

    Inc. for analysis of PCBs, volatiles, semivolatiles and metals. 2. Only detected constituents are summarized. 3. -- Indicates that all constituents for the parameter group were not detected.

    Data Qualifiers:Data Qualifiers:

    Organics (PCBs, volatiles, semivolatiles) J - Indicates an estimated value less than the practical quantitation limit (PQL).

    Inorganics B - Indicates an estimated value between the instrument detection limit (IDL) and (PQL).

    Page 1 of 1

    G:\GE\GE_Pittsfield_General\Reports and Presentations\Monthly Reports\2011\09-11\Analytical Data Tables\ Tables.xlsx - 2-6 10/10/2011

  • TABLE 2-7 AMBIENT AIR PCB DATA RECEIVED DURING SEPTEMBER 2011

    PCB AMBIENT AIR CONCENTRATIONS EAST STREET AREA 2 SOUTH

    GENERAL ELECTRIC COMPANY - PITTSFIELD, MASSACHUSETTS

    Sampling Event Period

    Date Analytical Results Received by

    Berkshire Environmental

    Consultants, Inc.

    Field Blank (µg/PUF)

    ES2S-2R (µg/m3)

    ES2S-2RCO (colocated)

    (µg/m3)

    ES2S-3 (µg/m3)

    ES2S-7 (µg/m3)

    Background -East of Building

    9B (µg/m3)1

    09/13/11-09/14/11 09/19/11 ND (

  • TABLE 2-8 AMBIENT AIR PARTICULATE MATTER DATA RECEIVED DURING SEPTEMBER 20111

    PARTICULATE AMBIENT AIR CONCENTRATIONS EAST STREET AREA 2 - SOUTH

    GENERAL ELECTRIC COMPANY - PITTSFIELD, MASSACHUSETTS

    Sampling Date2 Sampler Location Average Site

    Concentration (mg/m3)

    Background Site Concentration

    (mg/m3)

    Average Period (Hours:Min)

    Predominant Wind Direction

    09/01/11 ES2S-2R ES2S-3 ES2S-6 ES2S-7

    0.010 * 0.021 0.007 * 0.008 *

    0.015 10:30 10:45 11:00 10:45

    Variable

    09/02/11 ES2S-2R ES2S-3 ES2S-6 ES2S-7

    0.006 * 0.015 0.005 * 0.008 *

    0.008 10:30 10:45 11:00 10:45

    SSW

    09/06/11 ES2S-2R ES2S-3 ES2S-6 ES2S-7

    0.002 * 0.003 0.001 * 0.002 *

    0.003 10:30 10:45 10:45 10:15

    NNE

    09/07/11 ES2S-2R ES2S-3 ES2S-6 ES2S-7

    0.001 * 0.002 0.005 0.000 *

    0.002 10:30 10:45 7:153

    10:45

    ENE

    09/08/11 ES2S-2R ES2S-3 ES2S-6 ES2S-7

    0.002 * 0.006 0.000 * 0.002 *

    0.003 10:30 10:45 10:30 10:30

    ENE

    09/09/11 ES2S-2R ES2S-3 ES2S-6 ES2S-7

    0.002 * 0.007 0.001 * 0.002 *

    0.004 11:00 10:45 11:00 10:45

    WNW

    09/10/114 ES2S-2R ES2S-3 ES2S-7

    0.005 * 0.010 0.006 *

    0.006 9:45 9:45 9:45

    Calm

    09/12/11 ES2S-2R ES2S-3 ES2S-7

    0.014 * 0.016 0.019 *

    0.011 10:45 10:45 10:45

    Variable

    09/13/11 ES2S-2R ES2S-3 ES2S-7

    0.018 * 0.022 0.023 *

    0.016 10:30 10:45 11:00

    SSW

    09/14/11 ES2S-2R ES2S-3 ES2S-7

    0.034 * 0.030 0.030 *

    0.026 11:00 10:45 11:00

    WNW

    09/15/11 ES2S-2R ES2S-3 ES2S-7

    0.023 * 0.014 0.014 *

    0.012 10:15 10:45 10:45

    WNW

    09/16/11 ES2S-2R ES2S-3 ES2S-7

    0.003 * 0.006 0.003 *

    0.003 10:30 10:45 10:30

    NNW, WNW

    09/19/11 ES2S-2R ES2S-3 ES2S-7

    0.004 * 0.012 0.003 *

    0.005 10:30 10:45 10:30

    Variable

    09/20/11 ES2S-2R ES2S-3 ES2S-7

    0.007 * 0.008 0.005 *

    0.006 10:30 10:45 10:30

    SSW, WSW

    Page 1 of 2

    G:\GE\GE_Pittsfield_General\Reports and Presentations\Monthly Reports\2011\09-11\Analytical Data Tables\ Tables.xlsx - 2-8 10/10/2011

  • TABLE 2-8 AMBIENT AIR PARTICULATE MATTER DATA RECEIVED DURING SEPTEMBER 20111

    PARTICULATE AMBIENT AIR CONCENTRATIONS EAST STREET AREA 2 - SOUTH

    GENERAL ELECTRIC COMPANY - PITTSFIELD, MASSACHUSETTS

    Sampling Date2 Sampler Location Average Site

    Concentration (mg/m3)

    Background Site Concentration

    (mg/m3)

    Average Period (Hours:Min)

    Predominant Wind Direction

    09/21/11 ES2S-2R ES2S-3 ES2S-7

    0.011 * 0.013 0.009 *

    0.007 11:00 10:45 10:45

    SSW

    09/22/11 ES2S-2R ES2S-3 ES2S-7

    0.005 * 0.005 0.004 *

    0.006 11:00 10:45 10:45

    SSE, SSW

    09/23/11 ES2S-2R ES2S-3 ES2S-7

    0.008 * 0.008 0.008 *

    0.007 10:30 10:45 10:30

    Calm

    09/26/11 ES2S-2R ES2S-3 ES2S-7

    0.013 * 0.016 0.007 *

    0.007 10:15 10:45 10:15

    Calm

    09/27/11 ES2S-2R ES2S-3 ES2S-7

    0.010 * 0.016 0.010 *

    0.011 10:45 10:45 10:30

    Calm

    09/28/11 ES2S-2R ES2S-3 ES2S-7

    0.012 * 0.014 0.011 *

    0.012 10:30 10:45 10:15

    ESE

    09/29/11 ES2S-2R ES2S-3 ES2S-7

    0.002 * 0.005 0.003 *

    0.005 11:15 10:45 11:00

    Variable

    Notification Level 0.120

    Notes: All concentrations measured with an EBAM unless otherwise noted. * Measured with a DR-4000. The background monitoring station was located east of Building 9B, between Building 9B and New York Avenue (BK-3) through July 18, 2011. The background monitor

    was relocated 120 feet north following sampling on July 18, 2011, due to site activities in close proximity to BK-3, and was renamed BK-3R.

    Predominant wind direction determined using hourly wind direction data from the Pittsfield Municipal Airport Weather Station. 1 Monitoring was performed only on days when site activities occurred. 2 The particulate monitors obtain real-time data. The sampling data were obtained by Berkshire Environmental Consultants, Inc. on the sampling date. 3 Sampling period shortened due to power failure. 4 Work week schedule included Saturday from 7:00 AM - 4:00 PM.

