    Indah Water Konsortium Sdn Bhd

    INDAH WATER KONSORTIUM SDN BHD

    -Malaysia s National Sewerage Company-

    SEPTAGE MANAGEMENT IWK PERSPECTIVE

    By: Mohd. Zainal ZakariaRegional Manager, Indah Water Konsortium Sdn Bhd,Malaysia

    KSAN 2011, Jakarta, Indonesia 12 October 2011

  • 7/31/2019 SEPTAGE MANAGEMENT Indah Water Konsortium (IWK) PERSPECTIVE

    2/22

    Indah Water Konsortium Sdn Bhd

    Indah water provides sewerage services in 87 out of the 144 Local Authorities inMalaysia. Indah Water Konsortium Sdn Bhd (IWK) is responsible for providingsewerage services, operating and maintaining over 5,605 public sewage treatmentplants and 14,700km networks of sewerage pipelines as well as desludging andseptage management for 1 million ISTs. IWK covers most parts of Malaysia foroperation and maintenance whilst providing technical expertise to the remaining un-serviced area.

    BeforeIndependence

    Mostly Managed by Local Sanitary Board

    AfterIndependence

    June-93 Sewerage Act 1993 (Act 518) was passed by Parliament

    December-93 Dept. of Sewerage Services was formed as regulator for sewerage services under the SSA.

    Before 1994 Sewerage Services were managed by 144 Individual Local Authorities

    April-94 Indah Water took over sewerage management in most states in Peninsular Malaysia

    June-00 Govt. Under Minister of Finance Incorporated took over IWK

    June-06 Water Services Industry Act 2006 & SPAN approved by Parliament

    January-08 Establishment of National Water Services Commission (SPAN) & enforcement of WaterServices Industry Act 2006

    At Present

    Background of SewerageManagement in Malaysia

    Urban by Municipals & Rural by Ministry of Health

  • 7/31/2019 SEPTAGE MANAGEMENT Indah Water Konsortium (IWK) PERSPECTIVE

    3/22

    Indah Water Konsortium Sdn Bhd

    1950s 1980s1970s1960s 1990s 2000s

    Primary/Primitive Treatment Partial/Full Secondary TreatmentTertiaryTreatment

    Early DaysIn Malaya

    Prior to 1950s

    Address Public Health Address River Pollution Address Environment

    Pour Flush Septic Tank Imhoff TankOxidation PondAerated Lagoons

    Activated SludgeBiological Filters

    Fully MechanizedPlants

    Technology

    Year

    The sewerage systems in Malaysia has improved significantly within a span of over 5 decades

    3

    Evolution of Sewerage System inMalaysia

    Population = 28Mill, Urban Population = 18 Mill (95% - Improve Sanitation), Access toImprove Water = 98%, Sewerage Connections = 73%, Septic Tanks = 27%

  • 7/31/2019 SEPTAGE MANAGEMENT Indah Water Konsortium (IWK) PERSPECTIVE

    4/22

    Indah Water Konsortium Sdn Bhd

    Ministry of Finance

    Regulator ofSewerageServices

    Regulator ofEffluent

    Standards

    Ministry of NaturalResources &Environment

    Ministry of Energy,Green Technology &

    Water

    100% Equity Govt. SupportLoan & Subsidy

    1. Sewerage Services2. Operator in 88 Local

    Authority Areas.3. Sewerage Services

    Billing & Collection.4. Undertakes

    Refurbishment/Upgrading Projects

    Funded by Govt.

    Policy & Controlof NationalSewerageAgenda- Water ServicesIndustry Act2006

    4

    Current Governance Structure of Sewerage Services in Malaysia

    - EnvironmentalQuality Act 1974- EnvironmentQuality (sewage)Regulation 2009

  • 7/31/2019 SEPTAGE MANAGEMENT Indah Water Konsortium (IWK) PERSPECTIVE

    5/22

    Indah Water Konsortium Sdn Bhd

    3-Stage Strategy to meet desludging requirements nationwide

    Fully utilize sludgedisposal sites i.e.

    trenching method,sludge lagoons, DB

    and increase number

    of or MDU, CSTF

    One sludge facilityfor each LA,

    Permanent CSTF,Exploring reuse of

    biosolids as a

    resource

    Sludge disposal sitesi.e. trenching

    method, sludgelagoons or mobile

    mechanicaldewatering (MDU)

    SLUDGESTRATEGY

    IMMEDIATE(Up till 2000)

    SHORT TERM(2001-2010)

    LONG TERM(2011 Onwards)

    IWK Sludge Management Strategy

  • 7/31/2019 SEPTAGE MANAGEMENT Indah Water Konsortium (IWK) PERSPECTIVE

    6/22

    Indah Water Konsortium Sdn Bhd

    6

    Sludge Treatment & Disposal Facilities inMalaysia

    Mechanised DewateringUnit (MDU)-Completed

    :21 Nos.

