42
SECTION V SANITARY SEWER

SECTION V SANITARY SEWER - Anne Arundel County, MD · PDF fileTOC-V.2 of 2 Published: 01/01 Revised: TABLE OF CONTENTS STANDARD SANITARY SEWER DETAILS No. Title S-19 Concrete collar

Embed Size (px)

Citation preview

SECTION V

SANITARY SEWER

TOC-V.1 of 2

Published: 01/01 Revised:

TABLE OF CONTENTS

STANDARD SANITARY SEWER DETAILS

No. Title

S-1 Repaving Trenches and Payment Quantities

S-1A Trench Details for Flowable Fill

S-1B Temporary Pavement, Trench Details and Crusher Run Stone Payment Quantities

S-2 Trenches Cradle and Encasement

S-3 Building Sewer Layout

S-4 Typical Air Test Detail for Building Sewer

S-5 Standard House Connections

S-6 Type C Connections

S-7 Alternate Type “C” Connection – Precast Wye

S-8 Saddle Installation Detail Mainline Sewer to 4" House Connection

S-9 Standard Cleanout

S-10 Cleancut cover Assembly for All Paved Areas

S-11 Standard Precast manhole

S-12 Shallow Precast Manhole

S-13 Drop Manhole Type “A”

S-14 Drop Manhole Type “B”

S-15 Alternate Drop Manhole – Precast Base and Collars

S-16 Terminal Manhole

S-17 Standard Heavy Traffic Manhole Frame and Cover

S-18 Standard Watertight Frame and Cover

TOC-V.2 of 2

Published: 01/01 Revised:

TABLE OF CONTENTS

STANDARD SANITARY SEWER DETAILS

No. Title

S-19 Concrete collar for Manhole Frame and Cover

S-20 Adjustment Grade Ring

S-21 Standard Manhole Steps

S-22 Flexible Pipe to Manhole Connection

S-23 Waterstop Pipe to Manhole Connection for Steep Grades

S-24 Air Release and Vacuum Valve in Manhole

S-25 New Manhole Over Existing Pipe

S-26 Abandonment of Pipe at Manhole

S-27 Complete Manhole Abandonment

S-28 Pressure Sewer Blocking Details

S-29 Low Pressure Sewer and House Connection Blocking Details for Caps and Plugs

S-30 Anchoring Pressure Sewers (Upper Vertical Bends)

S-31 Air Test Requirements 6" and 8" Sewers with 4" Laterals

S-32 Air Test Requirements 10" and 12" Sewers with 4" Laterals

S-33 Air Test Requirements 15" and 18" Sewers with 4" Laterals

S-34 Air Test Requirements 21" and 24" Sewers with 4" Laterals

S-35 Air Test Requirements 4" through 24" Sewers without Laterals

S-36 Concrete Anchor (When Pipe Slopes Exceed 20º)

S-37 Trench Erosion Check (For use in granular soils)

V-1 of 39

Published: 01/01 Revised:

V-2 of 39

Published: 01/01 Revised:

V-3 of 39

Published: 01/01 Revised:

V-4 of 39

Published: 01/01 Revised:

V-5 of 39

Published: 01/01 Revised:

V-6 of 39

Published: 01/01 Revised:

V-7 of 39

Published: 01/01 Revised:

V-8 of 39

Published: 01/01 Revised:

S 6

V-9 of 39

Published: 01/01 Revised:

V-10 of 39

Published: 01/01 Revised:

S 8

V-11 of 39

Published: 01/01 Revised:

V-12 of 39

Published: 01/01 Revised:

V-13 of 39

Published: 01/01 Revised:

V-14 of 39

Published: 01/01 Revised:

V-15 of 39

Published: 01/01 Revised:

1

S/1

V-16 of 39

Published: 01/01 Revised:

V-17 of 39

Published: 01/01 Revised:

S 15

V-18 of 39

Published: 01/01 Revised:

S 16

S/20

V-19 of 39

Published: 01/01 Revised:

V-20 of 39

Published: 01/01 Revised:

S 18

V-21 of 39

Published: 01/01 Revised:

V-22 of 39

Published: 01/01 Revised:

V-23 of 39

Published: 01/01 Revised:

V-24 of 39

Published: 01/01 Revised:

V-25 of 39

Published: 01/01 Revised:

V-26 of 39

Published: 01/01 Revised:

V-27 of 39

Published: 01/01 Revised:

V-28 of 39

Published: 01/01 Revised:

V-29 of 39

Published: 01/01 Revised:

V-30 of 39

Published: 01/01 Revised:

V-31 of 39

Published: 01/01 Revised:

V-32 of 39

Published: 01/01 Revised:

V-33 of 39

Published: 01/01 Revised:

V-34 of 39

Published: 01/01 Revised:

V-35 of 39

Published: 01/01 Revised:

V-36 of 39

Published: 01/01 Revised:

V-37 of 39

Published: 01/01 Revised:

V-38 of 39

Published: 01/01 Revised:

V-39 of 39

Published: 01/01 Revised: