Upload
others
View
0
Download
0
Embed Size (px)
Citation preview
Semi-Annual Environmental Monitoring Report
This report has been submitted to ADB by the Government of Himachal Pradesh, Shimla and is made publicly available in accordance with ADB’s public communications policy (2011). It does not necessarily reflect the views of ADB.
Project Number: 40648-023 January 2015 Period: July – December 2014
Loan 2676-IND: Infrastructure Development Investment Program for Tourism, Project 1
Submitted by
Department of Tourism, Government of Himachal Pradesh
HIMACHALPRADESH ‒INFRASTRUCTURE DEVELOPMENT INVESTMENT PROGRAM FOR TOURISM
REVISED ENVIRONMENTAL
MONITORING REPORT (Semiannual)
July to December 2014
Department of Tourism, Government of Himachal Pradesh
EMR ‒ July to December, 2014 Page i
HIMCHAL PRADESH-INFRASTRUCTURE DEVELOPMENT INVESTMENT PROGRAM FOR TOURISM
This report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB’s Board of Directors, Management or
staff and may be preliminary in nature.
EMR July to Dec 2014 Page ii
ABBREVIATIONS
ADB–Asian Development Bank
BOD–Biological Oxygen Demand CCMP–Comprehensive Conservation Master Plan DC–Deputy Commissioner DP –Development Plan DSC –Design & Supervision Consultants EA- Executing Agency EARF – Environmental Assessment Review Framework EIA –Environmental Impact Assessment EMP –Environmental Management Plan FCA–Forest Conservation Act GoI –Government of India GoHP – Government of Himachal Pradesh HPIPH–Himachal Pradesh Irrigation & Public Health HPPCB–Himachal Pradesh Pollution Control Board HPSEB –Himachal Pradesh State Electricity Board IDIPT–Infrastructure Development Investment Program for Tourism IEE–Initial environmental examination MLD–Million Litres per day MOEF–Ministry of Environment and Forests MSL–Mean Sea Level
NGO–Non-Governmental Organization NHAI–National Highways Authority of India NOC –No Objection Certificate O &M–Operations & Management PFR –Periodic Financing Request PIU –Project Implementation Unit PMC-Project Management Consultants PMU–Project Management Unit REA –Rapid Environmental Assessment RH –Rest House RPM–Respirable Particulate Matter SADA –Special Area Development Authority SEAC –State Expert Appraisal Committee SEIAA–State Environment Impact Assessment Authority SPM–Suspended Particulate Matter SPS –Safeguards Policy Statement TCP–Town & Country Planning TDS –Total Dissolved Solids TSS–Total Suspended Solids VFDS –Village Forest Development Society YSS–Youth Services & Sport
EMR July to Dec 2014 Page iii
CONTENTS
PARTA
1 Introduction 1
2 Compliance status with National / State / Local statutory requirements 2
3 Compliance status with the environmental covenants as stipulated in the Loan Agreement 15
4 Compliance status with the environmental management and monitoring plans and environmental assessment and review framework/ procedures, as stipulated in the environmental documentation as agreed with ADB
15
5 Approach and methodology for environmental monitoring of the project 19
6 Follow up actions & conclusions 20
PARTB
Environmental Monitoring Status Chart 21
Annexure–Copies of NOCs and Statutory Approvals obtained by HPTDB 47
IDIPT – (HP) Project – 1 ADB Project No.40648
EMR July to Dec 2014 Page 1
1. Introduction
1.1 The Infrastructure Development Investment Program for Tourism (IDIPT) envisages environmentally and culturally sustainable and socially
inclusive tourism development in the project states of Himachal Pradesh, Punjab, Tamil Nadu and Uttara khand. The expected impact of the
project in the four states is sustainable and inclusive tourism development in priority State tourism sub-circuits divided into marketable cluster
destinations that exhibit enhanced protection and management of key natural and cultural heritage tourism sites, improved market connectivity,
enhanced destination and site environment and tourist support infrastructure and enhanced capacities for site improvement and sustainable
development with extensive participation of the private sector and local communities.
1.2 Supporting programs will be established for developing the capacities to promote private sector participation and small businesses to increase the
benefits they gain from tourism, and stimulating more active tourism-related economic and livelihood activities. Consultancy will support project
implementation and programs for developing the capacities of sector agencies for sustainable management of tourism and related infrastructure
and services. Two batches of subprojects are anticipated from each participating state, which the government will then consolidate, if applicable,
and forward to ADB in the form of periodic financing requests (PFRs).
1.3 The investment program uses a sector approach which requires reparation of an Environmental Assessment Review Framework (EARF) that sets
out specific procedures to be followed for subprojects, and for implementation of the project as a whole. The EARF is in accordance with
Government of India (the Government) rules and Asian Development Bank ADB) safe guard policies. The EARF reviews the types of subprojects
anticipated under the project and summarizes potential environmental impacts. The EARF provides an overview of the regulations of the
Government, as well as the states and ADB (as per its Safe guards Policy Statement, 2009 [SPS2009]) related to environmental assessment,
specifically concerning project environmental classification, review and clearance requirements. Organization for environmental management and
responsibilities for project tasks are enumerated within the project team and the respective state Tourism Departments, along with guidance on
capacity building needs.
1.4 This report is divided into two parts. Part A contains the status of compliance for subprojects in accordance with applicable national, state and local
environmental legislation. It also contains the compliance status as per the ADB Loan Covenants and status of subproject documentation
especially with respect to IEE and EMP and the proposed monitoring mechanism to be followed. Part B contains the factual information on the
basis of site visits by the Safeguards Specialists of PMC.
IDIPT – (HP) Project – 1 ADB Project No.40648
EMR July to Dec 2014 Page 2
2. Compliance status with National / State /Local statutory requirements is as follows:
Sr. No.
Name of project
Stipulations Compliance Status Remark/Remedial Actions
Status
Complied Partially complied
Not complied
1 Naina Devi sub project proposal
1.1 Circular Road – 1000 m x 3.75 m):
Statutory approval for diversion of forest land for non-forest purpose under FCA 1980 because 0.4363 ha of the total land required for road alignment passes through forest land has been
Obtained from the MoEF, GoI (conditional) vide letter dated 22
nd
April 2013 (copy attached as Annexure 1).
a) The Award of Contract for package 1.1 has now been extended to 31
st March, 2015.
b) The IEE/EMP for this subproject is part of contract agreement.
c) Retaining wall, pipe culvert and cutting and formation of roads is in progress.
Ongoing construction work
Statutory approval required from H.P. Forest department for clearing of 79 trees and 550 other vegetation
Forest Corporation and the site was handed over to HP Forest department vide fax dated 20-09-2013 (copy attached as Annexure 2)
IDIPT – (HP) Project – 1 ADB Project No.40648
EMR July to Dec 2014 Page 3
Sr. No.
Name of project
Stipulations Compliance Status Remark/Remedial Actions
Status
Complied Partially complied
Not complied
PUC of Vehicles
1.2 Car parking and other amenities
NOC from Temple Trust
Obtained vide letter no. SND-TTND-3022 dated 6
th July
2011 (copy attached as Annexure 3)
a) Project awarded on 3rd
September 2014 and the scheduled timeline for completion is 17
th March
2016. b) The updated IEE/EMP for this subproject is part of
contract agreement c) Contractor started working at site. Safety measures
are being displayed.
Breaking of big boulder by drill machine
NOC from HPSEB NoC will be obtained at an appropriate stage
NOC from HP I &PH NoC will be obtained at an appropriate stage
NOC from M.C. Naina Devi
Obtained vide letter no. 28 MCND-15/ 2010- 2023 dated 9
th
Dec, 2010 (copy attached as Annexure 4)
IDIPT – (HP) Project – 1 ADB Project No.40648
EMR July to Dec 2014 Page 4
Sr. No.
Name of project
Stipulations Compliance Status Remark/Remedial Actions
Status
Complied Partially complied
Not complied
2 Chintpurni area sub project proposal
2.1 Integrated parking, interpretation Centre, toilets & other visitor amenities
EC from the SEIAA is required as per the EIA notification 2009 under the Environment Protection Act, 1986 due to the project being categorized as B.
Application submitted on 21
st
October, 2013. The matter was placed in the 35
th meeting of
Himachal Pradesh State level Expert Appraisal Committee dated 23
rd January,
2014. The committee intimated to get the project approved from the SADA which later was approved vide letter no. SADA (chint) case no. BP 70/2013- 113-117 dated 18
th July, 2014
(copy attached as Annexure 5)
a) Contract was awarded and the agreement signed on 26 June, 2014. Stipulated time for completion is 1
st January, 2017.
b) Updated IEE/EMP is part of contract agreement c) Work in full swing
Construction work at site
Proper signages at site
NOC from department of Languages, Art & Culture to get the land transferred in the name of Temple Trust Chintpurni
Obtained vide no. TTC-7/Parking–
06V-III dated 12th
March 2013 as well as vide no. IDIPT-HP/2676-IND/HPTDB/2.1/2013/1219 dated 25
th
July 2013. The requisite NOC was obtained (copy attached as Annexure 6)
Statutory approval of project design from
Obtained vide letter no. TCP-F(6)-8/2014
IDIPT – (HP) Project – 1 ADB Project No.40648
EMR July to Dec 2014 Page 5
Sr. No.
Name of project
Stipulations Compliance Status Remark/Remedial Actions
Status
Complied Partially complied
Not complied
S.A.D.A. (Special Area Dev. Authority constituted under HP Town & Country Planning dept)
dated 3rd
June, 2014 (Annexure 7) and vide letter no. SADA (chint) case no. BP 70/2013- 113-117 dated 18
th July, 2014
(refer Annexure 5)
NOC from Temple Trust Chintpurni
Obtained vide no. 2601 MA-MC-1 dated 3
rd March
2012 (Annexure 8).
NOC from HPSEB Obtained vide letter no. SADA (chint) NOC No. 353/15/118-20 dated 18
th July, 2014 (copy
attached as Annexure 9)
NOC from HP I & PH Obtained vide letter no. SADA (chint) NOC No. 353/15/118-20 dated 18
th July, 2014
(Refer Annexure 9)
NOC from HP Forest department prior to commencement of construction works
NOC from forest department taken by Chintpurni Temple Trust, whereas no tree is expected to be cut.
2.2 Rest sheds, toilet facilities and view points along road from TRC to temple at Chintpurni
Statutory approval required from NHAI
Obtained Ref Letter No. PW-NHD-HMR-WA-NOC/2013-14-9196-9200 dated 03/01/14 (copy attached as Annexure 10).
a) Contractor has not commenced the work. The contract is terminated. The variation has already
been executed with the contract package -2/1.
IDIPT – (HP) Project – 1 ADB Project No.40648
EMR July to Dec 2014 Page 6
Sr. No.
Name of project
Stipulations Compliance Status Remark/Remedial Actions
Status
Complied Partially complied
Not complied
NOC from Temple Trust Chintpurni prior to commencement of construction works
Obtained vide no. 2601 MA-MC-1 dated 3
rd March
2012 (refer Annexure- 8)
NOC from HPSEB NoC will be obtained at an appropriate stage
NOC from HP I & PH at the time of completion of works.
NoC will be obtained at an appropriate stage
3 Pong dam area subproject proposal
3.1 Information Centre at Pong Dam
NOC required from HP Forest department
Obtained vide no. WL (Misc) 62/wetlands/333 dated 21
st April 2011
(copy attached as Annexure 11)
a) Work completed and closure report is being prepared by PIU.
NOC required from department of Youth, Sports & Services (YSS)
Obtained vide no. YSS-F(10)11/2011 dated 2nd December 2011 (copy attached as Annexure 12)
NOC from HPSEB at the time of completion of works
Applied
NOC from HP I&PH at the time of completion of works
Applied
3.2 Parking and toilet facilities
NoC required from HP Forest department prior to commencement of construction works.
Obtained vide no. WL (Misc) 62/wetlands/333 dated 21
st April 2011
(Refer Annexure 11)
a) Work completed and closure report is being prepared by PIU.