    Page 2 of 2

    G:\GE\GE_Pittsfield_General\Reports and Presentations\Monthly Reports\2011\09-11\Analytical Data Tables\ Tables.xlsx - 2-8 10/10/2011

  • ITEM 3

    PLANT AREA

    EAST STREET AREA 2-NORTH

    (GECD140)

    SEPTEMBER 2011

    a. Activities Undertaken/Completed

    - Continued discussions with PEDA relating to activities associated with transfer of the former 19s Complex and Woodlawn Avenue to PEDA.

    - Received subordination agreement from CSX Transportation, Inc. (CSX) for the ERE for Woodlawn Avenue.*

    - Executed the ERE for the portion of Woodlawn Avenue within East Street Area 2-North, combined with portion of that road adjacent to the former 20s Complex (September 9, 2011).*

    - Received EPA’s final comments on the draft ERE for the remainder of East Street Area 2North and associated survey information.*

    - Continued efforts to obtain a subordination agreement from CSX for the above ERE.*

    - Received EPA’s final comments on GE’s revised draft Final Completion Report (FCR) for the East Street Area 2-North Removal Action.*

    - Performed September 2011 dry weather flow inspection activities associated with Drainage Basin 005 under GE’s NPDES Permit.

    - Collected and transferred approximately 66,000 gallons of water from Building 9 to the Building 64G Groundwater Treatment Facility (GWTF) for treatment.

    - Collected and transferred approximately 72,000 gallons of water from Building 12Y to the Building 64G GWTF for treatment.

    - Continued pre-demolition preparation activities at the Building 9 and 10 Complexes.

    - Removed and loaded debris from former Building 14C and transported such debris to an off-site disposal facility.

    - Performed ambient air monitoring for particulate matter in conjunction with the above-referenced debris handling and load-out activities, as indicated in Table 3-1.

    - Collected equipment decontamination wipe samples of certain construction equipment used during the above-referenced debris handling and load-out activities, as indicated in Table 3-1.

    G:\GE\GE_Pittsfield_General\Reports and Presentations\Monthly Reports\2011\09-11\FINAL CD Monthly Text - 09-11.doc

  • ITEM 3

    (cont’d)

    PLANT AREA

    EAST STREET AREA 2-NORTH

    (GECD140)

    SEPTEMBER 2011

    a. Activities Undertaken/Completed (cont’d)

    - Performed inspections of the backfilled/restored areas as well as the crushed building material embankments for damage resulting from Tropical Storm Irene (September 21, 2011).

    - Notified EPA of PCB results from a sample of the liquid contents of a piece of equipment from Building 9 (September 23, 2011) (see Item 3.e below).

    b. Sampling/Test Results Received

    See attached tables.

    c. Work Plans/Reports/Documents Submitted

    - Submitted to EPA a report on the August 18, 2011 inspection of the herbaceous vegetation planted in the embankment areas within the former 19s Complex where crushed building materials have been placed (September 9, 2011).*

    - Submitted the executed ERE for Woodlawn Avenue to EPA for formal approval and MDEP for acceptance (September 14, 2011).* EPA provided approval on September 16, 2011.

    - Provided revised figures and appendices for the FCR for the East Street Area 2-North Removal Action to EPA for review and comment.*

    d. Upcoming Scheduled and Anticipated Activities (next six weeks)

    - Following receipt of MDEP’s acceptance of the ERE for Woodlawn Avenue, record that ERE.*

    - Continue efforts to obtain a subordination agreement from CSX for the ERE for the remainder of East Street Area 2-North.*

    - Upon receipt of a subordination agreement from CSX for the ERE for the remainder of East Street Area 2-North, finalize and execute that ERE, and submit it to EPA for formal approval and MDEP for acceptance.*

    - Schedule and conduct Pre-Certification Inspection of East Street Area 2-North (see Item 3.e below).*

    G:\GE\GE_Pittsfield_General\Reports and Presentations\Monthly Reports\2011\09-11\FINAL CD Monthly Text - 09-11.doc

  • ITEM 3

    (cont’d)

    PLANT AREA

    EAST STREET AREA 2-NORTH

    (GECD140)

    SEPTEMBER 2011

    d. Upcoming Scheduled and Anticipated Activities (next six weeks) (cont’d)

    - Following completion of the Pre-Certification Inspection of East Street Area 2-North, provide a revised draft FCR for East Street Area 2-North Removal Action (as well as additional photos taken during the Pre-Certification Inspection) to EPA for review and comment.*

    - Continue discussions with PEDA relating to activities associated with transfer of Woodlawn Avenue and the former 19s Complex to PEDA.

    - Potentially complete transfer of Woodlawn Avenue to PEDA (see Item 3.e below).

    - Submit report on the September 21, 2011 inspection of backfilled/restored areas as well as the crushed building material embankments to EPA.*

    - Perform October 2011 dry weather flow inspection activities associated with Drainage Basin 005 under GE’s NPDES Permit.

    - Perform manhole/catch basin cleaning activities within “select” manholes in accordance with GE’s NPDES Permit.

    e. General Progress/Unresolved Issues/Potential Schedule Impacts

    - GE and EPA are tentatively targeting October 2011 for a Pre-Certification Inspection of East Street Area 2-North.*

    - GE understands that installation of a pressure-reducing station by the Berkshire Gas Company in the northwest portion of East Street Area 2-North will be conducted in October; completion of this work is necessary prior to conducting the Pre-Certification Inspection.

    - By letter of August 25, 2011, GE and PEDA have jointly requested EPA and MDEP to agree to the transfer of the portion of Woodlawn Avenue within East Street Area 2-North from GE to PEDA prior to the issuance of a Certification of Completion for the East Street Area 2-North Removal Action. If they agree, Woodlawn Avenue may be transferred from GE to PEDA prior to issuance of that Certification of Completion.*

    G:\GE\GE_Pittsfield_General\Reports and Presentations\Monthly Reports\2011\09-11\FINAL CD Monthly Text - 09-11.doc

  • ITEM 3

    (cont’d)

    PLANT AREA

    EAST STREET AREA 2-NORTH

    (GECD140)

    SEPTEMBER 2011

    e. General Progress/Unresolved Issues/Potential Schedule Impacts (cont’d)

    - As noted in prior CD Monthly Reports, several equipment items were removed from Building 9 as part of routine pre-demolition activities in the Building 9 and 10 Complexes, the liquid contents of those items were sampled, and the results of such sampling were verbally reported to EPA on July 19, 2011. As also previously noted, a second sample from one item was collected on August 3, 2011. The final results of the August 3, 2011 sample were received and confirmed on September 20, 2011 and required notification to EPA. GE made the required verbal notification on September 23, 2011. Based on communications between GE and EPA, the formal written follow-up notification for both of these verbally reported sample results will be held in abeyance until the comprehensive pre-demolition work in the Building 9 and 10 Complexes has been completed. If, following completion of that work, additional equipment items requiring notification pursuant to GE’s Consent Agreement and Order (CAO) under the Toxic Substances Control Act (TSCA) are identified, such additional items will be identified, along with the original items (verbally reported on July 19, 2011 and September 23, 2011), in the formal written follow-up report.

    f. Proposed/Approved Work Plan Modifications

    None

    G:\GE\GE_Pittsfield_General\Reports and Presentations\Monthly Reports\2011\09-11\FINAL CD Monthly Text - 09-11.doc

  • TABLE 3-1 DATA RECEIVED AND/OR SAMPLES COLLECTED DURING SEPTEMBER 2011

    EAST STREET AREA 2 - NORTH GENERAL ELECTRIC COMPANY - PITTSFIELD MASSACHUSETTS

    Date Received by Project Name Field Sample ID Sample Date Matrix Laboratory Analyses GE or ARCADIS