    Integrated SludgeReception Facility-

    Completed : 8 Nos.

    Dedicated CentralizedSludge Treatment Facility

    (CSTF)-Completed: 6 Nos.

    Trenching System-Completed :25 Nos.

    Dedicated DryingBeds

    Lagoon System-Completed : 1 No. Sanitary Landfill : 11Nos.

  • 7/31/2019 SEPTAGE MANAGEMENT Indah Water Konsortium (IWK) PERSPECTIVE

    7/22

    Indah Water Konsortium Sdn Bhd

    PADANGTERAR

    SIK

    PENDANG

    YAN

    BALING

    KULIM

    BANDAR BAHARU

    DAERAH UTARA

    DAERAH

    TENGAH

    DAERAH SELATAN

    TIMUR LAUT

    BARATDAYA

    HULU PERAK

    SELAMA

    KERIANLARUT

    & MATANG

    KUALAKANGSAR

    KINTA

    MANJUNG

    PERK TENGAH

    BATANGPADANG

    HILIR PERAK

    GUAMUSANG

    KUALA KRAI

    JELI

    TANAH MERAH MACHANG

    PASIR PUTEH

    BACHOK PASIR MAS

    TUMPA

    KOTA BHARU

    BESUT

    SETIU

    KUALA TERENGGANU

    HULU TERENGGANU

    DUNGUN

    LIPIS

    KEMAMAN

    CAMERONHIGHLANDS

    JERANTUT

    RAUB

    BENTUNG

    TEMERLUH

    MARAN

    KUANTAN

    PEKAN

    ROMPIN

    SEGAMAT

    MUAR

    MERSING

    KELUANG

    BATUPAHAT

    JOHORBHARU

    KOTATINGGI

    PONTIAN

    ALOR GAJAH

    LANGKAWI

    KOTA SETAR

    KUBANGPASU

    KANGAR

    KUALA MUDA

    SUNGAI PETANI

    JOHOR BHARU

    KLUANG

    PORTDICKSON

    GOMBAK

    KUALA SELANGOR

    JASIN

    MELAKA TENGAH

    TAMPIN

    JEMPOL

    KUALA PILAH

    JELEBU

    SEREMBAN

    REMBAU

    SABAK BERNAM

    KLANG

    KUALA

    LANGAT SEPANG

    HULUSELANGOR

    GOMBAK

    HULULANGAT

    PETALING

    KUALA LUMPUR

    THAILAND

    MARANG

    MELAKA

    SEREMBAN

    KLANG

    KUALA LUMPUR

    IPOH

    ALOR SETAR

    GEORGE TOWN BALIK

    PULAU

    KUANTAN

    KUALA TERENGGANU

    SINGAPUR

    Kertih, Kemaman MDU

    Padang Matsirat, Langkawi CSTF

    Mukim Derga, Kota Setar CSTF

    Mukim Wang Bintong, Kangar CSTF

    Lot 130, Klang CSTF

    Sungai Udang, Melaka Tengah CSTF

    PD Town, CSTF

    Mak Mandin (SPI228), Seberang

    Perai MDU

    Papan, Batu Gajah MDU

    Taman Sri Gombak MDU

    Tanah Hitam, Ipoh MDU

    Bandar Seri Manjung (LPG020) MDU

    Gong Badak, Kuala TerengganuMDU

    Taman Yayasan (SGA004),Segamat MDU

    Taman Bakariah (MUN111), Muar MDU

    Taman Bukit Perdana (BPT045) Batu Pahat MDU

    Taman Megah (JPN023), Pontian MDU

    Bandar Indera Mahkota(KUN005), Kuantan MDU

    Taman Maran Jaya(HMN015), Maran MDU

    Taman Bukit Bendera III(HTH008), Temerloh MDU

    Taman Bandar Baru Juta Villa (HCH020),Cameron Highlands MDU

    Taman Desa Puteri (NJL085),Jempol MDU

    Glami-Lemi, Jelebu MDU

    Bandar Baru Seremban Selatan (SED079),Seremban MDU

    Taman Wira (KSR031), Alor Setar MDU

    Bandar Puteri Jaya (KMA288),Sungai Petani MDU

    Kulim Hi-Tech (KIM093), Kulim MDU

    6 CSTF21 MDU

    Sludge Treatment & DisposalFacilities in Malaysia