NoC required from department of YSS prior to commencement of
Obtained vide no. YSS-F (10)11/2011 dated 2nd December 2011 (Refer
IDIPT – (HP) Project – 1 ADB Project No.40648
EMR July to Dec 2014 Page 7
Sr. No.
Name of project
Stipulations Compliance Status Remark/Remedial Actions
Status
Complied Partially complied
Not complied
construction works Annexure 12)
Toilet
NOCs from HPPCB at the time of completion of works
NOC obtained.
NOCs from HPSEB at the time of completion of works
Applied
NOCs from HP I &PH at the time of completion of works
Applied
3.3 Camping facilities, with provisions for 10 tents, including toilets etc
NoC required from HP Forest department prior to commencement of construction works
Obtained vide no. WL (Misc) 62/4345 dated 16th November 2011 (copy attached as Annexure 13)
a) Work completed and closure report is being prepared by PIU.
NOC from HP I & PH at the time of completion of works
Applied.
IDIPT – (HP) Project – 1 ADB Project No.40648
EMR July to Dec 2014 Page 8
Sr. No.
Name of project
Stipulations Compliance Status Remark/Remedial Actions
Status
Complied Partially complied
Not complied
3.4 Jetty development
Statutory approval from HP Forest department prior to commencement of construction works
Obtained vide no. WL (Misc)-62/7136 dated 14
th March
2012 (copy attached as Annexure 14).
a) Work completed and closure report is being prepared by PIU.
3.5 Landscaping and signage
Statutory approval from HP Forest department prior to commencement of construction works.
Obtained vide no. WL (Misc)-62/7136 dated 14
th March
2012 (Refer Annexure 14)
a) Contract was signed on 17th December 2013 with
date for completion of work as 8th
January 2015. b) Updated IEE/EMP is part of contract agreement c) Stone work in progress
IDIPT – (HP) Project – 1 ADB Project No.40648
EMR July to Dec 2014 Page 9
Sr. No.
Name of project
Stipulations Compliance Status Remark/Remedial Actions
Status
Complied Partially complied
Not complied
Construction material stored
4 Ranser island and Karu island improvement subproject proposal
4.1 Redevelopment of Forest rest house- Ranser island
Statutory approval from HP Forest department prior to commencement of construction works.
Obtained vide no. WL (Misc)-62/7136 dated 14
th March
2012 (Refer Annexure 14).
a) Completion date further extended up to 28th July,
2014. Further extension of time given up to 31st
January, 2015. b) Updated IEE/EMP is part of contract agreement.
4.2 Jetty development, Ranser and Karu Island
Statutory approval from HP Forest department prior to commencement of construction works.
Obtained vide no. WL (Misc)-62/7136 dated 14
th March
2012 (Refer Annexure 14).
a) Extension of time granted up to 31st December,
2014. b) Updated IEE/EMP is part of contract agreement. c) Jetty completed at Ranser (railing work under
progress) but not started at Karu. 4.3 Treks around
the island - 4km
Statutory approval from HP Forest department prior to commencement of construction works.
Obtained vide no. WL (Misc)-62/7136 dated 14
th March
2012 (Refer Annexure 14).
a) Due to high level of water in Pong Lake, work got delayed. In view of the same, extended was granted upto 10
th September, 2015.
b) Updated IEE/EMP is part of contract agreement.
IDIPT – (HP) Project – 1 ADB Project No.40648
EMR July to Dec 2014 Page 10
Sr. No.
Name of project
Stipulations Compliance Status Remark/Remedial Actions
Status
Complied Partially complied
Not complied
Toilet provided for labors
First aid Box available at site
4.4 Landscaping, planting along the peripheral trail and directional signage
Statutory approval from HP Forest department prior to commencement of construction works
Obtained vide no. WL (Misc)-62/7136 dated 14
th March
2012 (Refer Annexure 14).
a) Extension of time granted up to 31st December,
2014. b) Work not yet started
4.5 Watch towers for bird watching in Karu island
Statutory approval required from HP Forest department prior to commencement of construction works.
Obtained vide no. WL (Misc)-62/Pong Dam/1652 dated 20
th
June 2013 (copy attached as Annexure 15).
a) Extension granted up to 31st December, 2014.
b) IEE/EMP is part of contract agreement.
IDIPT – (HP) Project – 1 ADB Project No.40648
EMR July to Dec 2014 Page 11
Sr. No.
Name of project
Stipulations Compliance Status Remark/Remedial Actions
Status
Complied Partially complied
Not complied
5 Forest rest houses & camping sites of VFDS subproject proposal
5.1 A Camping sites development at Nagrota Suriyan
Statutory approval for transfer of identified land to HPTDB
Obtained vide letter no. TSM-F(5)-8/2010 dated 24
th Nov, 2014
(copy attached as Annexure 16).
a) Site location has been shifted b) IEE/EMP updated and submitted to ADB c) Existing contract terminated. d) Rebidding done and LOA issued on November,
2014.
Proposed site
NOC from HP Forest Department.
Obtained vide letter no. 6810 HP. Forest Deptt. dated 7
th Nov,
2013 (copy attached as Annexure 17)
5.1 B Forest rest house - improvement and camping sites development at Dhameta
NoC from HP Forest department prior to commencement of construction works.
Obtained vide no. WL (Misc)-62/7136 dated 14
th March 2012
(Refer Annexure 15).
a) Extension is granted up to 24th October, 2014.
b) IEE/EMP is part of contract agreement. c) Work is in progress.
Project Board at site
IDIPT – (HP) Project – 1 ADB Project No.40648
EMR July to Dec 2014 Page 12
Sr. No.
Name of project
Stipulations Compliance Status Remark/Remedial Actions
Status
Complied Partially complied
Not complied
Newly constructed Forest Guest house
6 Community based tourism activities subproject proposal
6.1 Community based tourism activities in villages, including skill development, training, etc.
Statutory approval for coordinated planning & imparting skills training may be required from the Regional Water Sports Centre, GoHP at Pong Dam & Department of Forests & Wildlife, HP at later stages of the project development.
As & when required a) CBT 1, CBT 2 and CBT 5 are awarded. b) Consultancies have initiated working.
Interaction with ERA staff
8 Kangra Town subproject proposal
8.1 Parking for 100 vehicles at Brajeshwari temple, Kangra
Statutory approval required from Municipal Council, Kangra prior to commencement of construction works has been and
Obtained vide no. MCK/T&CP/2013-281 dated 1
st March
2013 (copy attached as Annexure 18)
a) Extension of time was up to 31st October, 2014
which was further extended upto 31st March, 2015.
b) IEE/EMP is part of contract agreement. c) Work is in full swing.
IDIPT – (HP) Project – 1 ADB Project No.40648
EMR July to Dec 2014 Page 13
Sr. No.
Name of project
Stipulations Compliance Status Remark/Remedial Actions
Status
Complied Partially complied
Not complied
Statutory approval required from Brajeshwari Temple Trust prior to commencement of construction works
Obtained vide no. 229-230 SDK/ST dated 9
th March
2012. (copy attached as Annexure 18)
Orientation training on safeguard/HIV/AIDs
Filtered water for drinking
NOC from HPSEB at the project completion.
NOC will be obtained at an appropriate stage.
NOC from HP I&PH for at the project completion.
NOC will be obtained at an appropriate stage.
9 Shimla subproject proposal
9.1 A Shimla Mall Road restoration project
Statutory approval from Municipal Corporation Shimla.
Obtained vide MCS/Xen/5436/MU/13-106 dated 13
th
January, 2014 (copy attached as Annexure 19)
a) Work awarded and agreement signed on 24th June,
2014. Completion date is 7th
January 2016. b) IEE/EMP is part of agreement c) Work has commenced and is under progress.
9.1 B Shimla Mall Rehabilitatio
Statutory approval from Heritage &
Obtained vide Commissioner’s
a) PBER is approved by ADB on 24th May, 2014 and
contract signed on 9th August, 2014. Date for
IDIPT – (HP) Project – 1 ADB Project No.40648
EMR July to Dec 2014 Page 14
Sr. No.
Name of project
Stipulations Compliance Status Remark/Remedial Actions
Status
Complied Partially complied
Not complied
n of town hall
Municipal Corporation Shimla
Order No. 183 (AP) dated 13
th May, 2014
(Annexure-19)
completion of work is scheduled to 21 March 2016. b) IEE/EMP is part of agreement c) Work is under progress.
10 Tutikandi Multistorey Parking Facility
NoC from H.P. State Pollution Control Board
Obtained vide letter no. HPSCB/Misc. Consent, R.O. Shimla/14-8971-73 dated 7
th August,
2014 (attached as per Annexure 20)
a) IEE prepared/updated and submitted to ADB. The project is under procurement stage.
NoC from Ministry of Forest
Obtained vide letter no. 9-HPB 830/2011-CHA/378 dated 1
st
October, 2014 (attached as per Annexure 21)
IDIPT – (HP) Project – 1 ADB Project No.40648
EMR July to Dec 2014 Page 15
3. Compliance status with the environmental covenants as stipulated in the Loan Agreement
3.1 SCHEDULE 5, Loan Covenant 1– 3.1.1 The subprojects under taken as part of the project meet the selection criteria set out in Schedule 4 to the FFA. 3.2 SCHEDULE 5, Loan Covenant 3(ii)
3.2.1 The subproject IEEs and EMPs are being implemented in nearly/fully in accordance with their terms.
3.2.2 The Contractors & the Field Staff of PIU/DSC are almost aware of their responsibilities during construction/implementation of subprojects towards the following:
(a) environmental parameters to be monitored (b) occupational health & safety and (iii) material handling & storage. The task of environmental testing for various
sites required co-ordination between many groups/units earlier, hence it has been delayed. However, the process is ongoing & testing reports for packages
1.1/1.2 and 2.1 are in place. Capacity Building is one of the main tasks of the Consultants, 2 workshops has been done to follow stipulated guidelines/EMPs and
has made a positive impact. The site situation with respect to implementation of safeguards is much better now and with sustained efforts of the entire team of
PMU/PIC/DSC/PMC/Contractor it being maintained almost satisfactorily.
3.2.3 The reasons for better compliance now are: (a) the prepared (IEEs & EMPs) documents are being read and interpreted properly (b) field staff for day-to-day monitoring and supervision has been placed. PMC and DSC Safeguards Specialist held onsite training/interaction with the Contractors and other field staff members available on site and have enthusiastically understood roles and responsibilities at all levels & mechanism safeguards yet not adhered at site. Two workshops have been also done till date and the detailed discussions with the Contractors & their representatives to inform them of their Contractual obligations and take steps to remedy the shortcomings in project execution at the earliest especially with respect to the Environmental aspects which resulted in positive action. Now it is expected that implementation of EMP will be fully complied.
3.3 SCHEDULE 5, Loan Covenant 3 (iv) 3.3.1 A revised IEE/EMP for subproject 1.1 was done as required and submitted to ADB for approval. 3.4 SCHEDULE 5, LoanCovenant3 (vii)
3.4.1 Quarterly reporting to PMU by DSC on the implementation of the IEEs and EMPs was started from the second quarter of 2013. The first annual report was
submitted by PMC/PMU to the ADB for the period January to December 2013 based on the quarterly field visits to the subprojects by DSC & PMC Safeguards
Specialists. The first Environmental Monitoring Report (EMR, Jan to Mar, 2014) was submitted to ADB and later it has been decided to submit the semiannual
EMR. Now this is the semi-annual EMR for the period July to December, 2014 as desired by ADB is prepared and submitted.
4. Compliance status with the environmental management and monitoring plans and environmental assessment and review framework/ procedures, as stipulated in the environmental documentation as agreed with ADB.
4.1 A consolidated IEE and EMP were prepared for the project dated July, 2010 that outlined the identification of overall environmental impacts and corresponding
mitigation measures for envisaged subprojects. Thereafter, individual IEEs and EMPs have been prepared for each of the packages and submitted to ADB for
IDIPT – (HP) Project – 1 ADB Project No.40648
EMR July to Dec 2014 Page 16
approval. Over the course of time, since PMC took over at Shimla (January 2012) all IEEs and EMPs have been prepared afresh/updated, There are a total of 20
packages in Tranche-1 out of which two subprojects of Masroor (sub-projects 7.1/7.2) and Peterhoff have been shifted in Tranche-3 and Tutikandi subproject is at
procurement stages.