    Building 9 Equipment Liquid Sampling Capacitor1 8/3/11 Oil SGS PCB 9/20/11 Excavator Bucket Wipe Sampling Bucket 1 9/26/11 Wipe SGS PCB 9/29/11 Excavator Bucket Wipe Sampling Bucket 2 9/26/11 Wipe SGS PCB 9/29/11 Excavator Bucket Wipe Sampling Bucket 3 9/26/11 Wipe SGS PCB 9/29/11

    Ambient Air Particulate Matter Sampling 14C-1 09/26/113 Air Berkshire Environmental Particulate Matter 10/4/2011 Ambient Air Particulate Matter Sampling 14C-2 09/26/113 Air Berkshire Environmental Particulate Matter 10/4/2011 Ambient Air Particulate Matter Sampling 14C-3 09/26/113 Air Berkshire Environmental Particulate Matter 10/4/2011 Ambient Air Particulate Matter Sampling Background Location 09/26/113 Air Berkshire Environmental Particulate Matter 10/4/2011

    G:\GE\GE_Pittsfield_General\Reports and Presentations\Monthly Reports\2011\09-11\Tracking Logs\ Tracking.xlsm - TABLE 3-1 1 of 1 10/10/2011

  • TABLE 3-2 PCB DATA RECEIVED DURING SEPTEMBER 2011

    BUILDING 9 EQUIPMENT LIQUID SAMPLING EAST STREET AREA 2 - NORTH

    GENERAL ELECTRIC COMPANY - PITTSFIELD, MASSACHUSETTS (Results are presented in parts per million, ppm)

    Sample ID Date

    Collected Aroclor-1016 Aroclor-1221 Aroclor-1232 Aroclor-1242 Aroclor-1248 Aroclor-1254 Aroclor-1260 Total PCBs Capacitor1 8/3/2011 1100000 ND(97000) ND(97000) ND(97000) ND(97000) ND(97000) ND(97000) 1100000

    Notes: 1. Sample was collected by Veolia ES Technical Solutions, L.L.C. and submitted to SGS Environmental Services, Inc. for analysis of PCBs. 2. ND - Analyte was not detected. The number in parentheses is the associated detection limit.

    Page 1 of 1

    G:\GE\GE_Pittsfield_General\Reports and Presentations\Monthly Reports\2011\09-11\Analytical Data Tables\ Tables.xlsx - 3-2 10/10/2011

  • TABLE 3-3 PCB DATA RECEIVED DURING SEPTEMBER 2011

    EXCAVATOR BUCKET WIPE SAMPLING EAST STREET AREA 2 - NORTH

    GENERAL ELECTRIC COMPANY - PITTSFIELD, MASSACHUSETTS (Results are presented in μg/100cm2)

    Sample ID Date

    Collected Aroclor-1016, 1221, -1232, -1242, -1248 Aroclor-1254 Aroclor-1260 Total PCBs

    Bucket 1 9/26/2011 ND(1.0) 0.67 J 3.2 3.87 Bucket 2 9/26/2011 ND(1.0) 0.17 J 1.3 1.47 Bucket 3 9/26/2011 ND(1.0) 1.3 1.8 3.1

    Notes: 1. Samples were collected by Veolia ES Technical Solutions, L.L.C. and submitted to SGS

    Environmental Services, Inc. for analysis of PCBs. 2. ND - Analyte was not detected. The number in parentheses is the associated detection limit.

    Data Qualifiers:

    J - Indicates an estimated value less than the practical quantitation limit (PQL).

    Page 1 of 1

    G:\GE\GE_Pittsfield_General\Reports and Presentations\Monthly Reports\2011\09-11\Analytical Data Tables\ Tables.xlsx - 3-3 10/10/2011

  • TABLE 3-4 1AMBIENT AIR PARTICULATE MATTER DATA RECEIVED DURING SEPTEMBER 2011

    BUILDING 14C DEMOLITION ACTIVITIES EAST STREET AREA 2 - NORTH

    GENERAL ELECTRIC COMPANY - PITTSFIELD, MASSACHUSETTS

    Sampling Date2 Sampler Location Average Site

    Concentration (mg/m3)

    Background Site Concentration

    (mg/m3)

    Average Period (Hours:Min)

    Predominant Wind Direction

    09/26/113 14C-1 14C-2 14C-3

    0.021 0.007 * 0.006 **

    0.008 7:45 7:30 7:00

    Calm

    Notification Level 0.120

    Notes: All concentrations measured with an EBAM unless otherwise noted. * Measured with a DR-4000. ** Measured with a pDR-1000 and DR-4000. The background monitoring station was located east of Building 9B, between Building 9B and New York Avenue (BK-3) through July 18, 2011. The background monitor

    was relocated 120 feet north following sampling on July 18, 2011, due to site activities in close proximity to BK-3, and was renamed BK-3R.

    Predominant wind direction determined using hourly wind direction data from the Pittsfield Municipal Airport Weather Station. 1 Monitoring was performed only on days when site activities occurred. 2 The particulate monitors obtain real-time data. The sampling data were obtained by Berkshire Environmental Consultants, Inc. on the sampling date. 3 Represents workday schedule from 8:00 AM - 3:00 PM.

    Page 1 of 1

    G:\GE\GE_Pittsfield_General\Reports and Presentations\Monthly Reports\2011\09-11\Analytical Data Tables\ Tables.xlsx - 3-4 10/10/2011

  • ITEM 4

    PLANT AREA

    EAST STREET AREA 1-NORTH

    (GECD130)

    SEPTEMBER 2011

    a. Activities Undertaken/Completed

    - Initiated pre-demolition activities in Building 69, given the potential for demolition of that building.

    - Collected building material characterization samples from Building 69 on September 6, 2011, as indicated in Table 4-1.

    b. Sampling/Test Results Received

    See attached tables.

    c. Work Plans/Reports/Documents Submitted

    None

    d. Upcoming Scheduled and Anticipated Activities (next six weeks)

    - Continue pre-demolition activities in Building 69.

    - Conduct annual Conditional Solution inspections (in November).

    e. General Progress/Unresolved Issues/Potential Schedule Impacts

    No issues.

    f. Proposed/Approved Work Plan Modifications

    None

    G:\GE\GE_Pittsfield_General\Reports and Presentations\Monthly Reports\2011\09-11\FINAL CD Monthly Text - 09-11.doc

  • TABLE 4-1 DATA RECEIVED AND/OR SAMPLES COLLECTED DURING SEPTEMBER 2011

    EAST STREET AREA 1 - NORTH GENERAL ELECTRIC COMPANY - PITTSFIELD MASSACHUSETTS

    Sample Date Received by Project Name Field Sample ID Date Matrix Laboratory Analyses GE or ARCADIS

    Building 69 North, South and West Outer Wall Sampling Bld-69-1 9/6/11 Solid SGS PCB 9/22/11 Building 69 North, South and West Outer Wall Sampling Bld-69-2 9/6/11 Solid SGS PCB 9/22/11 Building 69 North, South and West Outer Wall Sampling Bld-69-3 9/6/11 Solid SGS PCB 9/22/11 Building 69 North, South and West Outer Wall Sampling Bld-69-4 9/6/11 Solid SGS PCB 9/22/11 Building 69 North, South and West Outer Wall Sampling Bld-69-C1 9/6/11 Solid SGS TCLP - VOC, SVOC, Inorganics, RCRA Characteristics 9/22/11

