Connotation of Global Energy Interconnection and Asian Grid Interconnection Sep.2016 Dr. Haibin Wan

Sep.2016 Connotation of Global Energy Interconnection and Asian Grid Interconnection · 2017-12-25 · Date of foundation:March 2016 Mission:Building global energy interconnection

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Sep.2016 Connotation of Global Energy Interconnection and Asian Grid Interconnection · 2017-12-25 · Date of foundation:March 2016 Mission:Building global energy interconnection

Connotation of Global Energy

Interconnection and

Asian Grid Interconnection

Sep.2016

Dr. Haibin Wan

Page 2: Sep.2016 Connotation of Global Energy Interconnection and Asian Grid Interconnection · 2017-12-25 · Date of foundation:March 2016 Mission:Building global energy interconnection

Global Energy Interconnection Development

and Cooperation Organization

1

Page 3: Sep.2016 Connotation of Global Energy Interconnection and Asian Grid Interconnection · 2017-12-25 · Date of foundation:March 2016 Mission:Building global energy interconnection

Date of foundation:March 2016

Mission:Building global energy interconnection to

meet global power demand with clean and green

alternatives

Current members : 80 members, 14 counties, 5

continents

17 international council member (corporate/ Individual)

2

Page 4: Sep.2016 Connotation of Global Energy Interconnection and Asian Grid Interconnection · 2017-12-25 · Date of foundation:March 2016 Mission:Building global energy interconnection

2

3

4

5

Contents

3

Page 5: Sep.2016 Connotation of Global Energy Interconnection and Asian Grid Interconnection · 2017-12-25 · Date of foundation:March 2016 Mission:Building global energy interconnection

Resource Constraints

• The global proved reserve for coal, oil and natural gas can only sustain for

100, 53 and 54 years respectively if the current level of exploration remains

the same.

Challenges to world energy development

Three challenges to the world energy development

Remaining proved recoverable reserves

of global fossil energy

Coal

52%Oil

28%

Natural gas

20%

891.5 billion

ton

for 110 years

187 trillion m3

for 54 years 239.8 billion ton

for 53 years

4

Page 6: Sep.2016 Connotation of Global Energy Interconnection and Asian Grid Interconnection · 2017-12-25 · Date of foundation:March 2016 Mission:Building global energy interconnection

Environment Pollution

• Large scale production

transportation, storage and use

of fossil fuels have caused

serious pollutions to air, water

and soil, and posed great threat

to human health.

• In many regions, the damages

are beyond the capacity of the

environment, depriving the self-

recovering ability of nature.

Air Pollution in Tokyo

Serious smog in Beijing The oil spill in the Gulf of Mexico

Sink-Holes in Inner Mongolia

5

Page 7: Sep.2016 Connotation of Global Energy Interconnection and Asian Grid Interconnection · 2017-12-25 · Date of foundation:March 2016 Mission:Building global energy interconnection

Climate Change

• The carbon emission from fossil fuel is the

major cause for global warming. Global

temperature has risen by an average of 1℃

since industrial revolution.

• If no actions were taken, global temperature

rise would exceed 4℃ by the end of this

century, severely threatening human

existence.

• COP21 reached the agreement of

holding the increase in the global

average temperature to well blew 2℃

and pursing efforts to hold the

temperature increase to 1.5℃ by the

end of this century.

Atmospheric carbon dioxide concentration

and surface average temperature rise

Melting of glaciers in the Arctic 6

Page 8: Sep.2016 Connotation of Global Energy Interconnection and Asian Grid Interconnection · 2017-12-25 · Date of foundation:March 2016 Mission:Building global energy interconnection

1

3

7

4

5

Contents

Page 9: Sep.2016 Connotation of Global Energy Interconnection and Asian Grid Interconnection · 2017-12-25 · Date of foundation:March 2016 Mission:Building global energy interconnection

Clean

Replacement

Electricity

Replacement

Clean replacement on the generation side, replacing fossil

energy with clean energy such as solar, wind and hydro energy.

Electricity replacement on the energy consumption side,

replacing coal, oil and gas by electricity, drastically reducing the

direct combustion of fossil fuels.