4.2 The sub-project list is as follows:
S.N. Name of sub-project Compliance Status for Environmental Documentation of ADB
1 Naina Devi 1.1 Circular Road–1 Km long IEE/EMP prepared/updated and submitted to ADB and is part of contract 1.2 Car parking and other amenities IEE/EMP prepared/updated and submitted to ADB and is part of contract 2 Chintpurni
2.1 Integrated parking, interpretation Centre, toilets & other visitor amenities IEE/EMP prepared/updated and submitted to ADB and is part of contract 2.2 Rest sheds, toilet facilities & view points along road from TRC to temple at IEE/EMP prepared/updated and submitted to ADB and is part of contract 3 Pong Dam
3.1 Information Centre at Pong Dam IEE/EMP prepared/updated and submitted to ADB and is part of contract 3.2 Parking and toilet facilities IEE/EMP prepared/updated and submitted to ADB and is part of contract 3.3 Camping facilities, with provisionsfor10 tents, including toilets etc. IEE/EMP prepared/updated and submitted to ADB and is part of contract 3.4 Jetty development IEE/EMP prepared/updated and submitted to ADB and is part of contract 3.5 Landscaping & Signage IEE/EMP prepared/updated and submitted to ADB and is part of contract 4 Ranser & Karu Island Improvements
4.1 Redevelopment of Forest rest house- Ranser island IEE/EMP prepared/updated and submitted to ADB and is part of contract 4.2 Jetty development, Ranser and Karu Island IEE/EMP prepared/updated and submitted to ADB and is part of contract 4.3 Treks around the island -4km IEE/EMP prepared/updated and submitted to ADB and is part of contract 4.4 Landscaping, planting along the peripheral trail and directional signage IEE/EMP prepared/updated and submitted to ADB and is part of contract 4.5 Watchtowers for bird watching in Karu Island IEE/EMP prepared/updated and submitted to ADB and is part of contract 5 Forest Rest Houses & Camping Sites for VFDS
5.1 Forest rest house- improvement and camping sites development at Nagrota IEE/EMP prepared/updated and submitted to ADB and is part of contract 5.2 Forest rest house- improvement and camping sites development at Dhameta IEE/EMP prepared/updated and submitted to ADB and is part of contract 6 Community Based Tourism
6.1 Community based tourism activities in villages, including skill development, training, Not applicable. 7 Masroor
7.1 Conservation and restoration of Masroor temples, in line with the Management Plan Shifted to Tranche-3 IEE/EMP prepared/updated and submitted to ADB and has been approved 7.2 Parking and information Centre
8 Kangra 8.1 Parkingfor100 vehicles at Bajreshwari temple, Kangra IEE/EMP prepared/updated and submitted to ADB and is part of contract 9 Shimla
9.1A Rehabilitation of Shimla Town Hall IEE prepared/updated and submitted to ADB 9.1B Shimla Mall Road Restoration Project 10.1 Convention Centre and Restoration & Up-gradation of Existing Peterhoff Hotel, Shifted to Tranche 3 10.2 Tutikandi Multistorey Parking Facility IEE prepared/updated and submitted to ADB
IDIPT – (HP) Project – 1 ADB Project No.40648
EMR July to Dec 2014 Page 17
PHOTO GALLARY (Workshops/Trainings)
Workshop dated 25
th and 26
th April, 2014 at Hotel Chintpurni Heights, Bharwain.
Workshop on “Gender Mainstreaming/Gap Implementation and Safeguard Issues” on dated 21st August at Hotel Chintpurni Heights, Bharwain.
Workshop Report on “Enhancement Community Based Tourism in Himachal Pradesh” on dated 22ndAugust, 2014 at Yatri Bhawan, Chintpurni.
IDIPT – (HP) Project – 1 ADB Project No.40648
EMR July to Dec 2014 Page 18
Onsite Training for Package 1.1/1.2 at Naina Devi on 13th
September, 2014 on environmental Safeguards
Onsite Training for Package 8.1: Parking Brajeshwari on 24
th November, 2014 on HIV/AIDs/STD/ Safeguards
IDIPT – (HP) Project – 1 ADB Project No.40648
EMR July to Dec 2014 Page 19
SIT
E S
UP
ER
VIS
ION
& M
ON
ITO
RIN
G
5. Approach and methodology for environmental monitoring of the project
Table 1: SCHEMATIC DIAGRAM OF THE PROPOSED MONITORING MECHANISM
Review & Revise
SITE ENGINEERにCONTRACTOR
SITE ENGINEERにDSC&/PIU
DAILY SUPERVISION
DAILY RECORD
KEEPING
ENVIRONMENT SAFE
GUARDS SPECIALIST -DSC
MONTHLY
SUPERVISION &
REPORTING
ENVIRONMENT SAFE
GUARDS SPECIALIST -PMC
QUARTERLY
SUPERVISION &
REPORTING
REPORT TO ADB
IDIPT – (HP) Project – 1 ADB Project No.40648
EMR July to Dec 2014 Page 20
6. Follow-up actions and conclusions
6.1 A regular and meaningful monitoring mechanism has been established as mentioned in Table 1 and Final Monitoring Mechanism decided for the project is
attached as Annexure 22. The details and job responsibilities are clearly stipulated in the EARF and there is a strong need for transforming these stipulations into
actions so that environmental monitoring can lead to preventive measures rather than curative which is the case right now. The main reason is that there is a lack
of understanding of project requirements and lack of commitment to adopt best practice in project implementation. The sites are being visited regularly by the
Safeguards’ Specialists since, July2013. However, regular environmental monitoring is still deficient on some aspects of which appropriate training of the field staff
and environmental testing are the two major areas.
6.2 The field staff such as the site engineers/support engineers and the respective Contractors on site have been advised on maintaining a constant vigil in respect of
all environmental parameters to be monitored and adherence to record keeping on site. The situation is getting better however day today site supervision is
required to be strengthened.
IDIPT – (HP) Project – 1 ADB Project No.40648
EMR July to Dec 2014 Page 21
Part B–Environmental Monitoring Status Chart (Ref. IEE/EARF July 2010) Name IEE/EMP
Components
Environmental Issues Responsibility Overall Status Remarks
Package 1.1: Circular Road at Naina Devi
Location impacts
1. Siting of facilities
PMU & Line Agency (Temple
Trust Naina Devi)
Provision of temporary toilet on site for workers made by the Contractor.
Provision of litter bags for waste management done by the Contractor.
Baseline environmental conditions established by testing of air, noise and soil parameters and are within limit. Water of IPH supply is sampled and results awaited.
2.Impact on archaeological remains
-do- None so far
3. Other -do- None
Design impacts
1. Impact on sensitive areas DSC & PIU 1. Already complied
2. Slope stability related issues -do- 2. Earth cutting for road layout completed at both end points and construction of retaining structures ongoing at ‘meeting point’.
3. Increased storm water runoff
-do- 3. Six number culverts and V-shaped drains proposed to channelize surface run-off.
4. Impact on ground water quality
-do- 4. None anticipated.
5. Impact on aesthetic appeal
-do- 5. Not applicable
6. Integration of energy conservation
-do- 6. Not applicable
Pre-construction activities by the Contractor
1.Construction Camps
Contractor & DSC
1. Yes camps available at site.
2. Defining of construction/work areas on ground
-do- 2. Construction areas delineated by DSC Site Engr
3. Circulation plan during construction
-do- 3. Not Applicable
4. Site clearance activities
-do- 4. Removal of 79 trees and a number of saplings from the site was required to be done by the HP Forest dept. The requisite amount of money for
IDIPT – (HP) Project – 1 ADB Project No.40648
EMR July to Dec 2014 Page 22
Name IEE/EMP Components
Environmental Issues Responsibility Overall Status Remarks
compensatory plantation was deposited with the HP Forest department by the HPTDB. The land was cleared of designated number of trees and saplings and site was handed over to the HPTDB. The site was handed over to the Contractor for construction works.
5. Drinking water availability
-do- 5. Drinking water available from Municipal supply.
6. Identification of disposal sites
-do- 6. Identification of disposal sites done but no disposal from site yet.
7. Waste mgt on site -do- 7. Not yet due
Construction impacts
1. Improper stockpiling
Contractor 1. Stockpiling of material was found to be improper on site initially but following the instructions given, stockpiling now being carried out allowing free movement of road traffic and safely.
2.Quarry/ Borrow pit operations -do- 2. Borrow pit operations not applicable.
3.Stripping, stocking & preservation of top soil
-do- 3. Stripping/ Stocking of top soil done on site.
4.Soil erosion -do- 4. Soil erosion not applicable as yet.
5.Blasting
-do- 5. Blasting not required nor permitted.
6. Water pollution due to fuel/lubricants
-do- 6. No water pollution due to fuel or lubricants on site yet.
There is no nearby natural source of water.
7. Generation of dust -do- 7. Water sprinkling being done as per requirement.
8.Emission from constn vehicles -do- 8. Emissions from Const
n vehicles/equipment
are negligible. 9. Noise from const
n equipment
-do- 9. No noise from const
n equipment observed
on site. Noise results are within limit.
10. Material handling
-do- 10. Material handling on site duly being followed by the Contractor. No hazardous material in use at site during the period.
11. Disposal of constn -do- 11. Disposal not required yet.
IDIPT – (HP) Project – 1 ADB Project No.40648
EMR July to Dec 2014 Page 23
Name IEE/EMP Components
Environmental Issues Responsibility Overall Status Remarks
waste/debris
12. Safety measures -do- 12. Safety measures are being followed by workers.
13. Risks force majeure -do- 13. No force majeure risks yet.
14. Malaria risk -do- 14.No malaria risk
15. Chance archaeological finds -do- 15. No artifact’s/finds reported. 16.Religious structures -do- 16. No religious structure encountered yet
O & M impacts
1.Environmental conditions PMU, Contractor & DSC
Not yet arise
2.Uncontrolled tourism -do- -do-
3. Adequate drainage -do- -do-
4. Road safety -do- -do- Package 1.2: Car parking and other amenities
The IEE/EMP revised.
Package 2.1: Integrated parking, interpretation Centre, toilets & other visitor amenities
Location impacts
1. Siting of facilities
PMU & Line Agency (Temple
Trust Naina Devi)
Provision of temporary toilet on site for workers made by the Contractor.
Provision of litter bags for waste management done by the Contractor.
Baseline environmental conditions established by testing of air, noise and soil parameters and are within limit. Water of IPH supply is sampled and results awaited.
2.Impact on archaeological remains
-do- None so far
3. Other -do- None
Design impacts
1. Impact on sensitive areas DSC & PIU 2. Already complied
2. Slope stability related issues -do- 2. Earth cutting for road layout completed at both end points and construction of retaining structures ongoing at ‘meeting point’.
3. Increased storm water runoff
-do- 3. Six number culverts and V-shaped drains proposed to channelize surface run-off.
4. Impact on ground water quality
-do- 4. None anticipated.
5. Impact on aesthetic appeal -do- 5. Not applicable
IDIPT – (HP) Project – 1 ADB Project No.40648
EMR July to Dec 2014 Page 24
Name IEE/EMP Components
Environmental Issues Responsibility Overall Status Remarks
6. Integration of energy
conservation -do- 6. Not applicable
Pre-construction activities by the Contractor
1.Construction Camps
Contractor & DSC
1. Yes camps available at site.
2. Defining of construction/work areas on ground
-do- 2. Construction areas delineated by DSC Site Engr
3. Circulation plan during construction
-do- 3. Not applicable
4. Site clearance activities
-do- 4. Removal of 79 trees and a number of saplings from the site was required to be done by the HP Forest dept. The requisite amount of money for compensatory plantation was deposited with the HP Forest department by the HPTDB. The land was cleared of designated number of trees and saplings and site was handed over to the HPTDB. The site was handed over to the Contractor for construction works.
5. Drinking water availability
-do- 5. Drinking water available from Municipal supply.
6. Identification of disposal sites
-do- 6. Identification of disposal sites done but no disposal from site yet.
