ISSUE 02 October 2012

Shriram EPC Limited

Coated Steel Project of Tata Bluescope Steel Limited, Jamshedpur - completed with Zero Accidents

HSE (Health, Safety & Environment) guidelines for

Construction activities laid out in the Contract were strictly

followed by SEPC during the execution of Tata Bluescope

Steel Limited’s Coated Steel Project - so much so that there

were Zero Accidents. Special purpose accessories like aerial

platforms, boom lifters, man lifters (cherry pickers), special

lightweight scaffoldings etc. were deployed during

installation work.

A Colour Coating line was commissioned with a Line capacity

of 0.15 million tons per annum.

Metal on Strip: The first Zn-Alu Coating line was

commissioned with a Line capacity of 0.25 million tons per

annum and PG Tests completed recently .

Process & Metallurgy update

70 TPD Milk of Lime Plant - commissioned successfully for Sterlite Industries

Colour Coating Line - Coil Storage

Milk of Lime Plant - Sterlite Industries

Shriram EPC was involved in the construction of a Milk of Lime

plant of 70 TPD (with a concentration of 115-125 GPL) for

Sterlite Industries. Shriram EPC's scope in this project

included Engineering, Civil works, Supply, Erection &

Commissioning of the plant.

Main units/systems of the project are

Limestone storage shed

Silo system with weigh feeder

Drum slaker & Rake classifier

Auxiliaries and electrics

l

l

l

l

Official Newsletter of the Shriram EPC Group

Page 2: SEPC News October 2012

Oxygen Turbo Compressor - Bokaro

Shriram EPC Limited

300 TPD Cattle Feed Project for Kerala

Feeds Limited Commissioned

Amongst the recent projects completed by SEPC, is a

300 TPD Cattle feed project for Kerala Feeds Limited.

The Scope of Work for the same included Design &

Engineering, Civil construction, Supply of Imported and

Indigenous equipments, Fabrication & Supply of

Structurals, Erection of equipment and structures,

supply and erection of electrics, process automation &

commissioning.

Location: Karunagapally, Kollam, Kerala.

Silos - Kerala Feeds Limited

OXYGEN TURBO COMPRESSOR (OTC) at BSL, Bokaro - commissioned by P&M Kolkata

P&M Kolkata had successfully commissioned an Oxygen

Turbo Compressor (OTC) of Air & Oxygen Turbo

Compressor (ATC & OTC) Project on and from 2nd Aug

2012 to 18th Aug 2012 at Bokaro Steel Plant, Bokaro,

Jharkhand. The capacity of the Oxygen Turbo Compressor

(OTC) plant is 15000 Nm³ / hr and that of Air Turbo

Compressor (ATC) is 90000 Nm³ / hr. The complete work

included Civil, Structural, Mechanical, Electrical &

Instrumentation work on EPC. Associated equipments

like cooling towers, EOT cranes, pumps for water lines,

electrical equipments, air conditioning and ventilation

system were under the scope. Major Equipments of OTC

included Oxygen Turbo Compressor (Centrifugal compressor) -

1 unit, Motor, Transformer, MCC & Control equipments. The

Compressor was supplied by M/s CKD Nove Energo, Prague,

Czech Republic.

Major Equipments of the Air Turbo Compressor (Centrifugal

compressor) include – 1 unit, Capacity 90000 Nm3 / hr, Air

Filtration Unit, Motor including rotor, gear box and cooling

chamber, Cooling Tower 2000 Cum / hr (Common for Cooling

Water System of both ATC & OTC), Transformer, MCC &

Control equipments.

Commissioning of ATC is expected to be completed before

October’12 by CKD Nove. Once this plant is commissioned the

compressed air will be sent to Oxygen separation unit where

the oxygen will be separated and this oxygen will be fed to the

Oxygen Turbo Compressor. Both Air Turbo Compressor &

Oxygen Turbo Compressor will then run together.

AIR TURBO COMPRESSOR (ATC) at BSL,

Bokaro - a brief note

Completion of the Suryadev Alloys Power Project - scheduled for Q3

SEPC is presently executing a 2x80 MW Coal Based

Thermal Power Project for M/s Suryadev Alloys Pvt. Ltd.

at Gummidipoondi. The contract value is around ̀ 622 crores .