    G:\GE\GE_Pittsfield_General\Reports and Presentations\Monthly Reports\2011\09-11\Tracking Logs\ Tracking.xlsm - TABLE 4-1 1 of 1 10/10/2011

  • TABLE 4-2 PCB DATA RECEIVED DURING SEPTEMBER 2011

    BUILDING 69 NORTH, SOUTH AND WEST OUTER WALL SAMPLING EAST STREET AREA 1 - NORTH

    GENERAL ELECTRIC COMPANY - PITTSFIELD, MASSACHUSETTS (Results are presented in dry weight parts per million, ppm)

    Sample ID Date

    Collected Aroclor-1016, 1221, -1232, -1242, -1248 Aroclor-1254 Aroclor-1260 Total PCBs

    Bld-69-1 9/6/2011 ND(0.030) 0.0059 J 0.013 J 0.0189 J Bld-69-2 9/6/2011 ND(0.030) 0.0044 J 0.0071 J 0.0115 J Bld-69-3 9/6/2011 ND(0.031) 0.028 J 0.020 J 0.048 J Bld-69-4 9/6/2011 ND(0.031) 0.011 J 0.014 J 0.025 J

    Notes: 1. Samples were collected by ARCADIS, and submitted to SGS Environmental Services, Inc. for analysis of PCBs. 2. ND - Analyte was not detected. The number in parentheses is the associated detection limit.

    Data Qualifiers: J - Indicates an estimated value less than the practical quantitation limit (PQL).

    Page 1 of 1

    G:\GE\GE_Pittsfield_General\Reports and Presentations\Monthly Reports\2011\09-11\Analytical Data Tables\ Tables.xlsx - 4-2 10/10/2011

  • TABLE 4-3 DATA RECEIVED DURING SEPTEMBER 2011

    BUILDING 69 NORTH, SOUTH AND WEST OUTER WALL SAMPLING EAST STREET AREA 1 - NORTH

    GENERAL ELECTRIC COMPANY - PITTSFIELD, MASSACHUSETTS (Results are presented in dry weight parts per million, unless otherwise noted)

    Parameter Sample ID:

    Date Collected: Bld-69-C1 09/06/11

    Inorganics Cyanide Reactivity ND(0.12) Sulfide Reactivity ND(0.24) Conventionals PH (pH Units) 8.8 Ignitability (mm/sec) 0.8

    Notes: 1. Sample was collected by ARCADIS, and submitted to SGS Environmental Services, Inc. for

    analysis of TCLP constituents, reactive cyanide and sulfide, PH and Ignitability. 2. Please refer toTable 4-4 for a summary of TCLP constituents. 3. ND - Analyte was not detected. The number in parentheses is the associated detection limit.

    Page 1 of 1

    G:\GE\GE_Pittsfield_General\Reports and Presentations\Monthly Reports\2011\09-11\Analytical Data Tables\ Tables.xlsx - 4-3 10/10/2011

  • TABLE 4-4 TCLP DATA RECEIVED DURING SEPTEMBER 2011

    BUILDING 69 NORTH, SOUTH AND WEST OUTER WALL SAMPLING EAST STREET AREA 1 - NORTH

    GENERAL ELECTRIC COMPANY - PITTSFIELD, MASSACHUSETTS (Results are presented in parts per million, ppm)

    Sample ID: Parameter Date Collected:

    TCLP Regulatory

    Limits Bld-69-C1 9/6/2011

    Volatile Organics 1,1-Dichloroethene 0.7 ND(0.010) 1,2-Dichloroethane 0.5 ND(0.010) 1,4-Dichlorobenzene 7.5 ND(0.010) 2-Butanone 200 ND(0.25) Benzene 0.5 ND(0.010) Carbon Tetrachloride 0.5 ND(0.010) Chlorobenzene 100 ND(0.010) Chloroform 6 ND(0.010) Tetrachloroethene 0.7 ND(0.010) Trichloroethene 0.5 ND(0.010) Vinyl Chloride 0.2 ND(0.010) Semivolatile Organics 1,4-Dichlorobenzene 7.5 ND(0.050) 2,4,5-Trichlorophenol 400 ND(0.050) 2,4,6-Trichlorophenol 2 ND(0.050) 2,4-Dinitrotoluene 0.13 ND(0.050) 2-Methylphenol 200 ND(0.050) 3&4-Methylphenol 200 ND(0.050) Hexachlorobenzene 0.13 ND(0.050) Hexachlorobutadiene 0.5 ND(0.050) Hexachloroethane 3 ND(0.050) Nitrobenzene 2 ND(0.050) Pentachlorophenol 100 ND(0.050) Pyridine 5 ND(0.050) Inorgganics Arsenic 5 ND(0.100) Barium 100 0.369 B Cadmium 1 0.0179 B Chromium 5 ND(0.100) Lead 5 0.0587 B Mercury 0.2 ND(0.000300) Selenium 1 0.0601 B Silver 5 ND(0.100)

    Notes: 1. Sample was collected by ARCADIS, and submitted to SGS Environmental Services, Inc. for

    analysis of TCLP constituents, reactive cyanide and sulfide, PH and Ignitability 2. Please refer toTable 4-3 for reactive cyanide and sulfide, PH and Ignitability. 3. ND - Analyte was not detected. The number in parentheses is the associated detection limit.

    Data Qualifiers:

    Inorganics B - Indicates an estimated value between the instrument detection limit (IDL) and

    practical quantitation limit (PQL).

    Page 1 of 1

    G:\GE\GE_Pittsfield_General\Reports and Presentations\Monthly Reports\2011\09-11\Analytical Data Tables\ Tables.xlsx - 4-4 10/10/2011

  • ITEM 5

    PLANT AREA

    HILL 78 & BUILDING 71 CONSOLIDATION

    AREAS

    (GECD210/220)

    SEPTEMBER 2011

    * All activities described below for this item were conducted pursuant to the Consent Decree.

    a. Activities Undertaken/Completed

    - Conducted ambient air monitoring for PCBs (September 21-22, 2011), as identified in Table 5-1.

    - No leachate was transferred from Building 71 On-Plant Consolidation Area (OPCA) to Building 64G Groundwater Treatment Facility for treatment (see Table 5-2).

    - Completed communications with EPA regarding the Final Completion Report (FCR) for the OPCAs, including the revised Post-Removal Site Control (PRSC) Plan, and prepared final versions of those documents.

    - Mowed the herbaceous vegetation at the OPCAs during the week of September 5, 2011.

    - Performed inspection of the Building 71 and Hill 78 OPCAs for damage resulting from Tropical Storm Irene (September 12, 2011).

    - Performed fall 2011 post-closure inspection of Building 71 and Hill 78 OPCAs (including trees planted as part of restoration activities) (September 27, 2011).

    - Received EPA approval of the FCR (including the Revised PRSC Plan) and Certification of Completion for Hill 78 and Building 71 Consolidation Area Removal Actions (September 26, 2011).

    b. Sampling/Test Results Received

    None

    c. Work Plans/Reports/Documents Submitted

    - Submitted the FCR, including the Revised PRSC Plan, to EPA (September 15, 2011).

    - Submitted report on unscheduled inspections in late August and early September 2011 at the Building 71 and Hill 78 OPCA to EPA (September 23, 2011).

    G:\GE\GE_Pittsfield_General\Reports and Presentations\Monthly Reports\2011\09-11\FINAL CD Monthly Text - 09-11.doc

  • ITEM 5

    (cont’d)

    PLANT AREA

    HILL 78 & BUILDING 71 CONSOLIDATION AREAS

    (GECD210/220)

    SEPTEMBER 2011

    d. Upcoming Scheduled and Anticipated Activities (next six weeks)

    - Submit a report on the fall 2011 post-closure inspection of the Building 71 and Hill 78 OPCAs (including trees planted as part of restoration activities).