7. Waste mgt on site -do- 7. Not yet due
Construction impacts
1. Improper stockpiling
Contractor 1. Stockpiling of material was found to be improper on site initially but following the instructions given, stockpiling now being carried out allowing free movement of road traffic and safely.
2.Quarry/ Borrow pit operations -do- 2. Borrow pit operations not applicable.
3.Stripping, stocking & preservation of top soil
-do- 3. Stripping/ Stocking of top soil done on site.
4.Soil erosion -do- 4. Soil erosion not applicable as yet.
5.Blasting
-do- 5. Blasting not required nor permitted.
IDIPT – (HP) Project – 1 ADB Project No.40648
EMR July to Dec 2014 Page 25
Name IEE/EMP Components
Environmental Issues Responsibility Overall Status Remarks
6. Water pollution due to fuel/lubricants
-do- 6. No water pollution due to fuel or lubricants on site yet.
7. Generation of dust -do- 7. Water sprinkling being done as per requirement.
8.Emission from constn vehicles -do- 8. Emissions from Const
n vehicles/equipment
are negligible.
9. Noise from constn equipment
-do- 9. No noise from const
n equipment observed
on site. Noise results are within limit.
10. Material handling
-do- 10. Material handling on site duly being followed by the Contractor. No hazardous material in use at site during the period.
11. Disposal of constn
waste/debris -do- 11. Disposal not required yet.
12. Safety measures -do- 12. Safety measures are being followed by workers.
13. Risks force majeure -do- 13. No force majeure risks yet.
14. Malaria risk -do- 14.No malaria risk
15. Chance archaeological finds -do- 15. No artifact’s/finds reported. 16.Religious structures -do- 16. No religious structure encountered yet
O & M impacts
1.Environmental conditions PMU, Contractor & DSC
Not yet arise
2.Uncontrolled tourism -do- -do-
3. Adequate drainage -do- -do-
4. Road safety -do- -do- Package 2.2: Rest sheds, toilet facilities and view points along road from TRC to temple at Chintpurni
Since contractor has yet not commenced the work it is proposed to merge with package 2.1
Package 3.1: Information Centre at Pong Dam
O & M impacts
1. Environmental conditions
PMU & Line Agency
1. Environmental condition has been restored.
Work Completed Overall EMP application status is satisfactory.
2. Uncontrolled tourism development
-do- 2. Not yet
3. Mgt of toilet blocks -do- 3. Yet to be hand over to asset owner.
IDIPT – (HP) Project – 1 ADB Project No.40648
EMR July to Dec 2014 Page 26
Name IEE/EMP Components
Environmental Issues Responsibility Overall Status Remarks
4. Adequate drainage on site -do- 4. Yes
5. Hygiene & sanitation -do- 5, Good
6. Increased waste loads on the existing facility
-do- 6. Asset owner will plan to manage it
Package 3.2: Parking and toilet facilities
O & M impacts
1. Environmental conditions
PMU & Line Agency
1. Environmental condition has been restored.
Work Completed Overall EMP application status is satisfactory.
2. Uncontrolled tourism development
-do- 2. Not yet
3. Mgt of toilet blocks -do- 3. Yet to be hand over to asset owner.
4. Adequate drainage on site -do- 4. Yes
5. Hygiene & sanitation -do- 5, Good
6. Increased waste loads on the existing facility
-do- 6. Asset owner will plan to manage it
Package 3.3: Camping facilities, with provisions for 10 tents, including toilets
O & M impacts
1. Environmental conditions
PMU & Line Agency
1. Environmental condition has been restored.
Work Completed Overall EMP application status is satisfactory.
2. Uncontrolled tourism development
-do- 2. Not yet
3. Mgt of toilet blocks -do- 3. Yet to be hand over to asset owner.
4. Adequate drainage on site -do- 4. Yes
5. Hygiene & sanitation -do- 5, Good
6. Increased waste loads on the existing facility
-do- 6. Asset owner will plan to manage it
Package 3.4: Jetty development
O & M impacts
1. Environmental conditions
PMU & Line Agency
1. Environmental condition has been restored.
Work Completed Overall EMP application status is satisfactory.
2. Uncontrolled tourism development
-do- 2. Not yet
3. Mgt of toilet blocks -do- 3. Yet to be hand over to asset owner.
4. Adequate drainage on site -do- 4. Yes
5. Hygiene & sanitation -do- 5, Good
6. Increased waste loads on the existing facility
-do- 6. Asset owner will plan to manage it
Package 3.5: Landscaping and
Location impacts
1. Long term planning to ensure sustainability & integration with
PMU & Line Agency
1. The siting and location of the facility conform to the existing Management Plan for the
IDIPT – (HP) Project – 1 ADB Project No.40648
EMR July to Dec 2014 Page 27
Name IEE/EMP Components
Environmental Issues Responsibility Overall Status Remarks
signage the mgt plan
(Forest department)
Wetland prepared by the HP Forest department
Design & pre-construction impacts
1. Impact on sensitive areas
DSC & Contractor
1. Minimal impact as the facility is located outside the core sensitive area of the wetland.
2. Increased storm water runoff
-do- 2. Surface run-off channelized through proper slope
3. Impact on ground water quality
-do- 3. None anticipated.
4. Impact on aesthetic appeal
-do- 4. The landscaping design confirm to local aesthetics and merge well with the surroundings.
5. Integration of energy conservation
-do- 5. Lighting fixtures to be provided.
6. Construction camps
-do- 6. No construction camps allowed on site being a sensitive area.
7. Defining constn work areas -do- 7. Work areas are well defined and properly
barricaded.
8. Site clearance activities -do- 8. Not yet due as the work is in progress
9. Drinking water availability -do- 9. Drinking water facility exists on site.
10. Identification of disposal sites -do- 10. No disposal required at site.
11. Waste mgt on site -do- 11. No Solid Waste generated so far
Construction impacts
1. Improper stockpiling
Contractor 1. The material is properly brought in and safely stored and used on site as per the instructions given by the field staff.
2.Quarry/ Borrow pit operations
-do- 2. Not applicable.
3.Stripping, stocking & preservation of top soil
-do- 3. The stripped top soil has been re-used in planters and landscaping on site.
4. Soil & water pollution due to fuel
-do- 4. None observed.
5. Siltation of water bodies -do- 5. None – due to present activity
6. Generation of dust -do- 6. None – due to present activity
IDIPT – (HP) Project – 1 ADB Project No.40648
EMR July to Dec 2014 Page 28
Name IEE/EMP Components
Environmental Issues Responsibility Overall Status Remarks
7. Emission from constn vehicles -do- 7. Marginal emissions for very short durations
occur on site.
8. Noise from constn equipment -do- 8. Not required now
9. Material handling
-do- 9. Material handling is safe and proper and regularly checked by field staff.
10. Disposal of constn
waste/debris -do- 10. No waste generation at present
11. Safety measures -do- 11. Safety measures adhered to - First Aid Kit, and personal protection equipment are used and other norms laid out in the EMP being followed.
12. Risks force majeure -do- 12. Not applicable.
13. Malaria risk -do- 13. No incident reported from site.
14. Clearing of constn camps -do- 14. Not yet due.
O & M impacts
1. Environmental conditions
PMU & Line Agency
Not yet due as the work is still in progress
2. Uncontrolled tourism development
-do-
3. Mgt of toilet blocks -do-
4. Adequate drainage on site -do-
5. Hygiene & sanitation -do-
6. Increased waste loads on the existing facility
-do-
Package 4.1: Redevelopment of Forest rest house-Ranser island
Location impacts
1. Long term planning to ensure sustainability & integration with the mgt plan
PMU & Line Agency (Forest
department)
1. The siting and location conform to the existing Management Plan for the Wetland prepared by the HP Forest department.
No work at present .
Design & pre-construction impacts
1. Impact on sensitive areas
DSC & Contractor
1. Minimal impact as the facility is located outside the core sensitive area of the wetland.
2. Increased storm water runoff
-do- 2. Surface run-off channelized through proper drains and gutters.
3. Impact on ground water quality
-do- 3. Septic tank provided for sewerage generated from the toilets to prevent ground
IDIPT – (HP) Project – 1 ADB Project No.40648
EMR July to Dec 2014 Page 29
Name IEE/EMP Components
Environmental Issues Responsibility Overall Status Remarks
infiltration.
4. Impact on aesthetic appeal
-do- 4. The building design features conform to local aesthetics and merge well with the surroundings.
5. Integration of energy conservation
-do- 5. Lighting fixtures to be provided.
6. Construction camps
-do- 6. No construction camps allowed on site being a sensitive area and also located at island
7. Defining constn work areas -do- 7. Work areas are well defined.
8. Site clearance activities
-do- 8. Not yet due as the work is in progress.
9. Drinking water availability -do- 9. Drinking water facility exists on site.
10. Identification of disposal sites
-do- 10. No disposal required.
11. Waste mgt on site -do- 11. No Solid Waste generated on site is collected in bags and bins and disposed off at low land for land development
Construction impacts
1. Improper stockpiling
Contractor 1. The material is properly brought in and safely stored and used on site as per the instructions given by the field staff.
2.Quarry/ Borrow pit operations -do- 2. Not applicable.
3.Stripping, stocking & preservation of top soil
-do- 3.Not required
4. Soil & water pollution due to fuel
-do- 4. None observed.
5. Siltation of water bodies
-do- 5. Marginal siltation of the water body may have occurred due to ongoing construction activity but the same shall be minimized through landscaping, paving and channelization at completion of works.
6. Generation of dust -do- 6. Marginal dust generation was observed
7. Emission from constn vehicles
-do- 7. No emission
IDIPT – (HP) Project – 1 ADB Project No.40648
EMR July to Dec 2014 Page 30
Name IEE/EMP Components
Environmental Issues Responsibility Overall Status Remarks
8. Noise from constn equipment -do- 8. Noise testing to be carried out.
9. Material handling
-do- 9. Material handling is safe and proper and regularly checked by field staff.
10. Disposal of constn
waste/debris -do- 10. Done properly
11. Safety measures
-do- 11. Safety measures being adhered to - First Aid Kit, and personal protection equipment are used and other norms laid out in the EMP being followed.
12. Risks force majeure
-do- 12. Not applicable.
13. Malaria risk
-do- 13. No incident reported from site.
14. Clearing of constn camps -do- 14. Not yet due.
O & M impacts
1. Environmental conditions
Line Agency (HP Forest
department)
Not yet due as the work is still in progress.
2. Uncontrolled tourism development
-do- -do-
3. Mgt of toilet blocks
-do- -do-
4. Adequate drainage on site
-do- -do-
5. Hygiene & sanitation
-do- -do-
6. Increased waste loads on the existing facility
-do- -do-
Package 4.2: Jetty development, Ranser and Karu Island
Location impacts
1. Long term planning to ensure sustainability & integration with the mgt plan
PMU & Line Agency (Forest
department)
1. The siting and location of the facility conform to the existing Management Plan for the Wetland prepared by the HP Forest department.
Design & pre-construction impacts
1. Impact on sensitive areas
DSC & Contractor
1. Minimal impact as the facility is located outside the core sensitive area of the wetland.
IDIPT – (HP) Project – 1 ADB Project No.40648
EMR July to Dec 2014 Page 31
Name IEE/EMP Components
Environmental Issues Responsibility Overall Status Remarks
2. Increased storm water runoff
-do- 2. Run-off will lead to the lake.
3. Impact on ground water quality
-do- 3. Not applicable.
4. Impact on aesthetic appeal -do- 4. Not applicable.
5. Integration of energy conservation
-do- 5. Not applicable.
6. Construction camps
-do- 6. No construction camps allowed on site being a sensitive area.
7. Defining constn work areas -do- 7. Work areas are well defined and isolated
8. Site clearance activities -do- 8. Not yet due as the work is in progress.
9. Drinking water availability -do- 9. Drinking water facility exists on site.
10. Identification of disposal sites
-do- 10. Not applicable.
11. Waste mgt on site -do- 11. Solid Waste generated on site is to be collected in bags and bins and disposed off to the nearest dumping ground.
