41
RAILWAY Legend 4. Topsoil shall be paid for at plan quantity. Excavated Material Berms (EMBs). 3. "Topsoil Placement" bid item for the mainline track includes topsoil placed on the mainline track and evenly over the Excavated Material Berms (EMBs). 2. Topsoil shall be spread on the railway inslopes to a minimum depth of 6". Remaining topsoil shall be spread 1. Topsoil stripping is based on the removal of the top 12" of topsoil within the railway construction limits. Notes: 4. The price bid for "Surcharge" shall include all costs associated with placement and removal of surcharge material. If surcharge material does not meet material requirements no additional payment will be made for disposal of the material offsite. 3. Surcharge material is to be used as railway embankment, provided it meets requirements and approval by the Engineer. 2. Excess excavated material shall be placed on the Excavated Material Berms shown in the FMM Diversion Reach 6 Channel Plans. 1. This computation report is not a balance sheet. The Contractor shall calculate its own balance of materials. Notes: Quarter Corner Section Corner Section R/W Monument Iron Monument GPS-RTK PT Monument Found R/W Marker Reference Marker Guy Wire Overhead Power Wire Large Tree Gravel Surface Line Concrete Surface Line Asphalt Surface Line Overhead Sign Private Sign Highway Sign Rail Road Sign with Cross Arm Rail Road Crossing Sign Rail Road Line Post Telephone Pole Power Pole Gas Pipe Telephone Pedestal UtilityMarker Electric Meter Telephone Line Fiber Optic Line Fence Line Flow Line Electric Line Culvert Line Brush/Shrub Electric Locker Vault Box Culvert Line Construction Limits Railroad R/W STATE PROJECT NO. ND NO. SHEET NO. SECTION 2/20/2015 aruud H:\Fargo\JBN\6600\6680\6680-005 BNSF FMM Bridge No. 3\CAD\Design\Sheets\011DT_001_EarthSummary.dgn 9:07:11 AM purposes. implementation construction or and not for is preliminary This document P R EL I M I NA R Y 11 FMMDR6 1 FMM Diversion Reach 6 BNSF Railroad Earthwork Summary & Legend

SECTION SHEET NO. · RAILWAY Legend 4. Topsoil shall be paid for at plan quantity. Excavated Material Berms (EMBs). 3. "Topsoil Placement" bid item for the mainline track includes

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: SECTION SHEET NO. · RAILWAY Legend 4. Topsoil shall be paid for at plan quantity. Excavated Material Berms (EMBs). 3. "Topsoil Placement" bid item for the mainline track includes

RAILWAY

Legend

4. Topsoil shall be paid for at plan quantity.

Excavated Material Berms (EMBs).

3. "Topsoil Placement" bid item for the mainline track includes topsoil placed on the mainline track and

evenly over the Excavated Material Berms (EMBs).

2. Topsoil shall be spread on the railway inslopes to a minimum depth of 6". Remaining topsoil shall be spread

1. Topsoil stripping is based on the removal of the top 12" of topsoil within the railway construction limits.

Notes:

4. The price bid for "Surcharge" shall include all costs associated with placement and removal of surcharge material.

If surcharge material does not meet material requirements no additional payment will be made for disposal of the material offsite.

3. Surcharge material is to be used as railway embankment, provided it meets requirements and approval by the Engineer.

2. Excess excavated material shall be placed on the Excavated Material Berms shown in the FMM Diversion Reach 6 Channel Plans.

1. This computation report is not a balance sheet. The Contractor shall calculate its own balance of materials.

Notes:

Quarter Corner Section

Corner Section

R/W Monument

Iron Monument

GPS-RTK PT

Monument Found

R/W Marker

Reference Marker

Guy Wire

Overhead Power Wire

Large Tree

Gravel Surface Line

Concrete Surface Line

Asphalt Surface Line

Overhead Sign

Private Sign

Highway Sign

Rail Road Sign with Cross Arm

Rail Road Crossing Sign

Rail Road Line

Post

Telephone Pole

Power Pole

Gas Pipe

Telephone Pedestal

UtilityMarker

Electric Meter

Telephone Line

Fiber Optic Line

Fence Line

Flow Line

Electric Line

Culvert Line

Brush/Shrub

Electric Locker Vault

Box Culvert Line

Construction Limits

Railroad R/W

STATE PROJECT NO.

ND

NO.

SHEET

NO.

SECTION

2/20/2015 aruud H:\Fargo\JBN\6600\6680\6680-005 BNSF FMM Bridge No. 3\CAD\Design\Sheets\011DT_001_EarthSummary.dgn9:07:11 AM

purposes.

implementation

construction or

and not for

is preliminary

This document

PRELIMINARY

11

FMMDR6 1

FMM Diversion Reach 6

BNSF Railroad

Earthwork Summary & Legend

Page 2: SECTION SHEET NO. · RAILWAY Legend 4. Topsoil shall be paid for at plan quantity. Excavated Material Berms (EMBs). 3. "Topsoil Placement" bid item for the mainline track includes

RAILWAY

BNSF

55

+00

50

+00

45

+00

40

+00

35

+00

30

+00

25

+00

20

+00

15

+00

10

+00

5+00

ST 51

+77.82

CS 51

+37.82

SC 48

+24.25

TS 47

+84.25

PI 35

+88.19

PI 23

+47.58

ST 11

+50.89

CS 11

+10.89

SC 7

+97.31

TS 7

+57.31

PI 9

+54.42

TS 21

+50.48

SC 21

+90.48

CS 25

+04.05

ST 25

+44.05

TS 33

+91.09

SC 34

+31.09

CS 37

+44.66

ST 37

+84.66

PI 49

+81.35

Curve C24

R = 2,455.70

Ls = 40.00

Ts = 197.11

L = 313.57

PI = 49+81.35

Curve C23

R = 2,455.70

Ls = 40.00

Ts = 197.11

L = 313.57

PI = 35+88.19

Curve C22

R = 2,455.70

Ls = 40.00

Ts = 197.11

L = 313.57

PI = 23+47.58

Curve C21

R = 2,455.70

Ls = 40.00

Ts = 197.11

PI = 9+54.42

L = 313.57

120

+00

115

+00

110

+00

105

+00

100

+00

95

+00

90

+00

85

+00

80

+00

75

+00

Proposed FMM Diversion

Cass Cou

nty Roa

d 20

93rd St N

Work AreaPhase 1

During Phase 1 construction, trains shall operate on the existing BNSF line.

to connect the shoofly.

No construction shall be allowed on the existing BNSF line, except temporary closures

embankment construction to allow for settlement mitigation.

and track placement shall not occur until a minimum of 6 months after completion of

The Contractor shall construct the new embankment and subballast for the shoofly. Ballast

existing BNSF line in order to keep the line in service during mainline construction.

Phase 1 construction shall consist of constructing a shoofly north of the

Notes:

Temp. Construction Easement

200’ 200’

Sta 100+00.00

‘ Diversion Channel =

Shoofly 51+77.82

Mainline 116+97.11 =Shoofly 7+57.31

Mainline 73+02.89 =

R Mrk 9BM 100

STATE PROJECT NO.

ND

NO.

SHEET

NO.

SECTION

2/19/2015 aruud H:\Fargo\JBN\6600\6680\6680-005 BNSF FMM Bridge No. 3\CAD\Design\Sheets\020GD_001.dgn1:47:35 PM

purposes.

implementation

construction or

and not for

is preliminary

This document

PRELIMINARY

20

FMMDR6 1

FMM Diversion Reach 6

BNSF Railroad

Phase 1 Construction

Page 3: SECTION SHEET NO. · RAILWAY Legend 4. Topsoil shall be paid for at plan quantity. Excavated Material Berms (EMBs). 3. "Topsoil Placement" bid item for the mainline track includes

RAILWAY

BNSF

55

+00

50

+00

45

+00

40

+00

35

+00

30

+00

25

+00

20

+00

15

+00

10

+00

5+00

ST 51

+77.82

CS 51

+37.82

SC 48

+24.25

TS 47

+84.25

PI 35

+88.19

PI 23

+47.58

ST 11

+50.89

CS 11

+10.89

SC 7

+97.31

TS 7

+57.31

PI 9

+54.42

TS 21

+50.48

SC 21

+90.48

CS 25

+04.05

ST 25

+44.05

TS 33

+91.09

SC 34

+31.09

CS 37

+44.66

ST 37

+84.66

PI 49

+81.35

Curve C24

R = 2,455.70

Ls = 40.00

Ts = 197.11

L = 313.57

PI = 49+81.35

Curve C23

R = 2,455.70

Ls = 40.00

Ts = 197.11

L = 313.57

PI = 35+88.19

Curve C22

R = 2,455.70

Ls = 40.00

Ts = 197.11

L = 313.57

PI = 23+47.58

Curve C21

R = 2,455.70

Ls = 40.00

Ts = 197.11

PI = 9+54.42

L = 313.57

120

+00

115

+00

110

+00

105

+00

100

+00

95

+00

90

+00

85

+00

80

+00

75

+00

Work AreaPhase 2

Proposed FMM Diversion

Cass Cou

nty Roa

d 20

93rd St N

During Phase 2 construction, trains shall operate on the shoofly.

No construction activities shall be allowed on the shoofly.

once the required settlement has be obtained.