The project was awarded to the company in the month

of Dec 2010 and construction commenced from

May 2011.

Power update

Page 3: SEPC News October 2012

Shriram EPC Limited

South view of the OGPL Plant, Bhanwargarh Dist., Rajasthan

Biomass update

The construction of the 8MW Biomass power plant for Orient Green Power (Rajasthan) P Ltd., Bhanwargarh Dist. Rajasthan, is complete. Turbine rolling was successfully carried out.

plant would be completed by end September. The electrical and

Instrumentation works are also in the advanced stage. The total

number of people working at the site is nearly 1500 and the

first Unit is targeted for completion in Q3 this year.

Solar update

Imported parabolic mirrors - kept for installations in Solar

thermal power project at Nokh site, Rajasthan.

Imported parabolic mirrors at Nokh, Rajasthan

The construction activities at the site are at its peak for

the commissioning of the first Unit. The DM Plant which

is common for both the Units, has already been

commissioned and DM water for the Boiler Hydro test

was produced from the same plant. The taper chimney

of 140 M, which is again common for both the plants, is

complete in all respects and was handed over in July

2012. The Boiler & ESP for the first Unit is complete in all

respects. The first Unit Turbine erection works are

nearing completion for BOX-UP by mid-September. The

Coal Handling System works including the stacker

reclaimer, Coal shed are in advanced stage. The Air

Cooled Condenser works have all been completed. The

Ash Handling Systems works below the Boiler and ESP

are complete and the Ash Silo works are nearing

completion. The Switch yard works are going on in full

swing and the Transmission line from the Grid to the

Power Plant - Suryadev Alloys, Gummidipoondi

Steam Turbine & Generator - Suryadev Alloys, Gummudipundi

Page 4: SEPC News October 2012

Towards a Greener Planet - Initiatives on Sustainable Green Power Generation

The growing energy crunch is a great risk & barrier for India's development. Clean & green technology is necessary to ensure India's energy security & environmental safety.

OGPL has been generating power by using renewable energy resources since 2007. However, increasing shortage of biomass is felt as competing industries use at rising pace the urban green matter as fuel. Hence OGPL has started exploring alternate energy crops with the aim of benefiting farmers as well and it chose annual/seasonal crops for better availability of biomass. We found Cumbu Napier (CN4) species as the most promising species in short term coppice under irrigated conditions and Leuceanaleucacephala under rain fed condition through contract farming in surplus/underutilised land with farmers in neighbouring areas.

OGPL plans to set up decentralized biomass banks in rural backward areas for sustainable supply chain of biomass to power plants and green environment through cultivation of short term High Density Coppicing Energy crops.

In short we would like to set up green power villages.

In this front, OGPL has realized that growing Biomass in a large scale is possible only

When the Society takes this concept forward.

When there is real time benefit to the farmers by growing trees.

When it is accepted as doable by the farmer community.

As a first step at Sempatty, Dindugul District Buy back agreement system has been introduced in 5 acres of farmers' field for the cultivation of Cumbu Napier.

l

l

l

l

l

Orient Green Power Company Limited

To promote organic farming and sustainability in agriculture, OGPL initiated the Farmer's awareness program at Sempatty on Application of Fly Ash to increase yield and in part of soil conservation with Reddiar Chatram Sustainable Agriculture Producer Company Ltd. (A Farmer's producer company) & M S Swaminathan Research Foundation.

Capacity Additions

We have successfully commissioned 12.8 MW (8X1.6 MW) WTG of GE make at Koodangulam, Thirunelveli District of Tamil Nadu in August 2012.

CDM Project Registration

The 10 MW Biomass based power plant by Orient Green Power Company Limited, at Narsinghpur District, Madhya Pradesh and 8 MW biomass based power plant by SM Environmental Technologies Pvt. Ltd., a subsidiary of Orient Green Power Company Limited at Baran District, Rajasthan have been successfully registered with United Nations Framework Convention on Climate Change (UNFCCC) as a Clean Development Mechanism Project.

Reaping the REC benefits

OGPL being an organisation caring for the environment, has started reaping benefits by way of revenue from Renewable Energy Certificates (REC) and Certified Emission Reduction (CERs).