    - Submit a plan to EPA proposing final OPCA cover soil repairs due to erosion, as identified in GE’s September 23, 2011 inspection report; and following EPA approval of that plan, complete the approved repairs.

    - Initiate post-closure groundwater monitoring program for the OPCAs, as discussed in new Item 24A below.

    e. General Progress/Unresolved Issues/Potential Schedule Impacts

    In accordance with GE’s Revised PRSC Plan, approved by EPA, a separate post-closure groundwater monitoring program will implemented for the OPCA monitoring wells beginning in fall 2011. The activities in that program are described in new Item 24A below.

    f. Proposed/Approved Work Plan Modifications

    None

    G:\GE\GE_Pittsfield_General\Reports and Presentations\Monthly Reports\2011\09-11\FINAL CD Monthly Text - 09-11.doc

  • TABLE 5-1 DATA RECEIVED AND/OR SAMPLES COLLECTED DURING SEPTEMBER 2011

    HILL 78/BUILDING 71 ON PLANT CONSOLIDATION AREAS GENERAL ELECTRIC COMPANY - PITTSFIELD MASSACHUSETTS

    Date Received by Project Name Field Sample ID Sample Date Matrix Laboratory Analyses GE or ARCADIS

    PCB Ambient Air Sampling Northwest of OPCAs 09/21-09/22/11 Air NEA PCB PCB Ambient Air Sampling West of OPCAs 09/21-09/22/11 Air NEA PCB PCB Ambient Air Sampling West of OPCAs colocated 09/21-09/22/11 Air NEA PCB PCB Ambient Air Sampling North of OPCAs 09/21-09/22/11 Air NEA PCB PCB Ambient Air Sampling Southeast of OPCAs 09/21-09/22/11 Air NEA PCB PCB Ambient Air Sampling Pittsfield Generating (PGE) 09/21-09/22/11 Air NEA PCB PCB Ambient Air Sampling Background East of Building 9B 09/21-09/22/11 Air NEA PCB

    G:\GE\GE_Pittsfield_General\Reports and Presentations\Monthly Reports\2011\09-11\Tracking Logs\ Tracking.xlsm - TABLE 5-1 1 of 1 10/10/2011

  • TABLE 5-2 BUILDING 71 CONSOLIDATION AREA LEACHATE TRANSFER SUMMARY

    PLANT AREA - HILL 78 & BUILDING 71 CONSOLIDATION AREAS

    CONSENT DECREE MONTHLY STATUS REPORT GENERAL ELECTRIC COMPANY - PITTSFIELD, MASSACHUSETTS

    September 2011

    Total Volume of Leachate Transferred

    Month / Year (Gallons) September 2010 6,000

    October 2010 6,000

    November 2010 6,000

    December 2010 0

    January 2011 5,580

    February 2011 5,800

    March 2011 6,000

    April 2011 0

    May 2011 4,968

    June 2011 4,100

    July 2011 0

    August 2011 6,000

    September 2011 0

    Note:1. Leachate is transferred from the Building 71 On-Plant

    Consolidation Area to Building 64G for treatment.

    Page 1 of 1 10/10/2011G:\GE\GE_Pittsfield_General\Reports and Presentations\Monthly Reports\2011\09-11\Monitoring Data\

    OPCA.xlsActive

  • ITEM 6

    PLANT AREA

    HILL 78 AREA - REMAINDER

    (GECD160)

    SEPTEMBER 2011

    a. Activities Undertaken/Completed

    - Conducted summer 2011 inspection of backfilled/restored areas (including restored areas above re-routed sewer pipelines and western drainage swale), re-vegetated areas, and other ground-covering feature areas (September 26, 2011). This inspection included observations of any damage resulting from Tropical Storm Irene.

    b.

    - Received EPA approval of Final Completion Report and Certification of Completion for Hill 78 Area-Remainder Removal Action (September 6, 2011).

    Sampling/Test Results Received

    None

    c. Work Plans/Reports/Documents Submitted

    d.

    None

    Upcoming Scheduled and Anticipated Activities (next six weeks)

    Submit report on September 26, 2011 inspection of backfilled/restored, re-vegetated, and other ground-covering feature areas (including observations of any damage resulting from Tropical Storm Irene).

    e. General Progress/Unresolved Issues/Potential Schedule Impacts

    f.

    No issues.

    Proposed/Approved Work Plan Modifications

    None

    G:\GE\GE_Pittsfield_General\Reports and Presentations\Monthly Reports\2011\09-11\FINAL CD Monthly Text - 09-11.doc

  • ITEM 7

    PLANT AREA

    UNKAMET BROOK AREA

    (GECD170)

    SEPTEMBER 2011

    a. Activities Undertaken/Completed

    - Received comments from EPA regarding GE’s interim draft design submittal #1 for Unkamet Brook Area-Remainder.*

    - Transferred approximately 6,000 gallons of water generated during General Dynamics’ excavation for construction of a new employee entrance structure on the west side of Building OP-2 to the Building 64G Groundwater Treatment Facility (GWTF) for treatment.

    - Performed monitoring and sampling activities at Outfalls YD11 and YD12 in accordance with GE’s NPDES Permit, as indicated in Table 7-1.

    - Performed September 2011 dry weather flow inspection activities associated with Drainage Basin 005 under GE’s NPDES Permit.

    - Initiated cleaning activities at Oil/Water Separator 119W in accordance with GE’s NPDES Permit.

    - Collected and transferred approximately 6,000 gallons of water generated during cleaning activities at Oil/Water Separator 119W to the Building 64G GWTF for treatment.*

    - Performed ambient air monitoring for particulate matter in conjunction with demolition activities at Building 52 and 53, as indicated in Table 7-1.

    - Received final comments from EPA and MDEP on revised draft EREs for Parcels L12-1-5, L12-1-4, and L12-1-101.*

    - Received termination agreement from Petricca Industries of option to purchase Parcel L12-15.*

    - Sent final ERE for Parcel L12-1-5 to the property owner for execution.*

    - Sent final ERE for Parcel L12-1-101 to CSX Transportation, Inc. (CSX) with request for subordination agreement.*

    b. Sampling/Test Results Received

    See attached tables.

    G:\GE\GE_Pittsfield_General\Reports and Presentations\Monthly Reports\2011\09-11\FINAL CD Monthly Text - 09-11.doc

  • ITEM 7

    (cont’d)

    PLANT AREA

    UNKAMET BROOK AREA

    (GECD170)

    SEPTEMBER 2011

    c. Work Plans/Reports/Documents Submitted

    Submitted a letter to EPA responding to EPA’s August 19, 2011 comments on GE’s Dry Weather Ambient Monitoring Plan (relating to outfalls YD11 and YD12) under GE’s NPDES Permit (September 22, 2011).

    d. Upcoming Scheduled and Anticipated Activities (next six weeks)

    - Receive comments from EPA and conduct discussions with EPA regarding GE’s interim draft design submittals for Unkamet Brook Area-Remainder.*

    - Receive executed ERE for Parcel L12-1-5 from property owner, and transmit it to EPA for final approval and MDEP for acceptance.*

    - Continue efforts to obtain the last remaining subordination agreement (from CSX) for the ERE for Parcel L12-1-101.*

    - Upon receipt of above-referenced subordination agreement from CSX, send EREs for Parcels L12-1-4 and L12-1-101 to the property owners for execution.*

    - Following discussions with EPA, continue development of an ERE and survey plan for GE-owned Parcel K11-7-2 and begin work on requests for subordination agreements for that ERE.*

    - Perform October 2011 dry weather flow inspection activities associated with Drainage Basin 009 under GE’s NPDES Permit.