Construction activities from Sta 93+93.06 to Sta 104+77.12 shall only resume

approximately 6 months. See Section 20 Sheet 3 for additional details.

Sta 93+93.06 to Sta 104+77.12. The surcharge will remain in place for

proposed ballast) prior to performing any other construction activities from

480 (+/- 20) psf, over the new embankment (measured from the top of the

surcharge material, or enough material to achieve a surcharge pressure of

The Contractor shall construct the new embankment to grade and place 4’ of

proposed FMM Diversion.

Sta 77+70 to Sta 112+05 and construction of a proposed BNSF bridge over the

Phase 2 construction shall consist of reconstructing the existing BNSF line from

Notes:

200’

Sta 100+00.00

‘ Diversion Channel =

Temp. Construction Easement

200’

Shoofly 51+77.82

Mainline 116+97.11 =Shoofly 7+57.31

Mainline 73+02.89 =

R Mrk 9BM 100

STATE PROJECT NO.

ND

NO.

SHEET

NO.

SECTION

2/19/2015 aruud H:\Fargo\JBN\6600\6680\6680-005 BNSF FMM Bridge No. 3\CAD\Design\Sheets\020GD_002.dgn1:48:09 PM

purposes.

implementation

construction or

and not for

is preliminary

This document

PRELIMINARY

20

FMMDR6 2

FMM Diversion Reach 6

BNSF Railroad

Phase 2 Construction

Page 4: SECTION SHEET NO. · RAILWAY Legend 4. Topsoil shall be paid for at plan quantity. Excavated Material Berms (EMBs). 3. "Topsoil Placement" bid item for the mainline track includes

RAILWAY

the requirements above but is subject to approval by the Engineer.

Embankment material outside the above stated limits may be material from on site locations not meeting2)

Liquid limit (LL) ˘ 90% (materials from the Sherack and Alluvium formations)d)

be used more than 4 vertical feet below the subgrade elevation

with the exception to materials classsified as CL-ML (silty clay) and SC-SM (silty clayey sand) which may only

Classified in accordance with ASTM guidelines with a prefix letter of S, C or G (e.g. SP, SC, CH, GP, etc.),c)

the finished subgrade

Free of rocks larger than 4 inches in its longest dimension where placed within the top 1 foot ofb)

Mineral soil with an organic content of less than 3% by massa)

and away from the grading PI’s should meet the following requirements and approval by the Engineer.

Fill material below the new subballast and also within the areas extending out at a 1:1 slope down1)

Notes:

Subballast

Ballast10"

2:12:1

14’14’

12" 12"

(6" Depth)

Topsoil (6" Depth)

Topsoil 2.5:1

2.5:1

PROPOSED BNSF RAILROAD

1:1 1:1

Embankment (2)

Fill Material (1)Existing Ground

0.02 ’/’ 0.02 ’/’

12"

Subballast

Ballast10"

Existing Ground

2:12:1

14’14’

12" 12"

(6" Depth)

Topsoil (6" Depth)

Topsoil 2.5:1

2.5:1

1:1 1:1

Embankment (2)

Fill Material (1)

PROPOSED BNSF RAILROAD SHOOFLY

12"

0.02 ’/’0.02 ’/’

2:12:1

14’14’

12" 12"

2.5:1 2.5:1

EXISTING BNSF RAILROADExisting Ground

10" Existing Ballast (REMOVE)

12" Existing Subballast (REMOVE)

Varies (8’ Min)

Varies (8’ Min)

Varies (8’ Min)

Varies (8’ Min)

20:120:1

20:120:1

Existing Railroad Tracks (REMOVE & SALVAGE)

10" Ballast + 12" Subballlst)

" Tie + 43" Rail + 816

73.18’ (7

10" Ballast + 12" Subballlst)

" Tie + 43" Rail + 816

73.18’ (7

STATE PROJECT NO.

ND

NO.

SHEET

NO.

SECTION

2/20/2015 aruud H:\Fargo\JBN\6600\6680\6680-005 BNSF FMM Bridge No. 3\CAD\Design\Sheets\030TP_001_Typ.dgn9:07:14 AM

purposes.

implementation

construction or

and not for

is preliminary

This document

PRELIMINARY

30

FMMDR6 1

FMM Diversion Reach 6

BNSF Railroad

Typical Sections

Page 5: SECTION SHEET NO. · RAILWAY Legend 4. Topsoil shall be paid for at plan quantity. Excavated Material Berms (EMBs). 3. "Topsoil Placement" bid item for the mainline track includes

RAILWAY

BNSF

55

+00

50

+00

45

+00

40

+00

35

+00

30

+00

25

+00

20

+00

15

+00

10

+00

5+00

ST 51

+77.82

CS 51

+37.82

SC 48

+24.25

TS 47

+84.25

PI 35

+88.19

PI 23

+47.58

ST 11

+50.89

CS 11

+10.89

SC 7

+97.31

TS 7

+57.31

PI 9

+54.42

TS 21

+50.48

SC 21

+90.48

CS 25

+04.05

ST 25

+44.05

TS 33

+91.09

SC 34

+31.09

CS 37

+44.66

ST 37

+84.66

PI 49

+81.35

Curve C24

R = 2,455.70

Ls = 40.00

Ts = 197.11

L = 313.57

PI = 49+81.35

Curve C23

R = 2,455.70

Ls = 40.00

Ts = 197.11

L = 313.57

PI = 35+88.19

Curve C22

R = 2,455.70

Ls = 40.00

Ts = 197.11

L = 313.57

PI = 23+47.58

Curve C21

R = 2,455.70

Ls = 40.00

Ts = 197.11

PI = 9+54.42

L = 313.57

120

+00

115

+00

110

+00

105

+00

100

+00

95

+00

90

+00

85

+00

80

+00

75

+00

Proposed FMM Diversion

Cass Cou

nty Roa

d 20

93rd St N

Work AreaPhase 3

200’

Temp. Construction Easement

Sta 100+00.00

‘ Diversion Channel =

200’

constructed in Phase 2.

During Phase 3 construction, trains shall operate on the BNSF mainline

approved by the Engineer.

Materials shall remain property of BNSF and be stockpiled onsite at a location

Railway materials used to construct the shoofly shall be removed and salvaged.

on the Excavated Material Berm (EMB), See Reach 6 Channel Plans for EMB Location.

Embankment material placed to construct the shoofly shall be removed and placed

the mainline.

Construction Phase 3 shall consist of obliterating the shoofly and reconnecting

Notes:

Shoofly 51+77.82

Mainline 116+97.11 = Shoofly 7+57.31

Mainline 73+02.89 =

R Mrk 9BM 100

STATE PROJECT NO.

ND

NO.

SHEET

NO.

SECTION

2/19/2015 aruud H:\Fargo\JBN\6600\6680\6680-005 BNSF FMM Bridge No. 3\CAD\Design\Sheets\020GD_004.dgn1:49:43 PM

purposes.

implementation

construction or

and not for

is preliminary

This document

PRELIMINARY

20

FMMDR6 4

FMM Diversion Reach 6

BNSF Railroad

Phase 3 Construction

Page 6: SECTION SHEET NO. · RAILWAY Legend 4. Topsoil shall be paid for at plan quantity. Excavated Material Berms (EMBs). 3. "Topsoil Placement" bid item for the mainline track includes

RAILWAY

Notes:

1) Fill material below the new subballast and also within the areas extending out at a 1:1 slope down

and away from the grading PI’s should meet the following requirements and approval by the Engineer.

a) Mineral soil with an organic content of less than 3% by mass

b) Free of rocks larger than 4 inches in its longest dimension where placed within the top 1 foot of

the finished subgrade

c) Classified in accordance with ASTM guidelines with a prefix letter of S, C or G (e.g. SP, SC, CH, GP, etc.),

with the exception to materials classsified as CL-ML (silty clay) and SC-SM (silty clayey sand) which may only

be used more than 4 vertical feet below the subgrade elevation

d) Liquid limit (LL) ˘ 90% (materials from the Sherack and Alluvium formations)

2) Embankment material outside the above stated limits may be material from on site locations not meeting

the requirements above but is subject to approval by the Engineer.

Subballast

Ballast10"

2:12:1

14’14’

12" 12"

(6" Depth)

Topsoil (6" Depth)

Topsoil 2.5:1

2.5:1

PROPOSED BNSF RAILROAD

1:1 1:1

Embankment (2)

Fill Material (1)Existing Ground

0.02 ’/’ 0.02 ’/’

12"

Subballast

Ballast10"

Existing Ground

2:12:1

14’14’

12" 12"

(6" Depth)

Topsoil (6" Depth)

Topsoil 2.5:1

2.5:1

1:1 1:1

Embankment (2)

Fill Material (1)

PROPOSED BNSF RAILROAD SHOOFLY

12"

0.02 ’/’0.02 ’/’

2:12:1

14’14’

12" 12"

2.5:1 2.5:1

EXISTING BNSF RAILROADExisting Ground

10" Existing Ballast (REMOVE)

12" Existing Subballast (REMOVE)

Varies (8’ Min)

Varies (8’ Min)

Varies (8’ Min)

Varies (8’ Min)

20:120:1

20:120:1

Existing Railroad Tracks (REMOVE & SALVAGE)

10" Ballast + 12" Subballlst)

" Tie + 43" Rail + 816

73.18’ (7

10" Ballast + 12" Subballlst)

" Tie + 43" Rail + 816

73.18’ (7

STATE PROJECT NO.

