Upload
others
View
1
Download
0
Embed Size (px)
Citation preview
Seminars in Professional Practice, Spring 2010Topics in Masks and Armor
Portfolio Project Sheet
Name: __Kaitlin Fara_____________________________________________________
Project: __Simple Mask____________________________________________________
Hourly breakdown of labor:[ex.: “30 min research/planning, 30 min pattern drafting, 5 hour construction]
.5 hrs Setting up to sculpt matrix2 hrs Sculpting Matrix.5 hrs Applying 1st Layer of fabric mache5min Applying 1st Layer of plain sculpt or coat.5 hrs Applying 2nd Layer of fabric mache5min Applying 2nd Layer of plain sculpt or coat.5 hrs Applying 3rd Layer of fabric mache5min Applying 3rd Layer of plain sculpt or coat.5 hrs Applying 4th Layer of fabric mache5min Applying 4th Layer of plain sculpt or coat(4 hrs Drying -.5 hrs between each coat).5 hrs Painting 2 layers of base coat1 hrs cutting buckram and sewing bias on7 hrs applying wire, bells, and fabric to buckram pieces1 hr Sewing on 1st row of buckram pieces, removing shank from button decoration, and
gluing on trim2 hrs Hand sewing remaining buckram pieces to mask and attaching ribbon1 hr Applying button and painting scrollwork
Total 17hrs 20min (w/out dry time); 21hrs 20min (w/dry time)
Products used:Aluminum FoilStyrofoam HeadAir Dry ClayMuslinSculpt or Coat
Quilting FabricAcrylic PaintJingle BellsPuff Paint
Patcher Sewing Machine18 Gauge WireRibbon
Research citations, if any:
Please attach copies of any notes, drawings, mathematical formulae, etc. used in the process of completing this project.