  • 7/31/2019 SEPTAGE MANAGEMENT Indah Water Konsortium (IWK) PERSPECTIVE

    8/22

    Indah Water Konsortium Sdn Bhd

    O&M OperatorsTraining

    ConstructionContractors Training

    SpecializedTraining

    Key Areas: Treatment Plant

    Operations &Maintenance

    Sewer Network

    Maintenance Desludging Operation

    Desludging Works Know Your Tanker

    M&E of SewerageEquipments

    Health & Safety

    Key Areas: Sewage Treatment

    Plant Construction M&E of Sewage

    Treatment Plant Construction Sewer

    Laying On-site Material

    Handling Health & Safety

    Key Areas: Planning of

    Sewerage System Design of Sewerage

    System Nutrient removal in

    Treatment PlantProcess

    CCTV Training Project

    Management

    IWK Technical Training andCompetency Certification

  • 7/31/2019 SEPTAGE MANAGEMENT Indah Water Konsortium (IWK) PERSPECTIVE

    9/22

  • 7/31/2019 SEPTAGE MANAGEMENT Indah Water Konsortium (IWK) PERSPECTIVE

    10/22

    Indah Water Konsortium Sdn Bhd

    Comparative study visit by Indonesia Delegate (MalangCity, Surabaya City & East Jawa Disctrict)Date Visit: 5 9 December 2005

    Capacity Building Activities by IWKin Indonesia

    Study visit by Denpasar Sewerage DevelopmentProject (DSDP) Bali DelegatesDate Visit: 18-20 September 2006

    Outcome: The delegates learnt a range of options forimproving sanitation services, guidelines for seweragedevelopment and process control.

    Comparative study visit by Indonesia Delegate (BandungCity, Medan City, West Jawa Dictric, IATPI & BAPPEDAS)Date Visit: 15 20 May 2006

    Outcome: IWK s shared the best practices of seweragemanagement in Malaysia with the delegates

    Outcome: The delegates were gain hands on exposure andtraining for their newly completed STP. The training by IWKfocus on best practices for O&M

    Visitation from Perusahaan Daerah Air Minum (PDAM)Kota Bandung, IndonesiaDate Visit: 24 August 2007

    Outcome: IWK provided advisory services to improvePDAM s financial & technical knowledge for bettersewerage services

  • 7/31/2019 SEPTAGE MANAGEMENT Indah Water Konsortium (IWK) PERSPECTIVE

    11/22

    Indah Water Konsortium Sdn Bhd

    Contact us for Possible Collaborations:- The Manager,Level 1-4, Block J, Pusat Bandar Damansara, 50490 Kuala Lumpur, Malaysia Tel:+603 27801100 Fax:+603 27801101

    Website : www.iwk.com.my 11

    Regulatory Framework for Septage Management Regulateseptage collection and disposal .

    Public Awareness / Education Continuous public educationprogrammes to emphasize the importance of regular /scheduled desludging of ISTs.

    Investment in New Infrastructure Ensure adequate facilitiesfor septage sludge treatment and disposal.

    Capacity Building Continuous training for IST workers

    Regulatory Framework - Standardization of IST design fornew ISTs installations.

    Institutional Reform Agency to regulate sewerage industrywith enforcement power for existing ISTs.