ND

NO.

SHEET

NO.

SECTION

2/19/2015 aruud H:\Fargo\JBN\6600\6680\6680-005 BNSF FMM Bridge No. 3\CAD\Design\Sheets\030TP_001_Typ.dgn1:42:34 PM

purposes.

implementation

construction or

and not for

is preliminary

This document

PRELIMINARY

30

FMMDR6 1

FMM Diversion Reach 6

BNSF Railroad

Typical Sections

Page 7: SECTION SHEET NO. · RAILWAY Legend 4. Topsoil shall be paid for at plan quantity. Excavated Material Berms (EMBs). 3. "Topsoil Placement" bid item for the mainline track includes

PO

T 65

+45.58

70

+00

75

+00

80

+00

85

+00

Shoofly 7+57.31

Mainline 73+02.89 =

Sign

Gr

GrBNSF

100

CL DI

VERSION

16409

R Mrk 9BM 100

85

+00

90

+00

95

+00

100

+00

105

+00

Sign

GrSign

Gr

RAILWAY

Mainline Rail Removal

50’

50’

75’

250’

250’

75’

75’

250’250’

75’

75’

S INV. 891.35

N INV. 891.66

4 - 48" x 44’ CSP

REMOVE

75’

BNSF

W INV. 893.20

E INV. 893.29

12" x 24’ CSP

REMOVE

LF 24Sta 96+52 Lt

LF176Sta 89+70 ‘

REMOVAL OF CULVERTS-ALL TYPES & SIZES

CY3,069Sta 73+02.89 to 105+00.00

SUBBALLAST REMOVAL

CY2,694Sta 73+02.89 to 105+00.00

BALLAST REMOVAL

LF3,197Sta 73+02.89 to 105+00.00

TRACK REMOVAL

UnitQuantityDescription

Temp Easement

Ex R/W

Ex R/W

Ex R/W

Ex R/W

Ex R/W

Ex R/W

Temp Easement

Pr Shoofly

Pr Shoofly

Grading Tie Point

Grading Tie Point

Grading Tie Point

Grading Tie Point

93rd St N

Cass

Co. 20

STATE PROJECT NO.

ND

NO.

SHEET

NO.

SECTION

2/19/2015 aruud H:\Fargo\JBN\6600\6680\6680-005 BNSF FMM Bridge No. 3\CAD\Design\Sheets\040WL_001_REMOVALS.dgn1:51:51 PM

purposes.

implementation

construction or

and not for

is preliminary

This document

PRELIMINARY

40

FMMDR6 1

FMM Diversion Reach 6

BNSF Railroad

Sta 73+00 to 105+00

Removals - Mainline

Page 8: SECTION SHEET NO. · RAILWAY Legend 4. Topsoil shall be paid for at plan quantity. Excavated Material Berms (EMBs). 3. "Topsoil Placement" bid item for the mainline track includes

RAILWAY

Mainline Rail Removal

50’

50’

75’

75’

250’

250’

S INV. 892.86

N INV. 893.30

4 - 36" x 44’ RCP

REMOVE

Ex R/W

Ex R/W

Ex R/W

Ex R/W

Temp Easement

Pr Shoofly LF176Sta 109+00 ‘

REMOVAL OF CULVERTS-ALL TYPES & SIZES

CY1,149Sta 105+00.00 to 116+97.11

SUBBALLAST REMOVAL

CY1,009Sta 105+00.00 to 116+97.11

BALLAST REMOVAL

LF1,197Sta 105+00.00 to 116+97.11

TRACK REMOVAL

UnitQuantityDescription

Grading Tie Point

Grading Tie Point

105

+00

110

+00

115

+00

120

+00

125

+00

PO

T 126

+21.48

Shoofly 51+77.82

Mainline 116+97.11 =

STATE PROJECT NO.

ND

NO.

SHEET

NO.

SECTION

2/19/2015 aruud H:\Fargo\JBN\6600\6680\6680-005 BNSF FMM Bridge No. 3\CAD\Design\Sheets\040WL_002_REMOVALS.dgn1:58:03 PM

purposes.

implementation

construction or

and not for

is preliminary

This document

PRELIMINARY

40

FMMDR6 2

FMM Diversion Reach 6

BNSF Railroad

Sta 105+00 to 117+00

Removals - Mainline

Gr

Gr

Sign

BNSF

Page 9: SECTION SHEET NO. · RAILWAY Legend 4. Topsoil shall be paid for at plan quantity. Excavated Material Berms (EMBs). 3. "Topsoil Placement" bid item for the mainline track includes

PO

T 0

+00.00

0+00

5+00

TS 7

+57.31

SC 7

+97.31

CS 11

+10.89

PI 9

+54.42

ST 11

+50.89

20

+00

15

+00

10

+00

Shoofly 7+57.31

Mainline 73+02.89 =

Sign

Gr

GrBNSF

100

CL DI

VERSION

16409

R Mrk 9BM 100

Sign

SignGr

Sign

Sign

BNSF

Gr

RAILWAY

35

+00

30

+00

25

+00

PI 23

+47.58

PI 35

+88.19

Shoofly Rail Removal

20

+00

50’

50’

250’

250’

75’

75’

S INV. 892.12

N INV. 892.10

24" x 44’ RCP

REMOVE

250’

75’

75’

250’

75’

75’

Curve C23

R = 2,455.70

Ls = 40.00

Ts = 197.11

L = 313.57

PI = 35+88.19Curve C22

R = 2,455.70

Ls = 40.00

Ts = 197.11

L = 313.57

PI = 23+47.58

Curve C21

R = 2,455.70

Ls = 40.00

Ts = 197.11

PI = 9+54.42

L = 313.57

40

+00

Ex R/W

Ex R/W

Ex R/W

Ex R/W

Ex R/W

Ex R/W

Temp Easement

Pr Shoofly

Temp EasementPr Shoofly

ST 37

+84.66

CS 37

+44.66

SC 34

+31.09

TS 33

+91.09

TS 21

+50.48

SC 21

+90.48

CS 25

+04.05

ST 25

+44.05

EACH1No. 20 Turnout

TURNOUT REMOVAL

LF44Sta 15+85 ‘

REMOVAL OF CULVERTS-ALL TYPES & SIZES

LF3,243Sta 7+57.31 to 40+00.00

OBLITERATE EMBANKMENT

CY3,113Sta 7+57.31 to 40+00.00

SUBBALLAST REMOVAL

CY2,733Sta 7+57.31 to 40+00.00

BALLAST REMOVAL

LF3,243Sta 7+57.31 to 40+00.00

TRACK REMOVAL

UnitQuantityDescription

Grading Tie Point

Grading Tie Point

Grading Tie Point

Grading Tie Point

Cass

Co. 20

93rd St N

STATE PROJECT NO.

ND

NO.

SHEET

NO.

SECTION

2/19/2015 aruud H:\Fargo\JBN\6600\6680\6680-005 BNSF FMM Bridge No. 3\CAD\Design\Sheets\040WL_003_REMOVALS.dgn2:01:08 PM

purposes.

implementation

construction or

and not for

is preliminary

This document

PRELIMINARY

40

FMMDR6 3

FMM Diversion Reach 6

BNSF Railroad

Sta 7+50 to 40+00

Removals - Shoofly

Page 10: SECTION SHEET NO. · RAILWAY Legend 4. Topsoil shall be paid for at plan quantity. Excavated Material Berms (EMBs). 3. "Topsoil Placement" bid item for the mainline track includes

PO

T 126

+21.48

40

+00

45

+00

TS 47

+84.25

SC 48

+24.25

50

+00

CS 51

+37.82

PI 49

+81.35

ST 51

+77.82

55

+00

60

+00

PO

T 61

+02.19

Shoofly 51+77.82

Mainline 116+97.11 =

Gr

Gr

Sign

BNSF

RAILWAY

Shoofly Rail Removal

50’

50’ 250’

75’

75’Curve C24

R = 2,455.70

Ls = 40.00

Ts = 197.11

L = 313.57

PI = 49+81.35

250’

Ex R/W

Ex R/W

Ex R/W

Ex R/W

Temp Easement

Pr Shoofly LF1,178Sta 40+00.00 to 51+77.82

OBLITERATE EMBANKMENT

CY1,131Sta 40+00.00 to 51+77.82

SUBBALLAST REMOVAL

CY993Sta 40+00.00 to 51+77.82

BALLAST REMOVAL

LF1,178Sta 40+00.00 to 51+77.82

TRACK REMOVAL

UnitQuantityDescription

Grading Tie Point

Grading Tie Point

STATE PROJECT NO.

ND

NO.

SHEET

NO.

