Sensors, Radar Technologies and Cybersecurity UnitInstitute for the Protection and Security of the Citizen
Monitoring of the Danube Banks Stability with JRC’s LISA System
J. Fortuny-Guasch, G. Antonello, M. Basso, D. Tarchi, and A. J. Sieber
JRC Information Day
Bucarest, 11 May 2006
Sensors, Radar Technologies and Cybersecurity UnitInstitute for the Protection and Security of the Citizen 04/21/23
Outline
LISA working principle
Motivation of the recent JRC mission during the flood emergency
Description of sites monitored with the LISA system
Displacement maps
Interpretation of results
Concluding remarks
Sensors, Radar Technologies and Cybersecurity UnitInstitute for the Protection and Security of the Citizen 04/21/23
Working Principle
One image in 7 min
2 m Long Linear Scan
Radar Image
Sensors, Radar Technologies and Cybersecurity UnitInstitute for the Protection and Security of the Citizen 04/21/23
LISA Characteristics
It is a ground-based radar system to produce maps of displacement
Displacement in the line of sight to Lisa position
Monitored area spans 1-5 square km
Maximum range 3-4 km
Sub-millimeter accuracy
Relative measurement between two images
Day and night operation
1 kW power consumption and 100 kg total weight
Sensors, Radar Technologies and Cybersecurity UnitInstitute for the Protection and Security of the Citizen 04/21/23
Complementarity
Time
Cro
ss-R
ange
Range
TimeC
ross
-Ran
ge
Range
Space-Borne Ground-Based
Sensors, Radar Technologies and Cybersecurity UnitInstitute for the Protection and Security of the Citizen 04/21/23
LISA
Tsunami Early-Warning in Stromboli
LISA
Sensors, Radar Technologies and Cybersecurity UnitInstitute for the Protection and Security of the Citizen 04/21/23
Cummulated Displacement inStromboli - 64 Days / 6400 Images
LISA
Sensors, Radar Technologies and Cybersecurity UnitInstitute for the Protection and Security of the Citizen 04/21/23
Stromboli
Sensors, Radar Technologies and Cybersecurity UnitInstitute for the Protection and Security of the Citizen 04/21/23
Motivation of the Mission
The monitoring with the LISA instrument offered to Romanian Authorities on Thursday 20 Apr
First site of interest was in the Bistret area
Confirmation of interest the day after
Shipment of the LISA system to Timisoara on Sunday 23 Apr
Monitoring of 1 day in Borcea and 4 days in Bentu
Sensors, Radar Technologies and Cybersecurity UnitInstitute for the Protection and Security of the Citizen 04/21/23
Shipment from Timisoara to Craiova
Sensors, Radar Technologies and Cybersecurity UnitInstitute for the Protection and Security of the Citizen 04/21/23
Bistret Area
Originally the monitoring site was in the Bistret Area
Unfortunately, on 24 Apr 2006 the dike collapsed and about 10000 people had to be evacuated
Romania’s National Society of Land Reclamation (SIFI) suggested the sites of Borcea and Bentu (150 km East from Bucarest)
On Tuesday 25 Apr the Lisa system was shipped to Borcea on a helicopter
Sensors, Radar Technologies and Cybersecurity UnitInstitute for the Protection and Security of the Citizen 04/21/23
Bistret Area on 24 Apr 2006
Sensors, Radar Technologies and Cybersecurity UnitInstitute for the Protection and Security of the Citizen 04/21/23
Bistret Area on 24 Apr 2006
Sensors, Radar Technologies and Cybersecurity UnitInstitute for the Protection and Security of the Citizen 04/21/23
Shipment to Borcea
Sensors, Radar Technologies and Cybersecurity UnitInstitute for the Protection and Security of the Citizen 04/21/23
View from Helicopter
Sensors, Radar Technologies and Cybersecurity UnitInstitute for the Protection and Security of the Citizen 04/21/23
Arrival to Borcea on 25 Apr