Main countermeasures – two replacements

8

Page 10: Sep.2016 Connotation of Global Energy Interconnection and Asian Grid Interconnection · 2017-12-25 · Date of foundation:March 2016 Mission:Building global energy interconnection

Connotation of global energy interconnection

Global Energy Interconnection (GEI) is a globally interconnected strong

and smart electric grid, which applies ultra-high voltage technologies to

transmit and allocate green and low-carbon energies globally.

Arctic Wind

Energy Bases

Equatorial

Solar Energy

Bases

Centralized

Power

generation

Distributed

Power

generation

Transcontinental

Backbone Grid

Intracontinental

Backbone Grid

Smart Electric

Grids in Different

Countries

9

Page 11: Sep.2016 Connotation of Global Energy Interconnection and Asian Grid Interconnection · 2017-12-25 · Date of foundation:March 2016 Mission:Building global energy interconnection

Definition of GEI

GEI = Smart Grid + Ultra High Voltage electric grid + Clean Energy

Quoted from Global Energy Interconnection, Mr. Liu Zhenya

UHV Grid is the key

• 1000kV and over AC Transmission

• ±800kV and over DC transmission

Smart Grid is the foundation

• Advanced transmission, intelligent control, renewable energy integration, new types of

energy storage

• Remarkable flexibility and adaptability

• Integration of clean energy and distributed generation, plug-and-play of smart devices

as well as smart interaction services

Clean energy is the core

• Centralized and decentralised generation by clean energy

• Wind energy in the Arctic

• Solar energy in the Equatorial region

10

Page 12: Sep.2016 Connotation of Global Energy Interconnection and Asian Grid Interconnection · 2017-12-25 · Date of foundation:March 2016 Mission:Building global energy interconnection

1

2

11

4

5

Contents

Page 13: Sep.2016 Connotation of Global Energy Interconnection and Asian Grid Interconnection · 2017-12-25 · Date of foundation:March 2016 Mission:Building global energy interconnection

The theoretical reserves of hydropower, wind power and solar power in

Asia are 18 trillion, 500 trillion and 37,500 trillion kWh/year respectively.

Large hydropower bases are located in southwest China, Russian Far

East, Siberia, Southeast Asia and the Mekong region, Wind power bases

in China "Three North" region, Russian Far East, central and western

Kazakhstan, southeastern Mongolia and Solar power bases in Qinghai-

Tibet Plateau, southern Xinjiang, southern Kazakhstan, central and

southern Mongolia, as well as Saudi Arabia and Yemen.

Distribution of Asia Renewable Energy Bases

12

Page 14: Sep.2016 Connotation of Global Energy Interconnection and Asian Grid Interconnection · 2017-12-25 · Date of foundation:March 2016 Mission:Building global energy interconnection

Asia power grid is proposed composing of six grids , i.e. Northeast Asia Grid,

Central Asia Grid, South Asia Grid, Southeast Asia Grid, West Asia Grid, and

China Grid.

Clean, secure, efficient and modern Asia power grid:

covering major large-scale clean energy bases and load centers.

serving as a platform of optimizing the allocation of clean energy

resources.

bringing about complementation between wind, solar, and hydro power.

UHV/EHV technologies will be used to built robust synchronous grids in each

region.

UHV AC or DC technologies will be used in trans-regional connectivity

projects.

In the East:connected with the North American Grid via

Bering Strait

In the South: receive equatorial solar energy in Oceania

In the West: interconnect with the European Grid via Central

Asia and receive equatorial solar energy in in North Africa.

Asia Grid Interconnection Planning

13

Page 15: Sep.2016 Connotation of Global Energy Interconnection and Asian Grid Interconnection · 2017-12-25 · Date of foundation:March 2016 Mission:Building global energy interconnection

To Europe

To Europe

To Africa

To Oceania

Djakarta

Sumo Er

Astana

Jerusalem

To North America

Medina

Interconnection Plan

Power Flow Direction

Legend

Northeast Asia Grid

Central Asia Grid

West Asia Grid Southeast Asia Grid

South Asia Grid

China Grid

The figure shows the diagram of interconnection and coverage area.

The transmission method and voltage level should be studied further.