Construction impacts
1. Improper stockpiling
Contractor No work during the period
Jetty at Ranser has been completed. Due to high level of water in Pong Dam work could not be started on Karu island.
2.Quarry/ Borrow pit operations -do- -do-
3.Stripping, stocking & preservation of top soil
-do- -do-
4. Soil & water pollution due to fuel
-do- -do-
5. Siltation of water bodies -do- -do-
6. Generation of dust -do- -do-
7. Emission from constn vehicles -do- -do-
8. Noise from constn equipment -do- -do-
9. Material handling -do- -do-
10. Disposal of constn
waste/debris -do- -do-
11. Safety measures -do- -do-
IDIPT – (HP) Project – 1 ADB Project No.40648
EMR July to Dec 2014 Page 32
Name IEE/EMP Components
Environmental Issues Responsibility Overall Status Remarks
12. Risks force majeure
-do- -do-
13. Malaria risk
-do- -do-
14. Clearing of constn camps -do- -do-
O & M impacts
1. Environmental conditions
PMU & Line Agency (Forest
department)
Not yet due as the work is still in progress.
2. Uncontrolled tourism development
-do- -do-
3. Mgt of toilet blocks -do- -do-
4. Adequate drainage on site
-do- -do-
5. Hygiene & sanitation -do- -do-
6. Increased waste loads on the existing facility
-do- -do-
Package 4.3: Treks around the island - 4km
Location impacts
1. Long term planning to ensure sustainability & integration with the mgt plan
PMU & Line Agency (Forest
department)
1. The siting and location conform to the existing Management Plan for the Wetland prepared by the HP Forest department.
Design & pre-construction impacts
1. Impact on sensitive areas
DSC & Contractor
1. Minimal impact as the facility is located outside the core sensitive area of the wetland.
2. Increased storm water runoff
-do- 2. Surface run-off channelized through proper drains and gutters.
3. Impact on ground water quality
-do- 3. Not applicable
4. Impact on aesthetic appeal
-do- 4. Not applicable.
5. Integration of energy conservation
-do- 5. Not applicable.
6. Construction camps
-do- 6. No construction camps allowed on site being a sensitive area.
7. Defining constn work areas
-do- 7. Work areas are well defined and properly
barricaded.
IDIPT – (HP) Project – 1 ADB Project No.40648
EMR July to Dec 2014 Page 33
Name IEE/EMP Components
Environmental Issues Responsibility Overall Status Remarks
8. Site clearance activities
-do- 8. Not yet due as the work is in progress.
9. Drinking water availability
-do- 9. Drinking water facility provided on site.
10. Identification of disposal sites
-do- 10. No disposal required.
11. Waste mgt on site -do- 11. Solid Waste generated on site is collected in bags and bins and disposed off to the nearest dumping ground.
Construction impacts
1. Improper stockpiling
Contractor 1. The material is properly brought in and safely stored and used on site as per the instructions given by the field staff.
Overall EMP application satisfactory.
2.Quarry/ Borrow pit operations
-do- 2. Not applicable.
3. Stripping, stocking & preservation of top soil.
-do- 3. The stripped top soil shall be re-used in planters and landscaping on site.
4. Soil & water pollution due to fuel
-do- 4. None observed.
5. Siltation of water bodies -do- 5. None.
6. Generation of dust -do- 6. None.
7. Emission from constn vehicles
-do- 7. Negligible emissions for very short
durations. Environmental testing to be carried out.
8. Noise from constn equipment -do- 8. Noise testing to be carried out.
9. Material handling
-do- 9. Material handling is safe and proper and regularly checked by field staff.
10. Disposal of constn
waste/debris -do- 10. Not yet due.
11. Safety measures
-do- 11. Safety measures being adhered to - First Aid Kit, and personal protection equipment are being used and other norms laid out in the EMP being followed.
IDIPT – (HP) Project – 1 ADB Project No.40648
EMR July to Dec 2014 Page 34
Name IEE/EMP Components
Environmental Issues Responsibility Overall Status Remarks
12. Risks force majeure
-do- 12. Not applicable.
13. Malaria risk -do- 13. No incident reported from site.
14. Clearing of constn camps -do- 14. Not yet due.
O & M impacts
1. Environmental conditions
PMU & Line Agency (Forest
department)
Not yet due as the work is still in progress
2. Uncontrolled tourism development
-do- -do-
3. Mgt of toilet blocks -do- -do-
4. Adequate drainage on site -do- -do-
5. Hygiene & sanitation -do- -do-
6. Increased waste loads on the existing facility
-do- -do-
Package 4.4: Landscaping, planting along the peripheral trails and signage
Work on this package not started yet.
Package 4.5: Watch towers for bird watching in Karu island
Location impacts
1. Long term planning to ensure sustainability & integration with the mgt plan.
PMU & Line Agency (Forest
department)
1. The siting and location confirm to the existing Management Plan for the Wetland prepared by the HP Forest department.
Design & pre-construction impacts
1. Impact on sensitive areas
DSC & Contractor
1. Minimal impact as the facility is located outside the core sensitive area of the wetland.
2. Increased storm water runoff -do- 2. Not applicable.
3. Impact on ground water quality
-do- 3. Not applicable.
4. Impact on aesthetic appeal -do- 4. Not applicable.
5. Integration of energy conservation
-do- 5. Not applicable.
6. Construction camps
-do- 6. No construction camps allowed on site being a sensitive area and located at island
7. Defining constn work areas -do- 7. Work areas are well defined and isolated
8. Site clearance activities
-do- 8. Not applicable.
IDIPT – (HP) Project – 1 ADB Project No.40648
EMR July to Dec 2014 Page 35
Name IEE/EMP Components
Environmental Issues Responsibility Overall Status Remarks
9. Drinking water availability -do- 9. Drinking water facility provided on site.
10. Identification of disposal sites -do- 10. Not applicable.
11. Waste mgt on site -do- 11. Solid Waste generated on site is collected in bags and disposed off to the low land avoiding water body
Construction impacts
1. Improper stockpiling
-do- 1. The material is properly brought in and safely stored and used on site as per the instructions given by the field staff.
Overall application of EMP is satisfactory
2.Quarry/ Borrow pit operations -do- 2. Not applicable.
3.Stripping, stocking & preservation of top soil
-do- 3. Not applicable.
4. Soil & water pollution due to fuel
-do- 4. No fuel spills observed on or near the site.
5. Siltation of water bodies -do- 5. Not observed
6. Generation of dust
-do- 6. None observed.
7. Emission from constn vehicles
-do- 7. Marginal emissions for very short durations.
Environmental testing is to be carried out.
8. Noise from constn equipment
-do- 8. Noise testing to be carried out.
9. Material handling
-do- 9. Material handling is safe and proper and regularly checked by field staff.
10. Disposal of constn
waste/debris -do- 10. Not yet due.
11. Safety measures
-do- 11. Safety measures being adhered to - First Aid Kit, and personal protection equipment are being used and other norms laid out in the EMP being followed.
12. Risks force majeure -do- 12. Not applicable.
13. Malaria risk -do- 13. No incident reported from site.
14. Clearing of constn camps 14. Not yet due.
O & M impacts
1. Environmental conditions
PMU & Line Agency (Forest
department)
Not yet due as the work is still in progress.
IDIPT – (HP) Project – 1 ADB Project No.40648
EMR July to Dec 2014 Page 36
Name IEE/EMP Components
Environmental Issues Responsibility Overall Status Remarks
2. Uncontrolled tourism development
-do- -do-
3. Mgt of toilet blocks -do- -do-
4. Adequate drainage on site -do- -do-
5. Hygiene & sanitation -do- -do-
6. Increased waste loads on the existing facility
-do- -do-
Package 5.1: Forest rest house - improvement and camping sites at Nagrota Suriyan
Existing contract terminated. Rebidding process in on.
Package 5.2: Forest RH- improvement and camping site at Dhameta
Location impacts
1. Long term planning to ensure sustainability & integration with the mgt plan
PMU & Line Agency (Forest
department)
1. The siting and location of the facility conform to the existing Management Plan for the Wetland prepared by the HP Forest department.
Design & pre-construction impacts
1. Impact on sensitive areas
Contractor & DSC
1. Minimal impact as the facility is located outside the core sensitive area of the wetland.
2. Increased storm water runoff
-do- 2. Surface run-off channelized through proper drains and gutters.
3. Impact on ground water quality
-do- 3. Septic tank provided for sewerage generated from the toilets to prevent ground infiltration.
4. Impact on aesthetic appeal
-do- 4. The building design features conform to local aesthetics and merge well with the surroundings.
5. Integration of energy conservation
-do- 5. LED lighting fixtures to be provided.
6. Construction camps
-do- 6. Small camp allowed on site with drinking water and toilets.
7. Defining constn work areas -do- 7. Work areas are well defined and properly
barricaded.
8. Site clearance activities
-do- 8. Not yet due as the work is in progress.
IDIPT – (HP) Project – 1 ADB Project No.40648
EMR July to Dec 2014 Page 37
Name IEE/EMP Components
Environmental Issues Responsibility Overall Status Remarks
9. Drinking water availability -do- 9. Drinking water facility exists on site.
10. Identification of disposal sites -do- 10. No disposal required as all excavated earth has been used on site.
11. Waste mgt on site -do- 11. Solid Waste generated on site is collected in bags and bins and disposed off to the nearest dumping ground.
Construction impacts
1. Improper stockpiling
Contractor 1. The material is properly brought in and safely stored and used on site as per the instructions given by the field staff.
Overall application of EMP is satisfactory except baseline data generation of ambient air quality and noise level.
2.Quarry/ Borrow pit operations
-do- 2. Not applicable
3.Stripping, stocking & preservation of top soil
-do- 3. The top soil shall be re-used in planters and landscaping on site.
4. Soil & water pollution due to fuel
-do- 4. None observed.
5. Siltation of water bodies -do- 5. None observed. No water body nearby
6. Generation of dust
-do- 6. Marginal dust generation was observed but the same was mitigated through regular water sprinkling.
7. Emission from constn vehicles
-do- 7. Marginal emissions for very short durations
occur on site. Environmental testing is yet to be carried out.
8. Noise from constn equipment -do- 8. Noise testing to be carried out.
9. Material handling
-do- 9. Material handling is safe and proper and regularly checked by field staff.
10. Disposal of constn
waste/debris
-do- 10. Not yet due.
11. Safety measures
-do- 11. Safety measures being adhered to - First Aid Kit, Fire Safety equipment and personal protection equipment are being used and other norms laid out in the EMP being followed.
12. Risks force majeure
-do- 12. Not applicable.
IDIPT – (HP) Project – 1 ADB Project No.40648
EMR July to Dec 2014 Page 38
Name IEE/EMP Components
Environmental Issues Responsibility Overall Status Remarks
13. Malaria risk -do- 13. No incident reported from site.
14. Clearing of constn camps -do- 14. Not yet due.
O & M impacts
1. Environmental conditions -do- Not yet due as the work is still in progress.
2. Uncontrolled tourism development
-do-
3. Mgt of toilet blocks
-do-
4. Adequate drainage on site -do-
5. Hygiene & sanitation -do-
6. Increased waste loads on the existing facility
-do-
Package 6.1: Community based tourism activities in villages, including skill development, training, etc.
Consultancies for CBT-01, CBT-02 & CBT-03 have setup their offices and started working.
Package 7.1: Conservation and restoration of Masroor temples, in line with the Management Plan
Shifted in Tranche-3
Package 7.2: Parking and information centre
Shifted in Tranche-3
Package 8.1: Parking for 100 vehicles at Bajreshwari temple, Kangra
Location impacts
1. Long term planning to ensure sustainability
PMU & Line Agency(M.C.Kan
gra)
Provision of temporary toilet on site for workers made by the Contractor.
Provision of litter bags for waste management done by the Contractor.
Baseline environmental conditions to be established by testing of air, noise and soil parameters.
2. Impacts on archaeological remains, if any.
-do- 2. None.
IDIPT – (HP) Project – 1 ADB Project No.40648
EMR July to Dec 2014 Page 39
Name IEE/EMP Components
Environmental Issues Responsibility Overall Status Remarks
3. Other -do- 3. This package is located on government owned land in the heart of the town. The site is already used for open parking of large vehicles and is maintained by M.C. Kangra.