In the Second Quarter 2012-13, so far OGPL has traded 62747 RECs from Wind and Biomass put together.

OGPL's subsidiaries - Shriram Powergen Limited, Dindigul and Shriram Non-Conventional Energy Limited, Pattukkottai - Bundled Clean Development Mechanism Project registered under UNFCCC has received 75627 CERs successfully for the first time.

Initiatives towards Green Environment

Interactive result oriented session - a glimpse

Application of Fly Ash as organic manure

Mr. Rajasekaran, who signed the First Contract Farming Agreement with OGPL on 15.08.12

Mr. Prathaban,Plant Head ,SPGL,Sempatti initiating implementation at the site on 20-08-12

Page 5: SEPC News October 2012

Hamon Shriram Cottrell

Performance bettered

Hamon has introduced an ABS plastic formwork (framework)

at the Gail Pata Cooling Tower Work, for the first time ever. The

advantage of this is its ability to provide 100 pours as

compared to the average 8-10 pours obtained from a standard

timber shuttering. This introduction has been much

appreciated by EIL /GAIL.

Yet another feather in our hat

Hamon was awarded the contract of installing Pultruded

Cooling Towers at the 6x660MW Ultra Mega Power Project of

Reliance Infra, located in Sasan, Madhya Pradesh. The total

number of towers is 12, with 16 cells each and a capacity of

492800 cum of water per tower. The scope of work included

Design, Engineering, Manufacture, Supply, Civil Construction,

Erection, Commissioning & Performance Testing of the

Cooling Towers.

ABS Plastic Framework - Gail Pata

Reliance Infra – Sasan with Pultruded FRP Cooling Tower

Successful completions

One of Hamon's most prestigious projects was with BHEL,

where the company was awarded a contract for Design,

Manufacturing, Detail Engineering, Supply, Civil Construction,

Installation, Commissioning & Performance Guarantee Testing

of one Induced Draft RCC Counter flow for the Captive Power

Plant at Bharat Oman Refinery Limited, Bina, Madhya Pradesh.

The total circulating water flow rate is 36,900 cu mtr/hr. The

total number of cells is 12, and the water flow rate for each cell

is 3075 cu mtr/hr.

The commissioning of the plant is completed and the plant has

been in operation from December 2010.

Hamon successfully completed an Induced Draft counter flow

cooling tower with film type fill of Hamon design for Aarti

Steels, Cuttack. The contract was successfully executed &

commissioned and handed over on 28 May 2010 and is

in operation.

Page 6: SEPC News October 2012

Leitwind Shriram Manufacturing Ltd

R

Wind Farm in Puttalam, Sri Lanka - commissioned by Minister for Energy & Power

For LSML Aug 2012 was a significant month in terms of its

overseas presence. The Puttalam wind farm in Sri Lanka, was

dedicated to the nation on 07 Aug 2012 by the Hon. Minister

for Energy & Power, Mr. Patali Champika Ranawakka. This

wind farm features 7 WTGs of 1.5 MW capacity each, totalling

to an overall capacity of 10.5 MW for the national grid. This is

the first major overseas wind farm supplied, erected and

commissioned by LSML. The wind farm showcases the

advanced technology WTGs in the global arena. Post

commissioning, the monitoring of all the WTGs for health

diagnostics and operational requirements is being carried out

by the Central Monitoring Station of LSML, based out of

Chennai. This wind farm shall also be operated and

maintained by LSML.

Blades and Generators exported to Europe

The first consignment of blades manufactured at the state-of-art blade manufacturing unit of LSML was exported to Europe along with generators on 14 Aug 12. The set of 08 generators and 27 blades were loaded on board M V Malspina Castle bound for the port of Bari, Italy. The loading operation, being carried out for the first time, demanded high skill and precision as well as coordination between multiple agencies. The loading operation was carried out using specialised jigs and fixtures designed and manufactured by LSML. The entire loading operation on board the ship was completed within 4 days.