Sensors, Radar Technologies and Cybersecurity UnitInstitute for the Protection and Security of the Citizen 04/21/23
Map of the Area
BorceaBentuBucarest
Black Sea
Sensors, Radar Technologies and Cybersecurity UnitInstitute for the Protection and Security of the Citizen 04/21/23
Map of the Area
Borcea
Bentu
Danube
Sensors, Radar Technologies and Cybersecurity UnitInstitute for the Protection and Security of the Citizen 04/21/23
System Installation in Borcea (25 Apr)
Sensors, Radar Technologies and Cybersecurity UnitInstitute for the Protection and Security of the Citizen 04/21/23
Measurement Set-up
DikeDike
LisaDanube
Displacement in theline of sight (LOS) direction
3-4 m
Sensors, Radar Technologies and Cybersecurity UnitInstitute for the Protection and Security of the Citizen 04/21/23
Field of View
Dike
SmallLake
Sensors, Radar Technologies and Cybersecurity UnitInstitute for the Protection and Security of the Citizen 04/21/23
Map of Borcea
MonitoredArea
Displacement Map
400 m
LISA
Sensors, Radar Technologies and Cybersecurity UnitInstitute for the Protection and Security of the Citizen 04/21/23
Displacement Map in Borceaon 26 April
• 12 h 45 min of continuous monitoring
• Time series of 162 images
• No significant displacements observed
Areas with minorinstability (3-4 mm)
Far side of the river
Sensors, Radar Technologies and Cybersecurity UnitInstitute for the Protection and Security of the Citizen 04/21/23
Map of Bentu Site
MonitoredArea
Displacement Map1000 m
LISA
Poles
of Power Line
Dike
Houses
Sensors, Radar Technologies and Cybersecurity UnitInstitute for the Protection and Security of the Citizen 04/21/23
LISA Deployment in Bentu(26 Apr – 1 May)
• 3 days 15 h 3 min of uninterrupted monitoring
• Time series of 757 images • Power generator monitored
by local farmer
Sensors, Radar Technologies and Cybersecurity UnitInstitute for the Protection and Security of the Citizen 04/21/23
Field of View
Dredging Vessel
Sensors, Radar Technologies and Cybersecurity UnitInstitute for the Protection and Security of the Citizen 04/21/23
Displacements After 2 Days
Areas with minorinstability (3-4 mm)
Unstable Poles
Dike
Sensors, Radar Technologies and Cybersecurity UnitInstitute for the Protection and Security of the Citizen 04/21/23
Displacements After 3 Days
Areas with minorinstability
Unstable Poles
Dike
Sensors, Radar Technologies and Cybersecurity UnitInstitute for the Protection and Security of the Citizen 04/21/23
Displacements After 4 Days
Areas with minorinstability (3-4 mm)
Unstable Poles
Dike
Sensors, Radar Technologies and Cybersecurity UnitInstitute for the Protection and Security of the Citizen 04/21/23
Interpretation of Results
Both sites (Borcea and Bentu) are basically stable and no major displacements were observed
In Bentu, three poles of the power line are slightly unstable (3-4 mm in four days), the one near the dredging vessel more unstable
The houses area in the Bentu site is stable
Minor displacements due to the passing cars detected on the dike
Sensors, Radar Technologies and Cybersecurity UnitInstitute for the Protection and Security of the Citizen 04/21/23
Acknowledgement
Everyone at the National Society of Land Reclamation (SIFI) and specially Ing. Luigi Berghes, Messrs. Ion Nedelcu, Ionel Dan, and Vasile Florea, Ionel Patrichi, the interpreter, the driver, the farmers, …
Dr. Attila Blenesi-Dima at the Ministry of Agriculture, Forests and Rural Development
Ing. Ursuleanu Sorin at the Ministry for Internal Affairs
Dr. Marius-Ioan Piso, Director of Romanian Space Agency
Mr. Giorgio Ficcarelli (EC Delegation Office Bucarest)
Sensors, Radar Technologies and Cybersecurity UnitInstitute for the Protection and Security of the Citizen 04/21/23
THANKS!