Sediment Management in Prado Basin and Lower Santa Ana River. Greg Woodside, P.G., C.Hg Executive Director of Planning & Natural Resources September 20, 2011. Prado Dam. Main purpose is flood control Water conservation is additional beneficial use. Prado Basin Area = 11,500 acres. Prado - PowerPoint PPT Presentation
Citation preview
Sediment Management in Prado Sediment Management in Prado Basin and Lower Santa Ana River Basin and Lower Santa Ana River
Greg Woodside, P.G., C.HgExecutive Director of Planning & Natural Resources
September 20, 2011
Prado DamPrado Dam
Main purpose is flood control
Water conservation is additional beneficial use
Prado Dam
Prado BasinArea = 11,500 acres
Water/Sediment MechanicsWater/Sediment Mechanics
Sediment laden water enters Prado Basin
Velocity of water slows and sediment settles out in Prado Basin
Water released through Prado Dam is sediment deficient ─ >95% sediment trap
efficiency estimated by Warrick & Rubin (2007) for Prado Dam
Impacts of Prado Basin Impacts of Prado Basin SedimentationSedimentation
Prado Basin─ Water conservation reduced
25,000 af lost below elev. 505 since 1941─ Sedimentation threatens infrastructure─ Impacts to endangered species habitat
Lower Santa Ana River─ Scouring threatens infrastructure
SAR channel has incised between 5 and 15 feet from Prado Dam to Weir Canyon with localized incision exceeding 15 feet
─ Channel incising harms riparian habitat─ Beach replenishment reduced─ Marine ecosystems starved of sediment─ Riverbed armoring & coarsening reduces percolation rate
Sediment-deficient high flows change sediment characteristics below Prado Dam─ Cause armoring and coarsening
Percolation reduced
Percolation ImpactsPercolation Impacts
Changes in Sediment Changes in Sediment CharacteristicsCharacteristics
SAR at SAR at ImperialImperial
SAR at SAR at Five CovesFive Coves
SAR at SAR at Weir CanyonWeir Canyon
Proposed SolutionProposed Solution
Perform demonstration project to remove sediment from Prado Basin and place it below Prado Dam
Demonstrate feasibility of re-establishing natural sediment transport regime
Allow high flows released from Prado Dam to redistribute sediment down river
Use results from demo project to assess feasibility of long-term sediment management solution
Prado Basin
Sediment Management Demonstration Project LayoutSediment Management Demonstration Project Layout
Dredging─ Hydraulic dredge
Pump sediments to temporary storage area
Slurry pump sediments to re-entrain in SAR below Prado Dam
Project OutreachProject Outreach
U.S. Army Corps of Engineers U.S. Fish and Wildlife Service CA Department of Fish and Game CA State Parks Regional Water Quality Control Board Flood control districts OC Coastkeeper / Inland Empire Waterkeeper Santa Ana Watershed Project Authority Local cities
Near-Term & Near-Term & Long-TermLong-Term
Near-Term─ Prado Basin Demonstration Project
Test in fieldCollect data to measure benefits, assess potential
impacts
Long-Term─ Corps’ Prado Basin Feasibility Study─ Implementation of project(s) from FS