24
September 18, 2008 I-35 South Environmental Assessment North End of I-35 SH 9W Interchange Ramps North to ½ Mile North of Main Street in Norman Public Meeting

September 18, 2008

  • Upload
    totie

  • View
    33

  • Download
    2

Embed Size (px)

DESCRIPTION

Public Meeting. I-35 South Environmental Assessment North End of I-35 SH 9W Interchange Ramps North to ½ Mile North of Main Street in Norman. September 18, 2008. I-35 South Environmental Assessment. Introductions. ODOT Benham FHWA. I-35 South Environmental Assessment. - PowerPoint PPT Presentation

Citation preview

Page 1: September 18, 2008

September 18, 2008

I-35 SouthEnvironmental Assessment

North End of I-35 SH 9W Interchange RampsNorth to ½ Mile North of Main Street in Norman

Public Meeting

Page 2: September 18, 2008

ODOT Benham FHWA

I-35 South Environmental AssessmentIntroductions

Page 3: September 18, 2008

Meeting Purpose

I-35 South Environmental Assessment

Provide Project Status Update– Results of Environmental Data Collection & Evaluation to Date

– Interchange Alternatives for Main Street, Lindsey Street, and SH 9 East & Associated Traffic Analyses

Obtain Input / Feedback

Page 4: September 18, 2008

I-35 South Environmental AssessmentStudy Area

Page 5: September 18, 2008

Expand I-35 to 6 Lanes North of Canadian River Bridge

Reconstruct SH 9E, Lindsey, & Main Interchanges

I-35 South Environmental AssessmentProposed Improvements

Page 6: September 18, 2008

Establish Project within ODOT Complete Environmental Process Design Project Acquire Right-of-Way Relocate Utilities Construct Project

I-35 South Environmental AssessmentThe Roadway Improvement Process

Page 7: September 18, 2008

National Environmental Policy Act Decision Making Process

NEPA Process

Community Impacts

Wetlands Endangered Species

Safety

All Applicable Federal Laws

FlexibleDesign

State & Local Law

Transportation Enhancements Traditional

Cultural Properties

Environmental Justice

Parklands

Air Quality

Historic

NEPA Process

Community Impacts

Wetlands Endangered Species

Safety

All Applicable Federal Laws

FlexibleDesign

State & Local Law

Transportation Enhancements Traditional

Cultural Properties

Environmental Justice

Parklands

Air Quality

Historic

I-35 South Environmental AssessmentNEPA Process

Page 8: September 18, 2008

Minimize Social, Environmental, & Economic Impacts of the Project

Solicit Input from Federal, Tribal, State, Local Agencies, & Public

Collect Environmental Data Estimate Construction, Right-of-Way, &

Utility Costs Evaluate Data & Costs to Select

Preferred Improvements

I-35 South Environmental AssessmentNEPA Process

Page 9: September 18, 2008

Purpose & Need for Project Alternatives Affected Environment Possible Environmental Consequences Comments & Coordination / Public

Involvement Engineering / Design / Drainage Concerns Accidents / Safety Concerns

I-35 South Environmental AssessmentItems Considered During Project Development

Page 10: September 18, 2008

Increase Safety Provide Additional

CapacityExisting ADT Future ADT

I-35 72,400 100,600

SH 9E 29,500 42,700

Main 42,600 55,200

Lindsey 27,300 36,800

Implement OCART Study Recommendations

I-35 South Environmental AssessmentProject Purpose & Need

Page 11: September 18, 2008

I-35 South Environmental AssessmentInterchange Alternatives

Page 12: September 18, 2008

Existing I-35SH 9 to Main Street

Page 13: September 18, 2008

LOS = D/E

LOS = C/F2006 Concept Study

Page 14: September 18, 2008

2006 Concept Study

Page 15: September 18, 2008
Page 16: September 18, 2008
Page 17: September 18, 2008
Page 18: September 18, 2008
Page 19: September 18, 2008
Page 20: September 18, 2008

BRIDGE ADDITIONSOUTH RAMPS ATLINDSEY STREET

BRIDGE ADDITIONNO SOUTH RAMPS

AT LINDSEY STREET

CONCEPT 2

CONCEPT 1

CONCEPT 1

CONCEPT 2

Page 21: September 18, 2008

1st Public Meeting September 24, 2007

2nd Public Meeting September 18, 2008

Public Hearing Late 2008

I-35 South Environmental AssessmentPublic Participation Opportunities

Page 22: September 18, 2008

Web Address: http://www.okladot.state.ok.us/meetings/index.htm

Scott Stegmann – ODOTPhone: 405.522.8014200 NE 21st StreetOklahoma City, OK 73105E-mail: [email protected]

Diane Abernathy – BenhamPhone: 405.701.31673700 W. Robinson, Ste. 200Norman, OK 73072E-mail: [email protected]

I-35 South Environmental AssessmentInformation Sources

Page 23: September 18, 2008

We Want Your

Comments!

I-35 South Environmental AssessmentI-35 South Environmental Assessment

Holiday Inn Norman, Oklahoma September 18, 2008

Public Comments Form

Dear Participants: We would like to thank you for taking the time to attend this meeting and providing us with written comments. Putting your comments in writing is one of the most effective ways to have your concerns addressed. I have the following comments or questions about the I-35 South Environmental Assessment from the north end of the I-35/SH 9W interchange ramps north to approximately ½ mile north of Main Street in Norman: ________________________________________________________________________________

________________________________________________________________________________

________________________________________________________________________________

________________________________________________________________________________

________________________________________________________________________________

________________________________________________________________________________

________________________________________________________________________________

________________________________________________________________________________

________________________________________________________________________________

________________________________________________________________________________

________________________________________________________________________________

________________________________________________________________________________

________________________________________________________________________________

________________________________________________________________________________

________________________________________________________________________________

Name: Environmental Programs Division Engineer Oklahoma Department of Transportation Address: 200 Northeast 21st Street Oklahoma City, Oklahoma 73105 City, State, Zip: FAX: 405-521-6917 (Above information is optional) Please submit comments by October 2, 2008.

ODOT Website: http://www.okladot.state.ok.us/meetings/index.htm

Page 24: September 18, 2008

Thank you!

Questions &

Answers