SECTION

2/19/2015 aruud H:\Fargo\JBN\6600\6680\6680-005 BNSF FMM Bridge No. 3\CAD\Design\Sheets\040WL_004_REMOVALS.dgn2:01:44 PM

purposes.

implementation

construction or

and not for

is preliminary

This document

PRELIMINARY

40

FMMDR6 4

FMM Diversion Reach 6

BNSF Railroad

Sta 40+00 to 51+80

Removals - Shoofly

Page 11: SECTION SHEET NO. · RAILWAY Legend 4. Topsoil shall be paid for at plan quantity. Excavated Material Berms (EMBs). 3. "Topsoil Placement" bid item for the mainline track includes

RAILWAY

PROPOSED MAINLINE TOP OF RAIL

TOP OF EXISTING RAIL

Pr Shoofly

PROPOSED DITCH RT

PROPOSED DITCH LT

Ditch Bottom Lt

Ditch Bottom Rt

Ex R/W

Ex R/W

Temp Easement

50’

50’

200’

75’

75’

Cass Co.

20

Grading Tie Point

Grading Tie Point

860

870

880

890

900

910

920

930

860

870

880

890

900

910

920

930

STATE PROJECT NO.

ND

NO.

SHEET

NO.

SECTION

2/19/2015 aruud H:\Fargo\JBN\6600\6680\6680-005 BNSF FMM Bridge No. 3\CAD\Design\Sheets\060PP_001.dgn2:02:02 PM

purposes.

implementation

construction or

and not for

is preliminary

This document

PRELIMINARY

60

FMMDR6 1

FMM Diversion Reach 6

BNSF Railroad

Plan & Profile - Mainline

Sta 77+70 to 90+00

70

+00

75

+00

80

+00

85

+00

90

+00

Shoofly 7+57.31

Mainline 73+02.89 =

891.1

8

891.3

5 891.3

7891.4

8

891.5

0

891.6

589

1.66

891.8

2

Sign

GrBNSF

VPI 80+75.00

EL 900.00

+ 0.0086 % + 0.3000 %

L = 600.00’

K = 2059

VPI 90+81.59

EL 890.33

EL 892.10

DITCH LT & RT

DITCH LT VPI 77+70.00

VPI 77

+70.00

EL 899.98

- 0.0449 % RT

- 0.1350 % LT

69+0070+0071+0072+0073+0074+0075+0076+0077+0078+0079+0080+0081+0082+0083+0084+0085+0086+0087+0088+0089+0090+0091+00

899.98

900.03

900.12

900.26

900.45

900.69

900.98

901.28

901.58

901.88

902.18

902.48

902.78

903.08

900.43

900.30

900.18

900.08

899.94

899.95

899.96

899.93

899.90

899.95

899.97

899.97

899.92

899.93

899.98

900.06

900.17

900.28

900.45

900.52

900.52

900.56

900.60

Page 12: SECTION SHEET NO. · RAILWAY Legend 4. Topsoil shall be paid for at plan quantity. Excavated Material Berms (EMBs). 3. "Topsoil Placement" bid item for the mainline track includes

RAILWAY

Diversion Channel

Boring ST-6 Boring ST-5

Boring ST-4

Boring ST-3

Boring ST-2

Boring ST-1

TOP OF EXISTING RAIL

PROPOSED MAINLINE TOP OF RAIL

Pr Shoofly

PROPOSED DITCH RT

PROPOSED DITCH LTPROPOSED DITCH LT

PROPOSED DITCH RT

Ditch Bottom Rt

Ditch Bottom Lt

Ditch Bottom Lt

Ditch Bottom Rt

Invert N: 890.79

Invert S: 891.53

Install (2) 24" x 72’ RCP

Temp Easement

Ex R/W

Ex R/W

175’

75’

75’

50’

50’

Grading Tie Point

Grading Tie Point

Low Flow Channel External Drainage Ditch

External Drainage Ditch

External Drainage Ditch

EMB

EMB

860

870

880

890

900

910

920

930

860

870

880

890

900

910

920

930

STATE PROJECT NO.

ND

NO.

SHEET

NO.

SECTION

2/19/2015 aruud H:\Fargo\JBN\6600\6680\6680-005 BNSF FMM Bridge No. 3\CAD\Design\Sheets\060PP_002.dgn2:06:08 PM

purposes.

implementation

construction or

and not for

is preliminary

This document

PRELIMINARY

60

FMMDR6 2

FMM Diversion Reach 6

BNSF Railroad

Plan & Profile - Mainline

Sta 90+00 to 110+00

100

CL DI

VERSION

16409

R Mrk 9BM 100

90

+00

95

+00

100

+00

105

+00

110

+00

891.1

8

891.3

5 891.3

7891.4

8

891.5

0

891.5

3

891.6

589

1.66

891.8

2

893.1

4

893.1

4

893.2

0

893.2

7

893.2

8

893.2

9

893.3

1

893.4

9

893.4

9

Sign

SignGr

Sign

Sign

BNSF

Gr

VPI 95+74.25

EL 904.50

+ 0.3000 % + 0.0000 %

L = 300.00’

K = 1000

SSD = 3747’

VPI 104+25.75

EL 904.50

+ 0.0000 %

L = 300.00’

K = 1000

SSD = 3747’VPI 110+50.00

EL 902.63

- 0.3000 %

L = 300.00’

K = 8006

VPI 108+81.47

EL 890.31

VPI 91+74.51

EL 891.47

VPI 109+44.73

EL 890.37

VPI 90+81.59

EL 890.33DITCH RT

DITCH LTEL 900.31

DITCH LT & RT

VPI 95+45.80EL 903.24

DITCH LT & RT

VPI 105+26.87

DITCH RT

DITCH LT

+ 1.3947 % LT

+ 1.1715 % RT

- 3.0

803

% LT

- 3.6

468

% RT

+ 2.3817 % RT

+ 2.1505 % LT

- 0.0449 % RT

- 0.1350 % LT

89+0090+0091+0092+0093+0094+0095+0096+0097+0098+0099+00100+00101+00102+00103+00104+00105+00106+00107+00108+00109+00110+00111+00

902.48

902.78

903.08

903.38

903.68

903.98

904.25

904.42

904.50

904.50

904.50

904.50

904.50

904.50

904.50

904.42

904.25

903.98

903.68

903.38

903.08

902.79

902.50

900.52

900.56

900.60

900.68

900.77

900.86

901.07

901.22

901.41

901.60

901.76

901.92

902.10

902.18

902.39

902.51

902.56

902.59

902.70

902.78

902.69

902.73

902.59

893.05

895.26

897.26

899.26

896.54

894.95

883.68

874.62

867.78

874.62

884.17

894.46

894.96

901.20

900.17

897.25

896.97

891.09

Page 13: SECTION SHEET NO. · RAILWAY Legend 4. Topsoil shall be paid for at plan quantity. Excavated Material Berms (EMBs). 3. "Topsoil Placement" bid item for the mainline track includes

RAILWAY

PROPOSED MAINLINE TOP OF RAIL

TOP OF EXISTING RAILPROPOSED DITCH RT

PROPOSED DITCH LT

Pr Shoofly

Ditch Bottom Rt

Ditch Bottom Lt

Ex R/W

Ex R/W

Temp Easement

200’

50’

50’

Grading Tie Point

860

870

880

890

900

910

920

930

860

870

880

890

900

910

920

930

STATE PROJECT NO.

ND

NO.

SHEET

NO.

SECTION

2/19/2015 aruud H:\Fargo\JBN\6600\6680\6680-005 BNSF FMM Bridge No. 3\CAD\Design\Sheets\060PP_003.dgn2:06:45 PM

purposes.

implementation

construction or

and not for

is preliminary

This document

PRELIMINARY

60

FMMDR6 3

FMM Diversion Reach 6

BNSF Railroad

Plan & Profile - Mainline

Sta 110+00 to 112+05

110

+00

115

+00

120

+00

125

+00

PO

T 126

+21.48

Shoofly 51+77.82

Mainline 116+97.11 =

893.1

4

893.1

4893.2

7

893.2

8

Gr

Gr

Sign

BNSF

VPI 110+50.00

EL 902.63

- 0.2625 %

L = 300.00’

K = 8006

VPI 109+44.73

EL 890.37

VPI 112

+05.00

EL 902.22

DITCH LT

VPI 112+05.00

EL 894.10

VPI 112+05.00

EL 894.00

DITCH RT

DITCH LT

+ 1.3947 % LT

+ 1.1715 % RT

109+00110+00111+00112+00113+00114+00115+00116+00117+00118+00119+00120+00121+00122+00123+00124+00125+00126+00

903.08

902.79

902.50

902.24

902.69

902.73

902.59

902.24

902.07

902.01

901.93

901.76

901.53

901.42

901.26

901.16

901.03

900.91

900.84

900.83

900.72

900.74

891.09

Page 14: SECTION SHEET NO. · RAILWAY Legend 4. Topsoil shall be paid for at plan quantity. Excavated Material Berms (EMBs). 3. "Topsoil Placement" bid item for the mainline track includes

RAILWAY

mainline ballasting

No. 24 T.O. to be used during

PROPOSED DITCH LT

PROPOSED DITCH RT

Ditch Bottom Lt

Ditch Bottom RtInvert N: 892.10

Invert S: 892.12

Install 24" x 44’ RCP

Ex R/W

Ex R/W

Temp Easement

50’

50’

200’

75’75’

Cass Co. 20

Grading Tie Point

Grading Tie Point

PROPOSED SHOOFLY TOP OF RAIL

AT ‘ SHOOFLY

TOP OF EXISTING GROUND

860

870

880

890

900

910

920

930

860

870

880

890

900

910

920

930

STATE PROJECT NO.