Design & pre-construction impacts
1. Impact on sensitive areas
DSC & Contractor
1. The most critical issues impacting the sensitivity of the area are related to (i) drainage and (ii) traffic mgt. These have been appropriately dealt in the design proposal.
2. Slope stability related issues -do- 2. None as this is flat land.
3. Increased storm water runoff
-do- 3. All storm water shall be channelized and connected to M.C. sewer & roof top drains to be connected to RWH tank on site.
4. Impact on ground water quality
-do- 4. No impact on ground water quality is envisaged. Proper storage of fuel and lubricants prevents any possible pollution.
5. Impact on aesthetic appeal
-do- 5. Local architectural features in the facade and roof design have been incorporated for traditional aesthetics.
6. Integration of energy conservation
-do- 6. Solar hot water, solar PV lighting & energy efficient LED fixtures have been proposed in the design.
7. Construction camps
-do- 7. A labour camp has been established on site with proper water and sanitation.
8. Circulation plan during construction
-do- 8. Alternative circulation plan for peak season movement needs to be prepared by DSC in consultation with the Line Agency & proper information to be displayed for its follow up during execution.
9. Site clearance activities -do- 9. Not yet due.
10. Drinking water availability
-do- 10. Drinking water is provided from the Municipal supply.
11. Identification of disposal sites
-do- 11. Disposal sites to be identified by DSC in consultation with the Line Agency and local body.
12. Waste mgt on site -do- 12. Litter to be collected in bins and disposed
IDIPT – (HP) Project – 1 ADB Project No.40648
EMR July to Dec 2014 Page 40
Name IEE/EMP Components
Environmental Issues Responsibility Overall Status Remarks
in the M.C. dumper nearby.
Construction impacts
1. Improper stockpiling
Contractor 1. The material is properly brought in and safely stored and used on site as per the instructions given by the field staff.
Overall application of EMP is satisfactory except generation of ambient air quality and noise level data
2.Quarry/ Borrow pit operations
-do- 2. Not applicable.
3.Stripping, stocking & preservation of top soil
-do- 3. Not applicable.
4. Soil & water pollution due to fuel
-do- 4. None observed. Proper storage of fuel as indicated in the EMP being followed.
5. Siltation of water bodies
-do- 5. Not applicable.
6. Generation of dust -do- 6. No dust generation noted
7. Emission from constn vehicles
-do- 7. Marginal emissions for very short durations
occur. Occasional water sprinkling is carried out as required. Environmental testing is yet to be done.
8. Noise from constn equipment -do- 8. Noise testing to be carried out.
9. Material handling
-do- 9. Material handling is safe and proper and regularly checked by field staff.
10. Disposal of constn
waste/debris
-do- 10. Most of it is recycled on site. Minor items disposed off to scrap vendors or nearby dumper.
11. Safety measures
-do- 11. Safety measures being adhered to - First Aid Kit, Fire Safety equipment and personal protection equipment are being used and other norms laid out in the EMP generally followed.
12. Risks force majeure
-do- 12. None yet.
13. Malaria risk -do- 13. No incident reported from site.
14. Clearing of constn camps -do- 14. Not yet due.
O & M impacts
1. Environmental conditions
Line agency Not yet due.
2. Uncontrolled tourism -do- -do-
IDIPT – (HP) Project – 1 ADB Project No.40648
EMR July to Dec 2014 Page 41
Name IEE/EMP Components
Environmental Issues Responsibility Overall Status Remarks
development
3. Mgt of toilet blocks -do- -do-
4. Adequate drainage on site -do- -do-
5. Hygiene & sanitation -do- -do-
6. Increased waste loads on the existing facility
-do- -do-
Package 9.1A: Shimla Mall Road Restoration Project
Location impacts
1. Long term planning to ensure sustainability
PMU & Line Agency (M.C.
Shimla)
Provision of temporary toilet on site for workers made by the Contractor.
Provision of litter bags for waste management done by the Contractor.
Baseline environmental conditions to be established by testing of air, noise and soil parameters.
2. Impacts on archaeological remains, if any.
-do- 2. None.
3. Other -do- 3. This package is located on government owned land in the heart of the town. The site is already used for open parking of large vehicles and is maintained by M.C. Kangra.
Design & pre-construction impacts
1. Impact on sensitive areas
DSC & Contractor
1. The most critical issues impacting the sensitivity of the area are related to (i) drainage and (ii) traffic mgt. These have been appropriately dealt in the design proposal.
2. Slope stability related issues -do- 2. None as this is flat land.
3. Increased storm water runoff
-do- 3. All storm water shall be channelized and connected to M.C. sewer & roof top drains to be connected to RWH tank on site.
4. Impact on ground water quality
-do- 4. No impact on ground water quality is envisaged. Proper storage of fuel and lubricants prevents any possible pollution.
5. Impact on aesthetic appeal
-do- 5. Local architectural features in the facade and roof design have been incorporated for traditional aesthetics.
IDIPT – (HP) Project – 1 ADB Project No.40648
EMR July to Dec 2014 Page 42
Name IEE/EMP Components
Environmental Issues Responsibility Overall Status Remarks
6. Integration of energy conservation
-do- 6. Solar hot water, solar PV lighting & energy efficient LED fixtures have been proposed in the design.
7. Construction camps
-do- 7. A labour camp has been established on site with proper water and sanitation.
8. Circulation plan during construction
-do- 8. Alternative circulation plan for peak season movement needs to be prepared by DSC in consultation with the Line Agency & proper information to be displayed for its follow up during execution.
9. Site clearance activities -do- 9. Not yet due.
10. Drinking water availability
-do- 10. Drinking water is provided from the Municipal supply.
11. Identification of disposal sites
-do- 11. Disposal sites to be identified by DSC in consultation with the Line Agency and local body.
12. Waste mgt on site -do- 12. Litter to be collected in bins and disposed in the M.C. dumper nearby.
Construction impacts
1. Improper stockpiling
Contractor 1. The material is properly brought in and safely stored and used on site as per the instructions given by the field staff.
2.Quarry/ Borrow pit operations
-do- 2. Not applicable.
3.Stripping, stocking & preservation of top soil
-do- 3. Not applicable.
4. Soil & water pollution due to fuel
-do- 4. None observed. Proper storage of fuel as indicated in the EMP being followed.
5. Siltation of water bodies
-do- 5. Not applicable.
6. Generation of dust -do- 6. No dust generation noted
7. Emission from constn vehicles
-do- 7. Marginal emissions for very short durations
occur. Occasional water sprinkling is carried out as required. Environmental testing is yet to be done.
8. Noise from constn equipment -do- 8. Noise testing to be carried out.
IDIPT – (HP) Project – 1 ADB Project No.40648
EMR July to Dec 2014 Page 43
Name IEE/EMP Components
Environmental Issues Responsibility Overall Status Remarks
9. Material handling
-do- 9. Material handling is safe and proper and regularly checked by field staff.
10. Disposal of constn
waste/debris
-do- 10. Most of it is recycled on site. Minor items disposed off to scrap vendors or nearby dumper.
11. Safety measures
-do- 11. Safety measures being adhered to - First Aid Kit, Fire Safety equipment and personal protection equipment are being used and other norms laid out in the EMP generally followed.
12. Risks force majeure
-do- 12. None yet.
13. Malaria risk -do- 13. No incident reported from site.
14. Clearing of constn camps -do- 14. Not yet due.
O & M impacts
1. Environmental conditions
Line agency Not yet due.
2. Uncontrolled tourism development
-do- -do-
3. Mgt of toilet blocks -do- -do-
4. Adequate drainage on site -do- -do-
5. Hygiene & sanitation -do- -do-
7. Increased waste loads on the existing facility.
-do- -do-
Package 9.1B: Rehabilitation of Shimla Town Hall
Location impacts
1. Long term planning to ensure sustainability
PMU & Line Agency(M.C.Kan
gra)
Provision of temporary toilet on site for workers made by the Contractor.
Provision of litter bags for waste management done by the Contractor.
Baseline environmental conditions to be established by testing of air, noise and soil parameters.
2. Impacts on archaeological remains, if any.
-do- 2. None.
3. Other -do- 3. This package is located on government owned land in the heart of the town. The site is
IDIPT – (HP) Project – 1 ADB Project No.40648
EMR July to Dec 2014 Page 44
Name IEE/EMP Components
Environmental Issues Responsibility Overall Status Remarks
already used for open parking of large vehicles and is maintained by M.C. Kangra.
Design & pre-construction impacts
1. Impact on sensitive areas
DSC & Contractor
1. The most critical issues impacting the sensitivity of the area are related to (i) drainage and (ii) traffic mgt. These have been appropriately dealt in the design proposal.
2. Slope stability related issues -do- 2. None as this is flat land.
3. Increased storm water runoff
-do- 3. All storm water shall be channelized and connected to M.C. sewer & roof top drains to be connected to RWH tank on site.
4. Impact on ground water quality
-do- 4. No impact on ground water quality is envisaged. Proper storage of fuel and lubricants prevents any possible pollution.
5. Impact on aesthetic appeal
-do- 5. Local architectural features in the facade and roof design have been incorporated for traditional aesthetics.
6. Integration of energy conservation
-do- 6. Solar hot water, solar PV lighting & energy efficient LED fixtures have been proposed in the design.
7. Construction camps
-do- 7. A labour camp has been established on site with proper water and sanitation.
8. Circulation plan during construction
-do- 8. Alternative circulation plan for peak season movement needs to be prepared by DSC in consultation with the Line Agency & proper information to be displayed for its follow up during execution.
9. Site clearance activities -do- 9. Not yet due.
10. Drinking water availability
-do- 10. Drinking water is provided from the Municipal supply.
11. Identification of disposal sites
-do- 11. Disposal sites to be identified by DSC in consultation with the Line Agency and local body.
12. Waste mgt on site -do- 12. Litter to be collected in bins and disposed in the M.C. dumper nearby.
IDIPT – (HP) Project – 1 ADB Project No.40648
EMR July to Dec 2014 Page 45
Name IEE/EMP Components
Environmental Issues Responsibility Overall Status Remarks
Construction impacts
1. Improper stockpiling
Contractor 1. The material is properly brought in and safely stored and used on site as per the instructions given by the field staff.
2.Quarry/ Borrow pit operations
-do- 2. Not applicable.
3.Stripping, stocking & preservation of top soil
-do- 3. Not applicable.
4. Soil & water pollution due to fuel
-do- 4. None observed. Proper storage of fuel as indicated in the EMP being followed.
5. Siltation of water bodies
-do- 5. Not applicable.
6. Generation of dust -do- 6. No dust generation noted
7. Emission from constn vehicles
-do- 7. Marginal emissions for very short durations
occur. Occasional water sprinkling is carried out as required. Environmental testing is yet to be done.
8. Noise from constn equipment -do- 8. Noise testing to be carried out.
9. Material handling
-do- 9. Material handling is safe and proper and regularly checked by field staff.
10. Disposal of constn
waste/debris
-do- 10. Most of it is recycled on site. Minor items disposed off to scrap vendors or nearby dumper.
11. Safety measures
-do- 11. Safety measures being adhered to - First Aid Kit, Fire Safety equipment and personal protection equipment are being used and other norms laid out in the EMP generally followed.
12. Risks force majeure
-do- 12. None yet.
13. Malaria risk -do- 13. No incident reported from site.
14. Clearing of constn camps -do- 14. Not yet due.
O & M impacts
1. Environmental conditions
Line agency Not yet due.
IDIPT – (HP) Project – 1 ADB Project No.40648
EMR July to Dec 2014 Page 46
Name IEE/EMP Components
Environmental Issues Responsibility Overall Status Remarks
2. Uncontrolled tourism development
-do- -do-
3. Mgt of toilet blocks -do- -do-
4. Adequate drainage on site -do- -do-
5. Hygiene & sanitation -do- -do-
6. Increased waste loads on the existing facility
-do- -do-
The Contractors are complying with the EMP for each contract which is attached as per Annexure 23.