    - Continue cleaning activities at Oil/Water Separator 119W in accordance with GE’s NPDES Permit.

    - Revise GE’s Dry Weather Ambient Monitoring Plan in accordance with EPA’s comments and GE’s responses to those comments as outlined in letters dated August 19 and September 22, 2011, respectively.

    - Perform sampling and monitoring activities associated with GE’s Wet and Dry Weather Ambient Monitoring Plans.

    G:\GE\GE_Pittsfield_General\Reports and Presentations\Monthly Reports\2011\09-11\FINAL CD Monthly Text - 09-11.doc

  • ITEM 7

    (cont’d)

    PLANT AREA

    UNKAMET BROOK AREA

    (GECD170)

    SEPTEMBER 2011

    e. General Progress/Unresolved Issues/Potential Schedule Impacts

    - Based on agreement between GE and EPA, the submittal date for the Final RD/RA Work Plan for Unkamet Brook Area-Remainder has been postponed, and GE has submitted various interim draft design submittals for that area to EPA for review and discussion.*

    - While preparation of an ERE and survey plan for GE-owned Parcel K11-7-2 has begun, it is anticipated that these documents will not be completed until after proposed excavations on that property by GE have been completed. It is also anticipated that subordination agreements for that ERE will not be obtained until that time.*

    - It is anticipated that the City of Pittsfield will draft an ERE for City-owned Parcel K11-7-9.*

    f. Proposed/Approved Work Plan Modifications

    None

    G:\GE\GE_Pittsfield_General\Reports and Presentations\Monthly Reports\2011\09-11\FINAL CD Monthly Text - 09-11.doc

  • TABLE 7-1 DATA RECEIVED AND/OR SAMPLES COLLECTED DURING SEPTEMBER 2011

    UNKAMET BROOK AREA GENERAL ELECTRIC COMPANY - PITTSFIELD MASSACHUSETTS

    Date Received by Project Name Field Sample ID Sample Date Matrix Laboratory Analyses GE or ARCADIS

    NPDES Related 2011 YD Outfall Sampling YD-11-092311 9/23/11 Water Columbia Oil & Grease NPDES Related 2011 YD Outfall Sampling YD-11-092311 9/23/11 Water Columbia TSS, Total Zinc NPDES Related 2011 YD Outfall Sampling YD-11-092311 9/23/11 Water SGS PCB NPDES Related 2011 YD Outfall Sampling YD-12-092311 9/23/11 Water Columbia Oil & Grease NPDES Related 2011 YD Outfall Sampling YD-12-092311 9/23/11 Water Columbia TSS, Total Zinc NPDES Related 2011 YD Outfall Sampling YD-12-092311 9/23/11 Water SGS PCB

    NPDES Related Wet Weather Ambient Monitoring UNK-DOWNSTREAM-080911 8/9/11 Water Columbia TSS 9/1/11 NPDES Related Wet Weather Ambient Monitoring UNK-DOWNSTREAM-080911-25 8/9/11 Water Columbia Oil & Grease 9/1/11 NPDES Related Wet Weather Ambient Monitoring UNK-DOWNSTREAM-080911-50 8/9/11 Water Columbia Oil & Grease 9/1/11 NPDES Related Wet Weather Ambient Monitoring UNK-DOWNSTREAM-080911-75 8/9/11 Water Columbia Oil & Grease 9/1/11 NPDES Related Wet Weather Ambient Monitoring UNK-UPSTREAM-080911 8/9/11 Water Columbia TSS 9/1/11 NPDES Related Wet Weather Ambient Monitoring UNK-UPSTREAM-080911-25 8/9/11 Water Columbia Oil & Grease 9/1/11 NPDES Related Wet Weather Ambient Monitoring UNK-UPSTREAM-080911-50 8/9/11 Water Columbia Oil & Grease 9/1/11 NPDES Related Wet Weather Ambient Monitoring UNK-UPSTREAM-080911-75 8/9/11 Water Columbia Oil & Grease 9/1/11

    Ambient Air Particulate Matter Sampling QH-1 09/26/113 Air Berkshire Environmental Particulate Matter 10/4/2011 Ambient Air Particulate Matter Sampling QH-2 09/26/113 Air Berkshire Environmental Particulate Matter 10/4/2011 Ambient Air Particulate Matter Sampling QH-3 09/26/113 Air Berkshire Environmental Particulate Matter 10/4/2011 Ambient Air Particulate Matter Sampling Background Location 09/26/113 Air Berkshire Environmental Particulate Matter 10/4/2011 Ambient Air Particulate Matter Sampling QH-1 09/28/114 Air Berkshire Environmental Particulate Matter 10/4/2011 Ambient Air Particulate Matter Sampling QH-2 09/28/114 Air Berkshire Environmental Particulate Matter 10/4/2011 Ambient Air Particulate Matter Sampling QH-3 09/28/114 Air Berkshire Environmental Particulate Matter 10/4/2011 Ambient Air Particulate Matter Sampling Background Location 09/28/114 Air Berkshire Environmental Particulate Matter 10/4/2011 Ambient Air Particulate Matter Sampling QH-1 09/30/114 Air Berkshire Environmental Particulate Matter 10/4/2011 Ambient Air Particulate Matter Sampling QH-2 09/30/114 Air Berkshire Environmental Particulate Matter 10/4/2011 Ambient Air Particulate Matter Sampling QH-3 09/30/114 Air Berkshire Environmental Particulate Matter 10/4/2011 Ambient Air Particulate Matter Sampling Background Location 09/30/114 Air Berkshire Environmental Particulate Matter 10/4/2011

    G:\GE\GE_Pittsfield_General\Reports and Presentations\Monthly Reports\2011\09-11\Tracking Logs\ Tracking.xlsm - TABLE 7-1 1 of 1 10/10/2011

  • TABLE 7-2 DATA RECEIVED DURING SEPTEMBER 2011

    NPDES RELATED WET WEATHER AMBIENT MONITORING UNKAMET BROOK AREA

    GENERAL ELECTRIC COMPANY - PITTSFIELD, MASSACHUSETTS (Results are presented in parts per million, ppm)

    Sample ID: Parameter Date Collected:

    UNK-Downstream-080911 08/09/11

    UNK-Downstream-080911-25 08/09/11

    UNK-Downstream-080911-50 08/09/11

    UNK-Downstream-080911-75 08/09/11

    Conventional Oil & Grease NA ND(4.9) ND(5.2) ND(5.0) Total Suspended Solids 15.2 NA NA NA

    Sample ID: Parameter Date Collected:

    UNK-Upstream-080911 08/09/11

    UNK-Upstream-080911-25 08/09/11

    UNK-Upstream-080911-50 08/09/11

    UNK-Upstream-080911-75 08/09/11

    Conventional Oil & Grease NA ND(4.5) ND(4.5) ND(4.1) Total Suspended Solids 13.9 NA NA NA

    Notes: 1. Samples were collected by ARCADIS and submitted to Columbia Analytical Services, Inc. for analysis of total suspended solids and oil & grease. 2. NA - Not Analyzed. 3. ND - Analyte was not detected. The number in parentheses is the associated detection limit.

