Self Care Groups (SCG) in NLR Supported Districts in West Bengal. Review Meeting At Y W C A Of Delhi 3 rd , 4 th & 5 th May 2010. Mr. K.G. Patra Non Medical Supervisor Burdwan Zone (WB). Outline of Presentation. Introduction Map of West Bengal Out Come of SCG Cohorts - PowerPoint PPT Presentation
Citation preview
Self Care Groups (SCG) inSelf Care Groups (SCG) inNLR Supported Districts inNLR Supported Districts in
West BengalWest Bengal
Review Meeting Review Meeting
AtAt
Y W C A Of DelhiY W C A Of Delhi
33rdrd, 4, 4thth & 5 & 5thth May 2010 May 2010
Mr. K.G. PatraNon Medical Supervisor Burdwan Zone (WB)
Outline of PresentationOutline of Presentation
IntroductionIntroduction
Map of West BengalMap of West Bengal
Out Come of SCG CohortsOut Come of SCG Cohorts
Need for Physical RehabilitationNeed for Physical Rehabilitation
Need for Socio-economic RehabilitationNeed for Socio-economic Rehabilitation
Problems encountered and their Solutions Problems encountered and their Solutions
Unsolved ProblemsUnsolved Problems
IntroductionIntroduction
No. of district with PAL Homes = 2
No. of PAL Homes in these districts : 18
No. of PAL Homes where PAL have started SC Practice in Groups – 7No. of Block where PAL have started SC Practice - 2
Outcome of SCG CohortOutcome of SCG Cohort(As on 31(As on 31stst March 2010) March 2010)
Cohort as per Cohort as per the no. of the no. of months months
completedcompleted
TotalTotal
SCGSCG
MembersMembers
PALPAL
WithWith
UlcerUlcer
No. No.
Healing Healing
ObservedObserved
No.No.
NoNo
ChangeChange
No. No.
>> 9 – 11 9 – 11 2424 99 44 55
>>1212 -- -- -- --
TotalTotal 2424 99 44 55
Outcome …. Cont.Outcome …. Cont.Cohort as per the no. of Cohort as per the no. of
months completedmonths completedTotal SCG Total SCG MembersMembers
Status of Skin on Status of Skin on startingstarting
Status of Skin as of Status of Skin as of nownow
Dry No. (%)Dry No. (%) Dry No. (%)Dry No. (%)
>> 3-5 (Cohort ‘1’) 3-5 (Cohort ‘1’) 2626 96%96% 8%8%
>> 6-8 (Cohort ‘2’) 6-8 (Cohort ‘2’) 55 100%100% 20%20%
>> 9-11 (Cohort ‘3’) 9-11 (Cohort ‘3’) 2424 82%82% 8%8%
>> 12 (Cohort ‘4’) 12 (Cohort ‘4’) -- -- --
TotalTotal 5555
In the District Burdwan one PAL Home SCG Practice Started on March’2010, Total PAL – 24
In the District Paschim Medinipur one PAL Home SCG Practice Started on March’2010, Total PAL – 36
Need for Physical Rehabilitation-District wiseNeed for Physical Rehabilitation-District wiseDistrictsDistricts No. of No. of
PAL PAL HomesHomes
Self Care Self Care Materials Materials SuppliedSupplied
MCR MCR Footwear Footwear Neded/ Neded/
SuppliedSupplied
CrutchesCrutches ArtificiaArtificial Limbsl Limbs
Grips Grips AidsAids
Wheel Wheel Chairs / Chairs /
Tri Tri CycleCycle
GogglesGoggles Hand Hand StricksStricks
BurdwanBurdwan 55 5757 54 / 3054 / 30 11 22 44 4/04/0 1212 22
Paschim Paschim MedinipuMedinipu
rr
22 5656 56/2056/20 00 11 22 ½½ 22 11
TotalTotal 77 113113 110/50110/50 11 33 66 5/25/2 1414 33
Need for Physical Rehabilitation-District wise (Block)Need for Physical Rehabilitation-District wise (Block)DistrictsDistricts No. of No. of
BlocksBlocksSelf Care Self Care MaterialsMaterials
MCR MCR FootwearFootwear
CrutchesCrutches GogglesGoggles
BurdwanBurdwan 11 3434 3333 22 11
Paschim Paschim MedinipuMedinipu
rr
11 3737 3232 22 00
TotalTotal 22 7171 6565 44 11
In the district Burdwan One Block SC Practice Started on March, 2010 – Bahadurpur Block – Total PAL – 34
In the district Paschim Medinipur One Block SC Practice Started on March’2010 – Hijli Block – Total PAL - 37
Need for Socio-economic RehabilitationNeed for Socio-economic Rehabilitation(District wise)(District wise)
DistrictsDistricts No. of PAL HomesNo. of PAL Homes EducationEducation
No.No.
PensionPension
No.No.
EmploymentEmployment
No.No.
BurdwanBurdwan Out of 14 SCG started in Five Out of 14 SCG started in Five PAL HomesPAL Homes
6464 3232 1212
Paschim Paschim MedinipurMedinipur
Out of 4 SCG Started in Two Out of 4 SCG Started in Two PAL Home and One PAL Home PAL Home and One PAL Home
Assesment doneAssesment done
3939 5656 --
TotalTotal Out of 18 SCG started 7Out of 18 SCG started 7 103103 8888 1212
Need for Socio-economic Rehabilitation (District wise) (Block)Need for Socio-economic Rehabilitation (District wise) (Block)DistrictsDistricts No. of BlocksNo. of Blocks EducationEducation
No.No.PensionPension
No.No.
BurdwanBurdwan 11 1616 2121
Paschim MedinipurPaschim Medinipur 11 3232 2424
TotalTotal 22 4848 4545
Problems Encountered & SolutionsProblems Encountered & SolutionsS. S. No.No.
Name of DistrictName of District Problem encounteredProblem encountered How it was solvedHow it was solved
1.1. BurdwanBurdwan
Urban PAL Urban PAL HomesHomes
Dressing Materials are not Dressing Materials are not supplied at the Block supplied at the Block level to the Facilitator. level to the Facilitator.
Dressing Materials are not Dressing Materials are not supplied from any cornersupplied from any corner
At present Supply of Kits At present Supply of Kits to the facilitators by the to the facilitators by the Block PHC but not regularBlock PHC but not regular
Discussed with Act ZLO Discussed with Act ZLO requested to supply the requested to supply the dressing materials from dressing materials from ZLO end from State ZLO end from State budget.budget.
2.2. Paschim Paschim MededinipurMededinipur
Urban PAL Urban PAL HomesHomes
Supply Kits from BPHC Supply Kits from BPHC
No ProblemNo Problem
Dressing materials are not Dressing materials are not supplied from any corner.supplied from any corner.
--------
Discuss with ZLO & Discuss with ZLO & requested to supply requested to supply dressing materials from dressing materials from state budgetary provison.state budgetary provison.
Unsolved ProblemsUnsolved Problems
There are large PAL Homes in Urban areas like Asansol and Durgapur Municipal area at Burdwan District and Khargapur and Medinipur (Sadar) Municipal area of Paschim Medinapur District as there is no Government Health Infrastructure in the URBAN areas. The matter is discussed with the CMOH and DN Team of the districts the problem is solved partially – still needs attention.