ND

NO.

SHEET

NO.

SECTION

2/19/2015 aruud H:\Fargo\JBN\6600\6680\6680-005 BNSF FMM Bridge No. 3\CAD\Design\Sheets\060PP_004.dgn2:07:30 PM

purposes.

implementation

construction or

and not for

is preliminary

This document

PRELIMINARY

60

FMMDR6 4

FMM Diversion Reach 6

BNSF Railroad

Plan & Profile - Shoofly

Sta 7+50 to 25+00

5+00

TS 7

+57.31

SC 7

+97.31

CS 11

+10.89

PI 9

+54.42

ST 11

+50.89

TS 21

+50.48

SC 21

+90.48

25

+00

CS 25

+04.05

PI 23

+47.58

ST 25

+44.05

20

+00

15

+00

10

+00

Curve C22

R = 2,455.70

Ls = 40.00

Ts = 197.11

L = 313.57

PI = 23+47.58

Curve C21

R = 2,455.70

Ls = 40.00

Ts = 197.11

PI = 9+54.42

L = 313.57

Shoofly 7+57.31

Mainline 73+02.89 =

891.18

891.35

891.37

891.48

891.50

891.65

891.66 89

1.82

Sign

Sign

Gr

BNSF

VPI 7

+50.00

EL 899.94

+ 0.0413 % RT

+ 0.0527 % LT

EL 892.11

DITCH LT

EL 891.90

DITCH RT

VPI 15+65.00

VPI 11+10.00

+ 0.0486 %

4+005+006+007+008+009+0010+0011+0012+0013+0014+0015+0016+0017+0018+0019+0020+0021+0022+0023+0024+0025+0026+00

900.40

900.22

900.15

900.00

899.92

899.80

898.41

896.85

894.07

892.60

892.25

892.31

892.37

892.42

892.48

892.53

892.59

892.64

892.70

892.75

892.81

892.87

892.92

899.96

900.01

900.06

900.11

900.16

900.20

900.25

900.30

900.35

900.40

900.45

900.50

900.54

900.59

900.64

900.69

900.74

900.79

900.84

Page 15: SECTION SHEET NO. · RAILWAY Legend 4. Topsoil shall be paid for at plan quantity. Excavated Material Berms (EMBs). 3. "Topsoil Placement" bid item for the mainline track includes

RAILWAY

PROPOSED DITCH LT

PROPOSED DITCH RT

Ditch Bottom Lt

Ditch Bottom Rt

Temp Easement

Ex R/W

Ex R/W

175’

75’

75’

50’

50’

Curve C23

R = 2,455.70

Ls = 40.00

Ts = 197.11

L = 313.57

PI = 35+88.19

Grading Tie Point

Grading Tie Point

PROPOSED TOP OF SHOOFLY RAIL

AT ‘ SHOOFLY

TOP OF EXISTING GROUND

Low Flow Channel

EMB

EMBExternal Drainage Ditch

External Drainage Ditch

860

870

880

890

900

910

920

930

860

870

880

890

900

910

920

930

STATE PROJECT NO.

ND

NO.

SHEET

NO.

SECTION

2/19/2015 aruud H:\Fargo\JBN\6600\6680\6680-005 BNSF FMM Bridge No. 3\CAD\Design\Sheets\060PP_005.dgn2:27:00 PM

purposes.

implementation

construction or

and not for

is preliminary

This document

PRELIMINARY

60

FMMDR6 5

FMM Diversion Reach 6

BNSF Railroad

Plan & Profile - Shoofly

Sta 25+00 to 45+00

100CL

DIVERSI

ON

16409

R Mrk 9

BM 100

25

+00

CS 25

+04.05

ST 25

+44.05

30

+00

TS 33

+91.09

SC 34

+31.09

35

+00

CS 37

+44.66

PI 35

+88.19

ST 37

+84.66

40

+00

45

+00

891.18

891.35 891

.37891.48

891.50

891.53

891.65891

.66 891.82

893.14

893.14

893.20

893.27

893.28

893.29

893.31

893.49

893.49

Sign

SignGr

Sign

Sign

BNSFGr

+ 0.0527 % LT

EL 893.60

DITCH LT

VPI 43+90.00

+ 0.0413 % RT

24+0025+0026+0027+0028+0029+0030+0031+0032+0033+0034+0035+0036+0037+0038+0039+0040+0041+0042+0043+0044+0045+0046+00

892.81

892.87

892.92

892.98

893.03

893.09

893.14

893.20

893.26

893.31

893.37

893.42

893.48

893.53

893.59

893.64

893.70

893.76

893.81

893.87

893.92

893.98

894.03

900.74

900.79

900.84

900.88

900.93

900.98

901.03

901.08

901.13

901.18

901.22

901.27

901.32

901.37

901.42

901.47

901.52

901.57

901.61

901.66

901.71

901.76

901.81

Page 16: SECTION SHEET NO. · RAILWAY Legend 4. Topsoil shall be paid for at plan quantity. Excavated Material Berms (EMBs). 3. "Topsoil Placement" bid item for the mainline track includes

RAILWAY

TOP OF EXISTING RAIL

PROPOSED DITCH RT

Ditch Bottom Rt

Ex R/W

Ex R/W

Temp Easement

200’

50’

50’

Grading Tie Point

Grading Tie Point

PROPOSED TOP OF SHOOFLY RAIL

860

870

880

890

900

910

920

930

860

870

880

890

900

910

920

930

STATE PROJECT NO.

ND

NO.

SHEET

NO.

SECTION

2/19/2015 aruud H:\Fargo\JBN\6600\6680\6680-005 BNSF FMM Bridge No. 3\CAD\Design\Sheets\060PP_006.dgn2:08:54 PM

purposes.

implementation

construction or

and not for

is preliminary

This document

PRELIMINARY

60

FMMDR6 6

FMM Diversion Reach 6

BNSF Railroad

Plan & Profile - Shoofly

Sta 45+00 to 51+80

45

+00

TS 47

+84.25

SC 48

+24.25

50

+00

CS 51

+37.82

PI 49

+81.35

ST 51

+77.82

55

+00

60

+00

PO

T 61

+02.19

Curve C24

R = 2,45

5.70

Ls = 40.0

0

Ts = 197.

11

L = 313.

57

PI = 49+81.35

Shoofly 51+77.82

Mainline 116+97.11 = 893.1

4

893.1

4893.2

7

893.2

8

Gr

Gr

Sign

BNSF

VPI 49+80.00

EL 901.99

+ 0.0486 % - 0.2296 %

L = 300.00’

K = 1079

SSD = 4029’

VPI 51

+80.00

EL 901.53

+ 0.0413 % RT

EL 893.50

DITCH RT

VPI 49+85.00

44+0045+0046+0047+0048+0049+0050+0051+0052+0053+0054+0055+0056+0057+00

893.92

893.98

894.03

894.09

896.43

899.95

901.08

901.73

901.48

901.40

901.22

901.15

901.00

900.88

900.84

900.81

900.70

900.74

901.71

901.76

901.81

901.86

901.91

901.93

901.87

901.71

Page 17: SECTION SHEET NO. · RAILWAY Legend 4. Topsoil shall be paid for at plan quantity. Excavated Material Berms (EMBs). 3. "Topsoil Placement" bid item for the mainline track includes

PO

T 65

+45.58

70

+00

75

+00

80

+00

85

+00

Shoofly 7+57.31

Mainline 73+02.89 =

Sign

Gr

GrBNSF

R Mrk 9BM 100

85

+00

90

+00

95

+00

100

+00

105

+00

Sign

SignGr

Sign

SignGr

RAILWAY

EROSION CONTROL BLANKET (TYPE 2)

SEEDING CLASS II

Pr Shoofly

Temp Easement

Ex R/W

Ex R/W

Ex R/W

Ex R/W

Ex R/W

Ex R/W

Temp Easement

Fiber Rolls 12IN (Typ.)

Fiber Rolls 12IN (Typ.)

Pr Shoofly

Fiber Rolls 12IN

Install 50 LF

Blanket (Typ.)

Erosion Control

Blanket (Typ.)

Erosion Control

Blanket (Typ.)

Erosion Control

Fiber Rolls 12IN

Install 50 LF

Fiber Rolls 12IN (Typ.)

Blanket (Typ.)

Erosion Control

250’

50’

50’

75’

75’

250’

75’

250’

75’

75’

250’

75’

FIBER ROLLS 12IN

Fiber Rolls 12IN

Install 40 LF

Ditch Bottom Lt

Ditch Bottom Rt

Ditch Bottom Lt

Ditch Bottom Rt

LF1,993Sta 81+14.83 Rt to 105+00.00 Rt

LF2,335Sta 77+70.00 Lt to 105+00.00 Lt

FIBER ROLLS 12IN

SY4,027Sta 77+70.00 Rt to 104+85.00 Rt

SY4,129Sta 77+70.00 Lt to 104+80.00 Lt

ECB TYPE 2

Acres2.87Sta 77+70.00 Rt to 105+00.00 Rt

Acres3.06Sta 77+70.00 Lt to 105+00.00 Lt

SEEDING CLASS II

UnitQuantityDescription

BNSF

Fiber Rolls 12IN

Install 50 LF

(Typ.)