Asia Grid Interconnection Outlook

14

Page 16: Sep.2016 Connotation of Global Energy Interconnection and Asian Grid Interconnection · 2017-12-25 · Date of foundation:March 2016 Mission:Building global energy interconnection

Preliminary Project under Study

In the Global Energy Interconnection conference in 2016, SGCC has signed

the Memorandum of Understanding of joint promotion of an interconnection

electric power grid spanning northeast Asia with Korea Electric Power

Company, Softbank and Russia Electric Company and achieved a

consensus of cooperation.

15

Page 17: Sep.2016 Connotation of Global Energy Interconnection and Asian Grid Interconnection · 2017-12-25 · Date of foundation:March 2016 Mission:Building global energy interconnection

Tianjin

Seoul Weihai

Goseong

±800 kV DC Line

±500 kV Cable

80km

370km

Mongolia

Adopting UHV/EHV DC Technology to formulate the

project which will transmit the renewable energy from

Mongolia to the load center of Northeast Asia. The

sending terminal is located in Mongolia and receiving

terminals are located in China, South Korea and Japan.

Mongolia - China - South Korea - Japan interconnection project

Matsue

Korean AC Grid

16

Page 18: Sep.2016 Connotation of Global Energy Interconnection and Asian Grid Interconnection · 2017-12-25 · Date of foundation:March 2016 Mission:Building global energy interconnection

1 Challenges to World Energy Development

2

3

17

Research on Asian Grid Interconnection

5

Contents

Page 19: Sep.2016 Connotation of Global Energy Interconnection and Asian Grid Interconnection · 2017-12-25 · Date of foundation:March 2016 Mission:Building global energy interconnection

Power Flow Pattern

洲内电力流

洲际电力流

太阳能发电基地

风电基地

水电基地

负荷中心

Load center

Solar energy base

Wind power base

Hydropower base

Power flow within the continent

Intercontinental power flow

The trend of transcontinental power flow pattern among Asia, Europe

and Africa in 2030 will be as:

18

Page 20: Sep.2016 Connotation of Global Energy Interconnection and Asian Grid Interconnection · 2017-12-25 · Date of foundation:March 2016 Mission:Building global energy interconnection

Grid Interconnection Planning

Asia Grid

Africa Grid

China Grid

Thimphu

Cairo

Oran Tunisia

Athens

Lisbon Murcia

Van

Sophia

Bari

Astana

Kolner

Constantine

Cagliari Sevilla

Medina

Jerusalem

Rabat

Europe Grid

Transnational Intercontinental

Asia-Europe-Africa interconnection is characterized by four latitudinal and three longitudinal

interconnections

Between Asia and Europe:two latitudinal channels

Between Asia and Africa: two latitudinal channels

Between Europe and Africa: three longitudinal channels 19

Page 21: Sep.2016 Connotation of Global Energy Interconnection and Asian Grid Interconnection · 2017-12-25 · Date of foundation:March 2016 Mission:Building global energy interconnection

A. Turkey-Iran DC back-to-

back project:

• 1.2 GW converter station in

Turkey

• Two 400kV AC lines to Iran

B. I s rae l-Cyprus -Greece

interconnection project:

• ±400kV submarine cable

• 1520km

• 2GW

C. Tunisia-Italy ±400kv DC

project:

• 1250km

• 2GW

D. P o r t u g a l - M o r o c c o

networking project:

• 220km

• 1GW

Nicosia

Jerusalem

Crete Island

Athens

330

880 310

Van

Hoey

Projects under Study

Rome

Douz

1250

220

Faro

Tangier

20

Page 22: Sep.2016 Connotation of Global Energy Interconnection and Asian Grid Interconnection · 2017-12-25 · Date of foundation:March 2016 Mission:Building global energy interconnection

1

2

3

21

4

Contents

Page 23: Sep.2016 Connotation of Global Energy Interconnection and Asian Grid Interconnection · 2017-12-25 · Date of foundation:March 2016 Mission:Building global energy interconnection