Blades - bound for Italy

Hon. Minister for Energy & Power at Puttalam Wind Farm

Inauguration of the Wind farm at Puttalam by Hon. Minister for Energy & Power

Page 7: SEPC News October 2012

A pioneering effort

M/s. Hinduja National Power Corporation Limited

(HNPCL) has awarded a contract to M/s. Shriram EPC

Limited for Supply and Erection of GRP (Glass Fibre

Reinforced Plastic) piping system for their Power Plant (2

x 520 MW - Sea Water Intake Outfall System) coming up at

Vizag. The manufacturing and installation of the 3.6 mtr

dia (3600 mm) GRP pipe for a total length of 3.2 Kms will

be carried out by M/s. Shriram SEPL Composites P Ltd.,

against a total order value of ̀ 22.50 Crores.

It is the first time in the Country that GRP pressure pipe of

this dimension has been manufactured. A pipe of this size

will require specialized equipments and machinery for

manufacturing, testing, handling and transportation. The

Company has already made pipes of up to 3 mtrs dia

(3000 mm), not only of Circular shape but also Non

Circular shapes like Oval and Horse Shoe shape pipes and

are amongst the very few in the country who are capable

of handling pressure pipes of such large diameters.

Shriram SEPL Composites Pvt. Ltd. (SSEPL)

3.6m GRP Pressure Pipe - A glimpse

Page 8: SEPC News October 2012

1B, Sigappi Achi Building, 18/3, Rukmini Lakshmipathi Salai,Marshall's Road, Egmore, Chennai - 600 008. Tamil Nadu, India.

Tel : 044 - 4900 5555. Fax : 044 - 4900 5599 Email : [email protected]

Shriram EPC Limited

SHRIRAM EPC LTD.

(All figs. in ` Lacs)

ORDER RECEIPTS DURING JULY '12 TO SEPT '12

1 Municipal Services Rajasthan Urban Sector Development Investment Program (RUIDP), Barmer

Design, Construction, Supply, Erection, Testing, Commissioning and Five years

O & M of Sewage Treatment plant 10 MLD including all Civil, Electrical, Mechanical, Pumping and other allied etc. at Barmer.

800.00

2 Municipal Services Rajasthan Urban Sector Development Investment Program (RUIDP), Nagaur

Design, Construction, Supply, Erection, Testing, Commissioning and 5 years O&M

of 8 MLD STP near Balwa Road and Sewerage Pumping / Lifting station

including all Civil, Electrical, Mechanical and Pumping at Nagaur.

1105.00

3 Municipal Services Rajasthan Urban Sector Development Investment

Program (RUIDP), Sikar

Design, construction, Supply, Erection, Testing, Commissioning and five years

Operation and Maintenance of Sewerage Treatment Plant of 10 MLD near 132

KVGSS including all civil, electrical, mechanical, pumping and other allied works etc at Sikar under package No.

RUSDIP/TR-02/SKR/WW/02 Lot-2.

874.00

4 Municipal Services PHED, Kota Execution of the Intake Pumping Station, Raw Water Main, Treatment Plant, 11/0.44 kv sub-station, clear water

Reservoir, Clear Water Main, Pumping station, cluster rising mains, cluster distribution mains, cluster ESRs with

associated civil, electrical and mechanical works, village distribution system, IEC

activities etc. for Nagda-Anta-Baldevpura Water Supply Project on single

responsibility turnkey basis with 10 years O&M. District Baran, Rajasthan.

5710.00

5 Municipal Services Municipal Corporation, Bhavnagar

2095.00Engineering, Procuring, Constructing Commissioning (EPC) of

1. Sewage Treatment Plant of 30 MLD capacity at Bhavnagar based on UASB

followed by stabilization ponds process at Nari Road, Bhavnagar along with all

related Mechanical and Electrical equipment and accessories,

Instrumentation including miscellaneous works, etc.

2. Operation and Maintenance of the entire proposed sewage treatment

facilities at site for 2 years under SJMMSVY Scheme.

6 Municipal Services (Water-South)

Kerala Water Authority, Thiruvananthapuram

3999.00Distribution System (Balance Works) for Thiruvananthapuram City Region Package

P3-R1.

7 Process & Metallurgy (HO) Bhilai Engineering Corporation Ltd.

Chhattisgarh

115.00High Pressure Water Jet Door Cleaner.