Fiber Rolls 12IN

Fiber Rolls 12IN

Install 50 LF

Fiber Rolls 12IN

Install 50 LF

Grading Tie Point

Grading Tie Point

Grading Tie Point

Grading Tie Point

Cass Co. 20

93rd St N

STATE PROJECT NO.

ND

NO.

SHEET

NO.

SECTION

2/19/2015 aruud H:\Fargo\JBN\6600\6680\6680-005 BNSF FMM Bridge No. 3\CAD\Design\Sheets\075WL_001_Erosion.dgn2:11:12 PM

purposes.

implementation

construction or

and not for

is preliminary

This document

PRELIMINARY

75

FMMDR6 1

FMM Diversion Reach 6

BNSF Railroad

Sta 77+70 to 105+00

Erosion Control, and Seeding - Mainline

Page 18: SECTION SHEET NO. · RAILWAY Legend 4. Topsoil shall be paid for at plan quantity. Excavated Material Berms (EMBs). 3. "Topsoil Placement" bid item for the mainline track includes

105

+00

110

+00

115

+00

120

+00

125

+00

PO

T 126

+21.48

Shoofly 51+77.82

Mainline 116+97.11 =

Gr

Gr

Sign

BNSF

RAILWAY

Fiber Rolls 12IN (Typ.)

250’

75’

75’

Ex R/W

Temp Easement

Ex R/W

250’

Ex R/W

Ex R/W

50’

50’

Fiber Rolls 12IN

Install 40 LF

Ditch Bottom Lt

Fiber Rolls 12IN (Typ.)

Blanket (Typ.)

Erosion Control

Ditch Bottom Rt

Blanket (Typ.)

Erosion Control

Fiber Rolls 12IN

Install 50 LF

Pr Shoofly

EROSION CONTROL BLANKET (TYPE 2)

SEEDING CLASS II

FIBER ROLLS 12IN

LF435Sta 105+00.00 Rt to 108+85.17 Rt

LF776Sta 105+00.00 Lt to 112+05.00 Lt

FIBER ROLLS 12IN

SY1,181Sta 105+80.00 Rt to 111+95.00 Rt

SY1,330Sta 105+75.75 Lt to 112+00.00 Lt

ECB TYPE 2

Acres0.82Sta 105+00.00 Rt to 112+05.00 Rt

Acres0.88Sta 105+00.00 Lt to 112+05.00 Lt

SEEDING CLASS II

UnitQuantityDescription

at Pipe Inlet

Fiber Rolls 12IN

Install 30 LF of

Grading Tie Point

Grading Tie Point

STATE PROJECT NO.

ND

NO.

SHEET

NO.

SECTION

2/19/2015 aruud H:\Fargo\JBN\6600\6680\6680-005 BNSF FMM Bridge No. 3\CAD\Design\Sheets\075WL_002_Erosion.dgn2:18:44 PM

purposes.

implementation

construction or

and not for

is preliminary

This document

PRELIMINARY

75

FMMDR6 2

FMM Diversion Reach 6

BNSF Railroad

Sta 105+00 to 112+05

Erosion Control, and Seeding - Mainline

Page 19: SECTION SHEET NO. · RAILWAY Legend 4. Topsoil shall be paid for at plan quantity. Excavated Material Berms (EMBs). 3. "Topsoil Placement" bid item for the mainline track includes

PO

T 0

+00.00

0+00

5+00

TS 7

+57.31

SC 7

+97.31

CS 11

+10.89

PI 9

+54.42

ST 11

+50.89

20

+00

15

+00

10

+00

Shoofly 7+57.31

Mainline 73+02.89 =

Sign

Gr

GrBNSF

100

CL DI

VERSION

16409

R Mrk 9BM 100

Sign

SignGr

Sign

Sign

BNSF

Gr

RAILWAY

35

+00

30

+00

25

+00

PI 23

+47.58

PI 35

+88.19

40

+00

Curve C22

R = 2,455.70

Ls = 40.00

Ts = 197.11

L = 313.57

PI = 23+47.58

Curve C23

R = 2,455.70

Ls = 40.00

Ts = 197.11

L = 313.57

PI = 35+88.19

EROSION CONTROL BLANKET (TYPE 2)

SEEDING CLASS II

FIBER ROLLS 12IN

Ex R/W75’

75’

Ex R/W

250’

Temp Easement

Ex R/W 50’

50’

Ex R/W

Curve C21

R = 2,455.70

Ls = 40.00

Ts = 197.11

PI = 9+54.42

L = 313.57

250’

20

+00

75’

75’

250’

Temp Easement

Ex R/W

Ex R/W

250’

75’

75’

ST 37

+84.66

CS 37

+44.66

SC 34

+31.09

TS 33

+91.09

CS 25

+04.05

ST 25

+44.05

SC 21

+90.48

TS 21

+50.48

Ditch Bottom Rt

Fiber Rolls 12IN (Typ.)

Pr ShooflyBlanket (Typ.)

Erosion Control

Fiber Rolls 12IN (Typ.)Blanket (Typ.)

Erosion ControlDitch Bottom Lt

Blanket (Typ.)

Erosion Control

Fiber Rolls 12IN (Typ.)

Ditch Bottom Rt

Fiber Rolls 12IN (Typ.)

Blanket (Typ.)

Erosion Control

Ditch Bottom Lt

LF3,251Sta 7+57.31 Rt to 40+00.00 Rt

LF3,194Sta 7+57.31 Lt to 40+00.00 Lt

FIBER ROLLS 12IN

SY4,069Sta 9+65.00 Rt to 40+00.00 Rt

SY3,555Sta 12+00.00 Lt to 40+00.00 Lt

ECB TYPE 2

Acres2.31Sta 7+57.31 Rt to 40+00.00 Rt

Acres2.03Sta 7+57.31 Lt to 40+00.00 Lt

SEEDING CLASS II

UnitQuantityDescription

at Pipe Inlet

Fiber Rolls 12IN

Install 30 LF of

Pr Shoofly

Grading Tie Point

Grading Tie Point

Grading Tie Point

Grading Tie Point

Cass Co. 20

93rd St N

STATE PROJECT NO.

ND

NO.

SHEET

NO.

SECTION

2/19/2015 aruud H:\Fargo\JBN\6600\6680\6680-005 BNSF FMM Bridge No. 3\CAD\Design\Sheets\075WL_003_Erosion_Shoo-fly.dgn2:19:27 PM

purposes.

implementation

construction or

and not for

is preliminary

This document

PRELIMINARY

75

FMMDR6 3

FMM Diversion Reach 6

BNSF Railroad

Sta 7+50 to 40+00

Erosion Control, and Seeding - Shoofly

Page 20: SECTION SHEET NO. · RAILWAY Legend 4. Topsoil shall be paid for at plan quantity. Excavated Material Berms (EMBs). 3. "Topsoil Placement" bid item for the mainline track includes

PO

T 126

+21.48

40

+00

45

+00

TS 47

+84.25

SC 48

+24.25

50

+00

CS 51

+37.82

PI 49

+81.35

ST 51

+77.82

55

+00

60

+00

PO

T 61

+02.19

Shoofly 51+77.82

Mainline 116+97.11 =

Gr

Gr

Sign

BNSF

RAILWAY

Fiber Rolls 12IN (Typ.)

EROSION CONTROL BLANKET (TYPE 2)

SEEDING CLASS II

FIBER ROLLS 12IN50’

50’Ex R/W

Ex R/W

Curve C24

R = 2,455.70

Ls = 40.00

Ts = 197.11

L = 313.57

PI = 49+81.35

Temp Easement

Ex R/W

75’

75’

250’Ex R/W

Fiber Rolls 12IN (Typ.)

Ditch Bottom Rt

Blanket (Typ.)

Erosion Control

Pr Shoofly

Blanket (Typ.)

Erosion Control

Ditch Bottom Lt

LF1,172Sta 40+00.00 Rt to 51+78.82 Rt

LF1,136Sta 40+00.00 Lt to 51+77.82 Lt

FIBER ROLLS 12IN

SY1,381Sta 40+00.00 Rt to 49+90.00 Rt

SY824Sta 40+00.00 Lt to 47+30.00 Lt

ECB TYPE 2

Acres0.85Sta 40+00.00 Rt to 51+77.82 Rt

Acres0.82Sta 40+00.00 Lt to 51+77.82 Lt

SEEDING CLASS II

UnitQuantityDescription

250’

Grading Tie Point

Grading Tie Point

STATE PROJECT NO.

ND

NO.

SHEET

NO.

SECTION

2/19/2015 aruud H:\Fargo\JBN\6600\6680\6680-005 BNSF FMM Bridge No. 3\CAD\Design\Sheets\075WL_004_Erosion_Shoo-fly.dgn2:24:45 PM

purposes.

implementation

construction or

and not for

is preliminary

This document

PRELIMINARY

75

FMMDR6 4

FMM Diversion Reach 6

BNSF Railroad

Sta 40+00 to 51+80

Erosion Control, and Seeding - Shoofly

Page 21: SECTION SHEET NO. · RAILWAY Legend 4. Topsoil shall be paid for at plan quantity. Excavated Material Berms (EMBs). 3. "Topsoil Placement" bid item for the mainline track includes

00

00

2020

2020

4040

4040

6060

6060

8080

8080

100100

100100

120120

120120

140140

140140

900 900

910 910

890 89077+70.00

900 900

910 910

890 89078+00.00

900 900

910 910

890 89079+00.00

900 900

910 910

890 89080+00.00

200 1RAILWAY

Proposed Shoofly

Proposed Shoofly

Proposed Shoofly

Proposed Shoofly

Mainline

STATE PROJECT NO.