IDIPT – (HP) Project – 1 ADB Project No.40648
EMR ‒ July to December, 2014 Page 47
ANNEXURES
List of Appendices ‒ NoCs& Statutory Approvals obtained by HPTDB
Annexure 1: Statutory Conditional Approval of MoEF dated 22-04-2013
Annexure 2: HP Forest department letter of handing over of site dated 29-09-2013
Annexure 3: NoC from Temple Trust Naina Devi dated 06-07-2011
Annexure 4: NoC from Municipal Council, Shri Naina Devi Ji dated 09-12-2010
Annexure 5: NoC from the Member Secretary, SADA dated 18-07-2014
Annexure 6: NoC from department of Languages, Art & Culture dated 25-07-2013
Annexure 7: NoC from Town and Country Planning dated 03-06-2014
Annexure 8: NoC from Temple Trust Chintpurni dated 03-03-2012.
Annexure 9: NoC from the Member Secretary, SADA dated 18-07-2014
Annexure 10: NoC from NHAI dated 03.01.2014
Annexure 12: NoC from Department of Youth, Sport & Services dated 02-12-2011
Annexure 13: NoC from HP Forest department dated 16-11-2011
Annexure 14: NoC from HP Forest department dated 14-03-2012
Annexure 15: NoC from HP Forest department dated 20-06-2013.
Annexure 16: NoC regarding statutory approval for transfer of land dated 24-11-2014
Annexure 17: NoC from H.P. Forest Department dated 07-11-2013
Annexure 18: NoC from M.C. Kangra dated 01-03-2013 & 09-03-2013
Annexure 19: NoC from Municipal Corporation Shimla dated 13-01-2014 and 13-05-2014
Annexure 20: NoC from H.P. Pollution Control Board dated 07-08-2014
Annexure 21: NoC from Ministry of Forest dated 01-10-2014
Annexure 22: Final Mechanism decided for the project.
Annexure 23: EMP Compliance Status for the completed/on-going subprojects
IDIPT – (HP) Project – 1 ADB Project No.40648
EMR ‒ July to December, 2014 Page 48
Annexure 1: Statutory Conditional Approval for sub project 1.1 from MoEF dated 22-04-2013
IDIPT – (HP) Project – 1 ADB Project No.40648
EMR ‒ July to December, 2014 Page 49
Annexure 2: HP Forest department letter of handing over of site dated 26-04-2013
IDIPT – (HP) Project – 1 ADB Project No.40648
EMR ‒ July to December, 2014 Page 50
Annexure 3: NoC from Temple Trust Naina Devi dated 6-07-2011
IDIPT – (HP) Project – 1 ADB Project No.40648
EMR ‒ July to December, 2014 Page 51
Annexure 4: NoC from Municipal Council, Shri Naina Devi Ji dated 09-12-2010
IDIPT – (HP) Project – 1 ADB Project No.40648
EMR ‒ July to December, 2014 Page 52
Annexure 4: NoC from Municipal Council, Shri Naina Devi Ji dated 09-12-2010 (English Translation)
Telephone No.01978-288025 Municipal Council, Sh. Naina Devi Ji, Pin Code: 174310 28 MCND-15/2010-2023 09 December, 2010 To, Temple Officer, Temple Committee, Sh. Naina Devi JI, District Bilaspur, H.P. Subject: Approval of building plan for construction of multistorey parking
on Kh No. 1518/133, 1520/134, 1522/135 and 136 and Kh. No. 137 and 1524/141 Mauja Sh. Naina Devi Ji near Ropeway Upper Terminal, ward no. 2.
This is with reference to your letter no dated 28.09.2010 vide
which the Municipal Council in its resolution no. 382 (1) dated 29.11.2010 has granted approval for construction of multistorey parking on the following conditions.
1. The NoC on the approved drawing on the above mentioned Kh. No. will be granted subject to No objection from other departments. As per the revenue Department the total area on Kh. No. 1518/133, 1520/134, 1522/135 and Kh. No. 136 is 177.88 Sq. mtrs and the land belongs to Art & Culture Deptt, Bilaspur. The total area on Kh. No. 137 and 1524/141 is 977.43 Sq. Mtrs and the land belongs to HPPWD.
2. The Work Completion report should be submitted at the time of completion of the project.
3. In case of any disputes with any Stakeholders/ existing partners you will be liable for resolving that dispute. We shall not be made party to that dispute.
4. The Construction materials like sand, stone, dumping of debris etc shall not be stored on the road/ Nallah or in Municipal office without taking prior permission. The area should be kept neat and clean. If rules are broken then strict action will be taken as per the rules.
5. The construction of Cantilever, Sewerage Inspection Chamber etc should be constructed on your own land.
6. For the purpose of construction of multistorey parking, no trees/ branches/ loppings off etc should be made on the specified land or on the adjacent land.
7. Proper arrangement should be made for the rainwater, waste water etc in the project.
8. For construction of multi storey parking, the water for construction purposes should be arranged by yourself and the water from the public taps should not be used.
9. As per the drawings for the said parking project, the rain water should be stored properly and proper rain water harvesting tank to be made.
If the above conditions are not fulfilled or ignored the approval will be cancelled and construction of the multi storey parking will be considered as illegal.
------Sd----------
Officer-in-charge, Municipal Council, Sh. Naina Devi Ji.
Encl: 1. Approved copy of Building plan. 2. G 8, 41/66 dated 11.10.2010 amount Rs. 14,911/-
IDIPT – (HP) Project – 1 ADB Project No.40648
EMR ‒ July to December, 2014 Page 53
Annexure 5: NoC from the Member Secretary, SADA dated 18-07- 2014
IDIPT – (HP) Project – 1 ADB Project No.40648
EMR ‒ July to December, 2014 Page 54
Annexure 6: NoC from department of Languages, Art & Culture dated 25-07-2013
IDIPT – (HP) Project – 1 ADB Project No.40648
EMR ‒ July to December, 2014 Page 55
Annexure 7: NoC from Town & Country Planning dated 03-06-2014
IDIPT – (HP) Project – 1 ADB Project No.40648
EMR ‒ July to December, 2014 Page 56
Annexure 8: NoC from Temple Trust Chintpurni dated 03-03-2012
IDIPT – (HP) Project – 1 ADB Project No.40648
EMR ‒ July to December, 2014 Page 57
Annexure 9: NoC from the Member Secretary, SADA dated 18-07-2014
IDIPT – (HP) Project – 1 ADB Project No.40648
EMR ‒ July to December, 2014 Page 58
Annexure 10 : NoC from NHAI on 03.01.2014
IDIPT – (HP) Project – 1 ADB Project No.40648
EMR ‒ July to December, 2014 Page 59
Annexure 11: NoC from Forest Department dated 21st April, 2014
IDIPT – (HP) Project – 1 ADB Project No.40648
EMR ‒ July to December, 2014 Page 60
Annexure 12: NoC from Department of Youth, Sport & Services dated 02-12-2011
IDIPT – (HP) Project – 1 ADB Project No.40648
EMR ‒ July to December, 2014 Page 61
Annexure 13: NoC from HP Forest department dated 16-11-2011
IDIPT – (HP) Project – 1 ADB Project No.40648
EMR ‒ July to December, 2014 Page 62
Annexure 14: NoC from HP Forest department dated 14-03-2012
IDIPT – (HP) Project – 1 ADB Project No.40648
EMR ‒ July to December, 2014 Page 63
Annexure 15: NoC from HP Forest department dated 20-06-2013
IDIPT – (HP) Project – 1 ADB Project No.40648
EMR ‒ July to December, 2014 Page 64
Annexure 16: NoC regarding statutory approval for transfer of land dated 24-11-2014
IDIPT – (HP) Project – 1 ADB Project No.40648
EMR ‒ July to December, 2014 Page 65
Annexure 17: NoC from H.P. Forest Department dated 07-11-2013
IDIPT – (HP) Project – 1 ADB Project No.40648
EMR ‒ July to December, 2014 Page 66
Annexure18: NoC from M.C. Kangra dated 01-03-2013 & 09-03-2013
IDIPT – (HP) Project – 1 ADB Project No.40648
EMR ‒ July to December, 2014 Page 67
Annexure 19: NoC from Municipal Corporation Shimla dated 13-01-2014 and 13-05-2014
IDIPT – (HP) Project – 1 ADB Project No.40648
EMR ‒ July to December, 2014 Page 68
Annexure 20: NoC from H.P. Pollution Control Board dated 07-08-2014
IDIPT – (HP) Project – 1 ADB Project No.40648
EMR ‒ July to December, 2014 Page 69
Annexure 21: NoC from Ministry of forest dated 01-10-2014 (Hindi)
IDIPT – (HP) Project – 1 ADB Project No.40648
EMR ‒ July to December, 2014 Page 70
Annexure 21: NoC from Ministry of forest dated 01-10-2014 (English Translation)
Government of India
Ministry of Environment, Forests & Climate Change Regional office
FRI Campus, Pearson Road, P.O. New Forest, Dehradun- 248006, Phone: 0135-275080 Letter No. 9-HPB 830/2011-CHA/378 Dated: 01.10.2014 To,
Principal Secretary, Forest Department, Govt. of Himachal Pradesh Civil Secretariat Shimla. Subject: Diversion of 1.1210 Ha of Forest land in favor of
Commissioner, Municipal Corporation Shimla for the construction of Car parking near Tourism information Centre at Old barrier Shimla, within the jurisdiction of Shimla Forest Division & District Shimla, H.P.
Reference: Addl. Principal Chief Conservator of Forest cum-Nodal Officer,
Himachal Pradesh letter No. 48-2101/2010 (FCA) dated 22.09.2014 and Forest Conservator (Central) North Regional office letter no. 9-HPB 830/2011- CHA dated 09.12.2011.
Sir, This is with reference to above referred letters vide which permission was requested for the above mentioned subject under clause 2 of Forest Conservation Act, 1980 from Govt of India. The proposal received from the State Government was thoroughly studied and NoC is granted for construction of parking complex on 1.1210 Ha forest land on the following terms and conditions:
1. The existing legal statas of forest land shall not be changed.
2. The number of trees cut should be minimal and it shall not exceed to 215.
3. As per plan PF/10 Malgi for compensatory afforestation of Rs.2,17,250/- has been received from Implementing agency. The planting of trees on 2.242 HA forest land shall be done within one year from date of issue of this letter.
4. N.P.V rates are increased then the implementing agency has to bear the increased amount
5. No camps shall be made by the Implementing Agency for residing the labour/ staff on the proposed site.
6. The implementing agency shall provide LPG/ Kerosene oil to its labour/ staff so that the trees are not damaged.
7. During construction of the project, due care to be taken for plants and animals in the vicinity.
8. The forest land shall be utilized for the said objectives and not for any other purposes.
9. The demarcation of the project land should be done on the expenses of the procurer, RCC pillar method shall be used.
10. The instructions of Ministry of Environment & Forest, New Delhi vide letter no. 11-48/2002-FC dated 29/30
th April, 2005, 5-3/2007- FC dated
17.January, 2011 and other instructions received should be adhered to.
11. If any clause/ rule/ Court order etc. is applicable on the project, the State Government/ User Agency shall be responsible for taking the permission themselves.
If the above conditions are not fulfilled then the Ministry will cancel the NoC. The State Government, through Forest Department is responsible for fulfilling all the conditions.
Yours Faithfully, -------Sd--------
(D.P. Singh) Principal Chief Conservator of Forest,
Dehradun. Copy to the following for information and necessary action:
1. Addl. Director General (FC), Ministry of Environment & Forest, Environment Bhawan, C.G.O. Complex, Lodhi Road, New Delhi
2. Principal Chief Conservator of Forest cum-Nodal Officer, Forest Department, Talland, Himachal Pradesh
3. Divisional Forest Officer, Shimla Forest Division, Distt. Shimla, H.P.
4. Commissioner, Municipal Corporation Shimla, H.P.
5. Order register.
Yours Faithfully,
-------Sd-------- (D.P. Singh)
Principal Chief Conservator of Forest, Dehradun. .