    Septage Sludge Management Suggestion for Indonesia

    GRD. LEV

    Prefab septic tank

  • 7/31/2019 SEPTAGE MANAGEMENT Indah Water Konsortium (IWK) PERSPECTIVE

    12/22

    Indah Water Konsortium Sdn Bhd

  • 7/31/2019 SEPTAGE MANAGEMENT Indah Water Konsortium (IWK) PERSPECTIVE

    13/22

    Indah Water Konsortium Sdn Bhd

    13

    LinkSlides

  • 7/31/2019 SEPTAGE MANAGEMENT Indah Water Konsortium (IWK) PERSPECTIVE

    14/22

    Indah Water Konsortium Sdn Bhd

    Temp.(oC) pHBOD COD SS NH 3-N NO 3-N P O&G

    (mg/l) (mg/l) (mg/l) (mg/l) (mg/l) (mg/l) (mg/l)

    EQA Standards

    CurrentStandard

    Standard A 40 6.0 9.0 20 50 50 n/a n/a n/a n/d

    Standard B 40 5.5 9.0 50 100 100 n/a n/a n/a 10

    From 1st Feb. 2010

    Category 1(River)

    Standard A 40 6.0 9.0 20 120 50 10 20 5 5

    Standard B 40 5.5 9.0 50 200 100 20 50 10 10

    Category 1(Lake)

    Standard A 40 6.0 9.0 20 120 50 5 10 5 5

    Standard B 40 5.5 9.0 50 200 100 5 10 10 10

    Between 1st Jan. 1999 to 31st Jan. 2010

    Category 2Standard A n/a n/a 20 120 50 n/a n/a n/a 20

    Standard B n/a n/a 50 200 100 n/a n/a n/a 20

    Before 1st Jan. 1999

    Category 3

    CST n/a n/a 200 n/a 180 n/a n/a n/a n/a

    IT n/a n/a 175 n/a 150 n/a n/a n/a n/a

    OP n/a n/a 120 360 150 n/a n/a n/a n/a

    AL n/a n/a 100 300 120 n/a n/a n/a n/a

    MTPStdA n/a n/a 60 180 100 n/a n/a n/a 20

    StdB n/a n/a 80 240 120 n/a n/a n/a 20

    EFFLUENT DISCHARGE LIMIT UNDER ENVIRONMENTAL

    QUALITY (SEWAGE) REGULATIONS 2009,

    EQA 1974

  • 7/31/2019 SEPTAGE MANAGEMENT Indah Water Konsortium (IWK) PERSPECTIVE

    15/22

    Indah Water Konsortium Sdn Bhd

    15

    IWK s R&D Programs for Potential SludgeReuse & Recycle

    Land Reclamation/ SoilImprovement

    Composting

    Bricks / Tiles / Slab Reforestation

    Power Generation

    Bio Product andLandscaping

    http://www.google.com.my/imgres?imgurl=http://foodfreedom.files.wordpress.com/2010/09/chemical-farming.jpg&imgrefurl=http://foodfreedom.wordpress.com/2010/09/27/how-slop-from-natural-gas-fracking-could-end-up-in-your-food/&usg=__B1Ej49RopnMepZTOIr0fJbt2W58=&h=280&w=320&sz=21&hl=en&start=57&zoom=1&tbnid=sAy7hRokTXtd1M:&tbnh=103&tbnw=118&ei=K0uSTqKcKJHxrQfm56GqAQ&prev=/search?q=agriculture+sludge&start=42&um=1&hl=en&sa=N&tbm=isch&um=1&itbs=1
  • 7/31/2019 SEPTAGE MANAGEMENT Indah Water Konsortium (IWK) PERSPECTIVE

    16/22

    Indah Water Konsortium Sdn Bhd

    DESLUDGING OF IST DESLUDGING WORKSTitle

    Course Objective

    Learning Outcomes

    This course is designed to provide knowledge on sewerage system, types andfunction of septic tanks, septic tanks desludging work processes, goodpractices for desludging of septic tanks and sludge handling.

    Upon completion of this course, participants will be able to: Understand the importance of desludging work. Identify the difference between conventional method and septic tank of

    sewage treatment. Explain the functions of septic tank. Carried out desludging work in a correct and safe manner. Handle sludge in a safe and correct way.

    Duration 1 day.

    Target Group This course is designed for desludging personnel who are involved indesludging works namely Desludging Operators and Drivers

    MethodologyThe course will be conducted in theory and practical.Demonstration on desludging of IST will be carried out to facilitateunderstanding.