ND

NO.

SHEET

NO.

SECTION

2/19/2015 aruud H:\Fargo\JBN\6600\6680\6680-005 BNSF FMM Bridge No. 3\CAD\Design\Sheets\200XS_001_Mainline.dgn1:42:37 PM

FMMDR6

Page 22: SECTION SHEET NO. · RAILWAY Legend 4. Topsoil shall be paid for at plan quantity. Excavated Material Berms (EMBs). 3. "Topsoil Placement" bid item for the mainline track includes

00

00

2020

2020

4040

4040

6060

6060

8080

8080

100100

100100

120120

120120

140140

140140

900 900

910 910

890 89081+00.00

900 900

910 910

890 89082+00.00

900 900

910 910

890 89083+00.00

900 900

910 910

890 89084+00.00

200 2RAILWAY

Mainline

Proposed Shoofly

Proposed Shoofly

Proposed Shoofly

Proposed Shoofly

STATE PROJECT NO.

ND

NO.

SHEET

NO.

SECTION

2/19/2015 aruud H:\Fargo\JBN\6600\6680\6680-005 BNSF FMM Bridge No. 3\CAD\Design\Sheets\200XS_001_Mainline.dgn1:42:39 PM

FMMDR6

Page 23: SECTION SHEET NO. · RAILWAY Legend 4. Topsoil shall be paid for at plan quantity. Excavated Material Berms (EMBs). 3. "Topsoil Placement" bid item for the mainline track includes

00

00

2020

2020

4040

4040

6060

6060

8080

8080

100100

100100

120120

120120

140140

140140

900 900

910 910

890 89085+00.00

900 900

910 910

890 89086+00.00

900 900

910 910

890 89087+00.00

900 900

910 910

890 89088+00.00

200 3RAILWAY

Mainline

Proposed Shoofly

STATE PROJECT NO.

ND

NO.

SHEET

NO.

SECTION

2/19/2015 aruud H:\Fargo\JBN\6600\6680\6680-005 BNSF FMM Bridge No. 3\CAD\Design\Sheets\200XS_001_Mainline.dgn1:42:41 PM

FMMDR6

Page 24: SECTION SHEET NO. · RAILWAY Legend 4. Topsoil shall be paid for at plan quantity. Excavated Material Berms (EMBs). 3. "Topsoil Placement" bid item for the mainline track includes

00

00

2020

2020

4040

4040

6060

6060

8080

8080

100100

100100

120120

120120

140140

140140

900 900

910 910

890 89089+00.00

890 890

900 900

910 910

880 880

90+00.00

900 900

910 910

890 89091+00.00

900 900

910 910

890 89092+00.00

200 4RAILWAY

Mainline

STATE PROJECT NO.

ND

NO.

SHEET

NO.

SECTION

2/19/2015 aruud H:\Fargo\JBN\6600\6680\6680-005 BNSF FMM Bridge No. 3\CAD\Design\Sheets\200XS_001_Mainline.dgn1:42:43 PM

FMMDR6

Page 25: SECTION SHEET NO. · RAILWAY Legend 4. Topsoil shall be paid for at plan quantity. Excavated Material Berms (EMBs). 3. "Topsoil Placement" bid item for the mainline track includes

00

00

2020

2020

4040

4040

6060

6060

8080

8080

100100

100100

120120

120120

140140

140140

900 900

910 910

890 89093+00.00

900 900

910 910

890 89094+00.00

900 900

910 910

920 920

890 89095+00.00

900 900

910 910

890 89096+00.00

200 5RAILWAY

Mainline

Ex Ground

Ex Ground

Ex Ground

Pr Diversion EMB

Pr Diversion EMB

Pr Diversion EMB

Pr Diversion EMB

STATE PROJECT NO.

ND

NO.

SHEET

NO.

SECTION

2/19/2015 aruud H:\Fargo\JBN\6600\6680\6680-005 BNSF FMM Bridge No. 3\CAD\Design\Sheets\200XS_001_Mainline.dgn1:42:45 PM

FMMDR6

Page 26: SECTION SHEET NO. · RAILWAY Legend 4. Topsoil shall be paid for at plan quantity. Excavated Material Berms (EMBs). 3. "Topsoil Placement" bid item for the mainline track includes

00

00

2020

2020

4040

4040

6060

6060

8080

8080

100100

100100

120120

120120

140140

140140

900 900

910 910

890 89097+00.00

890 890

900 900

910 910

880 88098+00.00

880 880

890 890

900 900

910 910

870 87099+00.00

200 6RAILWAY

Pr Diversion Channel

Pr Diversion Channel

Pr Diversion EMB

Mainline

STATE PROJECT NO.

ND

NO.

SHEET

NO.

SECTION

2/19/2015 aruud H:\Fargo\JBN\6600\6680\6680-005 BNSF FMM Bridge No. 3\CAD\Design\Sheets\200XS_001_Mainline.dgn1:42:47 PM

FMMDR6

Page 27: SECTION SHEET NO. · RAILWAY Legend 4. Topsoil shall be paid for at plan quantity. Excavated Material Berms (EMBs). 3. "Topsoil Placement" bid item for the mainline track includes

00

00

2020

2020

4040

4040

6060

6060

8080

8080

100100

100100

120120

120120

140140

140140

870 870

880 880

890 890

900 900

910 910

860 860

100+00.00

880 880

890 890

900 900

910 910

870 870101+00.00

890 890

900 900

910 910

880 880102+00.00

200 7RAILWAY

Mainline

Pr Diversion Channel

Pr Diversion Channel

Pr Diversion Channel

STATE PROJECT NO.

ND

NO.

SHEET

NO.

SECTION

2/19/2015 aruud H:\Fargo\JBN\6600\6680\6680-005 BNSF FMM Bridge No. 3\CAD\Design\Sheets\200XS_001_Mainline.dgn1:42:48 PM

FMMDR6

Page 28: SECTION SHEET NO. · RAILWAY Legend 4. Topsoil shall be paid for at plan quantity. Excavated Material Berms (EMBs). 3. "Topsoil Placement" bid item for the mainline track includes

00

00

2020

2020

4040

4040

6060

6060

8080

8080

100100

100100

120120

120120

140140

140140

900 900

910 910

890 890103+00.00

900 900

910 910

890 890104+00.00

900 900

910 910

920 920

890 890105+00.00

900 900

910 910

890 890106+00.00

200 8RAILWAY

Mainline

Proposed Shoofly

Proposed Shoofly

Pr Diversion EMB

Pr Diversion EMB

Pr Diversion EMB

Pr Diversion EMB

Ex Ground

Ex Ground

Ex Ground

Ex Ground

STATE PROJECT NO.

ND

NO.

SHEET

NO.

SECTION

2/19/2015 aruud H:\Fargo\JBN\6600\6680\6680-005 BNSF FMM Bridge No. 3\CAD\Design\Sheets\200XS_001_Mainline.dgn1:42:51 PM

FMMDR6

Page 29: SECTION SHEET NO. · RAILWAY Legend 4. Topsoil shall be paid for at plan quantity. Excavated Material Berms (EMBs). 3. "Topsoil Placement" bid item for the mainline track includes

00

00

2020

2020

4040

4040

6060

6060

8080

8080

100100

100100

120120

120120

140140

140140

900 900

910 910

890 890107+00.00

900 900

910 910

890 890108+00.00

900 900

910 910

890 890109+00.00

900 900

910 910

890 890110+00.00

200 9RAILWAY

Proposed Shoofly

Proposed Shoofly

Proposed Shoofly

Proposed Shoofly

Pr Diversion EMB

Mainline

STATE PROJECT NO.

ND

NO.

SHEET

NO.

SECTION

2/19/2015 aruud H:\Fargo\JBN\6600\6680\6680-005 BNSF FMM Bridge No. 3\CAD\Design\Sheets\200XS_001_Mainline.dgn1:42:53 PM

FMMDR6

Page 30: SECTION SHEET NO. · RAILWAY Legend 4. Topsoil shall be paid for at plan quantity. Excavated Material Berms (EMBs). 3. "Topsoil Placement" bid item for the mainline track includes

00

00

2020

2020

4040

4040

6060

6060

8080

8080

100100

100100

120120

120120

140140

140140

900 900

910 910

890 890111+00.00

900 900

910 910

890 890112+00.00

900 900

910 910

890 890112+05.00

200 10RAILWAY

Proposed Shoofly

Proposed Shoofly

Proposed Shoofly

Mainline

STATE PROJECT NO.

ND

NO.

SHEET

NO.