IDIPT – (HP) Project – 1 ADB Project No.40648
EMR ‒ July to December, 2014 Page 71
Annexure 22: Final Monitoring Mechanism decided for the project
a) The Department of Tourism (DoT), Government of Himachal Pradesh, is the Executing Agency.
b) The implementing agency is the Himachal Pradesh Tourism Development Board (HPTDB).
c) The Project Management Unit (PMU) has been established in Shimla for the overall project management and
d) Project Implementation Unit (PIU) has been established in Dhaliyara at Distt. Kangra and Shimla. PIU Kullu will be established shortly.
e) Environmental Specialist has been deputed to the PMU, who will be responsible for implementation of the environmental safeguard provisions. Project
Management Consultants (PMC) and Design and Supervision Consultants (DSC) have been recruited to provide assistance to the PMU/PIUs in project
implementation.
f) Within the PMC team, an Environmental Specialist provides overall direction for management of environmental issues, and provides technical support to the
PMU including implementation of the environmental safeguards according to ADB requirements, and assist in monitoring impacts and mitigation measures
associated with subprojects.
g) The Environmental Specialist of the DSC team is responsible for preparation of the Environmental assessment documents in line with the EARF and supervises
the implementation of the EMP provisions in the subprojects. The DSC Safeguards specialist supports environmental management functions including updating
IEEs with respect to sub-project Environmental Management Plans, and assist in monitoring impacts and mitigation measures associated with subprojects.
He/she will be required to include mitigation measures in designs where appropriate, and to specify other measures in construction contracts. Contractors will
be required by their contracts to implement all specified mitigation, monitoring, and reporting assigned to contractors as presented in the EMP.
h) The PMU, oversees the implementation of the environmental provisions related to subproject implementation, its responsibilities include preparation and
updating of IEEs consistent with the ADBs Safeguards Policy Statement and the environmental compliance requirements of the Government of Himachal
Pradesh and the Government of India. Environmental monitoring will be undertaken by the PMU supported by the DSC - Safeguards specialist.
i) The project includes upfront and on-going supervision and training assistance for environmental monitoring reporting in project management structures. The
effective implementation of the measures proposed will be ensured through the building up of capacity towards environmental management within the PMU
supplemented with the technical expertise of a Safeguards Specialist as part of the PMC/DSC.
j) Towards addressing the environmental issues in the project components during design and implementation, the DSC will include provisions for inputs of an
Environmental Specialist. In addition to addressing the issues related to environmental management in the project, the Environmental Specialist will play a
central role in ensuring capability building on Environmental Management of the PMU/PIU, Contractor and Line Departments.
k) The sample monitoring plan are as below with responsibility.
IDIPT – (HP) Project – 1 ADB Project No.40648
EMR ‒ July to December, 2014 Page 72
Indicators Parameters Targets Frequency Responsibility Remedial action
Construction stage
Ambient Air Quality
PM10, PM2.5, NOX, SO2, CO
NAAQMS, 2009
Once during construction
Contractor, through approved Monitoring Agency
Stricter implementation of emission norms
Water quality
TDS, pH, Hardness, Faecal coliform, E coli
Designated best use parameters
Once during construction
Contractor, through approved Monitoring Agency
Identify source of contamination & treat effluent before discharge into receiving waters. For continued non-compliance, invoke penalty clauses
Dust suppression
Frequency, timing & location
No dust rising from construction site
Once a week during construction
PIU through DSC
Increase frequency
Machinery noise
dB (A)
五75Db(A) at 1 m free field from M/C
Once during construction
Contractor, through approved Monitoring Agency
Ensure compliance, for continued non-compliance invoke penalty clause
Occupational Health & Safety (OHS) Management Plan
Plan covers all activities
Compliance with applicable labour laws
Continuous
Contractor
Identify non-compliance and modify plan
OHS implementation record
Site maintenance, medical facilities, instructions, signage
Compliance with OHS
Continuous
Contractor
In case of continued non-compliance, invoke penalty clauses
Operations stage
Ambient Air Quality
PM10, PM2.5, NOX, SO2, CO
NAAQMS, 2009
Once annually during peak season
Dept of Forests & Wildlife Contractor, through approved Monitoring Agency
Stricter implementation of emission norms
Water quality
TDS, pH, Hardness, Faecal coliform, E coli
Designated best use parameters
Twice annually – May & September
Dept of Forests & Wildlife Contractor, through approved Monitoring Agency
Identify source of contamination & treat effluent before discharge into receiving waters. For continued non-compliance, invoke penalty clauses
Ambient noise
day and night time noise levels
NANQS (National Ambient Noise Quality Standards)
Once annually during peak season
Dept of Forests & Wildlife Contractor, through approved Monitoring Agency
Identify source and strictly regulate noise emissions
IDIPT – (HP) Project – 1 ADB Project No.40648
EMR ‒ July to December, 2014 Page 73
Annexure 23: EMP Compliance Status for the completed/on-going subprojects
Sr. No.
Name of project Stipulations Compliance Status Work Status Remark/Remedial Actions
Complied Partially complied
Not complied
1 Naina Devi Destination improvements
1.1 Circular Road – 1000 m x 3.75 m):
EMP provisions by contractors Work under progress
Inspection reports to be documented.
Ambient Air Monitoring Testing conducted by HPPCB (Himachal Pradesh Pollution Control Board) and results are within limit
Water Monitoring No natural/GW at site. Supply water sampled for testing by HPPCB
Ambient Noise Monitoring Testing conducted by HPPCB (Himachal Pradesh Pollution Control Board) and results are within limit
Machinery Noise Monitoring To be done 1.2 Car parking and other
amenities EMP provisions by contractors Work just started. Provisions to be followed
Ambient Air Monitoring Testing conducted by HPPCB (Himachal Pradesh Pollution Control Board) and results are within limit
Water Monitoring No natural/GW at site. Supply water sampled for testing by HPPCB
Ambient Noise Monitoring Testing conducted by HPPCB (Himachal Pradesh Pollution Control Board) and results are within limit
Machinery Noise Monitoring To be done 2 Chintpurni Destination improvements
2.1 Integrated parking, interpretation Centre, toilets & other visitor amenities
EMP provisions by contractors Work under progress
Inspection reports to be documented.
Ambient Air Monitoring Testing conducted by HPPCB (Himachal Pradesh Pollution Control Board) and results are within limit
Water Monitoring Testing conducted by HPPCB (Himachal Pradesh Pollution Control Board) and results are within limit
Ambient Noise Monitoring Testing conducted by HPPCB (Himachal Pradesh Pollution Control Board) and results are within limit
IDIPT – (HP) Project – 1 ADB Project No.40648
EMR ‒ July to December, 2014 Page 74
Sr. No.
Name of project Stipulations Compliance Status Work Status Remark/Remedial Actions
Complied Partially complied
Not complied
Machinery Noise Monitoring To be done 2.2 Rest sheds, toilet
facilities and view points along road from TRC to temple at Chintpurni
EMP provisions by contractors Contract terminated
Proposal to merge with 2.1 contract
Ambient Air Monitoring Testing conducted by HPPCB (Himachal Pradesh Pollution Control Board) and results are within limit
Water Monitoring Testing conducted by HPPCB (Himachal Pradesh Pollution Control Board) and results are within limit
Ambient Noise Monitoring Testing conducted by HPPCB (Himachal Pradesh Pollution Control Board) and results are within limit
Machinery Noise Monitoring To be done 3 Pong dam area subproject proposal
3.1 Information Centre at Pong Dam
EMP provisions by contractors Work completed
Ambient Air Monitoring Testing being conducted by HPPCB
Water Monitoring -do-
Ambient Noise Monitoring -do-
Machinery Noise Monitoring Not required 3.2 Parking and toilet
facilities EMP provisions by contractors Work completed
Ambient Air Monitoring Testing being conducted by HPPCB
Water Monitoring -do-
Ambient Noise Monitoring -do-
Machinery Noise Monitoring Not required 3.3 Camping facilities, with
provisions for 10 tents, including toilets etc
EMP provisions by contractors Work completed
Ambient Air Monitoring Testing being conducted by HPPCB
Water Monitoring -do-
Ambient Noise Monitoring -do-
Machinery Noise Monitoring Not required 3.4 Jetty development EMP provisions by contractors Work completed
Ambient Air Monitoring Testing being conducted by HPPCB
Water Monitoring -do-
Ambient Noise Monitoring -do-
Machinery Noise Monitoring Not required 3.5 Landscaping and signage EMP provisions by contractors Work under
progress Inspection reports to be documented.
Ambient Air Monitoring Testing being conducted by HPPCB
IDIPT – (HP) Project – 1 ADB Project No.40648
EMR ‒ July to December, 2014 Page 75
Sr. No.
Name of project Stipulations Compliance Status Work Status Remark/Remedial Actions
Complied Partially complied
Not complied
Water Monitoring -do-
Ambient Noise Monitoring -do-
Machinery Noise Monitoring -do- 4 Ranser island and Karu island improvement subproject proposal
4.1
Redevelopment of Forest rest house- Ranser island
EMP provisions by contractors Work under progress
Inspection reports to be documented.
Ambient Air Monitoring Testing being conducted by HPPCB
Water Monitoring -do-
Ambient Noise Monitoring -do-
Machinery Noise Monitoring -do- 4.2 Jetty development,
Ranser and Karu Island EMP provisions by contractors Ranser
completed but Karu work is not underway due to high water level
Inspection reports to be documented.
Ambient Air Monitoring Testing being conducted by HPPCB
Water Monitoring -do-
Ambient Noise Monitoring -do-
Machinery Noise Monitoring -do- 4.3 Treks around the island -
4km EMP provisions by contractors Work under
progress Inspection reports to be documented.
Ambient Air Monitoring Testing being conducted by HPPCB
Water Monitoring -do-
Ambient Noise Monitoring -do-
Machinery Noise Monitoring -do- 4.4 Landscaping, planting
along the peripheral trail and directional signage
EMP provisions by contractors Work not started
4.5 Watch towers for bird watching in Karu island
EMP provisions by contractors Work under progress
Inspection reports to be documented.
Ambient Air Monitoring Testing being conducted by HPPCB
Water Monitoring -do-
Ambient Noise Monitoring -do- Machinery Noise Monitoring -do- 5 Forest rest houses & camping sites of VFDS subproject proposal 5.1 A Camping sites
development at Nagrota Work yet not started
IDIPT – (HP) Project – 1 ADB Project No.40648
EMR ‒ July to December, 2014 Page 76
Sr. No.
Name of project Stipulations Compliance Status Work Status Remark/Remedial Actions
Complied Partially complied
Not complied
Suriyan
5.1 B Forest rest house - improvement and camping sites development at Dhameta
EMP provisions by contractors Work under progress
Inspection reports to be documented.
Ambient Air Monitoring Testing being conducted by HPPCB
Water Monitoring -do-
Ambient Noise Monitoring -do-
Machinery Noise Monitoring -do- 6 Community based tourism activities subproject proposal
6.1 Community based tourism activities in villages, including skill development, training, etc.
Shifted under consultancy assignments
8 Kangra Town subproject proposal
8.1 Parking for 100 vehicles at Brajeshwari temple, Kangra
EMP provisions by contractors Work under progress
Inspection reports to be documented.
Ambient Air Monitoring Testing being conducted by HPPCB
Water Monitoring -do-
Ambient Noise Monitoring -do-
Machinery Noise Monitoring -do- 9 Shimla subproject proposal
9.1 A Shimla Mall Road restoration project
EMP provisions by contractors Work under progress
Inspection reports to be documented.
Ambient Air Monitoring To be done by HPPCB
Water Monitoring -do-
Ambient Noise Monitoring -do-
Machinery Noise Monitoring -do- 9.1 B Shimla rehabilitation of
town hall EMP provisions by contractors Work under
progress Inspection reports to be documented.
Ambient Air Monitoring To be done by HPPCB
Water Monitoring -do-
Ambient Noise Monitoring -do-
Machinery Noise Monitoring -do-
10 Tutikandi Multistorey Parking Facility
Under Procurement Stage Baseline environmental in underway.
IDIPT – (HP) Project – 1 ADB Project No.40648
EMR ‒ July to December, 2014 Page 77
END OF REPORT