  • 7/31/2019 SEPTAGE MANAGEMENT Indah Water Konsortium (IWK) PERSPECTIVE

    17/22

    Indah Water Konsortium Sdn Bhd

    DESLUDGING OF IST KNOW YOUR TANKERTitle

    Course Objective

    Learning Outcomes

    This course is designed to provide knowledge on desludging tanker Components and functions of each components, vehicle inspection andmaintenance, safety aspect of handling desludging tanker, traffic procedureand offenses

    Upon completion of this course, participants will be able to: To identify desludging tanker components and its functions. To perform regular inspection on desludging tanker. To perform basic tanker service and maintenance. To drive and operate desludging tanker efficiently and safely. To understand traffic procedure and offenses. To conduct step-by-step basic troubleshooting of desludging tanker.

    Duration 1 day.

    Target Group This course is designed for desludging personnel who are involved indesludging works namely Desludging Operators and Drivers

    MethodologyThe course will be conducted in theory and practical.Demonstration on desludging of IST will be carried out to facilitateunderstanding.

  • 7/31/2019 SEPTAGE MANAGEMENT Indah Water Konsortium (IWK) PERSPECTIVE

    18/22

    Indah Water Konsortium Sdn Bhd

    Geotube

    Polymer tank

    Effluentdischargeline

    Polymer Injectionpump,875 l/hr

    v2

    Legend

    flexible hose / pipe

    4 PVC connecting parts

    valve

    stand

    pump

    Sample

    port

    in-linemixer

    v1 submersible pump35 m3/hr

    GeotubeDrainagelayer v4

    v3

    Optional

    GT500D/8.8m/15.3mDrainagelayer

    1

    2

    3

    4

    Geotube Dewatering TechnologyOperationComponents Of The System

    Alternative Dewatering Method- Geotube

  • 7/31/2019 SEPTAGE MANAGEMENT Indah Water Konsortium (IWK) PERSPECTIVE

    19/22

    Indah Water Konsortium Sdn Bhd

    19

    IST Category NoCommercial 161,922

    Domestic 958,893

    Govt Premises 28,189

    Govt Qtrs 87,659

    Industrial 6,955

    Total 1,243,618

    Category of ISTs in Malaysia

    Commerci13%

    Domestic77%

    Govt Premises2%

    Govt Qtrs7%

    Industrial1%

  • 7/31/2019 SEPTAGE MANAGEMENT Indah Water Konsortium (IWK) PERSPECTIVE

    20/22

    Indah Water Konsortium Sdn Bhd

    20

    Provide policy direction, goals& targets in line with Nationalneeds

    Economic regulation to protectcustomers and ensuresustainability

    In line with policy direction,goals & targets determine assetneeds

    Provide service to meet

    stakeholder expectation

    Assess asset needs of SL

    Determine funding andprocurement strategies

    Provide assets & lease

    SPAN

    Facilty Licensee Service Licensee

    Policy

    &regulation

    Assetprovision

    Sewerageservices

    GovernmentCapital Projects

    SPAN and Water Services Industry Act

  • 7/31/2019 SEPTAGE MANAGEMENT Indah Water Konsortium (IWK) PERSPECTIVE

    21/22

    Indah Water Konsortium Sdn Bhd

    Individual Septic Tank (IST) and CommunalSeptic Tank (CST)

    Individual Septic Tank

    Communal Septic Tank

    Pre-WSIA : Scheduled of Desludging for Individual Septic Tank is once in 2 years ( done by IWK) Post WSIA : Desludging of Individual Septic Tank is based on customer

    s demand (every threeyears) by permit holder or IWK

    BOD = 150 mg/l

    SS = 120 mg/l

    BOD = 200 mg/l

    SS = 180 mg/l

    BOD = 220 mg/l

    SS = 250 mg/l

    BOD = 250 mg/l

    SS = 300 mg/l

    NEW

    1 YEAR

    2 YEARS

    3 YEARS

    Inlet Outlet

    A A

    BPLAN VIEW

    IST DESLUDGING CAMPAIGN JOINTLY

  • 7/31/2019 SEPTAGE MANAGEMENT Indah Water Konsortium (IWK) PERSPECTIVE

    22/22

    Indah Water Konsortium Sdn Bhd

    IST DESLUDGING CAMPAIGN JOINTLYORGANIZED BY IWK, SPAN , LOCAL AUTHORITY

    Objective

    Educate public onmaintenance of ISTProvide information on thenew IST RegulationsEncourage public to deslugdeIST regularly