    Page 1 of 1

    G:\GE\GE_Pittsfield_General\Reports and Presentations\Monthly Reports\2011\09-11\Analytical Data Tables\ Tables.xlsx - 7-2 10/10/2011

  • TABLE 7-3 1AMBIENT AIR PARTICULATE MATTER DATA RECEIVED DURING SEPTEMBER 2011

    BUILDINGS 52 & 53 DEMOLITION ACTIVITIES UNKAMET BROOK AREA

    GENERAL ELECTRIC COMPANY - PITTSFIELD, MASSACHUSETTS

    Sampling Date2 Sampler Location Average Site

    Concentration (mg/m3)

    Background Site Concentration

    (mg/m3)

    Average Period (Hours:Min)

    Predominant Wind Direction

    09/26/113 QH-1 QH-2 QH-3

    0.003 * 0.006 * 0.041

    0.007 1:30 1:45 1:30

    WNW, W

    09/28/114 QH-1 QH-2 QH-3

    0.024 0.018 0.016

    0.012 8:45 8:30 8:45

    ESE

    09/30/114 QH-1 QH-2 QH-3

    0.018 0.018 0.013

    0.013 8:45 8:30 7:305

    SSW

    Notification Level 0.120

    Notes: All concentrations measured with an EBAM unless otherwise noted. * Measured with a DR-4000. The background monitoring station was located east of Building 9B, between Building 9B and New York Avenue (BK-3) through July 18, 2011. The background monitor was relocated 120 feet north following sampling on July 18, 2011, due to site activities in close proximity to BK-3, and was renamed BK-3R.

    Predominant wind direction determined using hourly wind direction data from the Pittsfield Municipal Airport Weather Station. 1 Monitoring was performed only on days when site activities occurred. 2 The particulate monitors obtain real-time data. The sampling data were obtained by Berkshire Environmental Consultants, Inc. on the sampling date. 3 Represents workday schedule from 3:30 PM - 5:00 PM. 4 Represents workday schedule from 8:00 AM - 4:00 PM. 5 Sampling period shortened due to a power failure.

    Page 1 of 1

    G:\GE\GE_Pittsfield_General\Reports and Presentations\Monthly Reports\2011\09-11\Analytical Data Tables\ Tables.xlsx - 7-3 10/10/2011

  • ITEM 8

    FORMER OXBOW AREAS A&C

    (GECD410)

    SEPTEMBER 2011

    * All activities described below for this item were conducted pursuant to the Consent Decree.

    a. Activities Undertaken/Completed

    Performed summer 2011 inspection of backfilled/restored areas and certain replanted trees (September 15, 2011). This inspection included observations of any damage resulting from Tropical Storm Irene.

    b. Sampling/Test Results Received

    None

    c. Work Plans/Reports/Documents Submitted

    None

    d. Upcoming Scheduled and Anticipated Activities (next six weeks)

    - Submit report on summer 2011 inspection of backfilled/restored areas and certain replanted trees (including observations of any damage resulting from Tropical Storm Irene).

    - Conduct annual Conditional Solution inspections (in November).

    e. General Progress/Unresolved Issues/Potential Schedule Impacts

    No issues.

    f. Proposed/Approved Work Plan Modifications

    None

    G:\GE\GE_Pittsfield_General\Reports and Presentations\Monthly Reports\2011\09-11\FINAL CD Monthly Text - 09-11.doc

  • ITEM 9

    LYMAN STREET AREA

    (GECD430)

    SEPTEMBER 2011

    * All activities described below for this item were conducted pursuant to the Consent Decree.

    a. Activities Undertaken/Completed

    - Performed summer 2011 inspection of engineered barriers, backfilled/restored areas, and certain replanted vegetation (September 20, 2011). This inspection included observations of any damage resulting from Tropical Storm Irene.

    - Shipped soils from Parcels I9-4-14/-19 to an off-site disposal facility.

    b. Sampling/Test Results Received

    None

    c. Work Plans/Reports/Documents Submitted

    None

    d. Upcoming Scheduled and Anticipated Activities (next six weeks)

    - Submit report on summer 2011 inspection of engineered barriers, backfilled/restored areas, and certain replanted vegetation (including observations of any damage resulting from Tropical Storm Irene).

    - Conduct annual Conditional Solution inspections (in November).

    - Conduct annual ERE inspection of City-owned property (in November).

    e. General Progress/Unresolved Issues/Potential Schedule Impacts

    No issues.

    f. Proposed/Approved Work Plan Modifications

    None

    G:\GE\GE_Pittsfield_General\Reports and Presentations\Monthly Reports\2011\09-11\FINAL CD Monthly Text - 09-11.doc

  • ITEM 10

    NEWELL STREET AREA I

    (GECD440)

    SEPTEMBER 2011

    * All activities described below for this item were conducted pursuant to the Consent Decree.

    a. Activities Undertaken/Completed

    Performed inspection of backfilled/restored areas for damage resulting from Tropical Storm Irene (September 16, 2011).

    b. Sampling/Test Results Received

    None

    c. Work Plans/Reports/Documents Submitted

    Submitted report on summer 2011 inspection of engineered barriers and backfilled/restored areas to EPA (September 14, 2011).

    d. Upcoming Scheduled and Anticipated Activities (next six weeks)

    - Submit report on inspection of backfilled/restored areas for damage resulting from Tropical Storm Irene.

    - Conduct annual ERE and Conditional Solution inspections (in November).

    e. General Progress/Unresolved Issues/Potential Schedule Impacts

    No issues.

    f. Proposed/Approved Work Plan Modifications

    None

    G:\GE\GE_Pittsfield_General\Reports and Presentations\Monthly Reports\2011\09-11\FINAL CD Monthly Text - 09-11.doc

  • ITEM 11

    NEWELL STREET AREA II

    (GECD450)

    SEPTEMBER 2011

    * All activities described below for this item were conducted pursuant to the Consent Decree.

    a. Activities Undertaken/Completed

    Performed inspection of backfilled/restored areas for damage resulting from Tropical Storm Irene (September 16, 2011).

    b. Sampling/Test Results Received

    None

    c. Work Plans/Reports/Documents Submitted

    Submitted report on summer 2011 inspection of engineered barriers, backfilled/restored areas, and certain replanted vegetation to EPA (September 16, 2011).

    d. Upcoming Scheduled and Anticipated Activities (next six weeks)

    - Submit report on inspection of backfilled/restored areas for damage resulting from Tropical Storm Irene.

    - Conduct annual Conditional Solution inspections (in November).

    - Conduct annual ERE inspection of City-owned property (in November).

    e. General Progress/Unresolved Issues/Potential Schedule Impacts

    No issues.

    f. Proposed/Approved Work Plan Modifications

    None

    G:\GE\GE_Pittsfield_General\Reports and Presentations\Monthly Reports\2011\09-11\FINAL CD Monthly Text - 09-11.doc

  • ITEM 12

    FORMER OXBOW AREAS J & K

    (GECD420)

    SEPTEMBER 2011

    * All activities described below for this item were conducted pursuant to the Consent Decree.

    a. Activities Undertaken/Completed

    Performed summer 2011 inspection of backfilled/restored areas and certain replanted vegetation (September 22, 2011). This inspection included observations of any damage resulting from Tropical Storm Irene.

    b. Sampling/Test Results Received

    None

    c. Work Plans/Reports/Documents Submitted

    None

    d. Upcoming Scheduled and Anticipated Activities (next six weeks)

    - Submit report on summer 2011 inspection of backfilled/restored areas and certain replanted vegetation (including observations of any damage resulting from Tropical Storm Irene).