SECTION

2/19/2015 aruud H:\Fargo\JBN\6600\6680\6680-005 BNSF FMM Bridge No. 3\CAD\Design\Sheets\200XS_001_Mainline.dgn1:42:54 PM

FMMDR6

Page 31: SECTION SHEET NO. · RAILWAY Legend 4. Topsoil shall be paid for at plan quantity. Excavated Material Berms (EMBs). 3. "Topsoil Placement" bid item for the mainline track includes

00

00

2020

2020

4040

4040

6060

6060

8080

8080

100100

100100

120120

120120

140140

140140

900 900

890 8907+50.00

900 900

910 910

890 8908+00.00

900 900

910 910

890 8909+00.00

900 900

910 910

890 89010+00.00

900 900

910 910

890 89011+00.00

RAILWAYShoofly

STATE PROJECT NO.

ND

NO.

SHEET

NO.

SECTION

2/19/2015 aruud H:\Fargo\JBN\6600\6680\6680-005 BNSF FMM Bridge No. 3\CAD\Design\Sheets\200XS_011_Shoofly.dgn1:42:57 PM

FMMDR6 200 11

Page 32: SECTION SHEET NO. · RAILWAY Legend 4. Topsoil shall be paid for at plan quantity. Excavated Material Berms (EMBs). 3. "Topsoil Placement" bid item for the mainline track includes

00

00

2020

2020

4040

4040

6060

6060

8080

8080

100100

100100

120120

120120

140140

140140

900 900

910 910

890 89012+00.00

900 900

910 910

890 890

13+00.00

900 900

910 910

890 89014+00.00

900 900

910 910

890 890

15+00.00

RAILWAY

Shoofly

STATE PROJECT NO.

ND

NO.

SHEET

NO.

SECTION

2/19/2015 aruud H:\Fargo\JBN\6600\6680\6680-005 BNSF FMM Bridge No. 3\CAD\Design\Sheets\200XS_011_Shoofly.dgn1:42:59 PM

FMMDR6 200 12

Page 33: SECTION SHEET NO. · RAILWAY Legend 4. Topsoil shall be paid for at plan quantity. Excavated Material Berms (EMBs). 3. "Topsoil Placement" bid item for the mainline track includes

00

00

2020

2020

4040

4040

6060

6060

8080

8080

100100

100100

120120

120120

140140

140140

900 900

910 910

890 89016+00.00

900 900

910 910

890 89017+00.00

900 900

910 910

890 89018+00.00

900 900

910 910

890 890

19+00.00

RAILWAY

Shoofly

STATE PROJECT NO.

ND

NO.

SHEET

NO.

SECTION

2/19/2015 aruud H:\Fargo\JBN\6600\6680\6680-005 BNSF FMM Bridge No. 3\CAD\Design\Sheets\200XS_011_Shoofly.dgn1:43:01 PM

FMMDR6 200 13

Page 34: SECTION SHEET NO. · RAILWAY Legend 4. Topsoil shall be paid for at plan quantity. Excavated Material Berms (EMBs). 3. "Topsoil Placement" bid item for the mainline track includes

00

00

2020

2020

4040

4040

6060

6060

8080

8080

100100

100100

120120

120120

140140

140140

900 900

910 910

890 890

20+00.00

900 900

910 910

890 89021+00.00

900 900

910 910

890 890

22+00.00

900 900

910 910

890 89023+00.00

RAILWAYShoofly

STATE PROJECT NO.

ND

NO.

SHEET

NO.

SECTION

2/19/2015 aruud H:\Fargo\JBN\6600\6680\6680-005 BNSF FMM Bridge No. 3\CAD\Design\Sheets\200XS_011_Shoofly.dgn1:43:03 PM

FMMDR6 200 14

Page 35: SECTION SHEET NO. · RAILWAY Legend 4. Topsoil shall be paid for at plan quantity. Excavated Material Berms (EMBs). 3. "Topsoil Placement" bid item for the mainline track includes

00

00

2020

2020

4040

4040

6060

6060

8080

8080

100100

100100

120120

120120

140140

140140

900 900

910 910

890 89024+00.00

900 900

910 910

890 890

25+00.00

900 900

910 910

890 89026+00.00

900 900

910 910

890 89027+00.00

RAILWAYShoofly

STATE PROJECT NO.

ND

NO.

SHEET

NO.

SECTION

2/19/2015 aruud H:\Fargo\JBN\6600\6680\6680-005 BNSF FMM Bridge No. 3\CAD\Design\Sheets\200XS_011_Shoofly.dgn1:43:06 PM

FMMDR6 200 15

Page 36: SECTION SHEET NO. · RAILWAY Legend 4. Topsoil shall be paid for at plan quantity. Excavated Material Berms (EMBs). 3. "Topsoil Placement" bid item for the mainline track includes

00

00

2020

2020

4040

4040

6060

6060

8080

8080

100100

100100

120120

120120

140140

140140

900 900

910 910

890 89028+00.00

900 900

910 910

890 89029+00.00

900 900

910 910

890 89030+00.00

900 900

910 910

890 89031+00.00

RAILWAYShoofly

STATE PROJECT NO.

ND

NO.

SHEET

NO.

SECTION

2/19/2015 aruud H:\Fargo\JBN\6600\6680\6680-005 BNSF FMM Bridge No. 3\CAD\Design\Sheets\200XS_011_Shoofly.dgn1:43:08 PM

FMMDR6 200 16

Page 37: SECTION SHEET NO. · RAILWAY Legend 4. Topsoil shall be paid for at plan quantity. Excavated Material Berms (EMBs). 3. "Topsoil Placement" bid item for the mainline track includes

00

00

2020

2020

4040

4040

6060

6060

8080

8080

100100

100100

120120

120120

140140

140140

900 900

910 910

890 89032+00.00

900 900

910 910

890 89033+00.00

900 900

910 910

890 89034+00.00

900 900

910 910

890 89035+00.00

RAILWAY

Shoofly

STATE PROJECT NO.

ND

NO.

SHEET

NO.

SECTION

2/19/2015 aruud H:\Fargo\JBN\6600\6680\6680-005 BNSF FMM Bridge No. 3\CAD\Design\Sheets\200XS_011_Shoofly.dgn1:43:10 PM

FMMDR6 200 17

Page 38: SECTION SHEET NO. · RAILWAY Legend 4. Topsoil shall be paid for at plan quantity. Excavated Material Berms (EMBs). 3. "Topsoil Placement" bid item for the mainline track includes

00

00

2020

2020

4040

4040

6060

6060

8080

8080

100100

100100

120120

120120

140140

140140

900 900

910 910

890 89036+00.00

900 900

910 910

890 89037+00.00

900 900

910 910

890 89038+00.00

900 900

910 910

890 89039+00.00

RAILWAYShoofly

STATE PROJECT NO.

ND

NO.

SHEET

NO.

SECTION

2/19/2015 aruud H:\Fargo\JBN\6600\6680\6680-005 BNSF FMM Bridge No. 3\CAD\Design\Sheets\200XS_011_Shoofly.dgn1:43:12 PM

FMMDR6 200 18

Page 39: SECTION SHEET NO. · RAILWAY Legend 4. Topsoil shall be paid for at plan quantity. Excavated Material Berms (EMBs). 3. "Topsoil Placement" bid item for the mainline track includes

00

00

2020

2020

4040

4040

6060

6060

8080

8080

100100

100100

120120

120120

140140

140140

900 900

910 910

890 89040+00.00

900 900

910 910

890 89041+00.00

900 900

910 910

890 89042+00.00

900 900

910 910

890 89043+00.00

RAILWAYShoofly

STATE PROJECT NO.

ND

NO.

SHEET

NO.

SECTION

2/19/2015 aruud H:\Fargo\JBN\6600\6680\6680-005 BNSF FMM Bridge No. 3\CAD\Design\Sheets\200XS_011_Shoofly.dgn1:43:14 PM

FMMDR6 200 19

Page 40: SECTION SHEET NO. · RAILWAY Legend 4. Topsoil shall be paid for at plan quantity. Excavated Material Berms (EMBs). 3. "Topsoil Placement" bid item for the mainline track includes

00

00

2020

2020

4040

4040

6060

6060

8080

8080

100100

100100

120120

120120

140140

140140

900 900

910 910

890 89044+00.00

900 900

910 910

890 89045+00.00

900 900

910 910

890 89046+00.00

900 900

910 910

890 89047+00.00

RAILWAYShoofly

STATE PROJECT NO.

ND

NO.

SHEET

NO.

SECTION

2/19/2015 aruud H:\Fargo\JBN\6600\6680\6680-005 BNSF FMM Bridge No. 3\CAD\Design\Sheets\200XS_011_Shoofly.dgn1:43:16 PM

FMMDR6 200 20

Page 41: SECTION SHEET NO. · RAILWAY Legend 4. Topsoil shall be paid for at plan quantity. Excavated Material Berms (EMBs). 3. "Topsoil Placement" bid item for the mainline track includes

00

00

2020

2020

4040

4040

6060

6060

8080

8080

100100

100100

120120

120120

140140

140140

900 900

910 910

890 89048+00.00

900 900

910 910

890 89049+00.00

900 900

910 910

890 89050+00.00

900 900

910 910

890 89051+00.00

RAILWAY

Shoofly

STATE PROJECT NO.

ND

NO.

SHEET

NO.

SECTION

2/19/2015 aruud H:\Fargo\JBN\6600\6680\6680-005 BNSF FMM Bridge No. 3\CAD\Design\Sheets\200XS_011_Shoofly.dgn1:43:18 PM

FMMDR6 200 21