Existing grids Interconnection

Russia-the Baltic Sea Synchronous

Interconnected Power Grid

China

Interconnected

Power Grid

North America

Interconnected

Power Grid

European Continent

Synchronous Power

Grid

European

Interconnected

Power Grid

Eastern North America

Synchronous Power

Grid

Southern Africa

Interconnected Power Grid

Gulf Synchronous

Interconnected Power Grid Northern South America

Interconnected Power Grid

Southern South America

Interconnected Power Grid

India Synchronous

Interconnected Power

Grid

Area Installed Capacity GDP

(10,000km2) (GW) (USD Trillion)

Eastern North America

Synchronous Power Grid 520 760 11.7

European Continent

Synchronous Power Grid 350 700 13.3

Russia-the Baltic Sea

Interconnected Power Grid 2300 200 3

"North China-East China-

Central China" Power Grid 268 670 7.7

22

Page 24: Sep.2016 Connotation of Global Energy Interconnection and Asian Grid Interconnection · 2017-12-25 · Date of foundation:March 2016 Mission:Building global energy interconnection

Global Transport Network (Airlines)

GEI is a feasible solution.

Transcontinental backbone network

Global Telecommunication Network

Global Energy Interconnection

23

Page 25: Sep.2016 Connotation of Global Energy Interconnection and Asian Grid Interconnection · 2017-12-25 · Date of foundation:March 2016 Mission:Building global energy interconnection

Roadmap of the development of GEI

Three phases to develop GEI :

Now 2020 2030 2050 2040

Phase I: Intracontinental interconnection

• Promote formation of a consensus before 2020

• Develop, deliver and consume clean energy via

intracontinentally interconnected grids

• Fast development of transnationally interconnected

grids. Phase II: Transcontinental interconnection

• Large-scale development of wind energy bases in the

Arctic region, solar energy bases in the equatorial

region and other key clean energy bases worldwide

• Economic benefits from sharing energy resources

across continents become more prominent. A globally

interconnected network begins to take shape

Phase III: Global interconnection

• Full development of solar, wind and other clean energy

bases

• Clean energy takes the lion’s share of power generation

by replacing fossil fuel fired generation

• Sharp decline in the development, delivery and

consumption of fossil energies 24

Page 26: Sep.2016 Connotation of Global Energy Interconnection and Asian Grid Interconnection · 2017-12-25 · Date of foundation:March 2016 Mission:Building global energy interconnection

Way forward

Extending the coverage of research

The establishment of GEI involves not only technical issues, but politics, economy,

environment, investment and other areas as well.

Energy

policy

Business

model

Geopolitics

Climate

change

Different countries have different energy policies. The development of

GEI needs research and coordination of policies of different countries.

An open, interactive, sharing and win-win business model is needed, such as the apportionment of cost of transnational and transcontinental power grid projects and income sharing mechanism, electric power price, tax, settlement and other market operation mechanisms.

Changes in the world energy pattern will have a significant effect on the geopolitics. A new geo-political pattern characterized by cooperation and win-win should be established.

The trend of climate change should be continuously tracked and researched, different countries should work together and provide support to cope with climate change. Obviously, the development of GEI is a way forward.

25

Page 27: Sep.2016 Connotation of Global Energy Interconnection and Asian Grid Interconnection · 2017-12-25 · Date of foundation:March 2016 Mission:Building global energy interconnection

Promotion of innovation

• The development of GEI relies on technical breakthroughs. R&D on power supply, power

grid, energy storage, information communication etc. should be greatly enhanced.

• Applications of ultra-high voltage technologies, intelligent control, clean energy generation,

energy storage and other advanced technologies should be speeded up.

• Cloud computing, big data, Internet of Things, mobile internet and other technologies

should be used in the power industry more widely.

• The construction of smart grids should be continued and demonstration projects on

transnational and transcontinental interconnection should be started in due course.

26

Page 28: Sep.2016 Connotation of Global Energy Interconnection and Asian Grid Interconnection · 2017-12-25 · Date of foundation:March 2016 Mission:Building global energy interconnection

Acceleration of clean energy development

The construction of clean energy bases should be accelerated.

GEI makes it possible to transmit clean energy from remote areas and

hence more clean energy will be consumed.

27

Page 29: Sep.2016 Connotation of Global Energy Interconnection and Asian Grid Interconnection · 2017-12-25 · Date of foundation:March 2016 Mission:Building global energy interconnection

Thank you!