    - Conduct annual Conditional Solution inspections (in November).

    e. General Progress/Unresolved Issues/Potential Schedule Impacts

    GE has received permission from the owner of Parcel K10-11-5 for access to that property to perform inspections to date. GE will continue efforts, as appropriate, to obtain a long-term access agreement for that property.

    f. Proposed/Approved Work Plan Modifications

    None

    G:\GE\GE_Pittsfield_General\Reports and Presentations\Monthly Reports\2011\09-11\FINAL CD Monthly Text - 09-11.doc

  • ITEM 13

    HOUSATONIC RIVER AREA

    UPPER ½ MILE REACH

    (GECD800)

    SEPTEMBER 2011

    * All activities described below for this item were conducted pursuant to the Consent Decree.

    a. Activities Undertaken/Completed

    None

    b. Sampling/Test Results Received

    None

    c. Work Plans/Reports/Documents Submitted

    Submitted trip report on August 16, 2011 inspection of aquatic habitat enhancement structures and armor stone (September 22, 2011).

    d. Upcoming Scheduled and Anticipated Activities (next six weeks)

    None

    e. General Progress/Unresolved Issues/Potential Schedule Impacts

    GE submitted a report evaluating the total organic carbon (TOC) content and effectiveness of the isolation layer on the river sediments on March 14, 2007. The Final Completion Report for the Upper ½-Mile Reach Removal Action will be submitted following EPA review and approval of that report.

    f. Proposed/Approved Work Plan Modifications

    None

    G:\GE\GE_Pittsfield_General\Reports and Presentations\Monthly Reports\2011\09-11\FINAL CD Monthly Text - 09-11.doc

  • ITEM 14

    HOUSATONIC RIVER AREA

    1½ MILE REACH

    (GECD820)

    SEPTEMBER 2011

    a. Activities Undertaken/Completed

    - On GE’s behalf, ARCADIS performed one round of water column monitoring at 10 locations along the Housatonic River between Coltsville and Great Barrington on September 29, 2011. Two of these locations are situated in the 1½ Mile Reach: Lyman Street Bridge (Location 4) and Pomeroy Avenue Bridge (Location 6A). A composite grab sample was collected at each location and submitted to Northeast Analytical for analysis of PCBs (total), TSS, POC, and chlorophyll-a, as identified in Table 14-1. The sample collected at Pomeroy Avenue Bridge was also analyzed for volatile suspended solids (VSS). (The other eight locations are discussed under Items 15 and 20 below.)

    - GE performed an inspection of riverbanks, riprap and articulated concrete block (ACB), and aquatic habitat enhancement structures following the high flow event associated with Tropical Storm Irene (September 13, 2011).

    b. Sampling/Test Results Received

    See attached tables.

    c. Work Plans/Reports/Documents Submitted

    None

    d. Upcoming Scheduled and Anticipated Activities (next six weeks)

    - Continue Housatonic River water column monitoring.

    - Submit trip report on the September 13, 2011 inspection of the restored of riverbanks, riprap and ACB, and aquatic habitat enhancement structures following the high flow event associated with Tropical Storm Irene.*

    - Conduct repairs identified in GE’s August 31, 2011 report on supplemental inspections of critical ancillary items and certain associated items, following EPA’s approval of that report.*

    - Conduct any repairs identified in GE’s report on the above-referenced September 13, 2011 inspection, following EPA’s approval of that report.*

    - Conduct annual ERE and Conditional Solution inspections (in November).*

    G:\GE\GE_Pittsfield_General\Reports and Presentations\Monthly Reports\2011\09-11\FINAL CD Monthly Text - 09-11.doc

  • ITEM 14

    (cont’d)

    HOUSATONIC RIVER AREA

    1½ MILE REACH

    (GECD820)

    SEPTEMBER 2011

    e. General Progress/Unresolved Issues/Potential Schedule Impacts

    No issues.

    f. Proposed/Approved Work Plan Modifications

    None

    G:\GE\GE_Pittsfield_General\Reports and Presentations\Monthly Reports\2011\09-11\FINAL CD Monthly Text - 09-11.doc

  • TABLE 14-1 DATA RECEIVED AND/OR SAMPLES COLLECTED DURING SEPTEMBER 2011

    HOUSATONIC RIVER - 1 1/2 MILE REACH GENERAL ELECTRIC COMPANY - PITTSFIELD MASSACHUSETTS

    Date Received by Project Name Field Sample ID Sample Date Matrix Laboratory Analyses GE or ARCADIS

    Monthly Water Column Sampling Location-4 8/31/11 Water NEA PCB, TSS, POC, Chlorophyll-A 9/12/11 Monthly Water Column Sampling Location-4 9/29/11 Water NEA PCB, TSS, POC, Chlorophyll-A Monthly Water Column Sampling Location-6A 8/31/11 Water NEA PCB, TSS, VSS, POC, Chlorophyll-A 9/12/11 Monthly Water Column Sampling Location-6A 9/29/11 Water NEA PCB, TSS, VSS, POC, Chlorophyll-A

    G:\GE\GE_Pittsfield_General\Reports and Presentations\Monthly Reports\2011\09-11\Tracking Logs\ Tracking.xlsm - TABLE 14-1 1 of 1 10/10/2011

  • TABLE 14-2 SAMPLE DATA RECEIVED DURING SEPTEMBER 2011

    MONTHLY WATER COLUMN SAMPLING HOUSATONIC RIVER - 1 1/2 MILE REACH

    GENERAL ELECTRIC COMPANY - PITTSFIELD, MASSACHUSETTS (Results are presented in parts per million, ppm)

    Sample ID Location Date

    CollectedAroclor-1016,

    1232, -1248, -1260 Aroclor 1221 Aroclor 1242 Aroclor 1254 Total PCBs POC TSS Chlorophyll (a) VSS LOCATION-4 Lyman Street Bridge 08/31/11 ND(0.0000220) ND(0.0000220) ND(0.0000220) ND(0.0000220) ND(0.0000220) 0.94 13.2 0.00130 NA LOCATION-6A Pomeroy Ave. Bridge 08/31/11 ND(0.00000550) 0.0000150 PB 0.00000890 PD 0.00000700 AF 0.0000309 1.0 13.1 0.00120 2.71

    Notes: 1. Samples were collected by ARCADIS, and submitted to Northeast Analytical, Inc. for analysis of PCBs (unfiltered), total suspended solids (TSS), particulate organic carbon (POC),

    chlorophyll (a) and volatile suspended solids (VSS). 2. Sampling methods involved the collection of composite grab samples at each location, representative of three stations (25, 50, and 75 percent of the total river width at each location) at

    50 percent of the total river depth at each station. 3. NA - Not Analyzed. 4. ND - Analyte was not detected. The number in parentheses is the associated detection limit.

    Data Qualifiers:

    AF - Aroclor 1254 is being reported as the best Aroclor match. The sample exhibits an altered PCB pattern. PB - Aroclor 1221 is being used to report an altered PCB pattern exhibited by the sample. Actual Aroclor 1221 is not present in the sample, but is reported to more

    accurately quantify PCBs present in a sample that has undergone environmental alteration. PD - Aroclor 1242 is being used to report an altered PCB pattern exhibited by the sample. Actual Aroclor 1242 is not present in the sample, but is reported to more

    accurately quantify PCBs present in a sample that has undergone environmental alteration.

    Page 1 of 1

    G:\GE\GE_Pittsfield_General\Reports and Presentations\Monthly Reports\2011\09-11\Analytical Data Tables\ T