Page 1: Selection Criteria for TBM

www.babeng.com

BABENDERERDEENGINEERS

Selection Criteria of Tunnel Boring Machines -Examples

Lars Babendererde

Page 2: Selection Criteria for TBM

www.babeng.com

General Selection Criteria

1.Geotechnical behaviour of the ground

2.Presence of ground water and pressure

3.Boundary conditions of the project

4.Experience of the contractor

Page 3: Selection Criteria for TBM

www.babeng.com

Criteria for Selection (by Babendererde 1999)

Rock Strength Rock Structure Water IngressJointing Grain size

Unilat. compr. MPa

cohesion Cu

KN/m²

Face Support

Shield Lining Install.

RQD Distance < 0.02 mm< 0.06 mm

Face Support

Shield Lining Install.

Volume per 30 m³

Consequences on

> 250 - - - - 100 - 90 %

> 2 m - - unlimited pump capacity

250

- 100

- behind TBM

90 - 75 %

2.0 -

0.6 m - - behind

TBM unlimited pump capacity

100

- 50

- behind TBM

75 - 50 %

0.6 -

0.2 m - possible behind

TBM > 20 l/s pump capacity

Rock50 -

25 - recom. behind

TBM

50 - 25 %

0.2 -

0.06 m possibly

mech. recom. in

TBM area

> 10 l/s face support

25 - 5

- recom. < 25 % < 0.06 m mech. required under shield > 5 l/s face support

5 - 1

recom. required under shield < 25 % < 0.06 m

mech., possibly

EPB/Slurry required under

shield > 2 l/s methodology

< 1 > 30 - required under shield < 25 % < 0.06 m vary

mech., possibly

EPB/Slurryrequired under

shield > 2 l/s methodology

Soil 30 -

10 recom. required under

shield > 30 % mech.,

possibly EPB/Slurry

required under shield > 2 l/s methodology

10 - 5

recom. requiredunder shield

immed. grout.

> 20 % < 50 % EPB / Slurry required

under shield immed. grout.

> 2 l/s methodology

5 - 1

required requiredunder shield

immed. grout.

> 10 % < 30 % EPB / Slurry required

under shield immed. grout.

> 2 l/s methodology

0

required requiredunder shield

immed. grout.

> 10 % < 20 % EPB / Slurry required

under shield immed. grout.

> 2 l/s methodology

Page 4: Selection Criteria for TBM

www.babeng.com

TBM type -difference by the way of face support

• No face support• Mechanical support• Compressed air• Active, by support medium:

EPB or Slurry

Page 5: Selection Criteria for TBM

www.babeng.com

Page 6: Selection Criteria for TBM

www.babeng.com

No face support – Hard rock TBMs

Page 7: Selection Criteria for TBM

www.babeng.com

Page 8: Selection Criteria for TBM

www.babeng.com

Page 9: Selection Criteria for TBM

www.babeng.com

Page 10: Selection Criteria for TBM

www.babeng.com

Active face support helps !

Page 11: Selection Criteria for TBM

www.babeng.com

Page 12: Selection Criteria for TBM

www.babeng.com

Range of Slurry- and EPB- TBM ApplicationConsidering Grain-size Distribution

0

0,002 0,06 2 63 2000,006 0,02 0,2 0,63 6,3 20 100

10

20

30

40

50

60

70

80

90

100

[ % ]

1000

Ton Schluff Sand Kies Steine Blöcke

fein mittel grob fein mittel grob fein mittel grob

Grain-size [mm]

0

0,002 0,06 2 63 2000,006 0,02 0,2 0,63 6,3 20 100

10

20

30

40

50

60

70

80

90

100

1000

1. Lyon2. Hamburg3. Grauholztunnel4. Wesertunnel5. Zürich, Hermetschloo-Werdhölzli 6. Zürich, Thalwil7. Portland, Gravel Alluvium8. Wittenberg (polymer suspension)

Slurry-TBM drives

9. Essen, U-Bahn Los 32/33EPB-TBM drives

10. Milano, Passante Ferroviario

12

3

54

6

7

9

10

8

11. Metro Porto11

Page 13: Selection Criteria for TBM

www.babeng.com

Selection of TBM with active face support

Slurry limitation

High content of fines < 0,06 mm requires expensive separation process

EPB limitation

High permeability k > 10-³ m/s requires intensive conditioning

Page 14: Selection Criteria for TBM

www.babeng.com

Page 15: Selection Criteria for TBM

www.babeng.com

Page 16: Selection Criteria for TBM

www.babeng.com

Page 17: Selection Criteria for TBM

www.babeng.com

Typical Thrust and Torque of a Ø 9m TBM

0

20.000

40.000

60.000

80.000

100.000

120.000

Open TBM Shielded TBM EPB-TBM Slurry-TBM

Thru

st [k

N]

0

2.000

4.000

6.000

8.000

10.000

12.000

14.000

Torq

ue [k

Nm

]

Page 18: Selection Criteria for TBM

www.babeng.com

Page 19: Selection Criteria for TBM

www.babeng.com

Page 20: Selection Criteria for TBM

www.babeng.com

Page 21: Selection Criteria for TBM

www.babeng.com

Page 22: Selection Criteria for TBM

www.babeng.com

Page 23: Selection Criteria for TBM

www.babeng.com

Page 24: Selection Criteria for TBM

www.babeng.com

Page 25: Selection Criteria for TBM

www.babeng.com

Page 26: Selection Criteria for TBM

www.babeng.com

Page 27: Selection Criteria for TBM

www.babeng.com

Water Strait Crossings in Northern Germany

River Weser TunnelØ 11,7m River Elbe Tunnel

4th Tube Hamburg Ø 14m

Herrentunnelunder river TraveØ 11,7m

River Elbe TunnelHamburg WestØ 14m

Page 28: Selection Criteria for TBM

www.babeng.com

Page 29: Selection Criteria for TBM

www.babeng.com

Page 30: Selection Criteria for TBM

www.babeng.com

Page 31: Selection Criteria for TBM

www.babeng.com

Page 32: Selection Criteria for TBM

www.babeng.com

Page 33: Selection Criteria for TBM

www.babeng.com

Page 34: Selection Criteria for TBM

www.babeng.com

Page 35: Selection Criteria for TBM

www.babeng.com

Page 36: Selection Criteria for TBM

www.babeng.com

Page 37: Selection Criteria for TBM

www.babeng.com

Page 38: Selection Criteria for TBM

www.babeng.com

Page 39: Selection Criteria for TBM

www.babeng.com

Page 40: Selection Criteria for TBM

www.babeng.com

Page 41: Selection Criteria for TBM

www.babeng.com

Page 42: Selection Criteria for TBM

www.babeng.com

Page 43: Selection Criteria for TBM

www.babeng.com

Moscow Metro Escalator Tunnels, Russia

Page 44: Selection Criteria for TBM

www.babeng.com

Page 45: Selection Criteria for TBM

www.babeng.com

Page 46: Selection Criteria for TBM

www.babeng.com

Page 47: Selection Criteria for TBM

www.babeng.com

Page 48: Selection Criteria for TBM

www.babeng.com